MONTHYEARML20217G6571999-10-13013 October 1999 Proposed Tech Specs Pages,Revising TS to Permit Relaxation of Allowed Bypass Test Times & Completion Times for LCOs 3.3.1 & 3.3.2 ML20217B1221999-10-0404 October 1999 Proposed Tech Specs Pages,Revising TS 5.5.6 Incorporating Exceptions to Reg Guide 1.35,rev 2,as Described in FSAR Section 3.8.1.7.2 Re Prestressed Concrete Containment Tendon Surveillance Program ML20212F4891999-09-22022 September 1999 Proposed Rev to TS SR 3.8.1.13,to Include Upper Limit for DG Loading for 2 H Portion of SR ML20211J5511999-08-30030 August 1999 Proposed Tech Specs,Raising Level of Approval Authority for Deviations from Guidelines Provided to Minimize Unit Staff Overtime Specified in TS 5.2.2 ML20211J7281999-08-26026 August 1999 Proposed Tech Specs Updating Versions of LCO 3.0.4 & SR 3.0.4 to Be in IAW with Versions of LCO 3.0.4 & SR 3.0.4 as Noted in Rev 1 to NUREG-1431 ML20211E9111999-08-24024 August 1999 Proposed Tech Specs,Relaxing Slave Relay Test Frequency from Quarterly to Refueling Frequency ML20196L3181999-05-18018 May 1999 Proposed Tech Specs SRs 3.8.1.3 & 3.8.1.13 Reducing Loading Requirements for DGs ML20205S3791999-04-19019 April 1999 Proposed Tech Specs Revising SR 3.3.5.2 & Associated Bases to Allow Loss of Voltage & Degraded Voltage Trip Setpoints to Be Treated as Nominal Values in Same Manner as Trip Setpoints for RTS & ESFAS Instrumentation ML20205Q7901999-04-13013 April 1999 Proposed Tech Specs,Updating Versions of LCO 3.0.4 & SR 3.0.4 to Be Consistent with Versions of LCO 3.0.4 & SR 3.0.4 as Appear in Rev 1 to NUREG-1431 ML20154M9961998-10-15015 October 1998 Proposed Tech Specs,Deleting & Modifing Conditions Which Were Issued with Licenses That Are Now Obsolete ML20151U2011998-09-0303 September 1998 Proposed Tech Specs Pages for Amends to Licenses NPF-68 & NPF-81,changing TS to Support Replacement of Nuclear Instrumentation Sys Source Range & Intermediate Range Channels & post-accident Neutron Flux Monitoring Sys ML20236R4661998-07-13013 July 1998 Proposed Tech Specs Eliminating Periodic Response Time Testing Requirements on Selected Sensors & Selected Protected Channels ML20154Q8611998-06-30030 June 1998 Proposed Tech Specs Bases Since Implementation of Improved TS on 970123 Through Aug 1998 ML20206N3131998-06-30030 June 1998 Proposed Tech Specs Re Replacement of Nuclear Instrumentation Sys Source & Intermediate Range Channels & post-accident Neutron Flux Monitoring Sys ML20236F1631998-06-26026 June 1998 Proposed Tech Specs Revising LCO 3.3.6 Re CVI Instrumentation & LCO 3.9.4 Re Containment Penetrations to Facilitate Outage Planning ML20248K5801998-05-25025 May 1998 Rev 1 to VEGP Units 1 & 2 Second 10-Yr Interval Valve IST Program ML20247K5041998-05-15015 May 1998 Proposed Tech Specs Pages Revising New Program 5.5.18 to Extent That Items B,C & D. Refer to LCO Action Statement & Bases Insert for New Required Actions B.5.1 & B.5.2 ML20247G9471998-05-0808 May 1998 Proposed Tech Specs Section 5.5.7, RCP Flywheel Insp Program, Specifying Alternate Flywheel Insp Once Every Ten Years ML20216J4971998-04-16016 April 1998 Proposed Tech Specs 3.3.1 & 3.3.2 Re Reactor Trip Sys & ESFAS Instrumentation ML20199E5351998-01-27027 January 1998 Complete Replacement of All Typed Pages of TS Changes Submitted in Ltr LCV-0849-E ML20199A4131998-01-22022 January 1998 Proposed Tech Specs Adding Conditions for DG for Extended DG Completion Time of Fourteen Days ML20198P6961998-01-16016 January 1998 Revised Spent Fuel Pool Boron Dilution Analysis ML20216B2621997-12-11011 December 1997 Rev 14 to ODCM, for Vogtle Electric Generating Plant ML20199G3901997-11-20020 November 1997 Proposed Tech Specs Facilitating Treatment of Trip Setpoints as Nominal Values & Correct Certain Typos ML20199J6651997-11-20020 November 1997 Proposed Tech Specs Pages Changing Capacity of Unit 1 Spent Fuel Storage Pool from 288 to 1476 Assemblies & Revising Design Features Description to Reflect Criticality Analyses & Storage Cell Spacing ML20211N2451997-10-10010 October 1997 Proposed Typed Tech Specs Pages,Revising Credit for Boron & Enrichment Increase for Fuel Storage ML20217H9051997-08-0808 August 1997 Proposed Tech Specs Pages Re Credit for Boron & Enrichment Increase for Fuel storage.W/marked-up Pages ML20141A8541997-06-13013 June 1997 Proposed Tech Specs Revising LCO 3.4.10 to Reduce Nominal Set Pressure by 1% to 2460 & Increase Tolerance to +2% ML20148E6481997-05-15015 May 1997 Rev 0 to VEGP Units 1 & 2 Second 10-Yr Interval Pump IST Program ML20148E6611997-05-15015 May 1997 Rev 0 to VEGP Units 1 & 2 Second 10-Yr Interval Valve IST Program ML20133L3081997-01-10010 January 1997 Proposed Tech Specs Table 3.3.1-1 Re Amends 96 & 74 ML20140J4591996-12-13013 December 1996 Rev 11 to ODCM for Vogtle Electric Generating Plant, ML20138F1001996-12-13013 December 1996 Revs 10 & 11 to ODCM, Part 2 ML20132C4711996-12-12012 December 1996 Proposed Tech Specs Re Physical Security & Contingency Plan ML20134J9841996-10-0808 October 1996 /Unit 2 Fuel Assembly Insp Program ML20117N5851996-09-13013 September 1996 Proposed Tech Specs 3.8.1 Re AC Electrical Sources ML20129A6461996-09-11011 September 1996 Proposed Tech Specs,Providing Updated Documentation for License Amends Application for Southern Nuclear to Become Licensed Operator ML20117C4151996-08-23023 August 1996 Proposed Tech Specs to Convert Units 1 & 2 Based on NUREG 1431 ML20117N6361996-06-17017 June 1996 Proposed Tech Specs,Clarifying Requirements of TS SR 4.8.1.1.2.j (2) That Prescribes Pressure Test of Portions of Diesel fuel-oil Sys Designed to Section Iii,Subsection Nd of ASME Code ML20117N6471996-06-17017 June 1996 Proposed Tech Specs Section 5.3.1,allowing Use of Fuel Assemblies Containing Fuel Rods Clad W/Zirlo ML20111A5501996-05-0606 May 1996 Proposed Tech Specs,Incorporating Extended DG AOT to 14 Days from Discovery of Failure to Meet Lco,Provided Standby Auxiliary Transformer Available ML20106H2391996-03-31031 March 1996 Rev 10 to Gap Security Dept Vogtle Electric Generating Plant Nuclear Security Training & Qualification Plan ML20101D4151996-03-0505 March 1996 Proposed Tech Specs Re Conversion Based on NUREG-1431 ML20100G0371996-02-19019 February 1996 Proposed Tech Specs Based on NUREG-1431 ML20097A3171996-01-30030 January 1996 Proposed Improved TS Based on NUREG-1431 ML20096G8241996-01-22022 January 1996 Inservice Insp Program, for VEGP-2 ML20095J2501995-12-22022 December 1995 Proposed Tech Specs,Allowing Use of Option B of 10CFR50,App J for Type B & C Testing ML20094N4071995-11-20020 November 1995 Proposed Tech Specs,Converting Existing TS to Format & Content of NUREG-1431 ML20093K2281995-10-16016 October 1995 Proposed Tech Specs,Adding Footnote to Spec 4.6.1.2.d Stating That Type B & C Tests Scheduled for Refueling Outage 1R6 Will Be Conducted Per Option B of 10CFR50 App J & Using Guidance of RG 1.163,Rev 0 ML20098C1471995-10-0202 October 1995 Proposed Tech Specs,Allowing Next Type a Test to Be Rescheduled 1999-09-22
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20248K5801998-05-25025 May 1998 Rev 1 to VEGP Units 1 & 2 Second 10-Yr Interval Valve IST Program ML20216B2621997-12-11011 December 1997 Rev 14 to ODCM, for Vogtle Electric Generating Plant ML20148E6611997-05-15015 May 1997 Rev 0 to VEGP Units 1 & 2 Second 10-Yr Interval Valve IST Program ML20148E6481997-05-15015 May 1997 Rev 0 to VEGP Units 1 & 2 Second 10-Yr Interval Pump IST Program ML20138F1001996-12-13013 December 1996 Revs 10 & 11 to ODCM, Part 2 ML20140J4591996-12-13013 December 1996 Rev 11 to ODCM for Vogtle Electric Generating Plant, ML20134J9841996-10-0808 October 1996 /Unit 2 Fuel Assembly Insp Program ML20106H2391996-03-31031 March 1996 Rev 10 to Gap Security Dept Vogtle Electric Generating Plant Nuclear Security Training & Qualification Plan ML20096G8241996-01-22022 January 1996 Inservice Insp Program, for VEGP-2 ML20078A3771994-05-12012 May 1994 Vols 1 & 2 of Vogtle Electric Generating Plant Unit 1 Readiness Review Module 4 Mechanical Equipment & Piping Program ML20069L8241994-03-30030 March 1994 Rev 8 to ISI-P-008, Inservice Test Program for Vogtle Electric Generating Plant Unit 1 ML20069L8311994-03-30030 March 1994 Rev 5 to ISI-P-016, Inservice Test Program for Vogtle Electric Generating Plant Unit 2 ML20082V2871994-01-0101 January 1994 Offsite Dose Calculation Manual, Rev 9 ML20064C7431993-11-0505 November 1993 Rev 6 to ISI-P-006, ISI Program for Vogtle Electric Generating Plant Unit 1 ML20064C7471993-11-0505 November 1993 Rev 6 to ISI-P-014, ISI Program for Vogtle Electric Generating Plant Unit 2 ML20094K1781992-03-0404 March 1992 Rev 3 to Vogtle Electric Generating Plant Process Control Program ML20094K1721991-12-31031 December 1991 Draft, ODCM for Vogtle Electric Generating Plant ML20086Q7231991-12-0404 December 1991 Rev 7 to Procedure 91202-C, Activation & Operation of Operations Support Ctr ML20091L7891991-07-0303 July 1991 Rev 5 to Procedure 29537-C, Outage Scheduling ML20079G4971991-06-10010 June 1991 Rev 5 to ISI-P-006, Inservice Insp Program for Vogtle Unit 1 ML20079G5071991-06-10010 June 1991 Rev 4 to ISI-P-014, Inservice Insp Program for Vogtle Unit 2 ML20091L7991991-04-22022 April 1991 Rev 6 to Training Lesson Plan LO-LP-39201-06-C, Introduction to Ts ML20091L7771991-04-17017 April 1991 Rev 21 to Procedure 10000-C, Conduct of Operations ML20043H3091990-06-15015 June 1990 Rev 3 to ISI-P-014, Inservice Insp Program. ML20091L8131990-05-22022 May 1990 Outdated Rev 0 to Training Lesson Plan RQ-LP-63107-00, Requal Current Events ML20043B6321990-05-22022 May 1990 Rev 5 to ISI-P-008, Inservice Testing Program. ML20043B6381990-05-22022 May 1990 Rev 2 to ISI-P-016, Inservice Testing Program. ML20129G8451990-04-0505 April 1990 Rev 19 to Procedure 14980-1, Diesel Generator Operability Test ML20129F7161990-03-29029 March 1990 Rev 2 to Procedure T-FND-90-15, Method Visual ML20091L8331989-05-19019 May 1989 Rev 0 to Corporate Guidelines 1.1.2, Positive Discipline ML20246N6241989-05-10010 May 1989 Rev 3 to Vogtle Electric Generating Plant Unit 1 Inservice Insp Program ML20078A5401988-11-15015 November 1988 Updated Vogtle Electric Generating Plant Unit 2 Readiness Review Module 3A Initial Test Program - Preoperational Test Phase ML20195J9191988-11-11011 November 1988 Rev 4 to ISI-P-010, Preservice Insp Program Vogtle Electric Generating Plant Unit 2 ML20196B1551988-10-25025 October 1988 Rev 0 to ISI-P-014, Inservice Insp Program ML20195B3901988-10-18018 October 1988 Aw Vogtle Simulator Certification Plan ML20091L8931988-10-0303 October 1988 Voided Rev 9 to Procedure 10000-C, Conduct of Operations ML20155C0751988-09-15015 September 1988 Rev 0 to Abnormal Operating Procedures 18038-2, Operation from Remote Shutdown Panels ML20091L8821988-09-0808 September 1988 Voided Rev 10 to Procedure 35110-C, Chemistry Control of Rcs ML20155C0871988-08-19019 August 1988 Rev 9 to Procedure 12006-C, Unit Cooldown to Cold Shutdown ML20151G1851988-07-18018 July 1988 Rev 1 to ISI-P-006, Inservice Insp Program ML20151G1881988-07-18018 July 1988 Rev 2 to ISI-P-006, Inservice Insp Program ML20078A6221988-07-12012 July 1988 Readiness Review Program Module 20 - Instrumentation & Controls ML20078A5931988-06-28028 June 1988 Readiness Review Program Module 13B - Coatings ML20078A5831988-06-22022 June 1988 Readiness Review Program Module 12 - Electrical Cables & Terminations ML20091L7821988-06-0707 June 1988 Rev 0 to Procedure 49006-C, Health Physics & Chemistry Dept Outage Activities Implementing Procedure ML20078A5461988-05-12012 May 1988 Rev 1 to Vogtle Electric Generating Plant Unit 2 Readiness Review Module 3A Initial Test Program - Preoperational Test Phase ML20078A5751988-04-13013 April 1988 Readiness Review Program Module 11 - Pipe Stress & Supports ML20151R0331988-04-13013 April 1988 Rev 3 to Inservice Test Program ISI-P-008, Summary of Changes ML20078A6311988-03-16016 March 1988 App F, Inspector Qualification of Vogtle Electric Generating Plant Unit 2 Readiness Review Program ML20148K4301988-03-0202 March 1988 Inservice Test Program 1998-05-25
[Table view] |
Text
_ . . _. .
l GEORGIA POWER COMPANY 3 INSERVICE INSPECTION PROGRAM i
- (ISI-P-014) i
! FOR
! VOGTLE ELECTRIC GENERATING PLANT UNIT 2 l
PREPARED BY SOUTHERN NUCLEAR OPERATING COMPANY INSPECTION AND TESTING SERVICES GROUP SNC GPC REV DATE DESCRIPTION PREP'D REV'D APPV. APPV. APPV. APPR BY BY BY V0GTLE MGR. GEN.
(ITS) (ITS) (ITS) PROJECT TECH. MGR.
NMS SUPP.
0 10/25/88 ORIGINAL ISSUE 2
5/18/89
"'n." e REVISED RE REQ'S XXXXXX 3 6/11/90 DELETE RELIEF REQUESTS RR-45,47,48,54 REV RR-32 4 6/10/91 INCORPORATE COMMENTS PER GPC LTR MSV-00318, ;
9/13/90 i E 00 9 05 6 11/5/93 INCORPORATE COMMENTS .i "lMifEd!M^ MS 4// 4 v.a.d p-[k c
I O 4
l Vogtle Electric Generating Plant - Unit 2 (VEGP-2)
Inservice Inspection (ISI) Program (ISI-P-014)
Revision 6 Summary of Chances l Affected ISI Program Document Paaes Chanaes l
l Table of Contents Deleted Line Designation List and Equipment Designation List references in table.
6-4 Added reference to RR-57.
l 6-53 Added Weld 21201-B6-004-W26 to table.
l 6-93 Editorial Change 6-93a thru 6-93b Hodified RR-49 concerning hydrostatic tests on the NSCW pumps and transfer pumps.
7-1 thru 7-140 Deleted Line Designation List.
8-1 thru 8-26 Deleted Equipment Designation List.
l I
I I
002824 Page 1 of 1
l VEGP-2 ISI-P-014 List of Effective Pages Distribution List, Rev. 4 Table of Contents, Rev. 6
Introduction:
Page 1-1, Rev. O Page 1-2, Rev. O Page 1-3, Rev. O Page 1-4, Rev. O Page 1-5, Rev. O Page 1-6, Rev. O Class 1:
Page 2-1, Rev. O Page 2-2, Rev. O Page 2-3, Rev. O Page 2-4, Rev. O Page 2-5, Rev. O Page 2-6, Rev. O Page 2-7, Rev. O Page 2-8, Rev. O Page 2-9, Rev. O Page 2-10, Rev. O Page 2-11, Rev. 0
, Page 2-12, Rev. 0 Page 2-13, Rev. O Page 2-14, Rev. O Page 2-15, Rev. 0 l Page 2-16, Rev. O Page 2-17, Rev. O Page 2-18, Rev. O Page 2-19, Rev. O Page 2-20, Rev. O i
Page 2-21, Rev. 0 l Page 2-22, Rev. 0 Page 2-23, Rev. 1 Page 2-24, Rev. O I Page 2-25, Rev. O i Page 2-26, Rev. O Page 2-27, Rev. O Page 2-28, Rev. O Page 2-29, Rev. O Page 2-30, Rev. O Page 2-31, Rev. O Page 2-32, Rev. O l Page 2-33, Rev. 3 Page 2-34, Rev. 3 Page 2-35, Rev. 0 l Class 2: l Page 3-1, Rev. 0 l Page 3-2, Rev. 0 002824 1 of 4 P014 Rev. 6
l e
~ Class 2 continued:
Page 3-3, Rev. O Page 3-4, Rev. 2 ,
Page 3-5, Rev. 0 ,
1 Page 3-6, Rev. O !
Page 3-7, Rev. O l Page 3-8, Rev. O Page 3-9, Rev. O Page 3-10, Rev. 0 l Page 3-11, Rev. O I Page 3-12, Rev. 0 1 Page 3-13, Rev. O '
Page 3-14, Rev. 0 Page 3-15, Rev. O Page 3-16, Rev. 3 Page 3-17, Rev. 3 Page 3-18, Rev. O Class 3:
Page 4-1, Rev. O Page 4-2, Rev. 3 Page 4-3, Rev. O Page 4-4, Rev. 3 Page 4-5, Rev. O Page 4-6, Rev. 3 Page 4-7, Rev. O Component Supports:
Page 5-1, Rev. O Page 5-2, Rev. O Page 5-3, Rev. 3 Page 5-4, Rev. 3 Page 5-5, Rev. O Page 5-6, Rev. O Page 5-7, Rev. O Relief Requests:
Page 6-1, Rev. O Page 6-2, Rev. O Page 6-3, Rev. 4 Page 6-4, Rev. 6 Page 6-5, Rev. 0 3
~
Page 6-6, Rev. O Page 6-7, Rev. O i Page 6-8, Rev. O
! Page 6-9, Rev. O Page 6-10, Rev. O Page 6-11, Rev. 0 l Page 6-12, Rev. 0
' Page 6-13, Rev. 0 Page 6-14, Rev. 5 Page 6-15, Rev. O Page 6-16, Rev. 5 Page 6-17, Rev. 0 002824 2 of 4 P014 Rev. 6
I .
R'elief Requests continued:
Page'6-18, Rev. O Page 6-19, Rev. 1 Page 6-20, Rev. 5 ' l Page 6-21, Rev. 0 Page 6-22, Rev. O Page 6-23, Rev. 1 l Page 6-24, Rev. 0 )
Page 6-25, Rev. 0 Page 6-26, Rev. O I Page 6-27, Rev. O i Page 6-28, Rev. 0 Page 6-29, Rev. 0 ,
Page 6-30, Rev. 0 Page 6-31, Rev. 4 Page 6-32, Rev. 4 Page 6-33, Rev. 4 Page 6-34, -Rev. O Page 6-35, Rev. O Page 6-36, Rev. O Page 6-37, Rev. O
- Page_6-38, Rev. O
! Page 3-39, .Rev. 0 '
l Page 3-40, Rev. 0 Page 3-41,- Rev. O Page 3-42, Rev. O Page 3-43, Rev. 4 Page 3-44, Rev. 4 Page 3-45, Rev. 0 ,
Page 6-46, Rev. 1 Page 6-47, Rev. O Page 6-48, Rev. O Page 6-49, Rev. O Page 6-50, Rev. O Page 6-51, Rev. O Page 6-52, Rev. O Page 6-53, Rev. 6 Page 6-54, Rev. O Page 6-55, .Rev. O Page 6-56, Rev. O Page 6-57, Rev. O Page 6-58, Rev. 0 Page 6-59, Rev. 3 Page 6-59a, Rev. 3 Page 6-60, Rev. 3 Page 6-61, Rev. O Page 6-62, Rev. O i Page 6-63, Rev.~ 0 Page 6-64, Rev. O Page 6-65, Rev. O l Page 6-66, Rev. 0 l Page 6-67, Rev. O 1
Page 6-68, Rev. 0 1 002824 3 of 4 P014 Rev. 6 l
)
, . _ . ,.,r. ,,, ., , , , , , , _.-7 , cyc _m_ ,, -,g., 9 , ,
i l
Relief Request continued: !
Page 6-69, Rev. O i Page 6-70, Rev. 0 l Page 6-71, Rev. 0 , l Page 6-72, Rev. 4 Page 6-73, Rev. O Page 6-74, Rev. O Page 6-75, Rev. O Page 6-76, Rev. 0 Page 6-77, Rev. O l Page 6-78, Rev. 0 Page 6-79, Rev. 0 l Page 6-80, Rev. 0 l Page 6-81, Rev. 0 1 Page 6-82, Rev. O !
Page 6-83, Rev. 0 Page 6-84, Rev. O !
Page 6-85, Rev. O Page 6-86, Rev. O Page 6-87, Rev. O Page 6-88, Rev. 3 Page 6-89, Rev. 0 l Page 6-90, Rev. 3 Page 6-91, Rev. 3 Page 6-92, Rev. 3 Page 6-93, Rev. 6 Page 6-93a, Rev. 6 Page 6-93b, Rev. 6 l l
Page 6-94, Rev. 5 l Page 6-95, Rev. 4
- Page 6-96, Rev. 4 l Page 6-97, Rev. 4 Page 6-98, Rev. O Page 6-99, Rev. 3 Page 6-100, Rev. 1 '
Page 6-101, Rev. 1 l Page 6-102, Rev. 5
, Page 6-103, Rev. 5 l Page 6-104, Rev. 5 !
Page 6-105, Rev. 5 002824 4 of 4 P014 Rev. 6 l
l I
I l
i
~ l
. l l
INSERVICE INSPECTION PROGRAM V0GTLE ELECTRIC GENERATING PLANT UNIT 2 l l
Table of Contents ,
l Section Pace Introduction ...................................................... 1-1 Class 1 System and Components ..................................... 2-1 l Class 2 System and Components ..................................... 3-1 l Cl as s 3 System and Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4- 1 Component Supports ................................................ 5-1 R e l i e f Re q u e s t s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1 l
l I
l l
l l
1 l
l l
l l
2824 014 Rev. 6 t
i
l I
j RR-52 Reactor Vessel integrally welded attachments RR-53 Class 3 hydrostatic test on Spent Fuel Cooling & Purification RR-54 Relief Request withdrawn conditionally RR-55 Pressurizer Safety Relief Valve Piping RR-56 Auxiliary Feedwater Integrally Welded Attachments and Associated Component Supports RR-57 Remote Mechanized Volumetric and/or Surface Examination of Pressure Retaining Reactor Vessel Outlet Nozzle-to-Shell Welds, Inner Radius, and Reactor Vessel Outlet Nozzle-to-Safe End Welds. =
i I
l l
l l
1 l
l l
001163 6-4 014 Rev. 6 !
VEGP-2. RR-29 Attachment 1 Percentage Code Examined ~
Cateaory Description Durina PSI Restriction Identification No. ,
C-A Upper Head to Upper Shell 98% 4 Welded plates restrict 21201-86-001-W01 access to part of weld Barrel "0" Weld C-A Lower Cone End Stub Barrel 90% Observation ports restrict 21201-86-003-W05 access to part of weld to Lower Shell Barrel "B" Weld C-A Lower Shell Barrel "A" to 98% Observation ports and 21201-86-004-WO7 coupling restrict access Tube Plate Weld to part of weld C-B 6" Auxiliary Feedwater Nozzle 67% Limited exam from nozzle 21201-86-004-W26 side to Shell Weld 6-53 014 Rev. 6 001163
.- .. - _- = . .. . . . - - . . . .- - . - . . .
VEGP-2 RR-49 -
Comoonent or Relief Area System hydrostatic test and VT-2 examination during system inservice test on Class 3 vertical pit-type pumps. The following nuclear service cooling water (NSCW) pumps and transfer pumps are affected by this relief request.
2-1202-P4-001 2-1202-P4-005 .
2-1202-P4-002 2-1202-P4-006 2-1202-P4-003 2-1202-P4-007 2-1202-P4-004 2-1202-P4-008 Recuirements From Which Relief is Recuested item number DI.10, Examination Category D-A, Table IWD-2500-1 of ASME Section XI requires a system hydrostatic test (IWD-5223) and a VT-2 examination .
during system inservice testing (IWD-5221) on Class 3 components. l Basis for Relief The NSCW pumps and transfer pumps are vertical pit-type pumps which take suction from the NSCW tower basins. Since these pumps are vertical pit-type -
pumps, there are no isolation valves on the suction side of the pumps to facilitate hydrostatic testing. Therefore, the performance of a hydrostatic test on the pumps and the piping to the first discharge shutoff valve is impractical. In addition, the performance of a VT-2 examination during system inservice testing is also impractical on the suction side portion of these pumps because they are submerged in the NSCW tower basins.
l Alternate Examinations i These pumps are periodically tested as required by Subsection IWP. These tests verify operability of these pumps and by doing so would detect significant leakages through the pressure-retaining boundary. A VT-2 examination will be performed each inspection period during system inservice testing on portions of the pumps which are not submerged in the NSCW tower basin.
l 001163 6-93 014 Rev. 6-l
l VEGP-2 RR-49 Addendum ,
Component or Relief Area l
In addition to the relief requested from performing hydrostatic tests on the NSCW pumps and the piping to the first discharge isolation valve, it is requested that the boundary be extended to the following:
discharge isolation valve 2-HV-11600 to discharge check valve 2-1202-U4-025, discharge isolation valve 2-HV-11607 to discharge check valve 2-1202-U4-027, discharge isolation valve 2-HV-11606 to discharge check valve 2-1202-U4-035, discharge isolation valve 2-HV-11613 to discharge check valve 2-1202-U4-037, discharge isolation valve 2-HV-11605 to discharge check valve 2-1202-U4-031, discharge isolation valve 2-HV-11612 to discharge check valve 2-1202-U4-033, Train A to Train B intertie from manual isolation valve 2-1202-U4-492 to check valve 2-1202-04-495, and l Train B to Train A intertie from manual isolation valve 2-1202-U4-497 to check
( valve 2-1202-U4-493.
Reauirements From Which Relief is Reouested Same as original RR-49. j Basis for Relief Same as original RR-49 plus:
l Performance of a hydrostatic test on the piping between the first discharge '
isolation valves downstream of the NSCW pumps and the downstream discharge check valves is impractical because no intermediate test connections are present to attach hydrostatic test equipment. To remove the check valve internals to facilitate hydrostatic testing is not prudent due to time constraints associated with disassembling and reassembling the check valves and restoring the NSCW system to service.
Similarly, portions of the "NSCW keep full system" are isolated from the remainder of applicable NSCW train by check valves with no intermediate test connections. The "NSCW keep full system" is designed to maintain the idle train of NSCW pressurized and full of water by the use of an intertie from the operating train. To remove the check valve internals to facilitate hydrostatic testing is not prudent due to time constraints associated with disassembling the check valves and restoring the NSCW system to service.
001163 6-93a 014 Rev. 6
. . _ - ,p.7
i VEGP-2 l RR-49 Addendum (Cont'd) i I
Alternate Examinations Same as original RR-49 for pumps plus:
Intertie piping sections will be VT-2 examined each inspection period during system inservice testing of NSCW pumps.
t l
001163 6-93b 014 Rev. 6