Proposed Tech Specs,Adding Footnote to Spec 4.6.1.2.d Stating That Type B & C Tests Scheduled for Refueling Outage 1R6 Will Be Conducted Per Option B of 10CFR50 App J & Using Guidance of RG 1.163,Rev 0
ML20093K228
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/16/1995
From:
GEORGIA POWER CO.
To:
Shared Package
ML20093K206 List:
References
RTR-REGGD-01.163, RTR-REGGD-1.163 NUDOCS 9510240133
Download: ML20093K228 (1)


Text

, - - - - -_ = . . . - - .._~.- - - - . ~ - - . - . - . - . . -.

l l

~

i ' CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS -

l

b. If any periodic Type A test fails to meet 0.75 L the test schedule for subsequent Type A tests shall be reviewed an8 approved by the

! Commission. If two consecutive Type A tests fail to meet 0.75 L , a

Type A test shall be performed at least every 18 months until tw,o i

consecutive Type A tests meet 0.75 L, at which time the above test j schedule may be resumed;

c. The accuracy of each Type A test shall be verified by a supplemental i test which:

l

1) Confirms the accuracy of the test by verifying that the absolute value of the supplemental test result, L,, minus the sum of the Type A and the superimposed leak, L,, is equal to or less than O.25 L,;
2) Has a duration sufficient to establish accurately the change in leakage rate between the Type A test and the supplemental test; j and
3) Requires that the rate at which gas is injected into the containment or bled from the containment during the supplemental test is between 0.75 L, and 1.25 L,. ,
d. Type B and C tests shall be conducted with gas at a pressure not less >

Ii than P , 37 psig, at intervals no greater than 24 months

  • except for testsinvolving: '
1) Air locks and
2) Purge supply and exhaust isolation valves with resilient material seals.
e. Air locks shall be tested and demonstrated OPERABLE by the require-ments of Specification 4.6.1.3; ,
f. Purge supply and exhaust isolation valves with resilient material seals shall be tested and demonstrated OPERABLE by the requirements of Specification 4.6.1.7.2; i
g. The provisions of Specification 4.0.2 are not applicable.

"Ibo ypt e h& C bs/s MG anll be CD N c M faecordance win O ho:rckrdu/rclfor refee/ish suf f

n 0 o1' /0 CFA-Argvl dory Gut 79le pfu

/,165 l J,

ey, C.

uskf flegudoce of

  • Th test i erval for it I v ves HV 974 (and a oc14ted C eck Valve j ;5 e Type 1217 113), -1975, HV- 978, an HV-197 may be ext ded to pr r to entry finto e 4 fo owing the ext sch uled r ueling out e (or th ext forced out e requi ng entry i o Mode , but o later th November , 1994.

V0GTLE UNITS - 1 & 2 3/4 6-3 Amendment No. 70 (Unit 1) 9510240133 951016 Amendment No. 49 (Unit 2)

PDR ADDCK 05000424 P PDR