ML20090L594

From kanterella
Jump to navigation Jump to search
Forwards GE Rept, Summary of Monticello Biological Shield Wall Strength
ML20090L594
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 06/08/1972
From: Ward E
NORTHERN STATES POWER CO.
To: Skovholt D
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20090L597 List:
References
NUDOCS 9102120451
Download: ML20090L594 (1)


Text

' ~

ws1= So-ac,3  :

h NORTHERN STATES POWER COMPANY M I N N E A P O L.t e. M I N N E S OT A 55408 June 8, 1972 s s x A

Regulatory Filo Cy. ( ef /'I/Ig h Mr Donald J Skovholt D Assistant Director d Mg "g2 IS 7'972A L l'

for Operating Reactors I Directorate of Licensing q, eg. ,

U S Atomic Energy Comission  %

Washington, DC 205!.5  % 4 Dear Mr Skovholts MONTICELLO NUCLEAR GENERATING PLANT E-5979 AEC Operating License - Reporting Our letter of April 21, 1971 conveyed several reports in response to the ACRS letter of June 15, 1970. Our co=mitment to supply these '

responses was outlined in Mr A V Dienhart's letter of July 30, 1970.

The ACRS letter also mentioned the need to gain assurance that the biological shield surrounding the reactor vessel can withstand the pressure that could be developed by a loss of integrity of a safe-end or nozzle, or that failure of the shield would have no intolerable consequences. Accordingly, we are enclosing 40 copies of a report on this subject by General Electr c Company dated March 21, 1972.

i Yours very truly,

-m N

Ub(,h Q E C Ward, Director Engineering Vice Presidential Staff Cc: G Charnoff -

D E Nelson c. \M, fkl h 6 , )J W

t o .1 Jbyl210

% y, ; h,,,fEh "

Q D:;ch;:[.' 9 3 1/;q ' %/ D .s (myy.m, \ j \

a /

. 6 m

9102120451 720600 PDR ADOCK 05000263 j P PDR -

[

  • -M6a .,M + m