MONTHYEARML20217G6571999-10-13013 October 1999 Proposed Tech Specs Pages,Revising TS to Permit Relaxation of Allowed Bypass Test Times & Completion Times for LCOs 3.3.1 & 3.3.2 ML20217B1221999-10-0404 October 1999 Proposed Tech Specs Pages,Revising TS 5.5.6 Incorporating Exceptions to Reg Guide 1.35,rev 2,as Described in FSAR Section 3.8.1.7.2 Re Prestressed Concrete Containment Tendon Surveillance Program ML20212F4891999-09-22022 September 1999 Proposed Rev to TS SR 3.8.1.13,to Include Upper Limit for DG Loading for 2 H Portion of SR ML20211J5511999-08-30030 August 1999 Proposed Tech Specs,Raising Level of Approval Authority for Deviations from Guidelines Provided to Minimize Unit Staff Overtime Specified in TS 5.2.2 ML20211J7281999-08-26026 August 1999 Proposed Tech Specs Updating Versions of LCO 3.0.4 & SR 3.0.4 to Be in IAW with Versions of LCO 3.0.4 & SR 3.0.4 as Noted in Rev 1 to NUREG-1431 ML20211E9111999-08-24024 August 1999 Proposed Tech Specs,Relaxing Slave Relay Test Frequency from Quarterly to Refueling Frequency ML20196L3181999-05-18018 May 1999 Proposed Tech Specs SRs 3.8.1.3 & 3.8.1.13 Reducing Loading Requirements for DGs ML20205S3791999-04-19019 April 1999 Proposed Tech Specs Revising SR 3.3.5.2 & Associated Bases to Allow Loss of Voltage & Degraded Voltage Trip Setpoints to Be Treated as Nominal Values in Same Manner as Trip Setpoints for RTS & ESFAS Instrumentation ML20205Q7901999-04-13013 April 1999 Proposed Tech Specs,Updating Versions of LCO 3.0.4 & SR 3.0.4 to Be Consistent with Versions of LCO 3.0.4 & SR 3.0.4 as Appear in Rev 1 to NUREG-1431 ML20154M9961998-10-15015 October 1998 Proposed Tech Specs,Deleting & Modifing Conditions Which Were Issued with Licenses That Are Now Obsolete ML20151U2011998-09-0303 September 1998 Proposed Tech Specs Pages for Amends to Licenses NPF-68 & NPF-81,changing TS to Support Replacement of Nuclear Instrumentation Sys Source Range & Intermediate Range Channels & post-accident Neutron Flux Monitoring Sys ML20236R4661998-07-13013 July 1998 Proposed Tech Specs Eliminating Periodic Response Time Testing Requirements on Selected Sensors & Selected Protected Channels ML20154Q8611998-06-30030 June 1998 Proposed Tech Specs Bases Since Implementation of Improved TS on 970123 Through Aug 1998 ML20206N3131998-06-30030 June 1998 Proposed Tech Specs Re Replacement of Nuclear Instrumentation Sys Source & Intermediate Range Channels & post-accident Neutron Flux Monitoring Sys ML20236F1631998-06-26026 June 1998 Proposed Tech Specs Revising LCO 3.3.6 Re CVI Instrumentation & LCO 3.9.4 Re Containment Penetrations to Facilitate Outage Planning ML20248K5801998-05-25025 May 1998 Rev 1 to VEGP Units 1 & 2 Second 10-Yr Interval Valve IST Program ML20247K5041998-05-15015 May 1998 Proposed Tech Specs Pages Revising New Program 5.5.18 to Extent That Items B,C & D. Refer to LCO Action Statement & Bases Insert for New Required Actions B.5.1 & B.5.2 ML20247G9471998-05-0808 May 1998 Proposed Tech Specs Section 5.5.7, RCP Flywheel Insp Program, Specifying Alternate Flywheel Insp Once Every Ten Years ML20216J4971998-04-16016 April 1998 Proposed Tech Specs 3.3.1 & 3.3.2 Re Reactor Trip Sys & ESFAS Instrumentation ML20199E5351998-01-27027 January 1998 Complete Replacement of All Typed Pages of TS Changes Submitted in Ltr LCV-0849-E ML20199A4131998-01-22022 January 1998 Proposed Tech Specs Adding Conditions for DG for Extended DG Completion Time of Fourteen Days ML20198P6961998-01-16016 January 1998 Revised Spent Fuel Pool Boron Dilution Analysis ML20216B2621997-12-11011 December 1997 Rev 14 to ODCM, for Vogtle Electric Generating Plant ML20199G3901997-11-20020 November 1997 Proposed Tech Specs Facilitating Treatment of Trip Setpoints as Nominal Values & Correct Certain Typos ML20199J6651997-11-20020 November 1997 Proposed Tech Specs Pages Changing Capacity of Unit 1 Spent Fuel Storage Pool from 288 to 1476 Assemblies & Revising Design Features Description to Reflect Criticality Analyses & Storage Cell Spacing ML20211N2451997-10-10010 October 1997 Proposed Typed Tech Specs Pages,Revising Credit for Boron & Enrichment Increase for Fuel Storage ML20217H9051997-08-0808 August 1997 Proposed Tech Specs Pages Re Credit for Boron & Enrichment Increase for Fuel storage.W/marked-up Pages ML20141A8541997-06-13013 June 1997 Proposed Tech Specs Revising LCO 3.4.10 to Reduce Nominal Set Pressure by 1% to 2460 & Increase Tolerance to +2% ML20148E6481997-05-15015 May 1997 Rev 0 to VEGP Units 1 & 2 Second 10-Yr Interval Pump IST Program ML20148E6611997-05-15015 May 1997 Rev 0 to VEGP Units 1 & 2 Second 10-Yr Interval Valve IST Program ML20133L3081997-01-10010 January 1997 Proposed Tech Specs Table 3.3.1-1 Re Amends 96 & 74 ML20140J4591996-12-13013 December 1996 Rev 11 to ODCM for Vogtle Electric Generating Plant, ML20138F1001996-12-13013 December 1996 Revs 10 & 11 to ODCM, Part 2 ML20132C4711996-12-12012 December 1996 Proposed Tech Specs Re Physical Security & Contingency Plan ML20134J9841996-10-0808 October 1996 /Unit 2 Fuel Assembly Insp Program ML20117N5851996-09-13013 September 1996 Proposed Tech Specs 3.8.1 Re AC Electrical Sources ML20129A6461996-09-11011 September 1996 Proposed Tech Specs,Providing Updated Documentation for License Amends Application for Southern Nuclear to Become Licensed Operator ML20117C4151996-08-23023 August 1996 Proposed Tech Specs to Convert Units 1 & 2 Based on NUREG 1431 ML20117N6361996-06-17017 June 1996 Proposed Tech Specs,Clarifying Requirements of TS SR 4.8.1.1.2.j (2) That Prescribes Pressure Test of Portions of Diesel fuel-oil Sys Designed to Section Iii,Subsection Nd of ASME Code ML20117N6471996-06-17017 June 1996 Proposed Tech Specs Section 5.3.1,allowing Use of Fuel Assemblies Containing Fuel Rods Clad W/Zirlo ML20111A5501996-05-0606 May 1996 Proposed Tech Specs,Incorporating Extended DG AOT to 14 Days from Discovery of Failure to Meet Lco,Provided Standby Auxiliary Transformer Available ML20106H2391996-03-31031 March 1996 Rev 10 to Gap Security Dept Vogtle Electric Generating Plant Nuclear Security Training & Qualification Plan ML20101D4151996-03-0505 March 1996 Proposed Tech Specs Re Conversion Based on NUREG-1431 ML20100G0371996-02-19019 February 1996 Proposed Tech Specs Based on NUREG-1431 ML20097A3171996-01-30030 January 1996 Proposed Improved TS Based on NUREG-1431 ML20096G8241996-01-22022 January 1996 Inservice Insp Program, for VEGP-2 ML20095J2501995-12-22022 December 1995 Proposed Tech Specs,Allowing Use of Option B of 10CFR50,App J for Type B & C Testing ML20094N4071995-11-20020 November 1995 Proposed Tech Specs,Converting Existing TS to Format & Content of NUREG-1431 ML20093K2281995-10-16016 October 1995 Proposed Tech Specs,Adding Footnote to Spec 4.6.1.2.d Stating That Type B & C Tests Scheduled for Refueling Outage 1R6 Will Be Conducted Per Option B of 10CFR50 App J & Using Guidance of RG 1.163,Rev 0 ML20098C1471995-10-0202 October 1995 Proposed Tech Specs,Allowing Next Type a Test to Be Rescheduled 1999-09-22
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20248K5801998-05-25025 May 1998 Rev 1 to VEGP Units 1 & 2 Second 10-Yr Interval Valve IST Program ML20216B2621997-12-11011 December 1997 Rev 14 to ODCM, for Vogtle Electric Generating Plant ML20148E6611997-05-15015 May 1997 Rev 0 to VEGP Units 1 & 2 Second 10-Yr Interval Valve IST Program ML20148E6481997-05-15015 May 1997 Rev 0 to VEGP Units 1 & 2 Second 10-Yr Interval Pump IST Program ML20138F1001996-12-13013 December 1996 Revs 10 & 11 to ODCM, Part 2 ML20140J4591996-12-13013 December 1996 Rev 11 to ODCM for Vogtle Electric Generating Plant, ML20134J9841996-10-0808 October 1996 /Unit 2 Fuel Assembly Insp Program ML20106H2391996-03-31031 March 1996 Rev 10 to Gap Security Dept Vogtle Electric Generating Plant Nuclear Security Training & Qualification Plan ML20096G8241996-01-22022 January 1996 Inservice Insp Program, for VEGP-2 ML20078A3771994-05-12012 May 1994 Vols 1 & 2 of Vogtle Electric Generating Plant Unit 1 Readiness Review Module 4 Mechanical Equipment & Piping Program ML20069L8241994-03-30030 March 1994 Rev 8 to ISI-P-008, Inservice Test Program for Vogtle Electric Generating Plant Unit 1 ML20069L8311994-03-30030 March 1994 Rev 5 to ISI-P-016, Inservice Test Program for Vogtle Electric Generating Plant Unit 2 ML20082V2871994-01-0101 January 1994 Offsite Dose Calculation Manual, Rev 9 ML20064C7431993-11-0505 November 1993 Rev 6 to ISI-P-006, ISI Program for Vogtle Electric Generating Plant Unit 1 ML20064C7471993-11-0505 November 1993 Rev 6 to ISI-P-014, ISI Program for Vogtle Electric Generating Plant Unit 2 ML20094K1781992-03-0404 March 1992 Rev 3 to Vogtle Electric Generating Plant Process Control Program ML20094K1721991-12-31031 December 1991 Draft, ODCM for Vogtle Electric Generating Plant ML20086Q7231991-12-0404 December 1991 Rev 7 to Procedure 91202-C, Activation & Operation of Operations Support Ctr ML20091L7891991-07-0303 July 1991 Rev 5 to Procedure 29537-C, Outage Scheduling ML20079G4971991-06-10010 June 1991 Rev 5 to ISI-P-006, Inservice Insp Program for Vogtle Unit 1 ML20079G5071991-06-10010 June 1991 Rev 4 to ISI-P-014, Inservice Insp Program for Vogtle Unit 2 ML20091L7991991-04-22022 April 1991 Rev 6 to Training Lesson Plan LO-LP-39201-06-C, Introduction to Ts ML20091L7771991-04-17017 April 1991 Rev 21 to Procedure 10000-C, Conduct of Operations ML20043H3091990-06-15015 June 1990 Rev 3 to ISI-P-014, Inservice Insp Program. ML20091L8131990-05-22022 May 1990 Outdated Rev 0 to Training Lesson Plan RQ-LP-63107-00, Requal Current Events ML20043B6321990-05-22022 May 1990 Rev 5 to ISI-P-008, Inservice Testing Program. ML20043B6381990-05-22022 May 1990 Rev 2 to ISI-P-016, Inservice Testing Program. ML20129G8451990-04-0505 April 1990 Rev 19 to Procedure 14980-1, Diesel Generator Operability Test ML20129F7161990-03-29029 March 1990 Rev 2 to Procedure T-FND-90-15, Method Visual ML20091L8331989-05-19019 May 1989 Rev 0 to Corporate Guidelines 1.1.2, Positive Discipline ML20246N6241989-05-10010 May 1989 Rev 3 to Vogtle Electric Generating Plant Unit 1 Inservice Insp Program ML20078A5401988-11-15015 November 1988 Updated Vogtle Electric Generating Plant Unit 2 Readiness Review Module 3A Initial Test Program - Preoperational Test Phase ML20195J9191988-11-11011 November 1988 Rev 4 to ISI-P-010, Preservice Insp Program Vogtle Electric Generating Plant Unit 2 ML20196B1551988-10-25025 October 1988 Rev 0 to ISI-P-014, Inservice Insp Program ML20195B3901988-10-18018 October 1988 Aw Vogtle Simulator Certification Plan ML20091L8931988-10-0303 October 1988 Voided Rev 9 to Procedure 10000-C, Conduct of Operations ML20155C0751988-09-15015 September 1988 Rev 0 to Abnormal Operating Procedures 18038-2, Operation from Remote Shutdown Panels ML20091L8821988-09-0808 September 1988 Voided Rev 10 to Procedure 35110-C, Chemistry Control of Rcs ML20155C0871988-08-19019 August 1988 Rev 9 to Procedure 12006-C, Unit Cooldown to Cold Shutdown ML20151G1851988-07-18018 July 1988 Rev 1 to ISI-P-006, Inservice Insp Program ML20151G1881988-07-18018 July 1988 Rev 2 to ISI-P-006, Inservice Insp Program ML20078A6221988-07-12012 July 1988 Readiness Review Program Module 20 - Instrumentation & Controls ML20078A5931988-06-28028 June 1988 Readiness Review Program Module 13B - Coatings ML20078A5831988-06-22022 June 1988 Readiness Review Program Module 12 - Electrical Cables & Terminations ML20091L7821988-06-0707 June 1988 Rev 0 to Procedure 49006-C, Health Physics & Chemistry Dept Outage Activities Implementing Procedure ML20078A5461988-05-12012 May 1988 Rev 1 to Vogtle Electric Generating Plant Unit 2 Readiness Review Module 3A Initial Test Program - Preoperational Test Phase ML20078A5751988-04-13013 April 1988 Readiness Review Program Module 11 - Pipe Stress & Supports ML20151R0331988-04-13013 April 1988 Rev 3 to Inservice Test Program ISI-P-008, Summary of Changes ML20078A6311988-03-16016 March 1988 App F, Inspector Qualification of Vogtle Electric Generating Plant Unit 2 Readiness Review Program ML20148K4301988-03-0202 March 1988 Inservice Test Program 1998-05-25
[Table view] |
Text
. . - . - _ .
4
- ommy contrw inspecuen neport Gwg h m,.
, g vooru otscRAriso rtxur-uNiis t ' 2 34222 a e-
i wwoo0NDA Na sviene Pror owwteet. No. mew
/ 9#D *% & M 47 /s w YA e A* *f*1'->f A - 4 o-1M' ,4< w o Aeom N*A*** Na srestLan #s D*Weaolm he ha i *)?D - 4 >? 2 n'u a 1 /? /R M DatD $
l orwwmeNaAew wnoor usnue Log Ns ove W/$ ,
'7l/A W/A I
i
- 1. Inspector will use separate form for each completed inspection function (s) and insert original with work packag ,
use continuation sheets when mWed.
i j
- 2. Use simple narrative type report procedure. Reference all applicable drawing numbers, specifications, speci instructicos, etc., connected with your inspection. Use sketche a, when applicable, showing dimensions checke alignment, physicallocation of defects found, etc. N/A all blocks not used.
) 3. Upon completion of the inspection activity, enter results below and sign and data 1
We*Y//n) O/d1/#)
//< f,' A d / / H M D Q D d h k r* 1' *?l0 /W) 'Y-ws/ M / W /' # ft ll d f /1 ] n M ne W a s ) <"ts JA ,,l 7" n ~,-s ** Ts' s> % W S e191/ e v1 / e it //>
e '7 'o ux L k < 7' le'>f-E" AAe do twerl D d P - Vf= V/ *)too 02>
j N N
l
)
$ N N !
i N i N N
N ,
i O ,e snoo ws e no
~~
t Dunan--oorvon nan ( ;y /
'" 8 M d 8
- 7.*d 'f 'fD 9610070024 960827 PDR FOIA WILMOTH95-81 PDR
.~. . . . - - _ _ _ _ _ _ . - - . - - - - - - - - _. _. ---
4 '
M*n*0 CCVER SHEET
< M'401 _ 19001576 d DATE: 03/28/90 SYSTEMI _2403 TOREMAN _
MWo OVTA0E REQUIRED _
CLEARANCE __
YES _ _ No _ X
- PARTS REQUIRED
- _ No
___- [j f - ), I STATUS: _6D C 'l c RCH: ICOP _
PRIORITY CODE 1
~ 4 PRi~0R1TV MODE
~
~~
PIANT ~
RESTR STATUS ~ RESTRAINT I CCHTROL FIELD: * *
- cHF GORY E5T5tM 5UTAGE ,,,~3PRC . . SPEC,
- i -
REQ REQ abgg i, --
TYPE * '
STATUS .
__ t . ., ;,
COMMENTS . . . .. . .. . .,
. y.*. ".. ,9* . i I -
1 l
. - i
+
1 a
l
~
I _
i _
~
~
3
~-
~
--M i
1 ,
1 a
4
4 .
NUCLEAR PIAN ~ MAINTENANCE WORX4 7ORDER *
(1 OF ~
- 1. CONTROL NO. 19001576 00 5.MPL/ TAG NO. LIST 2.DATE 03/28/90 3. UNIT 1 4. SYSTEM LIST i
1
- 6. PROB /
WORK MPL/ TAG (8) ASSOCIATED WITH SPECIAL INDICATORS 4 A.ere 5 REQ. DIESEL CENERATOR 1A TRIPPED TWICE FOLL START CONDITIONS.
AND 70 SECONDS OF OPERATION.THE TRIPS ACCURRED A
~
CONT. **NPRD**
N 7.INITI ATOR KEN STOKES _
I4C LIST 9.MWO 12.DCR N CLASS S EQP CLASS LIST 10. UNIT STAT
_ ,_ _ _,_ _ _ _ 11. FIRE PROTECT H 8.SUPRV JP RED 13.NCR/DR N 16.CRAPT MECH CREW (EST/ACTi ELEC(EST/ACT) 14. TYPE MAINT P 15. DURATION 0 0 16C(EST/ACT) ~'
i HRS. 0 CONT0 (EST/ACT) HP/OT(EST/A7 EXP. O ~~ 0 O ~* .
SCHED BEG
_f_f_____, , ,_/,__/ _,,_ 0 @c > kMr/4 ,$. .b.
SCHED EN /
__f_ __fJ,__, k__f___f__
f,__ __f__/_ ,_f_
I,Y_ ~
_f_/_ W _
'18 M LD. PERM N 'DI 19.QC HOLD WS 20. PROC QC REVIEWED BY 'RWP" YEN.'k
- 23. WORK
- _/__/ _ 21.PRI 14 2 2. LCD INST. _
SEE CONTINUATION SHEET CONT.
COOPER ENERGY TO PERFORM WORK UNDER P.O #600212
~~
OPS _ DATE 2 4. INI TI ATE REVI EW ------------
/ f_,
HP 27.ACT
__,, DATE __j_,,_f__, _ MNT ENG ,__DATE DATE_/,_f
,_f_f__ ---- 2 6.25.
_,SIG._ MWOSPEC REV REQ N _
RELEASE FOR WORK
_ DATE _/,_/__
PERTRHED - - . - - -
CONT. -
~~
~ ~ ~ ~
HIST SUM ~ _ - - - -
2 8.HTRL REQD ,, _
- 29. PERSON PERTORMINC WORK (NAME) DATE -
- 31. INSPECTION PERFORMED BY
- J.- /- 30. MAINTENANCE FOREMAN DATE~
- 32. METHOD OF F.T.
~
(. 33. PROCEDURE f _
DATE _.]_
f__j~ j"~-
- t. 36. PROVES OPERABILITY 34. PERFORMED BY _ . ~
38.SATISTY./UNSATISTY __, 39.IF UNSAT . CORR. ACTION 37. METHOD US F 40. UNIT STATUS AT TIME,OF FAILURE -
I. 43.CAUSE OF FAILURE ~ 41. TYPE FAIL _ ~~ 42. MODE OF FAIL f 46.EFF ON PLANT 50.NEW MWO 477MNO STAT 6D 48.CAUSE
- 44. DETECT BY ~~
45.EFFECT ON SYS ~~
~
I 52.OSOS APPROVAL~ ~ 151.OPER. ACCEPT BY4 n -
- 49. CORR ACT.
- J ,.
DATE _,f__/, DATE. ~"~/]-
i' I
- 53. SPEC REV COMP _ -
- t. 55.CICSE OUT APPROVAL BY QC _ DATE _/,,_/,__ 54. MEET f
-~
DATE _f_f -
t.
p
.s .
itVC:COPY ** :: TY *
EAR' PLMt" **C0FY ** ::' M PY ** C*.i MAINTEllANCE WOR); ORDER (CONT 2HUC,,
(2 Ol' 3)
CENTROL No. 19001576 00 I
MPL/ TAC No.. . . . SYSTEM . . . . . - - .. .. .. .. .. .. .. .. .. . . . . ... . . . . - - . . . _ . . . - ----............
.......... DESCKIIPTION 12403C4001
..........EQP CLS. . . . . . . . . . . . .. .. .. . .. .. ... .. .. . . . L:;o .....
CA T I ON 2403 015 ...........
12403P5DG2 2403 DIESEL GENERA *rDR 1 DC3B 1 -
11J DC 1A ENGINE CNTRL PNL 1D;3D1
., s i , , . . ,
e.if%<>*.
w *y {,y s
.. s
~$$s*U,* *
i Y, Q. .= .t 4 ' '- *Jt,* *h W * .
.......,.f O
t 4
I e
.o..
1
(
y- y
1
) **
r CCTY **l I*TY NUCLT.AR .'. .C MAINTENANCE** CIri se COPYWOhK ** COPY ORDER Cs~iT ** COPY (CONTINUED)
. '. C CONTROL NO. 19001576 00 (3 OF J'J ie, WORK INSTR *l0*TIONS t PERTORM ENGINE 14GIC TESTING PER PROCIDUREREV 27563.C, 2.
ABLE PERSONNEL, AS PROTIONS REQUIREC. OT THE PROCEDU 1
PROCEDURE NEED NOT BE RETESTED. Tile ELECTRICAL ADDITIONAL INSTRUMENTATION MAY BE CONNECTED BY TEST PERSONNEL TO ANY DOCUMENTED INSTRUMENTATION COMPLETELY ON THIS CONNECTEDMWO. OR ADTUST ENCOUNTERED WHILE PERTORMING THIS TEST. DOCUMEN
~ STEP lt IN THE EMERGENCY MODE AND A L LINES ! * *. . * * * ' e E-10A B-
~*
- E-16A 3 - TRIP e a HIC)! TEMPERATURE a a JACKET WATER e
C- * * *
- E-92 - TRIP HIGH PRESSURE CRANKCASE E-14 . TRIP 14W PRESSURE TURBO OIL E-23H - TRIP HIGH VIBRATION- TRIP I4W PRESSU E-19 E-18 . TRIP HIGH TEMPERATURE ENGINE ! EARINGS
- TRIP HIGH TEMPERATURE LUBE OIL.
TEST BULKHEAD TORAND LEAKAGE CONNECTING BY DISCONNECTING PHEUMATIC BUB!*.E TUBT OBSERVE TESTER FOR AIR FI4W WilEN LINE IS PRESE*.*RI2ED. RESTORE TUE*liG INSTRUMENTCONNECTION
~
LINE. AT BULKHEAD AND CON"*N STEP $2 NOPy.AL START
~
-TRIP BY HI. TEMP LUBE OIL
~
-TRIP BY li!GH VIBRATIONSTEP $3 14SP START )
STEP f 4 NORMAL START
~
-TRIP BY HIGH PRESS CRANKCASE STEP f 5 SI START (JUMPER IN GEN.
-TRIP BY 2 OF 3 L.O. PRESSURE CONTROL PANEL 204 TO 209)
NOTE
~
THE AREA OF TESTING SHALL BE ROPED AN ESSENTIAL PERSONNEL AS DETERMINED B AND GPC ENGINEERING.
'dPC ENGINEERING REPRESENTATIVE PRESENT SHALL AS REQUIRED. BE PRESENT AbD QC FOR
,l a, ] f ,
. 7 /I6/N we