Forwards Caseload Forecast Panel Data Package Presented to Panel Representatives During 840313 & 14 Visit to Plant. Data Package Prepared in Response to Encl Panel Agenda
ML20087J746
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 03/21/1984
From: Devincentis J
PUBLIC SERVICE CO. OF NEW HAMPSHIRE, YANKEE ATOMIC ELECTRIC CO.
To: Knighton G
Office of Nuclear Reactor Regulation
References
SBN-640, NUDOCS 8403230061
Download: ML20087J746 (139)


Text

PUBUC SERVICE SEAErOOK STATION Engineedng Office:

Companyof New Hampshis e 1671 Worcester Road Framingham, Massachusetts 01701 (617) 872 8100 Ma rch 21, 1984 SBN- 640 T.F. E1.2.1 United States Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Mr. George W. Knighton, Chief Licensing Branch No. 3 Division of Licensing

References:

(a) Construction Permits CPPR-135 and CPPR-136, Docket Nos. 50-443 and 50-444 (b) USNRC Memorandum, dated February 17, 1984, " Caseload Fo recas t Panel Meer 1.ig and Tour of Seabrook Station",

V. Nerses to G. W. i.aighton

Subject:

Caseload Forecast Panel Data Package

Dear Sir:

We have enclosed a copy of the data package which was presented to the Caseload Forecast Fanel representatives at their March 13 and 14,1984 visit to Seabrook Station.

This data package was prepared in response to the panel's agenda

[ Reference (b)].

Very truly yours, YANKEE ATOMIC ELECTRIC COMPANY

/

John DeVincentis Project Manager JDV/pmb cc: Atomic Safety and Licensing Board Service List i

8403230061 840321 d/

PDR ADOCK 05000443 A PDR J

William S. Jordan III, Esquire Brentwood Board of Selectmen Harmon & Weist RED Dalton Road 1725 I Street, N.W. Suite 506 Brentwood, New Hampshire 03833 Washington, DC 20006 Roy P. Lessy, Jr., Esquire Office of the Executive Legal Director Edward F. Meany U.S. Nuclear Regulatory Commission Designated Representative of Washington, DC 20555 the Town of Rye 155 Washington Road Robert A. Backus Esquire Rye, NH 03870 116 Lowell Street P.O. Box 516 Calvin A. Canney Mancehster, NH 03105 City Manager City Hall i

Philip Ahrens, Esquire 126 Daniel Street Assistant Attorney General Portsmouth, NH 03801 Department of the Attorney General Augusta, ME 04333 Dana Bisbee, Esquire Assistant Attorney General Mr. John B. Tanzer Office of the Attorney General Designated Representative of 208 State House Annex the Town of Hampton Concord, NH 03301 5 Morningside Drive Hampton, NH 03842 Anne Verge, Chairperson Board of Selectmen Roberta C. Pevear Town Hall Designated Representative of South Hampton, NH 03642 the Town of Hampton Falls Drinkwater Road Patrick J. McKeon Hampton Falls, NH 03844 Selectmen's Office j 10 Central Road 1 Mrs. Sandra Gavutis Rye, NH 03570 Designated Representative of the Town of Kensington Carole F. Kagan, Esq.

RFD 1 Atonic Safety and Licensing Board Panel East Kingston, NH 03827 U.S. Nuclear Regulatory Commission Jo Ann Shotwell, Esquire Assistant Attorney General Mr. Angie Machiros Environmental Protection Bureau Chairman of the Board of Selectmen Department of the Attorney General Town of Newbury One Ashburton Place, 19th Floor Newbury, MA 01950 Boston, MA 02108 Town Manager's Office Senator Gordon J. Humphrey Town Hall - Friend Street U.S. Senate Amesbury, Ma. 01913 Washington, DC 20510 (Attn: Tom Burack) Senator Gordon J. Humphrey 1 Pillsbury Street Diana P. Randall Concord, NH 03301 70 Collins Street (Attn: Herb Boynton)

SEabrook, NH 03874 Richard E. Sullivan, Mayor Donald E. Chick City Hall Town Manager Newburyport, MA 01950 Town of Exeter 10 Front Street Exeter, NH 03833 4

e6 N l (ga 4,/haf /&

J/r/f

/. Y /4rse s U / c /A'n'R /# L /4- 8 8 3

2. s 1. - % e , wa ees e e,
3. shve (? a v < ~ PJc AJF if . ,L ! , [ [ p q }'n L - Wx yj_g,nvTS Y c o T D J'l.

5- lN As M la62- / MZc/Kg 6 Q@Cb gs 6bgcT. Co u %,A - U E f C

~7- LJ.J, ~~i'A\/L o R ,

A s sT. c.evsrR.ucTio,; gg A -os 4c.

8 4? P 00husm VP P4v6

7. as.non srarrp u mys<

fo . 7.FMya. Pjoj. E.vy - V"o il 7 fyg c NECfEr A- 4/A1. /64i.7erO /fyYhi I3 &c Cene hcl Rr ser-

, Toud.

f . F.Ners eG 2 ys Love /pc e .<//c/lbdB,/btlcpac p/c pp g

3. fif(C
  • Sc.swowskt rJun . __

1 60'(w ;&r~s /$ a 2*

6 " n ,1) ]'vo ~A fwe ?)L,2(

3 e ej

t. //Ic rotz /Je rs e s 8 ac y, r, 7~axy ync,6pek) wu c rj/cnonr 15*3 nurn W P, JeImscn 73NH ~ W O. G, M 'Aai n /?S/YN - Sfar7-p Monoper p' R .Sc , n < a s c .m pssw - s , v' P l Q@ C_. k s p uE(c. - Ov,6 C ""T "h"*

Detotc E . Fico B s' F5M 14 - STATioV k%DAGER l lay A td.wie n 7a yaec - L%ca. .a c. r in ~ u e~ <.

Oatacf k Nr Np6

,V)EC

/ - /k5r f. fts'p r .

p' As thwseeH A3 ySose A-z~

7E /LA, a RI u:N/tc rr e ocm-aua sno u 8Ivi Ebner VGic - ?>g . N9 e a . m nye R ynEL- 14q.Ey A M Tefre PsNa - S Tp e

3-41 SEABROOK STATION UNIT 1 AND COMMON CASELOAD FORECAST PANEL l

l March 13, 1984

.O rn _

O, e

SEABROOK UNITS 1 AND 2 ii

SUMMARY

MILESTONE SCHEDULE i

u 1983 1984 1985 1986 1987 1988 1989 1990 I I I I I I I I I l l l l l 1 I I I I l l l l l 1 I I I ..

, tilllANGER INSTALLATION m l l

' ' " lm i , PIPING INSTALLATION ,& s co l 1@

l5 i

rTES11NG r

1 l4 ,3

'M ii c Jw lSj

, r lcr l2-p ELECTRICALINSTAllATION l 8 g t INSTRUMENTATION INSTALLATION m l l l5

! ' 7 i I l

, !II I l f STRUCTURAL CONCRETE m l l l lwo

! l PIPING & MECHANICAL E0PT INSTAlIATION m !cn !  ! Q5

! ELECTRICALINSTALLATION O!h!3

! I #I^ l l N a TESTING # g l

' s C la a i

lINSTRUMENTATIONINSTALLATION 1 i m i

l l2 i l l .

L1 l PUBLIC SERVICE OF NEW HAMPSHIRE Dc 7 9 l _g_ bW

(~0 ( O CONSTRUCTION PROGRESS -

TOTAL PROJECT UNIT 1 UNIT 2 -

I 100~- -

. . .I .lI l e ', . )# ' - .. *Ii I

! IlJ '

e'

  • lI '

It .

! 80- -

j i i

' J f . gi a s

. 2 2 60- - -

/I I

  • 'I

! O i 1 i i i$

l U: / I I

. l l E' l

1 l-Z 40F -

s

/ i i ... a ii s

! 111 .,' ,l . J

  • gl le

' ~

O 20- -

I I di cc I5 i COMMERCIAL E

i

$ CORE LOAD , OPERATION 8, ::,8 I I I I I I I I I a 0 , I. i I, 90 ,

76 78 80 82 84 86 , 88 ,

i i

! sar PUBLIC SERVICE OF NEW HAMPSHIRE lD s .

-- - - - . . - ~n , . - . - . - - - - - __ ________

. N 6 1

  • ' . TOTAL PROJECT PERFORMANCE RATE

_) Variance Actual From Target Total Target Monthly Target To Date Month To Date Month (1983)

January 70% -

February 72% 2%

March 74% 21 ,

~

April ,

75% 1%

Fay 78% 3%

June 80% 2%

July 81% 1%

August 83% 2%

September 85% 2%

October 86% 1%

ovember 88% 2%

December 73.24% *

(1984) .,

January 74.44% 1.2%

February 75.97% 1.53%

March 77.95% 1.98%

April 79.73% 1.78%

May 81.83% 2.10%

June 83.49% 1.66%

July 85.02% 1.53%

August 86.88% 1.86%

September 88.08% 1.20%

October 89.46% 1.38%

D:vember 90.87% 1.41%

.J December -

92.23% 1.36%

4 CNOTE:' Percentage drop due to revised estimate. 2'.'

s I

i .

m --

~

,e' .' '

TOTAL PROJECT

]

PERFORMANCE RATE

,' Variance

- - - Actual From Target Total Target Monthly Target To Date Month To Date Month (1985)

January 93.52% 1.29%

February 94.56% 1.04%

March 95.54% .98%

April 96.43% .89% -

May 97.39% .96%

June 98.17% .78%

July 98.82% .65%

August 99.40% .58%

Se ptember 99.80% .40%

October 99.94% .14%

November 99.98% .04% .

)

December 100.00% .02%

986 January ,

February '

March April .

May June July -

August Se ptember -

J

~ ' ~ e . ..;. ,

  • ~~ _

, p. *. . w -- .

' ~- y: -

~ '

T,,. 4*:.*;.... ,

~

O 9

S[-

(I SEAPP00K STATION llNIT 1 AND COMMON FACILITIFS STRilCTilRE PFPCFHT COMPLFTF UNIT #1 AND COMMON 74.44 C0ilTAINNF.HT BUILDING 68 TilRBINE BillLDING 84 ,

CONTROL BUILDING 83 DIESFL GENERATOD PillLDlHG 80 PRIMARY AllXILI ARY RUll. DING 60 Fl!EL STnRAGF ElllLDillG 87 WASTE PROCESS F5 86

(~'CIRCllLATINGWATER/SERVICEWATERPilPPH0llSE TllNilELS 00 C00LlHG TOWER 88 SulTCP YARD 9R AllMINISTRATInfl PulLDING 100 EllCLOSilRF/fiS/FW/PEi!ETPATIO!!/EMFRG FEEDWATFR PilFP 90llSF 04 PERCENT COMPLFTE BASFD !!P0il 1983 FSTIMATE AS OF 1/23/84.

f l

1

1 T! ' ( )

l UNIT 1 CONTAINMENT MILESTONES 1983 1984 1985 1986 .

l i

RX VESSEL I RCS lHFTlCORE '

HYDRO l LOAD PRE-0PERATIONAL flNTERNALSINST.AllATION+

TESTING m

f LD & SM PIPING AND MECH E0PTINSTALLATION l l UNIT 1 f LB HANGER INSTALLATION 2 .

e!m ' r l

[ O C AL m l -

t ELECTRICAL INSTALLATION I Y l INTRUMENTATION INSTALLATION l

ENCLOSURE INSULATION DOME ,

CONCRRE

}r W CONTAINMENTINTERG11Y TEST l .

m P -

I I I PUBLIC SERVICE OF NEW IIAMPSIIIRE $

w

PERCENT COMPLETE jl a

N A m co O

. .... . O O .O- O O O .

i e i' i i e 8

d I dh 8 8 8 $

g , .

g _ _

I C m_

M o

% g C -

y m - -

e .-

g ,

2 en ' E m - -

. m g

  • 2

$ CD _ _

'. M o 4 .

m

. c5 ze ,

o .

1 , , . QE )

2 . ,

  • .2 m O g - - . .

g.

. m 2

> m-m

. g E o m -- .

E ' a UNIT 1 CORE LOAD

  • g

= '

-Sm-------------

O p

g i m .__

o i m i CD -_ e_ UNIT 1 COMMERCIAL cp _gc__________ __

l r OPERATION mer i e , d, e

o/ l

.p .

l l UNIT 1 PRIMARY AUXILIARY BUILDING MILESTONES 1

! 1983 1984 1985 1986

( '

l IRCS . HFTl CORE lI HYDRO ll l LOAD g PRE 0PERATIONALTESTING l m 8 7 i I 1 LB & SB PIPING AND MECII E0PT INSTALLATION l f l UNIT 1 -

l

' 8 4  ! COMMERCIAL j f LB HANGER INSTALLATION m l . OPERATION l

, ELECTRICALINSTALLATION f INSTRUMENTATION INSTALLATION- m l  !.l l

g INSULATION g

lm l ,

1 I I I I I '

. I I I i  ? .

g h g PUBLIC SERVICE 'OF NEW HAMPSHIRE g

1 l

1 ,

PERCENT COMPLETE [')

l a I

O fc

o A m to o u C. 'O .O O -

o t .

I T t i e i a .. . - . . .

.t g; _ _

l  %

l G_ _ 2 i T W C

E l

a -- >

r=

a 8

g , C m - -

m . c 4 m ~

8 A" *

. 3 m _ _

g4 ,

O .

Em c -

m , ,

, yp .)

l 2 a . dc 1

m . -

2

. D l =

y m . T a- -

. m 2

t

' E *

3 g a UNIT 1 CO . ll5

,r

^ -9 m-O

- - - RE LOAD E

, m  : >

l m 2 o  :

$_ _gc__ UNIT 1 COMMERCIAL e

OPERATION .

i-.

alI 9P

=

A g .

[

~

l T/ >

O 9 Ci WASTE PROCESSING BUILDING MILESTONES 1983 1984 1985 1986 '

^

I RCSI HFTI ICORE HYDRO i g i LOAD .

, PRE-0PERATIONALTESTING i , i I '

- I I

< LD & SB PIPING AND MECH E0PTINSTAllATION

> I ^ I l UNIT 1 .

e LB llANGER INSTALLATION I -i i COMMERCIAL l

i > r OPERATION I I I

) e ELECTRICALINSTALLATION &

j s i ri I j INSTRUMENTATION INSTALLATION  : ui  ;

i '

V i INSULATION I L I '

Y"~l I

l l 1 1 I

! , I I I

\ -

1 n PUBLIC SERVICE OF NEW HAMPSIIIRE "

h w

I .

l PERCENT COMPLETE a Dj lo A cn co o  !

O.

I

o. ,

t C.

i

.O i

.o.

t

.ot 1 q' ., . . . . .

-) -

e m_

e lm y 1 2 m C . o o

. , - m u, '

. o .

m - - - c 1 m -

cm

< m -

'. Em

5 A- -

wm m . dW

- - . pc s m ,

- oc j o_

z . ,

m -

EZ g - -

. so  :

om 3 m- . Em

> m

. m n . . n m -- O

~

a UNIT 1 C0RE LOAD .'

_g__________y__

g l m __ o m

U l $- ag_ UNil1303WERCIAL _ _____

l L _ _ " 8- OPERATION

== .

s

). ,

y 1

N_ _ . -- -- - --

- s ~;  %

s

  • ' ~-

jf i ., ( .

s

~.- ~.

N, v. T *v ,

s, - -

1

~

,  :~ .

.. i .

,_ 3

  • x $

w s

e ,

ty A

!jATEPl Al PROCUREMENT SliMPARY

\

s PIPE SPOOLS 99.57 RECEIVED VALVES 987 RECEIVED EQUIPPENT AND PATERIAL 97% PLACED ELECTRICAL CABLE 987 RECEIVED

-4

  • b

'l s

F 9

i 6

6 l

. , . - s a N  %

k

- M. , , s

~

e ~ j .- i

, , f ,

SEABROOK STATION /

~

. UNIT 1 AND COMMON FACILITIES .

PIPE SPOOL PROCUREMENT STATUS TOTAL TOTAL QUANTITY' QUANTITY PERCENT BUILDING REQUIRED RECEIVED RECEIVED

1. TU RBINE 3,093 3,081 99.7%
2. PAB 1,421 1,419 99.8%
3. RHR VAULT 297 297 100% .
4. WPB 1,384 1,384' 100%
5. PENET. AREA 257 257 100% *
6. FUEL STOR. 149 149 100%
7. CONTAINMENT 1,392 1,371 98.5% , .
8. HYDROGEN RECOMB. 22 22 100%
9. DIESEL GEN. 271 ,,

271 100%

10. AUX. BOILER 131 131 100%
11. ADM 96 96 100%
12. COOLING TOWER 63 61 97%
13. RCA WALKWAY 10 10 100% ,

i

14. WATER TREAT. 79 79 100%

i 15. MS & FW CHASE 567 567 100%

16. TANK FARM 455 451 99.1%
17. EHERG. FWPH 128 128 100%
18. CW & SW PH 227 213 93.8%
19. CONTROL ,

64 64 10,0%

20. STM. CEN. BLWDN. 98 98 100%
21. PIPE TUNNEL 23 23 100%
22. FAN ENCLOSURE 53 53 100%
23. YARD 1,193 1,193 100%
24. CHLORINATION 28 26 92%
25. FIRE PUHPHOUSE BY SUBCONTRACTOR 100%

DELIVERY & INSTALLATION COMPLETED

26. OTHER AREAS 6 '4 66.7%

TOTAL 11,504 11,448 99.5%

~l FEBRUARY 20, 1984 IV-2

' r .

SEABROOK STATION /)

. UNIT 1 AND COMMON FACILITIES ,

VALVE PROCUREMENT STATUS TOTAL TOTAL QUANTITY QUANTITY PERCENT BUILDING REQUIRED RECEIVED RECEIVED

1. TURBINE 2,955 2,950 99%
2. PAB 1,439 1,396 97%
3. RHR VAULT 278 275 99% ,
4. WPB 1,674 1,664 99%
5. PENET. AREA 165 160 97%
6. FUEL STOR. 218 218 100%
7. CONTAINMENT 1,336 1,336 99%
8. HYDROGEN RECOMB. 41 36 88%
9. DIESEL CEN. . ,5,01 494 99%
10. AUX. BOILER 327 327 100%
11. ADM 150 150 100%
12. COOLING TOWER 16 16 100%
13. RCA WALKWAY 29 28 ,

97%

14. WATER TREAT. 165 165 100%
15. MS & FW CHASE 298 293 98%-
16. TANK FARM 427 420 98%
17. EMERG. FWPH 149 147 99%
18. CW & SW PH 332 315 95%
19. CONTROL ,

170 170 100%

20. STM. GEN. BLWDN. 400 399 99%
21. PIPE TUNNEL 0 0 0
22. FAN ENCLOSURE 106 106 100%
23. YARD 259 249 96%
24. CHLORINATION 122 121 99%
25. FIRE PUMPHOUSE BY SUBCONTRACTOR 201 197 98%

DELIVERY & INSTALLATION COMPLETED

26. GUARD HOUSE 274 272 99% _
27. OTHER AREAS 2,159 2,015 93%

TOTAL 14,069 13,775 98%

l FEBRUARY 20, 1984 IV-3

s. J

. /7 i

SEABROOK STATION UNIT 1 AND COMMON FACILITIES EQUIPMENT AND MATERIAL PROCUREMENT STATUS TOTAL PURCHASE PURCHASE PURCHASES ORDERS ORDERS

{ DISCIPLINE PLANNED PLACED CLOSED STRUCTURAL 50 48 ( 96%) 36 ( 72%)

MECHANICAL 51 51 (100%) 50 ( 98%)

ELECTRICAL 47 46 ( 98%) 40 ( 85%) . -

SUBSTATION 15 15 (100%) 15 (100%)

INSTRUMENTATION AND CONTROL 77 77 (100%) 61 ( 79%)

MECHANICAL SERVICES 34 32 ( 94%) 24 ( 71%)

NUCLEAg 72 69 ( 96%) 55 ( 76%)

PIPING 40 36 ( 90%) 21 ( 53%)

ARCHITE;TURAL 9 9 (100%) 6 ( 66%)

TOTAL 395 383 ( 97%) 308 ( 78%)

FEBRUARY 20, 1984 Iy-1 1

-l a

a -.

/f SEABROOK STATION

! UNIT 1 AND COMMON FACILITIES

, CABLE PROCUREMENT STATUS t

a i POWER CABLi 99.5% RECEIVED 1

1 CONTROL CABLE 100% RECEIVED INSTRUMENT CABLE 96% RECEIVED 1

i e

i -

1 i

i J

3 .

i 4

FEBRUARY 20, 1984 IV .

'7,.

j &

e t * = 9y 9

-- . .m, / , s. ---- %g . - - - g -%- , , -- -- 4: ,- g < he

J70 SFARP00K PROJFCT WORK FORCE

]INIT 1 AND COMMON FACILITIES 2/28/84** PFAK 1984**

MANUAL 4,948 ESTIMATED AT PEAK NON-MANUAL 2,670 TOTAL 7,618 WORKING 3 SHIFTS 2/28/84 IST 6,165 2ND 1,299 3RD 154 TOTAL 7,618

    • ON THE PAYRCLL EXCLUDES GUARDS MARCH, 1984

1 N

x 4

2E l

i e j l

CD 1 m (n I T- z- l 5_4J w , a E

i l

l

" :l~" -O -

V N

' . b 'A _wO

~<N, .

n 'e . .

',s t, s N:' >

>;s, J in s.

'~.'s ,',,, _ o' co u) .ss ,s

+- s,t ',, '1 .

cn

%- . i n ,. ' 'a"

', s ';f '

Q '> <',^ts

' .s *s:+ . ' ' ,

O :v -@

,., ,s a : n, @':;,

4 l%A,.. th O'.>'" 'N L 63; Y 4 E g

^ -$

s Q,m$,s$s'm" N . ^hj 1, 0 ,

g u ':;a e

h')MS 4

LLI w e, '.,,

lr ' ' > k' { '
z 3 ,!Ik~ l kl#' "' ' - +

!= -4i [

$ '? $Y ~jl  ! Q;hh.

~

1 $;"p, Q' ' i 1 k , ^ ' 4? alli!BR%4' >

_j rd<

p I' pan-PS' ' iss

'gji pqy, it 4<

g *s', -,g@-

4

'&M ' h%l Nf':5,,h <

5 *;^*

^c 'S "

. a.

F >- 4 - T' spyf4 O'29 >; 4;- -w T'> 've ' ',*c m O  %

awl=i

- t' <~

,,s  ; ,e3 'M >

~

p Y,%+4hb';o, S k ,~ 'jj b~ g;, l ',, a#m Y5$'$ ;lhy'&;cl  !$ '.'

,: , g a w< + , yW . . . , - _o

!'[$

'hkk f$': kh I I*b ~

U

, i "

&
,' - d $$l}W ;'f:%g} $%

',;, w , 8

- & &L , x ay{  %

' 'R, ,g " ;& ~~qi -1

., lbMM" w

w s mseg vi% B g a t

% h5 *

,n

~8'

.." I hi m vc !, .,c 'f!6ldth><N.~'tM. z 4

J r.

I I I I l l l l _

o o o o o o o o o o o o o o o o o o o o o o e o o q n m N N - -

AVO/ N3W 30VH3AV l i

1 O e

~ ~~ - - _ . ~ . . _ _ _ _

x 4

l ET

(%. ,') -

w m

m z-

<_n

, u my s _O>

s ...

a 9,

g s

_w(/)

,13 -

3A s ,s

- .s ..

y Ea,l _ am,m.o

s. e m'r,r --

',I' s, ,

sw* +' , t t

sa.#, O

-\'h(h. i ._.e '+

. + _ <>.

w':'d. 's. _r y ,

m S'*qw w

ar p'j'g# j m.-. h a t$m-

~ .a) _ m, w ,> ,,.

.c

"< ' . [ M sVN,'),. :".:/

-. ,##sw[eg asvs E

. /,,s

~.*x s

'v

^ .o g g

.s 4

,\ \ ,,

\ h g'

\

^

  • d" rs. >

', -.'s9+~,,,<.,

>p ' Q'3
a',c , 'm,,g,' +'(

> s

. s

,,> , <s s v z

,",\

-: w, , a w' . _ m . _<_ 7 J t

'+ s

'v.,' sv 2 <v~ 's ,

< s" %t,

- L

. vu> -; <,w

,s, k t , ~ s, x,f?> - s .

,s< ,

- v

' , ' ,'s,Y k 's: g# g ,

,^' , s '!' y s' , , '> s .,

1 .

,,.*.-,' ~ '

f.^

% w .,-

',yde< ' e99 f%

<,4,,$*'%,

~ , ,, ,

', ,/<

,,' g<,4 ,R [ . , -

Q

, , , ^

, . , 's s'>svs ( s '

l' Y ' r,4<

v

'~~,[- _

x ,'<, .$,,.,,

,\,.Y x ,, , .

A -', # , , , f{#, .,  ;<

' ~ 's%> ',r,I,- ,,

, ,,,,",S. ,' '- ,[s,,, y

.- N's rs v eg

'-+

\, , , <y '<'s n..,,.;,<,i,"<.'<, w

r-'/ ',,',y /< *f,

, ,. ' , ,E , ,,t, .'x, , l',C,',/

., > . .+. , '

p' , ,,

, - .v Y /,.'

O.

'">>~;>M,^,.

S ,

)

'..,'.'6 ' ,l p '+ , ~>x A>

<s. st s. f, >,j : v </- - -

~ , , ' ' , < ^;# *.

s~ - ~

/ ,

  • h m

/, ,

,\ / <,' ~ /

',., ' ~ ~ ,+A' < >,e q ' './,, .

,',* ;s y s <

>,,8 ,, l y ' **("4

< y .

s,,

,y , - ,~.

.y

.- ^ x .- ;- >

,,~s,.,>,<  ;, uve,~, ,v As _

/,+ ,,

v, v

~ '

^ '

s

~

<',/

,V  ?

,? 'Y^ '[g , * /, -' 4 " , '<'., ,,

., '^ / , ' ' ,~

g , ,', v x

, .;^ ' k;I' , 0 >

,.~,,,e.'D'{ W a' ' s

) ' ^

,l ,'

5,v* '- ' 3 w

, [ 5, -_ 5.; ,!. ',; , ,0, '; < *

,~ ,,- - 0

-+,. ..

,.s- ... ~ , . , , < ~ ' +, ,,s r,,', *tr

?>.

.,,,9,,< . ~, , , ,l,  % &

v+',.)er ' [.u >p, '

s. .'}l';'. , >

,"S / '" <" < x

=

,~

v,v :.t+, . . , ,, y z ^ ,

+. , . . ,,y.,,4' ,rr < , ,

, r ^ l, ,', , r ,' , y

.-' , ' s~,;

't, r

~

, ,':,i s

'.,,>r, , [

l +< < S,

< / , , ,r

,'s 4, 'y x, */ '

,s > r ' r

<s,s. ,< '

i,,$, 'z,,

u # #

,f ) , ,' , ',v, r 'y , = , ' s

.\6,8, <' ,-' , < ' ' ,,s,'

v s s ' ' ,' g,

t. s'< ',',$' 'v ,

+, >=

< < ' : z,,,,'+ ', ' s,s i

( /, [ +*  ;' ' r ., > f,s >

,.,,,+>',,,'v _4

,,,$>i 'y . ' , , , < < . 8

*,, </ ,T ,:,

~,,; .,,

S y'; < .

'.' ' ,; '\':.

< ,v, '^s

.-,~ ><%

^q ' ' ' +< <' 6 s o,,l 'r S,

,1 S

9,, ,, n,,,~"< E

,,3..i/

.v~: >,

, < '< ,< , , , > , < : <. , ,', , x, ~ e '

x ,; .-

, , , ,,k. n , ,, , ;,,-

9 x' >

,<!', , ' .{ r

' /

, ,' < ,' '-','~^',;,,'s

^

,+,

  • I,
, ' ss

,(',"

,- s l',,

',+ <

<<,, ,, " ,,~,>? ,v's% ,i, .4, ),,,<,, ',, ,,,, s, ' b ' 's

, n

.'J 'v>

,, ', , ,, ,' - v j .' ,,, , ( >

g

,'s,,' s- #c ,' a" ,, ', ' s,T

, , " , , ,y s'^,'

s ,

's,' ' < ?. ' , - ,s.,'- -

,s

< c, y, f,,

,5 , _4

' +' . -s ss' , -' -

> ,.,n ,

's

, ,, q/ /', ,.f F

s ,s I>v

,a, s<, ,

-[', ,I.

s -

"v, e,,- 4,,

m

,; >q e s . '. / , ,, ,- f ' * * ',

, ' / ~t

' ' ' .'s , -' ' , , +y s

4 ' , ,, Q, ,

\+ < ,# ,> <, ' ' ' +

' \/ ,,.s ', ' , , , , .,

so , .-

z g

4 Y

! I I l l l l l l l I I I i g g o o o o o o O

8 e

8 1

8 e

8 n

8

=

8a 8

m 8

w n . 8 8 g2 e AVO/N3W 39V83Ay

. i 23 j I

n

" ' - 4

['u.,') 27 w

zE (J ' '

. .sg[. .

. .Wh'i >

yu.' '

9 XR z a w -

. s.

a.

_w(f)

~

i an

_oe g.e '@

g - -

a t"+'a'A"GA97 :4' e+[: N,

. ~

l m i%ga.t Up -

A'p -w ' *;: $'M up %esr ,

x 4

[ h' s ,s, y

^" s' ~g

<C 2 d' -

O Q , , , ,.

A~Yd, .~

'1rm9 a s:.

,us 2

>, m'd , u _a,

~ c OL.

n .. 1 ,J r ', ,:.s:.

s,

u. .

L > . [. '.< 'sgg,,x t

/<^ < c >>s s ,,, a,

+~,;'~,+p

% >s - 4,

, ss ,

/w

n. ss, . , >- l x, v ,'

& 'e

  • s ,

7 J L

, s'xs,,',, ,y , g  ;>

,ss<<'. ~'s cds.e + ,.,4t 4v,, <

'v- s

,% 4 <5 p 0 '

,;",,d, k < - 4 cy%,;po  ;, : , , 'M %, xn:gy'?>a y  : . - ^ ,

.:, a ss -

- r s,

_O

~5 :; y' "

J cc ;s, a?z s

g= ;; .
.

W - ~ :4t&w

^

b%q%p tv. Wh'421 ~p;s'y;r% ~

$^ h'?'_b

- 7< ,

$f?f$h;gl,?

v,S'.6,; ' '<'g, w - ,  ;

'h;hfh,)h' y.:a:, - , p3;y?, 'yc '^o: ,

C' ;;;L:p; m s ',. Y > '( < ^ hj < fs, >,v,n, > 'a ,

^w

' ,;,4js 4

s

'y4,? s~' , ,,,' , ' 5 s

s n., < 4.w'; ,

'4 f

, ,, :. i ~'s>c., ,'$ +

,j '+ 2 ' '

';,') 4?,>'p, g T

'G,$} ' p 'N @ '),4'>',!^f' 'u 'v Xe zu,

.w~~.:,.,,,"~l,$s ': 4': '6.? ,> :/,/ mg >hy(A; [% '

> r ;s ~ <:,,. / ~  :~- y

+

k. 's > 5 $> s
A,y<[' 'k }, + 34 - '

,2 ,h/'.,v ,S s'

,s d x

~

S _@

v ~,.N~

A,,

. ' , ~,

,. ,+ ; %^%" .6 s' e+

< < ' g, .,,9,% 'ig~

< f

~ .,c.'

< >;, ~^ '4 *' g ' n ^

k: ,

T '$ -!

< Y "

.fikh';}

+

n+ ,,n:';.

e ,

l;l:?iW,h.  :,r 9,,v ,:;;><q,<Q'"g:l4&ily,niMifblf'm.,s,,:'d&;yO: ,; ! ., .

' ; , g, y s

, x 8: y<: u :,x ,,,; s' ~ 1

, , , < ' ,,<>- yy , *

  • a >l, 'r

,:~;,

, xf e'? ,% 'w,h'e'g,* ( cg'('* n'*

<.,,. /

d,' /.. ,~,tfr k-i

. w g; , i ,

s ,

4 l ..:' v '," 4 p' ' r',r:;;)

e%,;4 18%'i':, Rs.~.,c_,e,

,+

e

 ;, y:'?':^C;>

e ~c p, ~ mo $ ,;*/ - ,f, -v: [*4 5f ;kh,~

z I

w I I I I I I l l l l l l l l -

f'; O O O O O O O O O O O O O O O O

/ o O o O o O o o o O o O o O o

' N N @ @ ,o o y T r0 f() N N - -

AV0/N3W 30VH3AV

ps p q'J

\ ()

INSTRUMENT FITTERS 450 -

I 400 - , J

' , ^'.~ .r , ;

,< svy  :

^ "'c'f,s . 2 s

^

350 - .

'Js+sa ' ^ ' c& ~

>s

<.,i s::?Qk' <,xs

, # y #'.'

s.

W'

<~

> 'D s's v

=

s .

s ' < ' ) 't "r'yV w ~;,;.::a"1%"xo ^>*'. ':> .'

s ,

, v x '

300 - '

'2 ' M3o "b 4' 4t'%s t

^

d '*2:+ z ,

4  %,; J+'hy,<

'#s' > .

z 250 - i + t.% s.

a n'~

~-

$ [#s

+ y x'~'N A fy tc 61 wkfk,e,i' +t

,s<. . ;'m es . %sRA (d e ,,d > , , ., > ~. s':y \ +g'>

' :y af<p's '

O ^;p < <

's.' w/ 4s -p'$1^ , x .

s4 4 200 - ,

14vgi4'ag,e7,

~

c , se n v v,,, ,

e,s e, -satp a, t 's s-

..>n,-

ys ne % ^,*{ s# ,x*

A s

s

]

%,t xw

^ f -:3.;sA

. '* .wN ,,2y s*

s' > ' e s*<%ss'<

10 0 - g? s e a 1* f',{'> g'&y<#[,L:, g;%

- ~

Jm v s 59

<l ~ ~,,s<.~~.^v y. 4;2 . g+,~ ,

,sNA'

~

,s'~

,n'~n>y ~

, 's '

50 - c v

t ~'

~s hf,Y' s

  • S +,' r <">8 r, ~f5~s' $p',\S't ' ' ]$  ?, > 2<' ; '+4 ,n Qk~#'R',

,y Ls1

's' s s t,

d '<

  1. - -_. s "g

-)

s T . X,: s

,,s

++ ,

4s

,.,s q

A."- <s ,4ws' .x,, y -

ys s%s s is s

s g g,g3 s- x s <.Yslh '<' 2 N'W f Ag.

i h* \ f ^^ < Vs ^r ' 5 v' yw ', '- $4 k V[#'

O 1 I IJAN IMAR I MAY lJUL i SEP 1NOV IJAN IMAR I M AY IJUL 1SEP lNOV lJAN IMAR 4 1984  ; ; 1985 ;1986>

10

x 4

h

/

\ ) - w

%/

(

_D e-

,4 a 6

. o Z

1 W

m M

$ d 40 5 3

' CD T _c) w - .

en 4 y 1 x h<4^': +

t 4

s ss(, '.- 'es, 3 9' E 5 .c,1_'.  ;.'Y ~ (lk ' ? -

o ,- a wm,

/ s' - vs' . ,5s', ss + s.

g s ?> +

v ss l t.,.,--

,*s

>s sov.y <s ('.' -s-s s .f) s' y, , ,

) ' s ^' 's ,

, s; g. t

^ +

^3 .,sv, ++ '< s s'4 s' # '+','$'*'s 2 s de's < '. 3 'exs 4'+ >

q - ( _q b

' ' y ' ' ' ' #'v ' < ' ' ' y, Iy s - 7 d L

'\ ,

>. . , ,' /, s , C, as' > [,J'* ,

'o.,,, *j+' ,. .

y , ?s,. ,s

, s,

't , ^ A ,, i , g .

s s f. :

s , >)+, , I> ,'(' ,

$. ,, s>,'^ x' $.'[? .,. s,'ss', >,

Rr'I'~'R',<K,,\l'*)?;'

5f', '

W q ' ' *,st

'f'f, Q,l'k r, >

, ,s', < ' y,'^+

'^

, >, ,,i sj m . O vf ' s. )' ,, g

>< ,'s, t s

' j ,'Y

,3' ( 's >" , f, ,

? -

,s' ,,/". z '$ ) g',

  • ' f g<' < ,' f , ,,~' ,S,) < ,4 Y

,'>,p, .s' ' f, y >-'

I P

'(i,

^>l<<>+

', y v 9',.

s ' >

' ' '4 , ' T's,o ~ 't v ,'ss* s . .b g,* f', : ' , , ,,, v X. f' yg^s AY ' _r

  • z v

s, >;, Q 'f,,,~>>,'+,~>.,'g;p, ,s ,, , $ j, y > yg / ,. , , is s, een - Q 'S , , , nll

,- -l s' A, my

^ ' ' ', ', <' ,', f /, z s -)' Sv- v '/// <>, ' ' q' '> , {% ' $ yh ,a . 9 ,,r,

    • s

.,u .',l,[,,< ',$,',,-/_ o W ' ~ %x , ' s ,4, ' ^ ' . , *, 54 '" 4 ' > l , s M E ' 's ^s',s,, ) Q s ' ,'v~ ^ <>, ,'/, -,, ~,$',','",%,',d, ' , '^g<t 'l' ' ; ' ';,,,, f),,s, ' -,'9 .. ^ t ,, , 4 2-^,' k ', v >,,*/,'# 4,' * '^* , + , iV' V ' < 'S i>.,: ,'/ . / ,< g ,,',' 7 s . ,, ' ' Q ' ^ j', ^ T ';>+ ,y, >$g'>',S,,'p*.,e',',' - 3 M s , ', ,,^ ,,s;,- +>+9,j; Q::.0.. . / v ' , v,4 ' : ^ med O(+%::= s^g:/. i: ' , , " ,< / 'e < f  ;<  ;  ;+ .x - , gy<, , ?<, < s,y ,jg,g <.,, ,., , < m Q) ,, ,(- . , a-v: e ,~ ':. s, , a e' y p ,+t,y,. : q,v : , ,,y,< ,, - _' , s .,,/,; , + x n . ^s, ? . c,t , y ,,2 s +o,/>,+ ' y;, s g ~,,A ' ' qq , ;.,.i _ , g *, i > % 'kW,:gllQ 4, n 3;;, ' , , , . n ;/ ,,c- >,'s if)[ ,"' gQt7- N a~ n$n d' ; c 2,c'e,.

4:bp% ,:< ,
2. ' , ek:s 4s y:a' ~a??? A'jff,; sg o'gQ%),',<, ' ':, ', '. . ;;. E

>s ,~  % 3 ,/ p:+y ,l + ,n , y i ~~, ' 9 ;s , . , , y '1 w,, '+> , , s + E '* w* ' Qi, Y,? $hn'v;&<s%, yx? ^'Y. <4 ' ?f., ;.n s >h h > * ' ' 4v2~ +'1,* :* gpf';'^, > & , < ,. ~

-v . ':. ', < 9, s ,

n'n: %ixy,, a?t ^' ~ <+ ' m n +,

, .c x E~ ' c 3

', ~; #g;L_ 4'; L;,, v, , r.o e'l~'g z ',,s ;, , + l ',- ' ,~~ - g n - +~<.s s o , ,v - - 1 r, A.1^$'f., >,, ,$,f, A, -,/ n $ s 4, g ^,Y &,r%,, f$ a r,y ,<"$,$,~4C, X, p in ,, s , v d ..3,' , ,,,.' ) , < , ;,,,:~,9,m, .'>o:n s ' p' z _J E I I I I I I I I l l l 1 1 - o o o o o o o o o o o o o e /m e e N o e e e N 8 m o e N (_ ,)- N N N N AV0/N3W 30VB3AV J26 SEARR00K STAT 10t! UNIT 1 AND COMMON FACILITIES CRAFT LABOR AGREEMENTS EXPIRATION DATES ALL LABOR AGREEMENTS ARE FIRM FOR 1984 WITH THE FOLLOWING FXCEPTIONS: BOILERMAKERS 9/30/84 EXPIRATION SilRVEYORS 10/31/84 FPM OC EMPLOYEES C0'lTRACT llNDER HAH OC Ef1PLOYEES 97 l l l t PIPE SifPPORT R1GINEERING STATilS DESIGN 95% COMPLETE DELIVERY 95% RECEIVED / 3 l O O O UNIT l 8 COMMON Critical Path PIPING DCCUMENT REVIEW FOR COMPONENT BJP :C-M-l y COOLING TESTING q - 40 Days - -75 Days - l SYSTEM [TESTINC 4 q SI SYSTEM TESTING q RCS SYSTEM TESTING and CLEANING - 20 Days - - 97 Days - i g - 87 Days-1 I f RHR SYSTEM $ T T  ? l l l ' l tECCS I SAFETY t l l IN./ECTION t I r--------------------------+-------------------------8 CLEAN 8 PREP l HOT l FOR HOT FUNCTIONAL l RCS HYDRO FUNCTIONALS TESTING q q , q IRLT ~ 24 Days -~ T4 -S Doys- - 71 Days ~ IS pog fogg - Days ~ l LOAD $4 q fLOADq C q POWER ASCENSION q TYPE 'C" CONT -c0 Days LEAK RATE TESTING -15 Days - -14 6 Days - 1 D-N SEARR00K STATION llNIT 1 AND CmMON FACILITIES CONCRFTE (CYS) OlRNTITY FSTIMATED To DATE ESr. INSTALLED OLANTITY  % IINIT PATE IINIT RATE ITEM GTY. To DATE PFMAINING IOMPLETF (MH/IIMIT) (MM/IINIT) CONTAIMEFTT BUILDING 3ft,331 34,?76 55 10n R.11 7.nq CONTAINMENT ENCLOSLRE 11,120 10,878 2112 98 11 97 11 40 TLRBINE BUILDING 22,087 22,087 0 100 11 51 4 39 PRIMARY AlXILIARY BLDG. 15,395 15,373 22 100 9 39 9 07 FLEI STORAGE BUILDING 8,528 8,502 26 100 6 54 S.02 ADMINISTRATION BUILDING 5,f180 5,480 0 100 6 57 6 53 CONTROL & DIE TL GENERATOR BUILDING 16,156 16,148 8 100 6 35 6 10 WASTE PROCESS BUILDING 28,260 27,836 474 98 6.87 6 8fl CIRClLATING & SERVICE WATER PLMP HOUSE -27,923 26,629 1,294 95 5 13 fl.70 COOLING TOWER 14,993 14,728 265 98 6.17 5 67 SWITCHYARD 4,327 4,299 28 99 4 85 4 75 FILL CONCRETE 168,377 166,363 1,96fl 94 1 . 41 1 .10 TOTAL 356,927 352,599 4,378 94 3.40 4.17 TlNNELS 156,459 156A59 0 100 7 10 7.09 OTHERS 94,314 82,466 11,848 87 5 62 4 10 JANLARY 22,198ti SEABROOK STATION UNIT 1 AND CfMMON FACILITIES PIPING OlRNTITY ESTIMATED To DATE EST. INSTALLED OlANTITY  % llNIT RATE llNIT PATE ITEM OTY. To DATE REMAINING COMPLETE (MH/IlNIT) (MH/llNIT) (1)LARGE BORE PIPE (LF) 247,184 178,010 69,174 72 3 57 4 80 LARGE BORE PIPE HANGERS (EA) 8,817 6,603 2,209 75 161 55 127 58 (2)SMALL BORE PIPE (LF) 148,499 105,670 42,829 71 13 52 5 36 CIRClLATING WATER IN (d) 8,346 8,346 0 100 19,93 19,g3 (1)2-1/2" AND OVER; INCLLDES YARD AND BUILDING PIPING. (2) 2" AND LNDER; INCLLDES MANH0lRS FOR: HANGERS, VALVES, WELDS, SPECI ALTIES, ETC. JANLARY 22, 1984 .. ~ . _ - . . .- .- - - -- . 4 I. j PIPE HANGER SUPPORT POINTS 2 TOTAL PROJECT 4 AS BUILT l. CIASS .LARGE BORE SMALL BORE TOTAL LARGE BORE SMALL BORE TOTAL ASME- . , CLASS 1 235 195 430 13 1 14 ASME . CLASS 2 1278 1680 2958 135 94 229 - 4 ASME

CLASS 3 1631 976- 2607 198 108 306 NNS-1 '2292- 5057 7349 142 107 249

, NNS- -5881. 7032 12913 152 17 169 i 1 11317 ~14940 26257 640 327 967 i a 4 h-3._ r c PIFE HANGER SUPPORT POINTS CONTAINMENT AS BUILT CLASS LARGE BORE SMALL BORE TOTAL LARGE BORE SMALL BORE TOTAL ASME CLASS l 235 195 430 13 1 14 ASME CLASS 2 355 699 1054 40 66 106 ASME CLASS 3 623 47 670 58 3 61 NNS-1 479 1743 2222 0 0 0 NNS - 1 1 0 0 0 1692 2685 4377 111- 70 181 t W _ . - - - _ . -_ _ - - - _ _ - SEABROOK STATION UNIT 1 AND CmMON FACILITIES ELECTRICAL OLANTITY FSTIMATED TO DATT: EsT. INSTALLED OIANTITY 7. lINIT RATE llNIT PATE ITEM OTY. To DATF RFMAINING IOMPLETF (MH/IINIT) (M4/IINIT) CABLE TRAY (LF) 89,092 86,715 2,377 97 1.32 1 25 CONDUIT EMBEDDED & DttT (LF) 233,105 200,523 32,582 86 81 54 CONDUIT RIGID (LF) 349,295 310,964 38,331 89 1 20 1 06 CABLE (LF) POWER 1,180,900 815,635 365,265 69 12 11 CONTROL 2,040,600 1,929,800 110,R00 95 .09 08 SPECIALTY 150,000 4,2 92 145,708 3 10 .n6 INSTR LMENTATION 1,765,000 1,555,696 209,304 88 09 06 PLANT LIGHTING 572,735 397,127 175,608 69 20 20 TERMINATIONS (EA) POWER 43,229 18,534 24,695 43 1 66 1 27 CONTROL 76,750 56,738 20,012 74 1 10 78 SPECIALTY 4,500 - 4,500 - 1 10 - INSTR LMENTATION 88,700 50,099 38,601 56 1 10 68 PLANT LIGHTING - - - JANLARY 22, 1984 VII-3 00 SEARR00K STATION UNIT 1 AND COMMON FACILITIES INSTRUMENTATION OLANTITY ESTIMATED TO DATE ESr. INSTALLED QLANTITY  % llNIT RATE (INIT PATE ITEM OTY. To DATE REMAINING COMPLFTE (MH/IINIT) (MH/IINIT) LOCAL INSTRlNNTS & SLPPORTS (EA) 1,750 1,167 583 67 32 26 33 08 LEVEL COLlms (EA) 58 39 19 67 209 14 199 90 TLBING (LF) 178,800 90,414 88,386 51 1 00 1 10 TLBING TERMINATE (EA) 8,935 3,377 5,558 38 4 00 3 71 TRAY SLPPORTS (EA) 13,560 8,297 5,263 61 13 50 15 15 , TRAY (LF) 55,935 32,544 23,391 58 1 67 1 58 RACKS (EA) 74 57 17 77 56 08 56 58 INSTRlENT AIR PIPE ' SMALL BORE (LF) 11,900 10,349 1,551 87 2 00 1 03 INSIRlNENT AIR PIPE HANGERS-SMALL BORE (EA) 1,970 1,756 214 89 15 71 11 49 INSTRlENT AIR PIPE LARGE BORE (LF) 13,450 13,063 387 97 3 72 2 08 INSTRlENT AIR PIPE HANGERS-LARGE BORE (EA) 940 763 177 R1 37 70 77 32 INCORE TLBING 5,225 4,351 874 R3 4 60 5.R4 JANlARY 22, 1984 _ k . _7 _. m m .9. .;, l'; i ' 1983 ESTIMATE Il!!!T 1 R COMH0fl SIJslFICM!T O!!M!TITIFS I

ilNIT OF 1 98? 1 993 CHAtirr ComnDITY MFASilPF Ot! ANT!1Y OllAtrTITY 1007 To 19R3

,l i LARGE BORE PIPE LF 177,333 169,767 (-) 7,566 LARGE BORE IIANGERS FA 9,876 0,109 (-) 71 7 -: SHALL BORE PIPE LF - 13fi,189 152,351 18,16? i~ SMALL BORE IlANGERs EA 12,086 13,722 1,636 i CABLE TRAY LF 85,800 89,092 3,292 i C0tinu!T LF fi98,112 SR7,8100 8t,288 i i CAELE LF 'i,8153,950 5,156,500 702,550 i TERMINATIONS EA 182,372 71 ti,005 31,633 i INSTRtNENT TRAY- LF 'i5,520 55,935 10,til 5

INSTRINENT TUBING LF 205,000 1R'i,025 (-)70,975 HVAC 11UcT & ilANGERS LB 911,523 9?0,07'l 8,551

( I ai t 4

i.  %

i ~ l TOTAL PROJECT , LARGE BORE PIPE INSTALLATION RATE UNIT I a COMMON 180,000 - 170,000 - ,,........... 160,000 - J h 150,000 - i O , F i WC , 2 k ~j I40,000 - J 3 2 130,000 - . D I U ' 120,000 - TOTAL INSTALLED DURING MONTH MONTHLY TARGET REQUIREMENT TOTAL INSTALLED TO DATE l10,000 - TOTAL TARGET REQUIREMENT TO DATE 100,000 alFIMIAlMlJIJIAISIOINID JIFIMIAIMlJIJlAISl0lNlD JIFlMl AIMIJ lJI AIS!OINID JIFlMI AIMIJ IJl AISIOlNID

1983 -

- : 1984  :  : 1985  : : " ~I985 g B DATA DATE* I/23/84 6 D.I. #D40-#026 DATE: 12 MARCH 1984. jf7 TOTAL PROJECT LARGE BORE PIPE INSTALLATION_ l Variance Actual From Target Total Target Monthly Target To Date Month To Date Month I (1983) January 116820 - February 118082 1262 March 118549 467 April 123144 4595 May 136014 12870 June 139366 3352 July 150200 10834 August 151253 1053 Se ptember 151883 -630 Octobe r 152510 627 November 155338 2828 Decembe r 156171 833 (1984) January 156512 341 February 157512 1000 157234 722 <278> -<278) March 158912 1400 April 160292 1380 May 161642 1350 June 162977 1335 July 164277 1300 August 165351 .1074 September 166426 1075 Octobe r' 167129 703: November 167934 805 December: 168442 508 . D.I. #040sf026 DATE: 12 MARCH 1984 '~ TOTAL PROJECT 3Y LARGE BORE PIPE INSTALLATION 4 Variance-Actual From Target ' Total Target Monthly Target- To Date Month To Date Month (1985) January 168811 369 February 169051 240 1 March 169188 137 1 April 169359 171 i May 169549 190 l June 169614 65 July 169661 47 I August 169710 49 September 169735 25 i October 169750 15 November. 169759 9 December 169767 8 (1986) January February March April 4 1 1 1 4 I .c TOTAL PROJECT LARGE BORE HANGER INSTALLATION RATE UNIT I 10,000 - 9,000 - , e i .

  • e 8,000 - e e

in ' a: - , - til O 7,000 - g 4 Z 6,000 - TOTAL INSTALLED DURING MONTH s MONTHLY TARGET REQUIREMENT ~ 8 TOTAL INSTALLED TO DATE TOTAL TARGET REQUIREMENT TO DATE i JIFlMIAIMlJIJIAISIOlNID JIF IMI AIMl J IJl AISIO lNlD JIFlM1 AIM lJ l JI AISIOINID JIFlMl AIMIJ IJl AISIOlNID = .1986  : Q 1983 1984 = = 1985 q DATA DATE* I/23/ 84 l * . D.I. #040-#045 Date: .12 MARCH 1984 {y() } TOTAL PROJECT LARGit BORE HANGER INSTALLATION Variance Actual From Target Total Target Monthly Target To Date Month To Date Month (1983) , January 4169 - I February 4084 (85) March 4244 160 April 4479 235 l May 4778 299 June 5213 435 July 5365 152 J August 5622 257 i Se ptember 5749 127

October 5923 174 November 6269 346

'~ December 6425 156 (1984) January 6608 183 February 6788 180 6792 184 4 4 i March 6981 193 April 7236 255 3 May 7502 266

June .7704 202

. July 7912 208 August 8152 240 Se ptember 8317. 165 Octobe r 8464 ~1471 , November 8646 182 - December 8777 .131 . D.I. 1040-#045 Date: 12 MARCH 1984 p'f / . TOTAL PROJECT LARGE BORE HANGERS INSTALLATION Variance Actual From Target Total Target Monthly Target To Date Month To Date Month (1985) January 8864 87 February 8921 57 ffarch 8957 36 April 9000 43 May 9076 76 June 9093 17 July 9101 8 August 9105 4 Se ptembe r - -9108 3 s Octobe r 9109 1 e, 4* O w k s e a f ) x e O r w m 9 , y s e i 4 ( D, OY-TOTAL PROJECT ' SMALL BORE PIPE INSTALLATION RATE . UNIT I a COMMON

  • 160,000 - ' *

.i . '~ iso,000 - 140,000 -

  • 130,000 - .

4 . ., 3 g . - <C 120,000 -

  • b . ,.

o . , 110,000 -

  • u.s --
  • y tu: *

- 0- ~ k ~j 100,00'

  • j 90,000 -

2 - 8 ~ 80,000 - '. 70,000 - TOTAL INSTALLED DURING MONTH 's ,, _ MONTHLY TARGET REQUIREMENT  ; 8 TOTAL INSTALLED TO DATE . TOTAL TARGET REQUIREMENT TO DATE , 50,000 - * .40,000 JlFI lAlulalJialslolNio Jir lMI alm lJ IJl AISl0 lNID J IFIMl AIM lJ l JI AISIOINIO JIFlMI AIMIJ IJl AISIOld

  • 1983  : 1984 = =

1985 = 1986 , q ?eP DATA DATE: 1/23/84 - _ _ _- _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ ._ _ _ _ _ _ - _ _ _ _ _ _ . _ _ _m______ _ _ _ _ . . _ . _ _ _ _ _ .-,.r . . _ . ~ . . . . - . . . - _ . -, .--- ---. . - . - -. . _ - . . D.L #040 7f 029 ' DATE: 12 MARCH 1984 TOTAL PROJECT SMALL BORE PIPE INSTALLATION i N i Variance Actual From Target Total Target [fonthly Target To Date Month To Date Month

(1983)

! January 43292 - February- 44692 1400 March - 48542 3850 April 52979 4437 May 67068 14089 l June , 76095 9027 July , 77145 1050 August 80552 3407 Se ptember . 84586 4034 October 87252 2666 November 102161  : 14909 December 105584 ' 3423 (1984) January , 107415 1831 February 110735 3320 110152 2'737 <583) <583> March 113790 305S , April 116846 ' 3056 ' ~ May 120755'- '~~ ' '3909 June 123965. 3210 July 126951 2986 August :130765 3814' i - Se ptember 133490 ..t4 . 27J5 s -October 136258 V2768 November 9 '139777 13516., .. 1 .. ?;- .c Decem'oer -142329 ,, ,',,.2552 . . a _ 1,+ .f. .*y x U - , + -s w 6 .+ -- ,'tt - v - , -, 1-- ~- D.J. #040-#029 DATE: 12 MARCH 1984 / , TOTAL PROJECT SMALL BORE PIPE INSTALLATION Variance Actual From Target Total Target Monthly Target To Date Month To Date Month (1985) January 145079 2750 February 147054 1975 March 148490 1436 April 149657 1167 May 150574 917 June 151154 580 July 151615 461 August 152003 388 Se ptember 152206 203 October 152301 95 November 152338 37 Decembe r 152351 13 (1986) January Fe bruary March April \~~ . Q Q D ~b.{, c. I TOTAL PROJECT P .t . SMALL BORE HANGER INSTAL L ATION RATE I-a- UNIT I a COMMON O l,i,. 14,000 - *' , ,e ..**..e e

  • T

. ~ 12 ,0 0 0 .- . e .e y . . 10,000 - . - [-Y y 8,00 0 - . c . =, z e '.,.'- $ 6,000 - . -! -[ g 2 4,000 - 1 TOTAL INSTALLED DURING MONTH ,'... MONTHLY T ARGET REQUIREMENT _ TOTAL INSTALLED TO DATE ' { TOTAL TARGET REQUIREMENT TO DATE $ . -) Y JIFlMl AlMlJIJl AISl0lNID JIF IMI AIMlJ IJI AISIO lNID JIFlMl A!MIJIJI AISIOINID JIFIMIAIMlJIJl AISIOlNID b c 1983 a : 1984  : 1985  : 1986  : $ 7- 'Q DATA DATE: t/23/84 . i. - .?. M --- D.I. 1040-#035 DATE: 12 MARCH 1984 ~* TOTAL PROJECT YN l SMALL BORE HANGER INSTALLATION l Variance Actual From Target Total Target Monthly Target To Date Month To Date Month (1983) Jcnuary February March 304 April 1431 1127 j l May 1676 245 June 1924 248 l July 2056 132 l l August 2771 715  ! l Se pt ember 3715 944 l October 4083 368 November 4591 508 December 5073 482 (1984) January 5363 290 February 5866 503 5554 191 <312> <312> March 6492 626 April 7192 700 May 7892 700 June 8555 663 July 9148 593 August 9842 694 Se ptembe r 10367 525 October 10875 508 November 11502 627 December 11951 449 1 D.I. #04V-#035 DATE: 12 MARCH 1C84 l f TOTAL PROJECT SMALL BORE HANGER INSTALLATION  ! Variance Actual From Target Total Target Monthly Target To Date Month To Date Month (1985) January 12356 405 February 12629 273 March 12898 269 April 13127 229 May 13334 207 June 13432 98 July 13513 81 August 13604 91 September 13654 50 October 13716 62 November 13720 4 Decembe r 13722 2 (1986) January l TOTA L PROJECT CABLE TRAY INSTALLATION RATE UNIT l 8 COMMON r 100,000 - i I 80,000 - .J 4 O F 60,000 - WE Dj F-4 _J 40,000 - 3 2 3 0 i l 20,000 - T I AL INSTALLED DURING MONTH MONTHLY TARGET REQUlHEMENT TOT AL INSTALLED TO DATE TOTAL TARGET REQUIREMENT TO DATE JIFIMlAlMIJlJIAISIOINID JIF lMI AIM lJ IJl AISl0 lN!D JIf lMI AIMIJlJl AISlOINID JIFIMI AIMIJ IJl AISIOINID + 1983 * * -- 1984- * *-- 1985 *

  • 1986 -

DATA DATE* t/23/84 k' I D.I. #040-Disk 2 DATE: 12 MARCH 1984 Yk TOTAL PROJECT CABLE TRAY INSTALLATION Variance , Actual From Target

j. Total Target Monthly Target To Date Month To Date Month
(1983)

January 71,599 - February 73,101 1,502 4 March 75,728 2,627 April 76,832 1,104 May 78,789 1,9 57 June 80,653 1,693 July 81,738 1,085 August 82,576 838 Se ptember 83,055 479 Octobe r 85,320 2,170 l November 85,876 556 L December 86,579 .703 (1984) {. January 86,715 136 February 86,851 136 86,964 249 113 113 , March 87,025 174 April 87,461 436 } May 88,058 597 June 88,618 560 , July 88,828 210 August 89,036 208 Se ptember 89,076- 40 Octobe r '89,086 10 ! November 89,092 6 December l \' i TOTAL PROJECT RIGID CONDUlT INSTALL ATION RATE l UNIT I & COMMON 700,000 - 650,000 - 600,000 - J 4 $ 550,000 - > e WE g j 500,000 - r-4 8 3 450,000 - 2 3' O 400,000 - TOTAL INSTALLED DURING MONTH M ON T H LY TARGET REQUIREMENT TOTAL INSTALLED TO DATE 350,000 - TOTAL TARGET REQutREMENT TO DATE 300,000 JIFIMlAlMIJIJIAISlOINID JIFIMIAIMlJIJlAISl0lNID J IFlMI AIMlJ l JI AlSlOINIO JIFIMI AIMlJIJI A!SIOINID

1983  : 1984 * *- 1985- -* * -- -- 19 8 6

Og 'i O

DATA DATE! t/23/84

_. _ - _. =

D.Ig #040-Disk 2 DATE: 12 MARCH 1984 UI

.* TOTAL PROJECT I/

RIGID CONDUIT INSTALLATION Variance Actual From Target

Total Target Monthly Target .To Date ,_ Month To Date Month (1983) j January 356,100 -

l February 367,600' -

March 376,400 -

April 385,900 -

i May 394,500 -

June 405,400 10,683 4

July 421,208 15,808 August 435,750 14,542 September 456,234 20,484 October 468,874 12,600 i

} November 482,394 13,520

, Decembe r 499,929 17,535 (1984)

January 511,487 11,558 February 526,000 14,513 525,059 13,572 <941) <941>

March 537,500 11,500

. April 544,000 6,500 4

May 551,000 7,000 June 558,000 7,000 July 564,000 6,000 August 570,000 .6,000 September 573,808 3,808 Oct'o be r 575,200 1,392 -

i .

November ~577,030 ~1,830 l December 578,367 1,337 1

4  !

. . _ , , . , - . . . . ..s,.. ,_ m.m _ . . . . , , _ . . . , . . _ , , . _ . , _ , ~ .,

,m. ., , , _ , ,

' l D.I. #040-Dick 2 12 MARCH 1984

. TOTAL PROJECT RIDGID CONDUIT INSTALLATION Variance Actual From Target Total Target Monthly Target To Date Month To Date Month (1985)

January 579,599 1,232 February 580,299 700 March 581,036 737 April 581,743 707 May 582,093 350 June 582,400 307

TOTAL PROJECT CABLE INSTA L L ATION RATE a

UNIT I COMMON 6,000,000 -

t 5,000,000 - ,,.=*******

,e*

J 4 4,000,000' -

O b-hl E i >j 3,000,000 -

4 J

3 3 2,000,000 -

O TOT AL INSTALLED DURING MONTH 1,000,000 - MONTHLY TARGET REQutREYENT TOT AL 'NSTALLED TO DATE TOTAL TARGET REQUIREMENT TO DATE J lFlL4l AIMIJlJI AlS IO INID JIF IMl AIMIJ IJI AlSl0lNID J lFlMl AIM lJ l JI AIS lOINlD JIFIMIAIMlJ IJl AISIOINID 1983

  • 4 -l984 =
  • 1985 >
  • 1986 DATA DATE: I/23/84 L

1 l

D.I. #040-Dick 2 DATE: 12 MARCH 1984 ,

TOTAL PROJECT CABLE INSTALLATION i

Variance Actual From Target Total Target Monthly Target To Date Month To Date Month (1983)

January 2,542,317 137,229 February 2,695,228 152,911 March 2,903,470 208,242 April 3,023,126 119,656

! May 3,142,571 120,571 June 3,251,134 108,437 July 3,351,896 100,762 August 3,502,097 150,201 1 September 3,707,214 205,11 October 3,869,181 161,967 i

November 4,056,894 184,111 1

Decembe r 4,176,149 119,255 t (1984)

January 4,305,423 129,274 February 4,450,000 144,577 4,500,951 195,528 50,951 50,951 March 4,510,000 60,000

  • April 4,570,000 60,000 May 4,630,000 60,000 June 4,700,000 70,000 July 4,760,000 60,000 August 4,810,000 50,000 September 4,860,000 50,000-Octobe r 4,900,000 40,000 November 4,940,000 40,000 t

December 4,975,000 35,000 i

~ - -

n ----r- g -- - - . - -

p

D.I. #040-Dick 2 12 MARCH 1984

//

, TOTAL PROJECT <> J5

,- CABLE INSTALLATION Variance Actual From Target Total Target Monthly Target To Date Month To Date Month (1985)

January 5,010,000 35,000 February 5,040,000 30,000 March 5,070,000 30,000 April 5,095,000 25,000 May 5,115,000 20,000 June 5,130,000 15,000 July 5,144,921 14,921 August 5,152,736 7,815 Se ptember 5,154,520 1,784 October 5,156,500 1,980 l

i TOTAL PROJECT TERMIN ATIONS INSTA LL ATION RATE UNIT I a COMMON 240,000 -

200,000 - .

e

_J .

, 4 160,000 - e o

F-

  • g 4 120,000 -

p '

J

, "3

! 80,000 -

o TOTAL INSTALLED DURING MONTH 40,000 - M NTHLY TARGET REQUIREMENT TOTAL INSTALLED TO DATE TOTAL TARGET REQUIREMENT TO DATE O

JIFlMl AIM lJ.JlAlSIOlNID JIFIMI AIMIJ IJl AISl0lNlD JIFlMI AIMIJlJI AlSIOINID JIFlMlAIMIJ IJl AISIOINlD c 1983  : : 1984 *

  • 1985 *
  • 1986 =

DATA DATE: 1/23/84

.. e

' ' J~jp' *b DATE: 27 FEBRUARY 1984 TOTAL PROJECT

  • TERMINATIONS INSTALLATION

- VARIANCE

~

ACTUAL FROM TARGET DATE TOTAL TARCET MONTHLY TARGET TO DATE MO NTH TO DATE MONTH

[1983]

JANUARY 60,818 3,476

~

  • FEBRUARY 64,815 3,996 MARCH 69,017 4,202 APRIL 71,178 2,161 MAY 75,040 3,862 JU NE 78,732 3,692 JULY 86,990 8,258 AUGUST 93,556 6,566 SEPTEMBER 102,796 9,240 OCTOBER 110,211 7,415 '

NOVEMBER 115,601 5,390 DECEMBER . 120,781 5,180 (1984]

JANUARY 125,371 4,590 FEBRUARY 131,306 5,935 Oh2  % 659 CI(o) ('/6)

MARCH 137,306 6,000 APRIL 146,306 9,000 4

MAY 153,306 7,000 ,

JUNE 160,306 7,000 >

167,306 JULY 7,000 AUGUST 174,306 7,000 SEPTEMBER 180,306 6,000 OCTOBER 185,806 5,500 NOVEMBER 191,324 5,518 -

DECEMBER 195,000~ 3,676 i

~

4

- an. ,

1

.e . A

- , t ,, DATE: 27 FEBRUARY 1984 t TOTAL PROJECT 6

. TERMINATIONS INSTALLATION ,

' ~

VARIANCE ACTUAL FROM TARGET DATE TOTAL TARGET MONTHLY TARGET TO DATE MONTH TOIATE MONTH ,

[1985]

JANUARY 198,164 3,164 FEBRUARY 201,300 3,136 MARCH 204,382 3,082 APRIL 207,028 2,646 MAY 209,190 2,162 JUNE 210,941 1,751 JULY 212,773 1,832 AUGUST 214,005 1,232 M

i

.% s e

4 m

O

TOTAL PROJECT INSTRUMENT TUBE INSTALLATION RATE UNIT l a COMMON 250,000 -

200,000 -

g ..'*

i (

g .'

4 O

  • h 150,000 -

sc p; -

4w .

J

  • 3 100,000 -

2 3

O 50,000 - TOTAL INSTALLED DURING MONTH MONTHLY TARGET REQUIREMENT TOTAL INSTALLED TO DATE TOTAL TARGET REQUIREMENT TO DATE JlFlMl AIM lJlJIAlSIOINID JIF IMl AIMIJ IJI AlSl0lNlD J IFlMl AIMIJ I JI AIS IOINIO JIFIMIAIMlJIJlAISl0lNID N

< 1983 > < - 1984 - * *- -1985 * < - - - 19 8 6 = M DATA DATE: t/23/84

D.I. #040-Disk 2 DATE: 12 MARCH 1984 fQg TOTAL PROJECT INSTRUMENT TUBE INSTALLATION Variance Actual From Target Total Target Monthly Target To Date Month To Date Month (1984)

January 96,470-February 100,259 3,789 101,861 5,391 1,602 1,602 March 107,661 7,402 April 118,168 10,507 May 130,406 12,238 June 141,035 10,629 July 152,498 11,463 August 165,350 12,852 Se ptember 174,445 9,095 October 179,898 5,453 November 183,049 3,151 December ,183,665 616 (1985)

January 183,996 331 February 184,025 29 March j Anril May June July August l September l

'l

October l l

N:vember )

u. . .

2 . . ,g; ,, :s; :,

l December -. ',

= '

6'

.v , 3, > , , .

A,* . ; .. . ,

g. ,

s e

.--y7. --

CONTAINMENT BUILDING PERFORMANCE UNIT I 100 */. - ,ee e ee e 90 % - ,e e

80 % - ,

e e

N 70 % - ,

6 8.10 3 6 6.4 6 0

60 % -

0 g 50 % -

is E 40 % -

O

. g l $ 30 % -

l MONTHLY ACTUAL a 1.64 20 *4 -

l MONTHLY TARGET = 1.64 80 % -

l 0%

JlFIMlAIMIJIJlAISIOINID JIFIMIAIMlJIJlAISl0lNID J IFlMI AIMlJ l Jl AlSl0lNID JIFlMI AIM lJ IJl AiSIOINID

' 1983 - -

1984  : 1985  :

  • 1986 ,

g DATA DATE: t/23/84 e

i M.'LG-~TAoT36U9S') L'! AMU LOTMLLi't.AAn.MJJ

. .. c. . . .. ;.? a.,,..

  • . CONTAIINENT BUILDING ,

. " L .- 2

  • ~

. .'."c, n, .

PERFORMANCE RATE ., ,. - '"-1 3 ~~c.r'.

n.' .....,'

, + ., . .

.c '. '

a; :.-

.,a .

. d... .,: .

a s . .

.,,s g.,. e

. * " ' '. .' . Variance -

G.s . Actual From Target - .

Total Target Monthly Target ,,

To Date Month To Date Month

7 - 1 (1983) ~

J E dry 67% -

  • February 69% 2%

March 72% 3% '

April .

74% 2%

May 76% 2%

1 Juna 76% 0%

July 80% 4%

August 73% <7;%

Se ptember 74% 1%

October .

75% 1% .

-]

..ovember

~

76% 1%

December - * *

(1984)

  • January 68.10% - -

February 69.74% 1.64%

March 72.06% 2.32%

April 74.39% 2.33%

May 76.98% 2.59%

Juns 79.17% 2.19%  ?

' July 81.28% 2.I1% .

August 84.20% .

2.92% ,

Se ptember 86.02% 1.82%

October 87.83% - 1.81%

t 90.07% 2.24%

G'Ovrmber

.cc m . . . _ , .

...;..,f,<..,,..

2 3..

..;, I e

Decemberi' ,'

  • 91.7 2% + - FC" ' l'65% ."Y1 W ~f " "'- .

.'g : , . ;. ,:+

2- '

  • W

! 1: ~ [ ';.- h- :-.n:ClL,-fs:.., ' x % "Y^'M,Fl:;W'  :

  • 4lyi .' :f * ";}g?.' Y 9,, ws- ,y . ,

- CNOTE: 'Due' to estimate being revised,' calculations were not z.vailable.P y! ". "' i f ,3.., -

c .. ., , _ .

a-

Q.1. #040-f040 DATE: 27 FEBRUARY 1984

,- CONTAINMENT BUILDING  ; , "? h -;

. PERFORMANCE RATE

~

x- _

9;:'* , 2 ; '

Variance >

'j '

Actual From Target Total Target Monthly Trrget To Date Month To Date Month (1985)
  • J:nuary 93.51% 1.79% -

Fabruary 94.77% -

1.26%

March 95.71% 0.94%

April 96.52% 0.81%

May 97.51% 0.99% ,

June 98.29% 0.78%

July 98.83% 0.54%

August 99.24% 0.41%

September 99.47% 0.23%

cetober 99.88% 0.41%

November 99.99% 0.11%

~ -

December 100.00% 0.01%

(1986) .

JInuary  ?

~

February -

Mzrch -

April May i June ,

July 9

+- . e

+. W W O . 4_

= . . . .a . w. , , . ... + -

-4 ,

+ "" <g'. I '

"- I _

M 8 '. "' "

g O # 9 .W- 4 O w e . -, .x C * ' 4m

~

  • _,y.  : . ' ji:

>~ ;. - . '-

j~,_f
  • .-. . 3.' . ., jjh '.-; c. -

a.

y,.

. , :,i , ,- j m, -Ql -

{. - }

c .f ry 9 1,:

. . .- -, 1.r 1

W \

l l

4 2 ~K u)

CD 0)

Z 4J

, s f.

6

<.a w >

<.n ese -

O

,^

y.'...,'. Z

. . . , h kh

  • Nh.%h.

' kk' L

.# y

M -

iMsT4 @

A5W -

$ W.

j[.YN' ao

@ ,s

%;s O q) 7

, A - -0)

' ,18

[',

h ',

< 3 'Ys e k + s Z

g 8 /sse -y

@$""'('M 2 ,

. +3,,sa+

Z e

- (p) s ,; 's t q <' x' s

4 c' s h ,[s , '\- , 2 F"* + s,*

m

's

,.s . s s ,

._ u ':s '

O o s ,' s - M t'.ii . , 1 s4

. s s' z ,

c 9 -<- E o- O ," ,

. ,< . ms .

,'a W ^ sk @' . %

e-

, -y u f ,, y%

, n

, 'q gs.'.

a '. '. ,+ ' .s .

T , . , ,; , : ~

' *': c'.

' s'a' g *'. ,sg 4,% ,s I

,. . .m , , ,

<,s

',\+<i j p O

,,' N.' ,

s

,f

. x+ <>,s

, g- - x s' - >

O s\),

, <, , ' - s," <,

, ,"q , .

V' -

', ,~.'<,,e~, g,s><,t; 2

I - . + e s'

-,s.>, j , , ; ' >

. > 's,,

Q '><^ < ,

!. , . %', ,y <

4 / /,

'r

/I s, s ,

Y

> s,

' % v

, /

s

,s g #

gs 5 / , s s [

g  !' '

-,g-

, s; v',

y4 +,'^, ,,4 -w 3, ,-

,,, > n , ,

s,. s ,

x- <

s -

s> m

<.c,.<,, -

8,,,,

, r,,,, <

y% >,

<<'s ,

=

y'"? >' s, Y e > ,gs ,, sI,,, s

,'g <

,' <. 7 y- , < ,, , , > ',

xs

, v v ps I ,'+ 7 / , . , , , ,<, . , .

[, : , '

L' ,' : ', ' t < , * ' ' u. ,'h ' .,' L" , [ 's ' ,,' W,Q,, ,, ,'_ 4,' _ ={, CD0)

,~ ': ', + . .-r',s ,., , ~s -

< a s? . . -, < , , 4,s -

s-

"y, s' s, , , y, b< -+ s t, "4

,<g,,' *

,s '

} l>.~<s'$','<,,^;',

~ ^

, ., , \

9' , , , , 'y,?

'_ '>6'>< >s

, cy,, , y , , , , >p s,

v>,: n ^ ,> e , -

, ~.

.c ./, , .  ;~ ,, g , , , >'

4

+" s .,

w gs,Q v'

'y' c '^ ' ',. / q , g.' s ~

', ,',< > +','3>>_ :, s;,s , ',^sy*<:a, fg yqs+

1- , ,.,, -

,>, ,,s v

,d s+%**~,,* , >, g / ,- , ,- . -

> s y* ',' ',f

,l s ,

,/,, , # % ,b,

-f .$ r

> r- , <, > c -

- ' +.

' , ', ~>>,/ s

< ~s ,<,,s r ' ,,$

v>, , f9, s

.s > 'p* 9, +< ^

,,s

,s ,L ,

s'^$.',/- 7, 5 g ef%

','^

'* 'A ,s'- s, s

, s' s, ,V *) > ,

' 4 , , >,'^f

e. ' * -, ::,s "'

, - es >  %

, ,, ),,~ , , ' ' , , , . <,, ,sp' ' , . - +

,>,- 4 , , , . , '- *

~

, ,: ,, , , - s . '., ,. \ ,

o ar"x, gy , , ~ + ,

r

,,- ,, - a

> r' t,

,, ', ,# , , ',, ~ <> ,,, /s

  • , , W // '

b

/y ' )*

, g, ,

'/,

' ,' y

, ,,, ~, / ',+~; , ,,

, ^ ',, ' ., '

't Z

4 -Q 1

A i i g

i i l l I 7 O O O O O O O O O O O O O - O O

. O O-CD f* c o y to N AVO /N3W 30V83AV

&S K

4 I ,T 27 (J/

- q)

CD CD Z

43 2 a E

6 O

Z Q.

LsJ C/)

G{ J D

.

  • 6 D (D y's ~2 m

, *y$

.g.u ;

H ' t,;,

s .?. s gs w s'e , p 2

L,.g' q sy 'n s s ^ y",r! _ g b g4 * ' 'I$

Z l

' p'n 6 s' U M b >

' >'^,. l+k'^ ^ N

+

y. y s h~

t'_SI @ , , , . sg' >'

+ . 6 '*

se z

(V g .e-

.',.<y sy ,s' fs, v4  ;,, 5g ' 'y6 .. y j< ,J , g' ,c 4,

> a

[

6

.-.= .e. v si

, ,.%y'4, ~ .

+ssi 4 s. 8 s, ;. '.' ' i * , ' , fy/. " * >s'. s g > 4 ee@ ~ 0 ,E'P'T '#'$> ^4',>v l S,< 's, ,$, ,1+" (y >,. *, ~, v, , ,.

  1. p'5 *;? s 'pt' g <r d< y

,s, ' k s'. b; ,.'t^s <<. Z .- , ,c , r .,<t ,3'+ x' ' , . d,3.,y .', , v t' ,, +s,s' s < + s' p st, ' "y ' >' .,j O s . $,. n r . ,,.,. ~ , t,,'x y . ,p > e 4  % fA'#' 4r, () ~ ,/ [g,J [ h,'[' '/ k> : $,U'.,,O^ bY [ ' l' h>' ^ + y , ' v *y, <+,> ~ .. , , ' r, syc s ', '<, g, c.- x',<,- s, . s, ,o,jpse ,,g' ,@+; x c. j s ~,P g s*,4

  • t >

s>, ,)/ ,s , ,,,. g,j r'~ ' ~.; s: , ' 1, y < , , .'s e,, p Y ,~ g s +' w

,. ~, + - ; ; , f ,~,;, ,y& .9er[. ,

+ ,. y,y +. 1y+ ,~v , ;,; ,,,g; j %<,>,a ,s,,, ~ * ~ ' . :, . 'y' ,s ^diu::ti;, -' ' f A, ll ~ k", ',, ' , ' , ,' ',~, ' k ' N' ,~ ', l K,' ,,v /s< ;, ,,; ,' ,, < ,v

y' , '} , j .' * (#'*

' m. .< fy'{'!kf/> v< t .'.>m , p J e ,+ / - ' ' , , sr s , , y }. 'ff,s w', , 's..~ , : jf f ' $ ^ ,' ,. '; g,'. ,s, x>s # 2 O ') < 'J ./,^,,,_',,

  • ,,g,,' '

'_,, h S/S 'g,,.< s', 'L' :# 's^;A s s ,* . ,/ <j. l <y; ' ^5 ; , A , p, t, ' $ ..k.h^ , * ' I< 4 - s+ ^ t.ss'<<eg n: ~ ~e ,>4, ^y,<,, Vy ,1 '%, , M

  • y 'AS0 , ,3,si%m ,AV's - &

. I4 <<> , < w5 - m, 's 's ~I, .,p -- n > (, ; ' ' r s',, ' ' ' ' , , 2 s ^ ,/ ',c'*'~ ', 1: ^ ]$ 4.,2'.sg.,~ /' :f<n$ - ?> . J,*V,,,l/ , ',t . ~, t 4. y ,- s.* d,9 j ' :t .'*ls.) ,;p.m' ,q ,1X ',, '  : < , x ' l .' ~ ,,s4 s ,'. '.,', n,3r':>. , lvJ 4,.: s#,q< ,~,r.(- , , g ,,;,/,.'' > < snss .,s - y

Q',,n, g'\

'u,',~ ,'"A ,&^'^,,^ s'. ;.}~~ ,,,,',o, -<s^ ' ,, ,,',>>/.,< , : < , ^+ (+,z.~< , ' + < {', s> / f. 1,, ,. >g , , , ,,,,,o - j/+' y 's ,'a , ,:, / ~^ ^ % 'l 9 s n ll4 ' ';,, , '>' . , " ,y} Y<; , S,y 9 6 < == ? ,, ~ . 't , ' , ;.,., < 9 ,,, ^1 '> ? +/, vv h,f Ws v,, ,g + ' ,v , a . ~< ,+,1 #s ,, '<. ,q,, >. ,A*^ ; , %. ,, 6, :s ,< , /,

f x4e

. ~ , . , , .'.,#.4 bn - s ., '%, ; - ~ ' , ' ~ - , ',, - 3- : .' t Y ,s Z l l 1 i i i i i h 4V> ~ O O O O O O O O O /_'1; O O n O o N O O O o ( ,.s e n N - - AV0/N3W 30VH3AV . , ( CONTAINMENT BUILDING LARGE BORE PIPE INSTALLATION RATE UNIT I 17,000 - 16,000 - .....**** 15,000 - . J

  • 4 .

y 14,000 -

  • h .

'~ ~ >g 13,000 - se f J $ 12,000 - 3 .O I I,0 0 0 - . TOTAL INSTALLED DURING MONTH MONTHLY TARGET REQUIREMENT TOTAL INSTALLED TO DATE 10,000 - TOTAL TARGET REQUIREMENT TO DATE JlFlMlAlMlJIJIAISlOINID JIFIM! AIM lJIJl AISIOlNID JIFlMl AI4lJIJl AlSIOINID JIFlM I AlMIJ IJI AI SIOlNID 1983 = 1984  : = 1985  : = -19 8,6  :

D m -DAre. uwu

D .I. #040-#013 DATE: 12 MARCH 1984 [a )7 +- l l l CONTAINMENT BUILDING LARGE BORE PIPE INSTALLATION Variance Actual From Target Total Target Monthly Target To Date Month To Date Month (1983) January 9781 - February 9822 41 March 10032 210 April 10269 237 May 11274 1005 June 11550 276 July 13072 1522 August 13341 269 Se ptembe r 13390 49 Octobe r 13540 150 November 13726 186 Decembe r 13803 77 (1984) January 13884 81 February 14020 136 14001 117 (19) <l9) March 14183 163 April 14338 155 May 14511 173 June 14700 189 July 14870 170 August 15037 167 Se ptember 15198 161 October 15400 202 , i November 15731 331 J Decembe r 15928 197 l l I D.I. #040-#013 , DATE: 12 MARCH 1984 1 i b CONTAINMENT BUILDING LARGE BORE PIPE INSTALLATION l Variance Actual From Target Total Target Monthly Target To Date Month To Date Month (1985) January 15975 47 February 15995 20 March 16004 9 April 16013 9 May 16023 10 June 16027 4 1 July 16031 4 August 16033 2 Se ptember October November Decembe r (1986) January February March April % 6 CONTAINMENT BUILDING LARGE BORE HANGER INSTALLATION RATE ' UNIT ! f ~ 2,000 '- , 1,800 - 1 \ / I, GOO - . s 1,400 - , , e s 1.200 - m E .

. LAI O 1,000 -
  • Z .

4

  • I
800 -

4 600 - 4 400 - TOTAL INSTALLED DURING MONTH MONTHLY TARGET REQUIREMENT TOTAL INSTALLED TO DATE 200 - . TOTAL TARGET REQUIREMENT TO DATE JlFlMlAlMIJIJIAISl0lNID JIFIMI AIM lJ IJl AISIO lNID JIFlMI AIMlJIJI AISIOINID JIFlMIAiMiJIJl AISIOINlD g c 1983  : : 1984 = = 1985  : -- 1986 = DATA DATE: I/23/84 1 , , D.1 -#040-#015 s DATE: 12 MARCH 1984 c CONTAINMENT BUILDING LARCE BORE HANGER INSTALLATION ! Variance ! ' Actual From Target ' Month Total Target Monthly Target To Date Month To Date , (1983) l January 412 - ! February 438 26 i March 455 17 ] I April 494 39. j i May 527 33 June 594 67 July- 641 47 l August 702 61 Se ptembe r 739 37 j October 765 26 November 801 36 Decembe r 833 32 i (1984) January 848 15 February 881 33 884 36 3 3 March 948 67 April 1015 67 May 1090- 75 June 1155 65 ' i t July _ 1221 66 August 1310 89 i Se ptember 1378 68 October '1444 66 November 1527 -83 December 1587 60 i 1 - , ,+~ e --, v , . ,lw ,:, , --rm,...-+-,- , -, . ,,r, ,. r,.-~ . , , . - , , , . , _ , - ...,-y , ,. .-w', .y_ , , - D.I. #060-#015 DATE: 12 MARCH 84 (7,/ CONTAINMENT BUILDING LARGE BORE HANGER INSTALLATION 4 Va riance r Actual From Target Total Target Monthly Target To Date Month To Date Month (1985) January 1614 27 February 1632 18 March 1648, 16 April -1662 14 May 1679 17 June ~ 1683 6 July 1689 4 .e k ,m e, m s h,W 4 ' f ~ j .. ~ CONTAINMENT BUILDING ~. SMALL BORE PIPE INSTALLATION RATE '.' UNIT I  ?.I . .t . 20,000 - , ,...+ - i ,, 16,000 - . 1-14,000 - . 1, a  ; .e 4 ' 12,000 - . .t-F . i. . - ia , 10,000 - . p. ._ a .r. - . g . j 8,000 - ", . s y "3  : O 6,000 - [ . .V 4poo - TOTAL INSTALLED DURING MONTH ',, , MONTHLY TARGET REQUIREMENT - TOTAL INSTALLED TO DATE sg . 2poo - L A G EQWREMENT TO DATE . ,f . JlFIMlAlMlJIJlAISIOINID JIFIMl AIM lJIJlAISl0lNlD J lFlMl AIMIJ lJI AlS l0lNID JlFlM I AlMlJ IJl AISIOIN ID' , 4 1983  : 1984  : : 1985 > 4  ; J - --~1986. . DATA DATE* I/23/84 ' -

j. <

y < . . . - s .- D.I. #040-#014 DATE: 12 MARCH 1984 . 73 CONTAINMENT BUILDING SMALL BORE PIPE INSTALLATION Variance Actual From Target Total Target Monthly Target To Date Month To Date Month (1983) January 1199 - February 1364 165 March 2181 817 April 3123 942 May 4667 1544 June 5099 432 July 5675 576 August 6776 1101 Se ptember 7303 527 October 7981 678 November 8858 877 Decembe r 9853 995 (1984) January 10308 455 February 11108 800 11167 859 59 59 March 11908 800 April 12708 800 May 13508 800 June 14067 559 July 14608 541 August 15414 806 Se ptember 16082 668 October 16689 607 November 17469 780 Decembe r 17919 450 1 D.I. #040-#014 DATE: 12 MARCH 1984 ~ . 37 5' CONTAINMENT BUILDING SMALL BORE PIPE INSTALLATION Variance Actual From Target Total Target Monthly Target To Date Month To Date Month (1985) January 18332 413 February 18489 157 March 18592 103 1 1 April 18668 76 May 18704 36 June 18737 33 July 18767 30 August 18787 20 Se ptember October November December (1986) January February , March l April l l b CONTAINMENT BUILDING SMALL BORE HANGER INSTAL LATION RATE UNIT I 2,500 - 2,000 - , l 1 N, 1,500 - s g

  • W ,

'O . z l C 1 Z. I,000 - . 500 - TOTAL INSTALLED DURING MONTH MONTHLY TARGET REQUIREMENT TOTAL INSTALLED TO DATE TOTAL TARGET REQUIREMENT TO DATE JIFlMlAIMlJIJIAISIOlNID JIFIMIAIMIJIJlAISl0lNIO J 5FlMl AIM lJ l JI AlSl0lNIO JIFIMI AIMIJ IJl AISIOINIO l DATA DATE: l/23/84 D.I. #040-#030 DATE: 12 MARCH 1984 - CONTAINMENT BUILDING SMALL BORE HANGER INSTALLATION i

j. Variance Actual From Target Total Target Monthly Target To Date Month To-Date Month I (1983)

January f February March 7 April 14 7 May 20 6 June 30 10 July 62 32 August 176 114 Se ptetuber 235 59 October 297 62 November 374 77 December 425 51 (1984) January 472 47 February- 585 113 476 4 <109>- <109) March 722 137 April 833 111 May -972 139 June 1091 119-July 1224 133 August 1380 156 Se ptembe r 1503 123 October 1626 123 November 1774 148 December 1876 '102 'l D.I. #040-#030 DATE: 12 MARCH 1984 ." CONTAINMENT BUILDING 7s l SMALL BORE HANGER INSTALLATION Variance Actual From Target Total Target Monthly Target To Date Month To Date Month (1985) January 1972 96 , February 2033 61 March 2088 55 April 2117 29 May 2128 11 June July August Se ptember October l 'l i ^ O O O CONTAINMENT BUILDING CABLE INSTALLATION RATE UNIT I 300,000 - 275,000 , ,e e** I e 250,000 - i i . J e a 4 200,000 - F o

  • j F i a i L&l IA:

! >j 150,000 - *

F-
4

- J e i 3 100,000 - , O e j - 3,006 TOTAL INSTALLED DURING MONTH e 13,430 MONTHLY TARGET REQUIREMENT O,000 - so,00s TOTAL INSTALLED TO DATE e 20,430 TOTAL TARGET REQUIREMENT TO DATE l 4 ** JIFIMlAlMlJIJIAISIOINID JIF IMI AIMIJ I Jl AISIO lNID J IFlMI AIMIJ I JI AIS IOINIO JIFlMI AIMIJ IJl AISIOiNID < 1983  : : 1984 = = 1985  : : 1986 = N DATA DATE 2 /21/84 D.I. #040-Dick 2 DATE: 12 MARCH 1984 1 CONTAINMENT BUILDING 7j7 CABLE INSTALLATION j l Va riance Actual From Target Total Target Monthly Target To Date Month To Date Month (1984) - January 7,000 February 20,430 13,430 10,006 3,006 <10,424> <10,424> March 36,149 15,719 April 54,516 18,367 May 76,115 21,599 June 95,074 18,959 ! July 120,074 25,000 August 150,074 30,000 Se ptember 179,909 29,835 i October 208,921 29,012 , November 239,699 30,778 December 262,877 23,178 i (1985) January 271,105 8,228 February 273,405 2,300 4 March 274,114 709 April 274,823 709 May 275,000 177 June July August September l I Octobe r November Decembe r - O O O CONTAINMENT BUILDING RIGID CONDUlT IN STA L L ATION RATE UNIT I 40,000 - 37,600 35,000 - J e a 4 F-

O ,

F-W >C _ _j 30,000 - p., - . 4 J

  • D 2

3 . O 25,000 - [ 1,000 TOTAL INSTALLED DURING MONTH 1,000 MONTHLY TARGET REQUIREMENT , 25,292 TOTAL INSTALLED TO DATE 25,292 TOTAL TARGET REQUIREMENT TO DATE 4 JIFIMlAIMIJIJIAISIOlNID JIFIMIAIMIJIJlAISl0lNID JlFlMl AIMlJ I JI AlSIOINlD JIFlMI AlMIJ IJl AISIOlNIO ' 1983  : : 1984 = = 1985 = = 1986 = - oo DATA DATE: 2 /21/8 4 ' ~ D.I.'#04 -Diak 2- . DATE: l'2 MARCH 1984 . CONTAINMENT BUILDING R?CID CONDUIT INSTALLATION g Variance. Actual From Target Total Target Monthly Target To Date Month To Date Month (1984) January 24,292 February 25,292 1,000 25,292 1,000 0 0 March 26,592 1,300 April 27,992 1,400 May 29,392 1,400 June 30,892 1,500 4 July 32,392 1,500 August 33,892 1,500 September 35,292 1,400 October 36,340 1,048 November 37,049 709 December 37,452 403 (1985) January 37,600 148 February March April May June July August Se ptember October ! November December O- O O 1 INSIDE CONTAINMENT TERMINATIONS INSTALLATION RATE UNIT I 30,000 - 25,000 - 22,54I

J ..

' h 20,000 - e O s . i w-2N 15,000 - i' Fd <t i J a ! o i' 3 D 10,000 - . o l . 5,000 - s O JIFIMIAIMlJialAlslOINID JIFIMIAIMlJIJIAISIOlNID J IFlMI AIMlJ IJI AlSlOINID JIFlMI AIMlJ IJI AISIOINID

' 1983  : : 1984  : -

1985 --  : : 1986  : i 9 DATA DATE*. 2 / 21/ 8 4 h a D.I. #040-Disk 2 DATE: 12 MARCH 1984 I-S CONTAINMENT Id TERMINATIONS INSTALLATION - Variance Actual From Target Total Target Monthly Target To Date Month To Date Month (1984) January 0 February 0 0 0 0 0 0 March 175 175 April 1,498 1,323 May 2,563 1,065 June 3,529 966 July 5,500 1,971 August 8,039 2,539 Se ptember 10,010 1,971 October 12,150 2,140 November 15,537 3,387 December 18,305 2,768 (1985) January 20,019 1,714 February 20,821 802 March 21,586 765 April 22,350 764 May 22,541 191 June ] July August Se ptember October l l November December * - 9 - * - -e- --v MO 3 O O.=. 0-- 0 -O g* O . O O O =. 0 0 0 O.=,O .O O O.= 0- 0 C - .. --..:-- w- '- . 2: a.=: 2.. . t: u .2- u - .< i  : i 1 i , .I I l i .i. . , i ..,,n. i.t . ,.i ..i .. .. 1 .1 t, q . .. e! . ... . . . o - , - -- = , . o -.,.i .. .., , . . o ~ .. . .. . s , . o, , . , .. . ...,i . . . :s .s. 5.,,, . .,1 . . . , . i.. - . = , .1 . : o,.1: . i. . 2 , . o 1 . ..= ,.: . . J,, _ , 4 ..: . - t . . -,.. i . - ,, ! -. i . . .i ,= . . . . . . ~ 1, .. ~,:. ,t , . . . i ,. . . l .= , ;,. , .m . ., ~ = . l, . .a . - ,i . o 1. .: ..,, ,.., ,.. .w., ~ ,

i

. m. I . ! I ...o,.e .., . - I l 1 . . o' i i  ; l ul .. . . I. ..,a i , .. . , , i I

i. I

\' i , i i . - . i . .. i , , , o, u, . . ,t . I. , l

  • i

. i . . t , . . .

I, d . a  ! .

l t - i . . . I J  ; .  : I .

1. . o a, g

,i . - e - i .. ,i. . . .a i , i t x . - - o t . .i 1 1.. . n i i i l . , i, . , ., . . . . o  : . , . , .,. ... i li i 1 . . o , .. . . , i. ., 4 - e , . . . . .e qi ~. ,. . , - - - - o,. . i. i l j i li, i j , .. i n .. . .= i i . . ... l, .. ,' e > i .,. .. 11 g ., . I. i ,e , i .. - o .a . -<x w . . . . f1,, i *

;5 . i '; % : . . . ,i, . , ;-6 + . 4 ~ .,

- * * :. < > a i. - , ,, to : i ::: .,.u.,. in ~ ~ ~ ,. ~ ; -  ; . . . o r, .. l i .

. {. .

. -> a 3- . ., I. . . . yl . - e. - r  ; c, j i .. , l. ., g. . . l,2 . i a u s x . -1 e l ,- <  % .s .u ** ,, , I lw l . { gg y v-- v u- v v-v . ;. . . 7y U-] ; v , ,vgv] yW _._ ~ ... ...... i i , l I  ! i .e : . e !. .a; .e l .si ' i ,.t .e: e:  ; e- , 6 e gi e - I  : > e 9' I e en f i l elf l s et

  • e e 4 e!' '

s e; , e e n el 4 u et , e e-ei e j e. ,. i e, 4 e. et a = a w l of e e' ei e- O e. ju o g 8: e e 4 as e e! R e e e 1 e' e a ~ O e e ses lo

en 3 e e:

o e, sie. ee e E se eW D0 3 e u me ' ese e e N4 e 3 e y e Im o e ,' y e J .e a e o e l ' l e e. e. E 4 e < w ik 3 'J Ig e e, e

  • el e.

e e-e e e 0 e s' e W e-4 31 I 1 I .l l e e e > er is ! r e ene e o o. e aee n 4 41 e e b 4 & E e e d 'NM e l e se ans e e e. . e ..e 2 m e e e- e *

  • 4 s u e e. t e H e y e e e
e. . .

e, . e a. . e e 2 - ( i e w I e e 4:; e { e o 1 e e 3e e . x< e e e o . l . . . .s e. .. 1 I .e e . I e e .r e - e at e e 8 e >= n l ens o

  • e 9. e E e se o e' g, e ene e=

a o a 8, o E e 9 e e 3, e eed es e > p

  • e, e de e u o e tz 3. e uw e ese a e 30 e 2 ena e s 8
  • e e o at 0 e #4 we i

o O  ! e e e* 9 e ' ans e e a e # a s9 8 e *J et [ e a p - e p. e EA e e , e 8 e. ee w l e o es 8 e H en 4 e y e l r, e e a e . 3 e t e e e e xa e-l e l 28 e 38 e

  • I e e e 4 oe e 5 e e , Ng e e i

,, o_ e l e e NB e e i e l p. e I m e e g e e, e

  • * ** e

! e e l' e e 8 e . e e i o <6 1 e i o , , e t' o a 3 e

e. m9 e e s8 e l e o e eo at e e I e e p3 e e l l e '.*M e e e e .e 's e l c't e e er e s' o I e e

a e s o e e-e e I o e i o el ge e e e-I > e e 6 gg g , e a e , , e i me m e e e- e i e E e e'e tw 40 e et e e 4 e e i N m. e ee tai i e e t .e . g e e e6 to c e i og e' 6' e 4 ( e e s u .e l 8, e a .s at , i, t. .n e e ij - e I e e ee e g a g3 e j e >g l e x e e e A ' f 4 e ) e oe o se , e e de e > I # ' k e 3 l .- e .e 8 e

  • e _

e Ng e .af C O e I o' ,i eL e j i' s . e e , I e b i o j e t e et ees e i e g e [

  • e l a e 4 i e s e o e e a e o e '

i e , e e i ! ,'es e a9 . a we . = e l e , l  ; I e e .e . e w e e l ng e e a ! .  ! , x e a e l , j , e e3 e e i . e e e l- , e .. e > , i  ! e e e e j e . . j e e e i e e j l e l e j e to e 6 x e g o, e 4 e ' t e l l I ] .. e J4 e  ; e o e  ! , 4 4 i e pg e , e l ** e I i M e e s4 e

  • p ,

e 3 e. l l MM e he e e .a l ,e e o n . I t e e e o j *= n e ,j',,,l e a e , se n e , e g e. e = e E

  • e o e

, >$' .e , s. o 4 e  ! 's u e , ,. e ee o

  • ** 2*
  • a .e 1
  • 9 I o e es oe -

ee g g e e e r ts u e ' e se a e e e at .so m > e , x 4 x x ar x x x at x W x x W M x ac x x W M M M x x W x x x x x x e me e a o , e e , e e e e en a e e g g

  • I e er .a; eI 9 4 no e , 3 e I, a w - w i o. I . .

I e w > e i e t f e ' 3 e a p 3 w w e . - . . . .e  ; . l mg e Ii e. :i .e . .,s

v. . .a

_e. e ~ ., . M e ,e . . . ,, x= N - = = M, ,t x x o. .e . .,..,ee e. e i . .e i ._ .t e e . . .e - ~ ~ . om :1 o .N m .,, , - ~ 4 . e -. l i,.. . - e s,o. .. i e. e l .e tu s se e .e . e

e. .- , s _, ee *

, i . .. l o - . .- = , -1 . . te- e e v s a jw w w a ! . 1

_5 8 e___ i
>  ! ._ . .  ! i -l _ _i i _i i i_ . .  ! -

~_ - w. "' " E" W V V ,l,_ __. t . c 3.... _ .___ Z,_. 3_.. .. _. . ..__. "a 5 _ -_ . D... _..S. w.- -, 'i* I i - - I  !;,! .,1 ,4  !  ! , I r, I .. u.. ,i l ..- a l ,i . ;o .U . N l ..

4 o

.i .. 3l i, o, l l t . . - ;s i l . . . .. x .:e ,. ~, l l ...o g! o .., .'.o ., . l . ~.i.. . ., . J> . a Ii . <= ' I . 4 . o m : .a  ! . .m .. . .. ., l .. t2 . < . ' ~, .. - . =. l .l- .r . o ,. .i. .. .. w .,. J .l. . . ., . .. i .= w .. <~ . l . , . a . . ~ l , , .,. i xx x-ww,=---===--==== =====. .o . . -. .. .l .i, . I  ; o < . .. .r a;... - w I . . 4 we ,. . = .l . .. W-l l . - . . .. => . .. . o .: . um I . o., . . .s .. . . e-w l . .... . .. a=- . . . - \ I . . - i . . .. .x. . , i l l l a.. s,. l .- . ~. ~.

l. .

- 6 i =. . i . l l . - I xxxx-x l 4 .: i . . . l . ., an i i . l , l . . ,. .. l .i- . l... i.. . . i . ,, a . . . u l .; 4 u n u n, , =w . l . 4 == = 4 .< .i- . .o. . . . l . . I ..wx

~ . = .

l 2 . . =~.

1. u .u =<. .  :

l .t , . , xxxx ~ . . a<

o. , . x .

l . w . .i. . l . [, i . , < - , x, ... .. l; . .  ! i , . = . . . .. . t i i i , i. i . . } < ll I .t i . . $ I .. l, . i . ==x d ~ lll . i. , i , x . . . a 1 I t a a., s. . .o. - , I;. . o 2 3 l x I* . . o 1-t s . , 3, . . . 1 l, 1 . , 4 . . . .o . l, . i . n. . , i

  • . l l>' . 1= ...

it n .r oo u~. ,i ============x====-===4 i --g ~. i, , li t .. c - u .. . .rs . i. oo j 1 , , . m . > ,~- . I . . a . I . ~ . , ~. w . . . . . . i l i i ., o . . , .r . , r, . s . ,~. l n.

  • ~

e n

o. a n ~

~ ~ - o e ~ o.. I ~ o. s.c.. ~ l i j l i e w . i . l a . .z ! .s. w s . 4 w  % s. = w -l . l l l, f I i Lf _.-. - .. -.a ^ -l C= 0 O d ~r.' Om:::nb r O ~d O'=0'O 'O O~O I..: O d O=O O 10 0 := G

l

. =. . r_ . _. . .r;rrc =. - .,. .n . . r. ...._. =_,. ._ u .

I.

.. ..,1 t .. i . ,, l .o. .. . ..  : .. ~ i t. ,. 4 1,.. . ..l 1 . o. . ..t.. .[

o. - ,,

o . o ,.,. . l l , ~ o-o. m ~. . .=. I . . . . . i. . 4 - e, j . . - , . . ,. =. o l . ~, . . .. , - .. ... .-.J. .t 4. - . i . - . - t . l ..j < . .- l .2. ,. - .i l . . t. ... .a l . .. . , ., . o. 1 . ... . ~u. . i . . [ . . . ~ 1 . l . . ,. , .l . ~, ~.. . . . . x . .

. i .

r c ~ .i . ... i. [ ~.. . . t . t . ---- . .

l. . . .

1 ~, . i. .. , . l .. ---, ......~.. . . .. .~ l . ~ , o. -i . i t, ---.- . . i, . i j  : i . . . i . i . ---x . .. .. .. .~ S i - ,,i . . i. ,  ! . . . 1 . i . i . . 0 * . . . t . , I . .o. i .i  : i 3. . o, . ,  !. t i . 1 . . . .0 . = . .o  ; i i - - , - . - - . . . o .i 1 - . . f! .:. < ia.... . . ~, ; a ~. ~. . .r .

o. . . ., , < . ~ . . ., . ,. .,

. ~ 1 4 ,,.., .m ,, , ~ ~~ - ,- ~. . .o .

a. ,.

.. .,.o.. l 3 a e fit,.- . i  ; . ~ ~ . .r w.. . , , i , -i g , ~. .. i. . m -  ;  ; i- < . ,, .~q- } [l [D ., C= O O . V . Of=" O U t t S C O ." U U . .U . O O V U UCU . i V U l:_ _ __! i  !  : l_  !  ! i i  !  : l i .; e .i lt l

i

' e, e,.; .., e .i ea. i  : i j i l l 1, , , .:  ; .: > l- }  ! l. . e e n i .. i , ., ! t [ .. e . n l i 3 . l .1 e.. e . n i ..; 4 o ., ' l .t- .4 .. x. ,, .i i ei, I. .  : l . r o x ~ su . t i >. =e I tx e n 2 .. i . xe a.

  • x ~

l ., o ., . I . . .t es a . l . ..o .e

.* . 2 e . J l o x o ,

. e. . x

2 e zta . .. = '

s ;x 'x . .e I  : 4 w . . e .

  • w .lsr . ze I .

e < x 1 xo 3 .- o e, I at .r .a e . w i. . m e. . JA i a o a . e e. . w u, e . a i . . e - . e. . - . . . e . u l . w . , >e . e . l lo o . . . os . s . . .- e . Iw !. . .4 we ,w I . . t e e m . we l . .. e . m n . . e . wo i . os s a: e u ,- . . o> , . ne . <e . .a.a. .

  • i, se . -e .

l ,. . ne . .e' ~=

l. .

.e . .x . l . . . . : e e .~. l . . - i. re . e . l . x- .i n,ee .. e . ., . um ,w e . s . . . . ~e . . . i e l . xu .

  • e 1' - , i i * .

l . 6 . . e . l . i es. x . ae

l. xxu . <e a . .o. xx r e.

t . i . xx . 1 -e . .a . x . . . l e s xxxx xxxx I e e . o w . .. l. xm=xxxxw . e. w . <xx<xxx . ze g . i e I . xxxwxxx . t i =x . . n. x i .xxx ev o . . l . .e i . t .xwxxx e e. .x, . xxx e . ] . i . e- . w . o . . e . o I . i s. . l . . . . i . xxx . e o 6 .=. w . .e I . i z . , , i ad x x x . os. .e. . e . , , t x . . v e . w I > t , , , lx w w . .. , x o 't i g i wwwxxx . .v e . - . . , xxxx=x . e . l . = .  ! < 1 l xxx . e . . w . ,

xx . e i e.

l = i 1 ( ixx= . e .e s !x x x . e . l x=w . a. e . o. l  ; l l t > xxxx . we . I , + i . xx . .. e . u. . 2 . ., xxx .. ee . = Il: . i . t l, , i I wxxx xxxx ee l.l . i' i i i xxxxx . .e . 1 e . j lxxxx,x x x . . e l . .i . .x=w . . li s I - . x i . , , , i x . Je . . o , xxx . ,2 ee . n xxx=w . . I. -i i . v . = 2 a , i 1' i I i i i l. p w=xwwxw xx x

c. e .

s . e . t i lI . > o . xxxx e n e l, . e i eie 2 . i ww . e o I I wwx-w . e

w +

i 8 > I xw . es l -lI . n 4 a

m. l, -
l. 1 l, .

xxxxx wwxxx . . xe . ae . i l l a . z = o. . l , . ee .

l' . ,x = o.

x x x x x n = x .e x w a x w x = w = w o x x w = x =: x x x x x x . e . l . x o i .  ; e . . i. x4 .x n. i i i t l  : . a . 3 . - .a. i o. - l e . . ;= > . l 1 . e . I. f w i .m. .e, 4-. .e w ' e . t I . I . ll . 6 , i . . . ia w u  ! l . . i. r w w r . . .; . l . lw a, = , x . e u 4 to 4 u <a 4 o.e o N e o ;e4 o, e u. .e 4 o.' e.. l . ,. a n. .w w x .  !,.c . ,e. s . .. o . n. ~: e ~,r. , o .e. o n. n j .- e , e - n . m e . a , e. . w .

  • , i

. .e , .  ; . . . . a9 . - a ~ a .. . l- , 4Q ..is3 s e w r - o a. I I ! I Ie .e w w 2 ;w t l e w i . t 4 j i l- , . i , B } I * { l l. l t  ; I i .ar.

v= ~

~._~_i_. m E _ .' - - --- r._.~_._r . v .= 2W - - . <X_N._.r - - ' ' - _ w.u 7 X '_2'CLLL- D 5~-w _. J > I @  ; --, v.E - j  ! j 9 ., s'. .li . ll ,

5.  ;

i e . ,, j ', w .- ' .4, s . . > . l i r . i e . e .t er a .. j . i . .. .n.

  • w

. a n ei .' a . 1> .i .e... .

t a w .-

e . ,s w u .

e ..

e . . i ..o as e i *: 's e w a l i er s. . .' 'r es I , <a . .;o e i v. r3 1 . ,- t .- e, ee . w (w w . - i i n e > . . .a . a. I . a w o e . 1 e z .4 .. s . c

e 3 t w wo e .. .. .

e e w: i

re

=e 2

=, u e s a

c. e 1 w

=

u

4-

.o.

w a.

.4

.e 4 .e , e.. .

e..

e, .

.u.

. w . .e - . e . ,

o Dee, .

e. o o .

e e n . . ne I .. m .. . ea e .a

. < . ej w.

. w . e r s,.

. . . e -

I e;

c e .

e. . =a

.- .w.

. o ae .

I. .

w n

=e.

e . uwm ss.

l . o . < -e . .

u e.

r no . .s ..

1 . . at. 6

. . .- .e l.. w.

e -

. . e . .x 5 . ' . e, l z e' e l . .. .: as . '

. . .+  %

e.  :.

n si .

.e I e

a

. . I, e.

.; e .

l m unw .. , s .

x >

e. .

. m ..i ae.e,. ..

'1

. .o. . . .i ne <e

. i ,

,f .e j e .

t ,

e:

i e, n a . . .

l .e o . e e,

=

. . .. t,.

e- .

e

.  ; e:

.. . t x .. ,; wm m . c .a.o . we

. .,c t i s.

e

- s. o i

[

. w .

  1. - 4 e a t

. e . .

. s . is

. x .

,. , . t' > . .e

. e . } .5 os . m ,

[ .

er *

! .. .=.ee . e.e .

.t o . ne e <

i l .I

. a i. ,

i I

i  !. e

. n w l

. i . . 3 e j la l

[ = .

, t . a

. . ' e e o

,I .I e \ '

w me . w e

i -

we . a

.!

  • l e . e

( . I i .. ee . e.

e i j

i

]

. -s

. e

. i - I .

t I i

. . s .  !

l,. . w I , .

f i . .

l I t e .

. i= j . I t ' .

ae ..

l l

i

. .o t

I

, i w n,e

. u I

w . e .

{ .

1 . , . We .

i .n .' i r

Ii . . -

I -

.e . 4 sI . +* n  ! l . . I ,

e i . u m 1 . . . e. -

it . .x i

. a

. I o  : i  : l

.- ' e . '1 l e e l u. . t l l se 1 3*

I . ; .-  ; m j , 4 l

. as ..

I

. ja r 4 a , o i l t i

. . <e me t

,e o. .~.. w w w w w w w w = w x w w w w .< w w w .4 w w w w w w . w w x w w w w n ,

. 4 l, .t<..e x

a

,c s. .

. ni e . >

e, .

e. .a i .e o n ,

e .

Io

. w - u .

. w - > . .a n- . . t

. . e 1j . e

.x. w .- ~ :n w

I i l 1 e

3 .ee

- njo 1

n:o.

. i ,:. u a . t = m w x w w n w .c w w .e x .e w w w .

. w ar. m. m..

ll n ;o i ,

f .}w o ar .<.

o. .- io o. , n es n a o o , o o i rs o j .

I .

. n ,. .

y a. o e: -

e

.e.

'n e c e m;n ,e

  • o o o.4 s ,e n .n n .- .

w =

.3. n, i

. 1 er, a.

l

  • 2 .  !  ;

,. w .. . i i . .

i

. o .. .

1"!"'I"!"]*.

i fr}l"i i

u. _ i . __ :.

l ' ' j'  !

i J '

I f.

l'

4o NT ON I

T E A M T T R S A K P O E OD R T B S A E E T S

F P O T U S R A E T N

IS L

D GN E N NA R #ICO I I

H EFT C

IYU TF S

D O

R F P

V &",R P OA M

PT A

ES R

H .

W E -

N t

F n e y O d g i r s e E e n C

I rE P

r V e a R c e i l E V c S u rN o

C i I n L e S

B U

P T

N " 9 M4 g4P U O

R g%G E l C 4c I

V

! t t' .

a --,. m. -

e t a5" h5 -

-s 5c er a-k EE f

_=5 m s sz g z

. 3.

k 5 h ZH

- -- OC 3

WE is -c o

g y

p[Z cWO 68 -

!g HQp

-3j f - - U) iq 5w 5 *$

) g u

ie g*

M cn N OwZ

__ __ O i- C

~~

C C CD C. C 3 de, g ,g CDO w5 w WH

-gL Ej -- c en c-5- .w c EN "I 3s l-

. (n 4

i i __ __ __

! e i g= "g g! W g ..

!=

E Ea OE

-d 03 05" 3

s we

=3

, w .

mamme amm D

  • 5
  1. m

-ws I"E -

If -

g*

I WE

-ce eg ES 55 e

E Eg f

_A v

- E 3{

2 l

_e,

, e o

_c.

WE 2

. Eg e = _

=c g e U SW Dip 5 E Ej &

j

_ 12 er-I b _

3 e5 s.a

,g w

-r--y-. w. me -ww =

  • n y

m

SEABROOK STATION STARTUP MANPOWER CURRENT '

PROJECTED LOADS PEAKS ENGINEERS 81 90 TECHNICIANS

-lNSTRUMENT 28 55

- ELECTRICAL 47 50 CRAFTS

- MECHANICAL 104

- ELECTRICIANS 37 1

1 l

l SEABR00K UNIT NO.1 SCHEDULE MILESTONES 1984 1985 JFMAMJJASONDJFMAMJJASOND A A A A A A A A A A A A 1 2 3 4 5 6 7. 8 9 10 11 12

{ MILESTONE SCHEDULED MILESTONE SCHEDULED

1) REAC VSL PRE-SERV INSPECTION 15 MAR 84 7) MAIN STEAM /SG HYDRO 28 MAR 85 l 2) SECONDARY SYS CHEM CLEAN 1APR84 8) PT-35 RCS HYDRO 21MAY85 l 3) INITIAL START BOTH DIESEL GENS IMAY84 9) PT-38 ESF INTEGRATED TEST 7AUG85
4) RC-1 REACTOR COOLANT SYS T/O 90CT84 10) PT-40 HOT FUNCTIONAL 9SEP85
5) MAIN CONDENSER GROSS VAC TEST 30NOV84 11) PT-36 &37.1 SAT & ILRT 12NOV85
6) RCS IN-VESSEL FLUSHES 16JAN85 12) CORELOAD 26DEC85 l

i i

1 '/F BUILDING & AREA TURNOVER MILESTONES l BUILDING TURNOVER DATE l

, ADMINISTRATION BLDG (actual) 3/29/82

' INTAKE STRUCTURE 8/27/84

, DISCHARGE STRUCTURE 9/20/84 1

DIESEL GENERATOR BLDG 10/29/84 l

CIRC WATER PUMPHOUSE 12/24/84 COOLING TOWER 2/19/85 FUEL STORAGE BLDG 6/18/85 PRIMARY AUXILIARY BLDG 8/13/85 TANK FARM 8/30/85 SERVICE WATER PUMPHOUSE 9/25/85 CONTROL BLDG 10/08/85 CONTAINMENT BLDG 10/24/85 WASTE PROCESSING BLDG 11/26/85

. _ _ , - . . _ , . . _ . _ . . . . . . _ _ _ . . . . _ _ . . . _ _ . . _ . . _ . . . _ ~ . _ _ . . _ - . . . .

BIP TURNOVERS SCHEDULE VS. ACTU AL l

l 1100-l 1000- s 4%

900- 0 l

1 800- eS -

O 700- g CUM 0 4

000- +

NUMBER U g

500-OF DIPS 400-ys*s 300- 4 06 200- gG 100-i l ' 'l '

l 'l i I i Ii I i i i l l i l l i

l i i i l J J A S O ND J F MA MJ J A S O H D J F MA M J J A S O N D i 1983 1984 1985 N

h!

B.lPS PER MONTH 1 a m ca A ci en s co

) o o. o. o- o o o o o g ,, I I I I I I I I I

' b

,ij ,i31 -

~ ~

h .,

g '

m Cu

e E a - -

m C , ,

  1. j O 3 m

a 6 L'-

m m I

, cD m-a -

0 5 t si "o

m ' "'

n O ~f

, Ro 4 9 , ,

00 2 6 -

Og m

EN

( --

i go

= m E Ch

> cn - a 2 2 E

T - -

E

$ a UNIT 1 CORE LOAD O

=

g

,7 n

-H om- - - --------- 2

.-1 m __

I C - c- UNIT 1 COMMERCIAL  !

U 3 CD Le c_- - - - - - - - - - - - .

Td2 i l r

OPERATION y@r_u ej s me i j

  • )b

qq A

SYSTEMS TRANSFERRED TO PSNH

, OPERATIONAL JURISDICTION SYSTEM DATE AUXILIARYST5AN(PARTIAL) 11/05/82 AUXILIARY STEAM-CONDENSATE (PARTIAL) 1/14/83 AUXI'LIARY STEA'M HEATING (PARTIAL) 1/14/83 CONTROL BUILDING AIR HANDLING (PARTIAL) 11/04/82 DEMINERALIZED WATE'R (PARTIAL) 10/15/82 FIRE PROTEC'fl0N (PUMPS & TANKS) 10/15/82 Ho'T WATER (A6 MINISTRATION BLDG. ) 11/05/82 INSTRUMENT AIR (DRYER SKIDS) 11/05/82 SERVICE AIR (COMPRESSORS & RECEIVERS) 11/05/82 WATER TREATMENT 11/04/83 e

  • 4 5

g.

. l I y .

< 4 s l5.

e

s k%

  • fr 4

i e

CONDITIONAL ACCEPTANCE TURNOVER STARTUP TO PSNH SYSTEM DATE i

ADMINISTRATION BLDG. HVAC 9/26/83 AUXILIARY BOILERS 9/26/83 CHILLED WATER 9/26/83 4

480 VOLT MOTOR CONTROL CENTERS N0s 161, 162, 163, AND 262 9/26/83 SOUND POWERED PHONES 3/08/84 SWITCHYARD 3/09/84 I

'I e

9

's t' *u g -I r7 7

SEABROOK STATION PHASE 1 CONSTRUCTION VERIFICATION TEST STATUS t'

DRAFT IN . IN NOT

, GENERAL TEST TOTAL N0. APPROVED REVIEW PREPARATION STARTED

~

MECHANICAL 4 3 -1 0 0 1

FLUSHING 4 4 .0 0 0 INTEGRITY 1' 1 0 0 0 INSTRUMENTATION 46 45 0 1 0 ELECTRICAL 46 44 1 . 0 1 SPECIALTY 4 INSTRUMENTATION 59s -

34 10 14 1 (RPS, RMS, ETC.)

~

l TOTAL GT'S 167 131i 12s 15 2

~

i -

3 _

x 4

s

...e 4 , s

.~ j

.y 'I , L.

, *A.

+

, .c,

-~%4

~

2 --,. &.

') . _ . . - ,,% - ,~, v '; '?4 I'm ,

SEABROOK STATION STATUS OF TEST PROCEDURE PREPARATION (PHASES 2 THROUGH 6)

DRAFTS DRAFTS DRAFTS DRAFTS TOTAL JTG IN JTG IN IN NOT TEST TYPE NUMBER APPROVED COMMITTEE REVIEW PREPARATION STARTED

' PREOPERATIONAL 88 7 41 37 0 3 (PT)

- ACCEPTANCE (AT) 87 27 27 33 0 0 1

STARTUP (ST) 53 0 0 53 0 0 TOTAL PT/AT 175 34 68 70 0 3 TOTAL. TESTS 228 34 68 123 0 3

\

D

/o/

PHASE 1 TESTING STATUS SCHEDULED TEST PACKAGES 5554 TEST PACKAGES COMPLETE 759 (14%)

HYDR 0 PACKAGES SCHEDULED 476 HYDR 0 PACKAGES COMPLETE 56 (12%)

CLEANING PACKAGES SCHEDULED 306 CLEANING PACKAGES COMPLETE 60 (20%)

WEIGuTED COMPLETION OF PHASE 1 TESTING (11%)

/o L ACCEPTANCE TESTS AND PREOPERATIONAL TESTS COMPLETE JTG PERFORMED APPROVED 1-AT-38 AUXILIARY B0ILER MAR 83 9/1/83 1-AT-51 SERV BLDG RCA HEAT & VENT MAY 83 7/6/83 1-AT-55.1 ADMIN BLDG VENTILATION MAR 83 6/27/83 1-AT-55.3 ADf11N BLDG - CHILLED WATER NOV 82 11/24/82 1-AT-60 GENERATOR LEAK TEST NOV 83 1-AT-13.8 TRANSFMER AREA FIRE PROT FEB 84 1-AT-7 SECONDARY COMP C00L'G MAR 84

/413 j

^ '

LEABR00K STATION

SUMMARY

OF MAJOR EVOLUTIONS MARCH 1982 WATER TREATMENT PLANT FEBRUARY 1982 1

FIRED AUXILIARY BOILER MARCH 1982 ENERGIZED RAT'S APRIL-MAY 1982 ENERGIZED BUS 1 THROUGH 6 JUNE 1982 ,

START ENERGIZING SUBSTATIONS AND MCC'S INITIAL TESTING OF THE BALANCE OF PLANT FEBRUARY 1983 PROCESS INSTRUMENTATION RACK SECONDARY COMPONENT COOLING SYSTEM MARCH 1983-AVAILABLE FOR SERVICE AS REQUIRED APRIL 1983 LUBE OIL / SEAL OIL SYSTEM FLUSH COMPLETED CONTROL ROOM MANNED BY OPERATIONS APRIL 1983 INITIAL TESTING OF THE PRIMARY PROCESS MAY 1983 INSTRUMENTATION RACKS START PHASE 1 TESTING OF STATION COMPUTER MAY 1983

~ JULY 1983 MAIN TURBINE OPERATED ON TURNING GEAR COMPLETED MAIN CONDENSER HYDROSTATIC TEST AUGUST 1983 NOVEMBER 1983 TUNNELS - FLOOD START COMPLETED TURBINE GENERATOR LEAK TEST, AT-60 NOVEMBER 1983 SERVICE WATER PUMPHOUSE BASIN FILLED WITH NOVEMBER 1983 WATER TO OPERATING LEVEL JANUARY 1984 START CONTAINMENT BLDG. SPRAY FLUSH /HYDROLASING FEBRUARY 1984 STARTED LONG-TERM LAY-UP OF MAIN TUR'B. GEN.

FEBRUARY 1984 COMPONENT COOLING - TRAIN B IN SERVICE STARTED FILLING REACTOR VESSEL FOR PRE-SERVICE MARCH 1984 INSPECTION

! /st' i SEABROOK STA TION PREOPERA TIONAL & ACCEPTANCE TEST DISTRIBUTION I

40 35

30
25 a

N 20 k

+

15

v.  !

l

~

10 l

u. - ..

., hLi _.....<I 1984 1985

- - - - - - - _ _ _ _ _ _ __.. _ _ _ _ _ _ _ . _ . . _ _ _ . _ _ _ _ . ___.a

700-SEABROOK STATIOP INCOMPLETE ITEMS -

600-me NEW CLO_ SED 500-U3 y - -

s y 400-W g= 300-8 -

5 _

200- . _

1

_ t. -

~

100- _

l a m ,

map 0 Li - - - - -- -- ---

4 11 17 25 1 8 15 21 29 6 13 20 30 10 17 24 31 7 14 21 28 OCT NOV DEC JAN FEB g 1983 1984- g

SEABROOK STATION INCOMPLETE ITEf1S 5000-4000-t- _

m h3000_ = = .N * * =

W E

y 2 0 0 0-1000-0- l l l l l l 1 l l l l l l l l l l l l l l 4 11 17 25 1 8 15 21 29 6 13 20 30 10 17 24 31 7 14 21 28 OCT NOV DEC JAN FEB x 1983 1984-  %

. q j' hTAwT-uP TEJT D E P A < T M e e.T PROJECT-SEA 9R00( UNIT 1 & COMM0'4 [q WtvudT JATi* 13nAR3.( .._l _b )_ , . . _ - _ . . _ . _ . REPORT _____... ATS, PTS DATA DATE-21FEa54

  • I'

_ _ . _ _ _ _ m e; 50Ridu NuiiA!CALLY-UNLkVELED 3ETWORK PAGE NO.

{\

s, 1

_ .._ _._.___.-___... __ _ _ . _ _ _ . . _ _ . . I e

C. .es.................................................................................................................................

4044 I T E..

' ~ ~ ~ ~ ~ ~ ~ ~ ~

U2u.~dia. P C T ~~ ~ ~ ~~ ~ '~ cA'Atr-~ ~ E4*Lv LATE I A T E '-- T O T A L " -"-' 9

'f is J . Odd. DUM. CAP. CC CODES DESCRIPTION START FINI$H START FINISH FLO&T

' ~~ ~..........'...'..T.'..................................................................................................................

1r14*.22 7 7 u 1 AT -1.1 FEEDmATEM SYS 3JUNd5 11JUN65 2$4U665 6 SEPP 5 61 3 19992 73 5 5 0 3 AT-1.2 FEEDdATER (HFT) HFT 75EP35 13SEPe5 40CTb5 100CT85 10 19291o33 5 5 J 1 AT-2 HEATER DRN3 + EATRACTION STM 21FEso5 27FES35 304UG85 6SEP55 133 191 W 42 10 15 y_*, ,, _,,_ __, AT ,3.1 , _t y_q.DENSATE H5 , . _ _ . _ _ , _ , __ 2{AN55 6 fed 85 7AUG8{2{AUG35,_, g ,___ __ 3 1999247 3 5 0 0 AT-3.2 CONDENSATE (HFT) nFT 95EPd5 135EP85 40CTuS 100 CTS 5 to

_ . . ~ . _ . _ . - . _ _ - . - _ . .. - . _ . . . . . _

191. 32 3 3 'O 1 AT 4.1 MN 6 COND VAC & INTEGRITY TEST 24MAY85 31MAYb5 214UGe5 274UGP5 61 19s2433J 3 5 0 1 AT-4.2 DATER PHINE An-2 bFiBoS 14FEuB5 12AUGS5 toAUG55 127 3 19144233. 5 5 0 0 AT-5.1 SEC01DARf SANPLING SYS*AUA au!LER CAS-2 22FEB34 28 fee!4 1dDEto5 24DECS5 45m 191. 243 5 5 0 1 AT-5.2 SECONDARY SAMPLING SYS CONDENSATL CAS-3 24JAN85 30JAN85 14AUG85 20AUGS$ 140 19144253 5 2 0 0 AT-5.3 SECONDARY SAMPLING SYS-5/G RECI4C C45-3 24JANo5 30JANS5 144uG85 204UuS5 140 ,)

19184324 14 14 0 1 AT -o CIRC DATER SYS 17MAY85 0JUN55 194UG55 6SEP95 e4

'I 1'#5o4030 7 7 U 1 AT -7 SEC COMP COOL WTR SYST 2dAUG34 oSEP34 94UG85 19AUG85 238

. .. ..~. ._.

19174=33 5 5 0 0 AT-B deb 4S SYSTEM CS-2 1JUL65 B J U Lt' 5 304UGs5 65EP85 43 ,)

1949.441 5 3 0 1 AT-4 HEACT00 WATER MAKEUP MMw-1 22FEH54 2SFEBS4 7MAYe5 13mAY85 303 19 9 9 d't. 7 5 3 5 d 3 AT-10.1 SAPPLING-REACTOR COOLANT HFT 95EP65 13SEP35 40CTd5 100CT85 to 199ve470 C a A T-10. 2 S AMPLI'36-S T E AM 4LNERATOR HFT WSEPU5 13SEPs5 40CTd5 100CT85 to 2 5 5

_ _ g) 19dv2477 5 5 u ') AT-10.3 SAPPLtNw-AUAILIARIES HFT 9sEPa5 13SEPa5 40CTd5 100CT35 to I 199v247s > > a 1 AT-10.6 SAMPLING-SECONDARY MFT 93EPd5 13hEPs5 40CT55 100CT85 10 t

_ __ . x _ _.

19403330 2J 2C 0 1 AT-10.5 SAMPLING-POST ACCIDENT MONITUN 2DECd4 25JAN85 1?OCTUS 9N0vh5 190 .

,= ._. ._ _. . _ . . . _ . . . _ . . . __ ._ _ _ _ . . _ . _

s 1**>132o 3 5 u 1 AT -11 NC DR4 Svs 21DEtte 28DECSS 29 Mand 5 4APRd5 67  ;

y *) i

) .. . . . . . . . . , . . - - - _ . _ . . _ . . . _ . . . . _ . . ~ . . _ ~ _ , . , . . , . . . _ _ ., ,

-- - _ - - . ~ - .. . -. - . . _ . .. ..

. ~ . . * . - - - - _ _ ~ _..%_-_..%._. . . . _ . . . _ _ ~ . , _ . , , . __ _I E

y -- . _ . . _ _ _ . _ . _ _ . _ . , ,

,0 -

h, j STAdi-ud T:JT DiPAdTP.ENT PouJtCT-SEA 9R00< UNIT 1 s COMMON 'a

. f M E PO 4 T DATE- 13MARb4L 14) REPORT- ATS, PTS

  • I DATA DATE-21FEBc4 7

A SQdTc0 Nd9EdIC LLY-UNLEvtLED NETWORK PAGE NO. 2 si j

_ - _ . . _ _ _ _ . _ . _ _ . _ _ _ _ . . _ _ _ _ _ _ _ D

', \

/ AM ITc3 'GnG.~ rim. P C T ' ~-~ -- - ~--- - ~~ -

E4WLY EA9LY L ATf- L A f t.- T O T A L----- y I

. t. O . DJ4. aus. CMP. CC CGDES DtSCRIPTION START FINISH START FINI$H FLCAT ,

s ?'~' .............~.7.~. U.................................................................................................................

y Iv5 W 3 l ', 1C v 1 AT-12.1 145thuMENT A*N D SERVICE AIk b y S T E] IA-SA TJUN65 20JUNS$ 23AUGd5 6SEP85 54 , l 195 4035 1) 10 0 0 AT-12.2 INSTRUMENT AIR-CONTAINMENT IA-9 29MARa5 11APk35 23auG85 65EP85 102

  • 1421732 5' 5 0 0 AT-13.1 FI2i PdMP' HOUSE FLOW CAP 60CT54 110CT64 304UG85 e5EP85 227 y 193217o2 3 5 0 0 AT-13.2 FIRE PUMP MuuSE HVAC eMARd4 12MAks4 304UGd5 6SEP85 375 ,

.19321772 5 $ 9 0 AT-13.3 TURSINE uu!LDING AUT0/SPRINKLA L DELUGE 170CT54 230CT84 2eJULuS 1AUGd5 194 19321/d2 5 5 0 0 AT-13.4 Cd E D3 AUTOMATIC SPRINKLER 75EP84 13SEP54 22APR55 26APR85 155 y 19321792 5 $ J 0 AT-13.5 CHL TUNNEL ELEC PENN DELU E SPRINKLER 150CTb4 190CT24 23 JUNE 5 2$JUNP5 171 ,

19321402 5 5 0 0 AT-15.o HALON SYSTEM TESTING 94Ubb4 15AUGS4 23APRB5 30APR85 176 193213:2 10 10 0 0 AT-13.7 FIRE DETECTION TEST 1FESa5 14FEdE5 23AUGd5 oSEP85 141 y 19321423 5 3A 10J O AT-13.8 TRANSFORMER AaEA FIRE PROTECTION 17FEP54A 22FESB4A 300 ,

19os102o 10 10 0 1 AT -14 RADID ACTIVE GASEOUS WASTE STS SJONd5 18JUNb5 234UG85 6SEP85 56 19W54033 20 20 0 1 AT -15 L.w SYS 30JULd5 26AU685 1240V85 10DEC35 72

? )5'*50 15

.. 1?. ' ' _ _. _ _ _ ^.'J .'_* 5 "_6 "_f d 5 8 3 " 5 '.u I C E,_

1.JANas iFEse5 19 Nova 5 iODEC85 214 ,

19d$1333 10 10 0 1 AT-17 SOLID dASTE SYSTE1 wS-1 90Eco5 20DEC55 11DEC85 24r .85  ?

1vb5=e33 1J 10 0 1 AT 1d das S15 9 5 -4 21AUGd5 ASEP35 23AUGd5 .. EPM 5 2

.y 3 19221o3) , b d J 1 _ .

AT 19.1 3J MLud30wN SYS 9JulHS 15JUL9S 304uGd5 6SEP65 38 3,3 ,

tyvv2=7v 3 5 0 C AT-tv.2 S/6 %LOdD0dN (NFT) nFT WSEPe5 13SEP55 40CTa5 100CT95 to i

g. . .

'1vc9 J33 . 13 . . _ __

10 u 1 AT-20.1 WASTE 40 CESS su1LDING vs.47 wAN fem &Yo5 3094Ye5 SJUL85 iSJULs3 34 N

, ,q

i. = 19s h032 0 0 a 3 27-20.2 44STE P40 CESS du1LDI% nEATINb d4N 33APdc5 30APR*5 19JUL55 19JULB5 56 Y

,g . , _. 3 IvLolo33. 10- 10 L 1 AT 21.1 CJNT C 'J O L sv5 -CAN -1 2dMAvs5 11JuN45 5Juta5 19Jutm5 26

) ,.. _... . _ . . . _ . . . . . . . _ . _ . _ _ _ _ . ._ _ _ . _ _ . _ _ _ _ _ _ ___ G t . .

. - . ~ . _ _ . . _ . . , . .

. .. . _ . .~ - . . _ _ _ . , . , , , _ _ _ _ . , , , , _ _ _ , , ,

l

._ _... _ _ _ . _ ._ __ . . . _ _ _ _ . _ e e

. - . _ . . . _ _ _ _ _ e

[

~ '

\

STAdf up TsST D E ,' A N T M E.. T PROJECT-SEAdR00E UNIT 1 b COMMON e p herudi DATc- 13 matt 4( . . . . _ _ . _

15)

DEPORT- ATS, PTS DATA DATE-21FEHu4 50hitD hu it_M I_C A L,L Y -u4 Li v cL E D NETWJRA PAGE NO. 3 "N 28 b

_. . . _ _ _ . - _ . . _ _ _ _ _ . _ . _ _ _ . _ _ _ _ _ _ _ . _ _ . _ ,. _ . _ . _ _ _ _ _ _ _ _ _ _ . _ . _ p nGAA ITc4

~ ~ ~ ~ ~ ' - --""-~~~~-~ - -

OAG.~REr8 FACT' ------ E A R L Y - - EARLY L4TE L A T E -- T O T 4 L--

NU. DUR. Dum. CM*. CC C0sE3 DESCRIPTION START FINIsn START FINISH FLOAT #

197744o0 i a u 0 AT-21.2 CONT T COOLING (HFT) HFT YSEPb5 135EP85 4cCToS 100CTi5 10 ..

. _ . . . _ - . . _ . _ _ _ . - . . _ . - _ _ _ _ . _ _ _ _ _ . _ _ _ _ __ ______ _ ,__ g .

Iv131c24 1J IJ U 1 AT -22 CONT PURGE SYS -COP -1 22 Feed 5 7 MAR 55 234UG65 65EPS5 127 tvi41o3J 10 10- o 1 AT -24.1 ELECTRICAL PENET AREA AC 25DECD4 11JAN85 234uGd5 6SEPS5 165 i .

l Idvv26d1 5 5 0 0 AT-24.2 ELECT PENETR (HFT) HFT VSEPd5 13bfP85 40CTd5 130CT85 19 2

19J 1o33 1J Iu G 1 AT -25 TURe talos HE AT AND VENT 24DEC54 aJANBS 224UG85 5SEP85 167 J il 1v101222 43 40 J 1 *T-26 ROD CONTROL SYSTEM CP-1 21FEdd5 17APRe5 15AUGb5 ISOCT85 122 "'

i 19234222 50 26 J 1 AT -27 ROD POSITION INDICATION SYS 16JUL85 20SEP85 110 cts 5 24DIC85 60

, __ _ .._ . . _ . . . _ . - . . . - - . . . _ . . . - - _ . . . _ - _ . - . _ . _ - . _ . .. . _. . _ _ . _ _ . . on .

1945023 'v 3 90 0 1 aT-28.1 STATION COMPUTER SC 214UGS4 310EC84 1M4Y65 6SEP85 173 4;

1943o233 13 to 0 0 AT.2H.2 STATION C O.4 P U T E R SC 195EP34 20CTh4 11DECd5 24DEC85 307 #  ;

1, 19vos21s 20 29 zu 1 AT-29 PPIMARY PLANT INST 90 MENTATION SSPS-2 1v0CTo4 16HOV84 110CT85 8N0v55 246 .I

. _ _ _ . . _ _ _ _,_ p . jp 1w5334o$ 23 20 0 0 AT-30.1 LOOP 3 RMS-25 SAPRb5 eMAYS5 23MAY35 20JUN85 32 j' 19533472 o3 oc 0 0 4T-30.2 LU0as 1,253 RMS-25 20M4fo$ 13AUG81 154UG85 PNOV85 61 d ,

19223422 *$ 45 0 1 AT -31 SEISMIC -PHASE 2 TESTINb 14 MAR 45 16 MAT 85 210CTb5 24DEC35 152 i i

. - _ . . . _ ._ ~._ _ - . . - . _ _ _ . . _ _ . _ _ _ _ . - - - _ _ . . _ - . _ _ - _ _ . . _ . . . o 19 v v 1313 23 10 J 1 AT-3) COMMUNICATION SPC-2 26MAPb5 8APR55 23AUG85 6SEP45 105 >

Ivev1111 15 15 W 1 4T -34 EMERG LIuMTINu 22MAY35 12 JUNE 5 104UGs5 6SEP95 $0 d' 'i 4

Ivvels13 33 3o J 1 AT -35 POL 4R CRANE 3C40Gb4 120C)84 20 JUNO 5 1AUGs5 201 y.

  • q 191**232 2 3 0 1 af -30 GLAND $i4L SYS 15J4No5 21JAN85 21Aube5 274U435 152 l IMa445 7 MAR $5 144uG55 20AUu85 115
  • Iv34*J3G $

3 C 1 AT-37 FtEDwATEd PJMP LudE OIL $YS F.-2

a 19u11o33 / loa 100 1 AT 3e Aux 'stk 21 F t t' a 3 A 10M4R53A 389 ,.

. _ _ . _ . .. . _ . . _ . - _ _ _ _ _ _ . . _ . _ . . _ _ _ ... __ ___ _ _ _ _ _ . _ _ _ . . _ m i, 193. 14J 5 5 J 1 AT-34 TRANS 4 Puk!t 2DDCC64 2J4Nd5 10JUL85 16JUL85 135 b,. - . . - . . . _ _ __. .

_i- :,

. _ _ _ . . . _ _ . _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ . _ _ _ 4

.~ . l

. ._ . . . _ . . _ _ _ _ . _ _ . ..__________ a 7 j 4i

_ _ _ . _ __ e

_._!'"**"****_"*?."*!.?*.***************'************"*******************************"*************************'**********'****'* ,

l'! 1 l start-u# T:3T DePAditnNT .

PP0JiCT-SEAdE00( UNIT 1 & COMMON 8,

. il,.

Ain'Jni DATE- 1294e41 1M .._ .__ R E 7 0 P T _ ..A T PTS S ,.___ DATA DATE-21FEH64

  • _. _ . _ - . _ _ _ . . _ _ . . . _ . ____ _ _.._ __.._._ .,_ . . l.;

.-S0nfi3 Nu1cRICALLY_UNLcVLLho 1tTWG94

. _ . . PAGE NO. 4 a s

.l i

.. . . _ - _ . . . . . . . _ . ~ . . . . . . _ . . _

S

eees....................................................................................................e...........................

  • adAn ITiN ~ 0 E G .' Rid. ' P C T " " ~ ~ ~ - ~ ~ ' ' ~ ~ ~ ~ - ' ~ ~ ~ - ~ ~ - ~ ~ ~ - ~ ~ -

--- ~ ~ ~ ~- ~~ ~~ - ' E A

  • L Y CA*LT i;471 L A f t - T O T A L- - ---- ,

NJ. Jun. Dum. CMv. CC CODES DESCRIPTION S TAoi FINISH START FINISH FLOAT e..e......................................................................................................... pg .................

19v16033 1J 17A 100 1 AT -40 wT SYSTim 27NuVs3A 20DECS34 303

>ttdTonpardw&orda., ___

  • 19,1635s 13 10 0 1 AT -61 MAIN LU36 OIL SYSTEM 11 MAYO 4 24MAYd4 164UGs5 20AUG55 31P IVec2 26 21 21 3 1 AT-42.1 EHC SYSTEM EHC-1 2JUL54 31JUL24 84uGd5 6SEP85 277 19371o30 5 5 u 1 AT-42.2 HF S Y 3 T aim

_ _ eM48p4 _14MARb4 13AUGd5 19AUGi$ _

360 .

1Yvd221s 5 5 0 1 AT -43 SEAL. OIL SYSTEM 25MAYB4 1JONd4 30AUG85 6SEPd5 318 1933433J $ 0 1 AT -44 6EN STATOR COOL SYS

  • 5 4 APP 34 10APRS4 13AUGa5 10AUus5 341 1923o42o a 5 0 1 AT .o DM o 21FEeb5 27Ffds5 304UG55 6SEP85 133 ,

19095o34 5 5 J 1 AT -47 COMPUTER dM HVAC 210EC54 28DEC84 19JUL65 25JUL55 144 194/lo3J 5 5 0 1 AT -45 EMEPG FD WTA PMPHSE HEAT $ VENT 30JULd5 54U685 40 ecd 5 100EC55 87 193v3433 '

2 5 0 -1 AT -49 NON ESS SWG9

  • CONT ttLOG HEAT 20 MARS 5 26 MAR $5 4DEC85 10DEC45 179 ,

19394033 5 5 0 1 AT ~50 P4d + FSd HEAT 1AUGB5 7AUG85 29AUG85 SSEPS5 20 DJ 310 3 ) 5 23A 1Cu 1 AT-51 SERV 3LDG RCA HEAT -VENT 19APad34 20MAY534 3R0 191vlo24 3 5 0 1 AT -52 Cw H5E HiAT + VENT 13Nov64 19NOV94 30AUG35 6SEP85 201 g 1/2 443J 5 > J 1 AT -53 MS + Fd PIPE CHASE VENT SYS toNovo4 22MOV94 26JULs5 1Aub95 173 19s04233 5 oA 100 1 AT-55.1 ADMIN /StRV dLD4 NON-RCA VENTS AAH-1 14 MAR 334 21 MAR 33A 369 19uv2333 5 oA 103 1 Hw-1

~

w Nili/ U 3 '4 4 Y E 3 4 10MAV83A . _ .ps47u,,/au fge/-g 380 9.

AT-55.2

_. . . . _ . ADMIN dLDu . SENVICE AREA . _ . . .

l 19JU2*33 5 oa 100 1 AT-55.3 ADMIN 9LDb 4 SidVICE AAEA A/C chm-1 2cDEC82A 310ECS2A 390 i IvsD3 33 -3 14A 1Cu 1 AT 56 AUX ALR WT SYS.McAT VENT SYSTEM 19APWd3A 14MAY334 oage/2/ V4 M/ss. 4 350 f

p. .. . . _ . . . _ . _ . - . _ . . . _

_ _ _ _ _ _ . . . _ sp/fbar/Apr p4 .,

to 1*colo33 5 5 . _ ';. 1 AT -57 reaN -ESSENTIAL SoR VENT 22MAkd6 2PMAR34 g . .- .- ._ __ . _ _ . _ _ . . . _ _ . .

40EC55 100EC35 477 Y. I b 19411o3d 3J 0 1 3G AT -Sb PLANT DvN s UIL SEP SYS 200ECs4 1 Fin 35 ?oJULES -esEP85 150  !

3 . . _

a p . _ . . _ . .. _ _ . . .. _ ._ _ _ ___. - _ . . _ . . .__ . . . _ . . _ _ _ . _

  • g
o

)

. . _. .-__ , . . . - . _ _ . _ . . . _ _ . . _ st7 .

e  ?

(

..+ .

.................................................................................................................................... , lj; j START-up itST DEP4RTat:47 Ph0 JECT-SEASA004 UNIT 1 s COMMON ', , l it c h) m i DATt- 1 3 .% d 5 =. _t . - . .

10 .._..,__..__.4 .._,,_s.

REPURT- ATS, PTh DATA D A T E-21 F iis s4

  • e Il PAGE NO. 5  !

.$ 3 kT c 0 fe J 9 E.N I C 4 L L Y -u re L t V E L E D te t T *4 0 P (

a .

) +

8 1

qE

~ e0dA I T E M ~ ~ 0 E 6 ' P E M .~ 7 C T ~~ - -~~~~ ~~- ~~~ - - ---

2 4 #t;Y E4#tY L4TE L 4 T t--- T 0 T 4 L- 1 N0. cur. D u e . C M r' . CC CODES DESCRIPTION STAdT FINISM START FINISH FLa47 #

e................................................................................................................................... <

141:,432s 1J 10 0 1 AT-59.1 CnLORINATION SYSTEM CL VJULe5 22JUL85 23AUG85 6SEP85 33 {

. .. - ._. - _ . - _ _ _ . . _ . _ . . . . __ ._ B 19132034 5 5 U 0 ACCEPTANCE TEST SV.2 CLA-1 2TFEso5 SM4RSS 26NOV85 3DEC85 188  ;

170o3J3% 5 b, 100 0 AT-nD GENERATOR AIR TEST w/GE HGG-1 14NOVd3A 18NOVB3A 34R M 195o*J33 7 7 0 1 AT -61 Sw + CW SCREEN d4SN 17mAYb5 26MAY85 2DEC55 10DEC85 135 19331s34 5 5 0 1 AT -62 GEN H2 CC2 GAS SYS 310ECb4 TJANS5 26JUL85 1AubS5 144 i

19992,42 5 S U o 4T-o3 ItITIAL TdNu!NE ROLL MFT WSLP85 13SEP65 40Cid5 100CT95 10 #

g IW593245 3 3 0 1 AT-64 RE4CTOR CAVITY SKIMMER SF-2 15 MAR 65 19 MAR 85 22MARd5 2eMAP35 5 '

d -l 19:c2J2* 3 $ 0 C AT oS EQUIPM4NT VENTILATION v6-1 AT-oS 25FEBe5 1 MAR 85 164uG55 22Aub85 121 1999113J $ 2 0 0 AT-60 NON-ESSENTIAL dATTERIES 17MAY34 23MAf94 23APRd5 3QAPR85 234 8

  • 6' Iv sto24 4 4 0 1 PT 1.1 RCP INITIAL OPS 15MAY85 20MAY85 15MAV85 20MAY85 0 4

f 19 v '/ 2,5 0 5 S 0 0 PT-1.2 RC PUMP (HFT) MFT 95EP65' 135EP85 40CT65 100CT85 19 15 7$Q2s 10 10 0 1 PT -2.1 PIR REL TK BJAN55 21JAN85 20 MARS 5 2APR15 50 17994,51 5 5 0O eT-2.2 PRESSURIZER RELIEF TANK (HFT) MFT 95EP55 13SEPB5 40CT85 100CTd5 19 1dvv2-52 5 5 G 0 PT-3 RCS VIsRATIOf4 (HFT)

MFT 4SEP65 13SEP85 40CT85 100CTd5 19 +

19994453 5 5 0 0 PT-4 RCS THERMAL EXPANSION ~HFT) et F T 95EPd5 13SEPES 40CT85 100CT95 to i

__. ; p j

.li b

'19171,00 ) 't 0 0 .

PT-5.1 CHARGING SYSTEM OPERATION CS-1 ofts35 12 fed 85 16MAYd5 20M4Y35 67

  • 19173553 U 0 CS-3 107 3

_ _ 9T -5.2 90nIC.__..ACID 13DECb4 14DEC84 14MAYd5 20P4Y85 S l *

,, .. _ . _ ._ . . . . _ . _ _ ~ _ . . _ . _ . .._ . _ . __ _ ._ ._ ,

19992454 ._.

5 5 0 C _ _ _ . . . . _ .

PT 5.3 CVCS :s3RIC 4CID (HFT) nFT v5EP55 135EP55 40CT85 100CT85 19 l'

  • n 1917*40s 15 15 0 9 PT-o.1 uTNS SYS CL-4 27JUNa5 ISJUL8) 164UGd5 ASEP85 35 .

-)

e

. . . .. . . _ _ . .~ . _ ._ . . _ _ . . . .

. 19972455 5 .) O C PT-6.2 CVCS-MTRS (MFT) HFT 9 5 E P t.5 135EP25 40CT85 100 CTS 5 19 l

y '# 1 1

._ . . _ _ . .. _. . . _ _ . , . _ , _ . . .._.._ .__- _ _ _ _ _ S q

.. . _ _ _ _ __ _ e9 f 8

s '3 6 e

ATART U# TLST DiPAMThiMT PROJtCT-SEA 3R00< UNIT 1 s COM90N ',

e 7's . ) . - . - . - . . . - _ _ . -

HE70nT DATi- 13 MANS.( 13) REPORT- ATS, *TS DATA DATE-21FE9b4

  • m
  • PAGE NO. o +

n

] ._ $0 dico NUME. TIC ALLY-JHLEV ELED N E TwdRE

)' e 1 e fq ' ....................................................................................................................................

dORCITE1 OR G. R E9 T' PCT

~~

EARCT EARtY CATE t. ATE - TOTAL g i FINISH FINISH FLOAT K{!=.

NO. Dud. 00R. CMP. CC C00E5

..;......~.~.T.7......................................................................................................................

DESCRIPTION START START Id47103o s 0 1 PT -7 RHR SYS 15 Maps 5 26M A R!! S . 15 MAR 85 26 MAR 45 0 ,

p $

19 71923 d a 0 1 PT-M.1 SAFETY INJECTION 15M4R85 20 MAR 85 15MApa5 26 MAR 85 0 159ARb5 26 MAR $5 159Anu5 2sMARSS I

19 71v26 s a "., 1 PT-M.2 ECCS 60RUN INJECTION YAN( O p 19992 53 5 5 0 0 PT-9 EMERG C0kE COOLING (HFT) MFT 95EP85 135EP85 40CT85 100CT85 to g ly*11o2e 4 4 0 1. PT -10 ACCum BLuwo0wN 22 JANE 5 25JAN85 6FEB85 11 fee 85 11 IV o2333 5 5 0 1 PT-11 CON'T SudP OPa$ RM-1 4JANo5 10JAN85 23JAN85 29JAN85 13 Iv1G4J33 5 5 u 1 PT 1 CONT SPRAY 21FEB85 27 fed 85 23JULe5 20JUL35 105 1 _1 19104032 3 3 0 1 . PT 2 N0ZZLE 25FE8d5 4MARd5 3DJUL55 1AUG85 105 PT-13.1 MSIV TEST M5-1 10JUN85 21JUNd5 19JUL85 1AUG85 28 19441o34 10 10 0 1 y -19vv2 57 5 5 0 0 PT-13.2 MAIN STM ISOL VALVES (HFT) MFT v$EP85 13SEP85 40CT35 100CTE5 10 ,

19341033 7 7 J 1 PT .14.1 EMERG FDWTP SYS 15 MAR 65 25MARB5 124UG85 20AUG95 103 PT-14.2 EMERG F EDdATER (HFT) HFT 95EP85 13SEPS5 4CCT85 100CTa5 to

  • lyvy2452 3 5 0 0 _ __ .

0 0 PT-14.3 EMERh FwPH VEhTILATION MFT 95EP55 13SEP85 40CT85 100CT85 10 p 199924o3 5 5 9 1/s25323 7 7 0 1 PT-15.1 SEFVICE WATER -

Sw-3 94PRu5 17APR85 26APR85 7MAY35 13 Ivs2203G 40 20 0 1 PT 15.2 SERW .TN PMP + TOWCA ACTUATION loAPRd5 16 MAYS 5 8MAY85 SJUN85 13

=

p 19o21o30 7 7 0 1 FT 15.3 COOLING tower PERFORMANCE TEST 1AUG45 9AUG85 30CT85 110CTB5 44

..k p' 19431033 / 7 0 1 PT 15.4 SEPV wfR PMPHSi COOL tower HVAC 130EC54 210ECS4 17JULd5 25JUL85 148 19a25232 2J JC o 1 FINAL FLod aAt ho VERIFY AT OP LvL dT-13.5 Sw-3 1/NAYc5 14JUNd5 OJUN55 3JUL85 13 L' n-1%2 yg,, M 115tP53A 195EPB3A r/Wd._t,,c ,, Mp Q*

Iv.21434 5 o4=1c3 1 PT-15.s wEPFOR1 FIM NPS{ VERIF-P-110 A&n 4 p g p,. 253_ - _ .

  • 19 2524o 2 2 0 0 P T-15. 7 C00LI% TOW E R PUMP 09 LEVEL s.-1s2 217 6 54 27 FEDS 4 72FEBa5 28FEeu5 253 k.. g g ' -- -- - - - - - - - - - - - - - - - - -

e-~

. _ . . -._ - - . . . _ _ . . . . . ._. ~ .. _ . _. . . _ .

Pl-

. _ . . _ _ _ _ __ - _ _ _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ __ _ .__ . _ _ _ . _ . . _ - . . _ . _ __ m

. . _ - _ .._. _ _ . _ _ - _ _ . _ . _ _ _ - _ . _ . _ . _ r9 -

a  ?-

.6 i

. , t t

1 S T uc T -U P Toi D UARTrtb4T PRcJiCT-hEA%00( UNIT 1 5 COMMON . .p \ -

._ _ . _ . , . _ . . _ _ _ _ _ . . _ ._ . . _ _ . . _ _ _ - _,. ,. g HE PON T D A T i- 131 W 4( .

15)

REPOPT- ATS, PTS DATA DATE-21FEBB4 . {

oAGE NO. 7

/. 3, . _ _SubicD NJ1:41C4LLY-UNLEVELED N c T.l3 a g 3

i

. .- _ _ ....___._ - -_- _ .._. _ .. _ _ _ _ _ ._ . __ q

  • h .................................................................................................................................... t U wCHA 172:1 Uhu. h E N. 7 C T - ' ~ - - ~ ~ ~ ~ ' ~ ~ ' '"~~ ~ ' ^ - ~^ " - - - ' ^ ' -

'----'E A R L Y~"- ~ E A R L Y LATE- t. 4 T E- T O T A L-- - - - .

U NO. Dud. bud. UP. CC CODES DESCRIPTION STA4T FINISd START FINISH FLUAT O'j. ~

'-~~~.'.L......~.~.'...U..~.~.7........~.-';................................................................................................... *'

1423c2 IU 10 9 1 S ai P H PUMP NPSM MIN LEVEL PT-1).d Su-3 13Dite4 27DEC54 3J AWS teJANBS 11 e!

1*st>25o 10 10 0 3 PT-15.9 PMPHSE JP LEVEL Sh-112 2dJANe5 8FESB5 14FERd5 28FEH85 13 Ivo252oc 15 15 0 0 PT-15.10 PUMP TRIP / START Sw-162 1714Ya5 TJUN35 13JUNs5 3JULM5 18 Y 19stS2s3 3 3 0 3 PT-15.11 CT MAAL UP PU9P SW-162 oAUGd5 8AUGS5 4SEP65 6SEP35 20 1#112351 5 5 0 1 3E61N PT-10.1 PRIMARY COMPONENT C00LINb CC SMAmo5 11 MARE 5 5mAvd5 14MAYH5 45

. - - - - _ . . .__ _._ ._.. _._ . _ _ _ . _ _ _ . _ _ . _ _ _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ i 1911o17e 3 5 0 0 PT-10.2 PRIMARY COMPONENT COOLING SYSTErt CC-756 2]MARb5 26hAR85 14MAYB5 20MAY85 3P . I' 1929204/ 10 10 U 0 SPENT FUEL POOL COOLING SYSTEM PT-17.1 SF-1 300Cie4 13 NOVA

  • 16NOVs4 30NOV34 12  !

1959204J 10 to 0 1 SPENT FUEL POOL CLEAN-UP PT-17.2 SF-1 150CT24 260 CTS 4 16NOV84 30NOWB4 23 L

i 1011c22 oO oO O 1 AT -14 EXCORE NUC INSTRU SYS PHASE 2 TESTING 17JANd5 11APR85 19FE985 14MAY85 22 3 197U3433 '30 3u G 1 SOLIO STATE PROT N -PHASE 2 TESTS PT-19+2USSPS-2 13MAYB5 24JUN85 13JUNBS 25JUL85 22 Y lt 19202c22 35 30 0 1 CONTINui PT-19+20 SSPS-2 25JUN85 6AUG35 20JUL85 6SEP85 22 l Ivvo4322 3 5 0 1 PT -21 CONTAINMENT ISOL VLVS 4NOV65 BNOV25 4 Novo 5 BNOV 35 _ 0_ . _ . _ _ Y '

p 1924.4933 5 .5 0 1 PT 22.1 CONT ENCL VENTS 25JUN85 1JULS5 27JUN85 3JUL85 2 3 ,

19992 59 5 5 0 0 TP-22.2 CONT T ENCLOSURE (HFT) HFT 95EPd5 135EP55 40CT85 100CT85 10 19244133 5 5 0 1 PT 23 CONT EXH 14FEBd5 21FE865 27JUN35 3JUL85 92 .

. - - _ _ _ __ __ __. . . _ . __ p, 19244334 2J 20 0 1 PT 24 CONT kNCLOSURE LEAK PLATE TEST 2JULt5 30JUL85 SJULd5 1AUG95 2 k; I 5

19121324 $ 5 6 1 PT 25.1 H2 ANALYZiR 16FAYb5 22MAYd5 19Jul85 25JUL55 44 . .

Iv124u2$ 10- 1 (, u 1 PT-25.2 H2 THENMAL R E C orld 1 N E R C3C-2 2MAYe5 15MAY35 19JUL55 1AUG85 54 j y_ _.-.__-_ _ . . . . . _ _ . _ _ . . _ _ _ . . _ __- . _ . _ _ . . __. _._. _ _____. _. ,

a Iv121o33 3 5 0 1 PT 25.3 5Acr. up PuhE 2JUL85 VJUL55 2eJULo5 1AUG85

_ . . . \} ,;

17

  • Idvo5o2s 3 5 . 0 1 PT -20 CONT AIR REC 14C SYS 12JuNt5 1&JUN85 12JuLa5 18.sLd5 21 g.. . - ._ __ .

o

_ _ _ . _ _ . Ay e

) . . _ - _ . ~. _ - - _ . , _ . . .

, . . , . _ _ _ , , , . . _ _ _ U L .- . - . _ . , _ . . _ _ . . _ . _ . . - . _ _ _ _ - . _ _ _ _ _ _ _ _

.g-

e l

sO y

4

. _ . _ _ _ _ , _ _ - . . . ~ . - - _ . _ _ - , _ _ . . . . _ _ . _ . .

e

', 1 s STAwT-ud Tc5T sEP4dTNc1T PROJECT-SEASA00( UNIT 1 b COM*0N

_ _ _ . _ _ _ . . .' e NEPuni JATi- 13 MAP 344 1,) REP 0ki- ATS, PTS DATA DATE-21FES34

  • i ,*, 10kTi0 NuiikIC ALLY-UNLEV dLiD NiTwCR aC PAGE NO. 8 ",,

.s A

a ....................................................................................................................................

-i. 'c0RK ITE9 ORG. REM. FCT ~ ~-- - -~ ' " " - ~ ~ ~ - - " -

tAnLY TAtLY - TATE L A T E--T O T A L- ----

(~ wa. Duy. Oud. CNr. CC CODES DESCRIPTION START FINISH START FINISH FLOAT 4 .....................................................................................................................mrm........

1vjQ1c24 5 > J 1 PT 27.1 FUEL dLDG VtNT 21MAYd5 28MAY85 14 JUNE 5 20JUNB5 17

.I 19sJ1 ole 5 5 0 1 PT 27.2 EAw FILTER 21 M A Y d 5 28h4YS5 14JUNd5 ?OJUN95 17 Ivsv5o. 0 10 IL 0 0 PT-23.1 CONROL ROOM Hv4C C9A 140ECs4 28DEC84 12JUL35 25JUL85 144 lisstolt 5 3 0 1 PT-25.2 CONTWOL ROOM VENT 31DEC84 7JAN85 FeJULd5 1AUG85 144 9

19avso)4 5 3 0 1 PT-28.3 Po$. PRESSURE ENVEL. TEST CONTROL ROOM 50CTe4 120CT84 ivJUL85 25JUL65 196 IvJdloje 5 ) G 1 PT-2w EMEaucNCY $w1TCHGEAR CSA-152 7JuN84 13JUN54 40EC85 10DEte5 374 I 19ss. 3J 3 5 0 1 PT-30 EMERG 4C DIST.(UAT/NAT TRANSFfR) $f-3 29MAY85 4JUNS5 245EP85 30$EP85 82

)

I v v'e 161 s 75 75 0 1 PT-31 125v DC DISTRIsuTION,5YSTEM 24MAY84 10$EP84 1MAYd5 15AUGa5 234 19vv121s 00 c0 0 1 PT-32 120 VAC INSTRO PodER SUPPLY 1MARd4 24MAY84 13JuNa5 6SEP85 323 I

tv225o30 1J 10 0 1 PT 33.1 DIESEL GhNEHATOR DG 3JANb5 16JANt5 30APPE5 13:1AY85 81 3

19231o2e 10 10 0 1 PT 33.3 DG VENT SYS 19JUNs4 2JUL54 3QAPRt3 13MAV35 21 6 Ivs11o22 15 15 0 1 PT 34.1 NEw FUEL HANDLING EQUIPMENT FHo-2 22 MARS 5 11APR85 31MAYd5 20JUN95 4e I tv311o33 14 14 C 1 PT-34.2 FINAL INDEAING FHC-1 40Eco5 23DEC85 5DECE5 24DEC35 1

)

19dv2*1o 5 5 y 1 PT -35 RCS + HYDRO -

21MAY85 28mAY35 214AYd5 28 MAYA 5 0

1) 'I 199 ns3 15 G 1 PT-30 & 37.1 (TYPc A) SAT & ILRT 12N0vb5 3DEC55 12Novd5 30EC65 0 y

1992 32. 20 2J u a COMPL PT-37.2 TYPE u LEAK RATE TESTINu 110Cie5 8Nov55 110CTa5 8Mov85 f1 P.

19ss.J23 15 lb 'J G COMPL PT-57.3 TYPt C CONT LtAK RATE TESTING 110CTo5 1N3v85 110CTa5 1Novi5 0 l 19202o20 2J 20 0 1 vi -3J tSF INTEu TAuuS5 45EP45 110CTd5 MN0v85 46 ,f

,, - .I a 19425o3s = 4 e 1 C 0:* PL P T- 5 '# Lu15 0F 0FF51TE P0wER 110 cts 5 170CTJ5 300CTa5 4Novd5 12

. _ _ . _ . _ _ . . _ _ _ _ _. _._. . . _ _ . . .- a e 19vv2 3'J 24 d4 b 1 PT -40 HOT FUNCTIONAL TESTING v5 Lea 5 100CTd5 vsEP85 100 cts 5 0 7

_n ..a ._

. _ . _ . _ . _ _ _ _ _ _ _ __ __ __ y~i

._.__.__u__

. . =~ _ .

i . I-l e . 3,

. _. ._. . ~ _ _ . _ _ _ _.m....-_ _ _ _ _ . _ . _ _ , _ .. _

e. ,o l

s l-l

. . . _ _ . _ _ _ . - . . . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . p

.................................................................................................................................... ', - l:,

1 ST Abi-uP TEST JEJ AWThE sf PPOJeCT-SEA 9w00( UNIT 1 s COM*0N ,

REPORT DATi- 13 MAR ,L 18) Rtd0AT ATS, PTS DATA DATE-21FEB64

._ . . . . . - _ - . . . . . _ . . _ _ _ _ _ . . . _ _ _ e ,;

PAGE NO. 9 "-  ?,

y. . ' . $0.xTt3 N u. .d. i 4 A_C A L L f -u N L e v l L E D NET *0RK n 3

.t I ,1 l til d uk A' 1T6 4 "' 0%. E W.' P C T ~~""~~^

~ ~ ~ ~ ' - - - ~ ~ - - - ~ ~

EARLT- tARCY T ATt LATt iOTAL f tG . c g et . Dud. C P. P . CC CODES DESCRIPTION START FINISH START FINISH FLOAT -

's C*~~ %...........'.".~.....................................................................................................................

IVvv24o] 1 1 0 U PT-40.1 PRLs 4 PkES5 6 LiVEL CONTL HFT WSiPSS 95EPS$ 26SEPuS 26SEP85 13 19f92 01 1

. _1_ . . . _ .

0 0 PT-40

_._._ ..___ ...__ 2 RCS LcAt_ _ _ _ _ _ _ _ _

DETECTION SYSTEM HFT 10SEPo5 10SEP85 27SEP85 2758P85 13  !

_. _ _ . . . _ _ . _ . _ _ . . _ _ . _ _ _ _ j

~

1/ v v 21. o 2 1 1 0 0 PT-40.3 5/G dTR LivEL INSTR VEHIF HFT 115EP55 11 SEPT $ 30SEPBS 30$EPd5 13 -

19vv2.o3 1 1 0 0 PT 40.4 PPIMARf6 SECONDARY INSTR MFT 12SEP65 12SEP65 10CT55 10CT35 13 '

1*v,2 o= 1 1 u O PT-40.5 REM 3TE SHJTDOWN PANEL nFT 135EPs5 135EP85 20CT85 20CT35 13 j terv2.oh 1 1 0 0 PT-40.o PRES R 5 MSSV SETPT VERIF HFT 10SEPd5 10SEP85 30CT85 30CTB5 13 19dv24os 1 0 0 PT-40.7 CONDEN3ER STEAM PUMP HFT 17sEPd5 17SEP85 40CT85 40CT35 13 1

._. . __- . - . _ _ . _. _ _ _ . _ _ . . _ _ . _ _ . _ . ,3 ,

1 Y v 'v 24 o r 1 1 0 0 PT-4.0.8 S/G ATMOS STEAM RELIEF VLV HFT 18SEP85 18SEPS$ 70CTd5 70CT85 13 l a

tyvfiscs 1 1 0 0 PT-40.9 SW L PCCW PERF (HFT) HFT 195EP85 195EP85 80CT85 80CT85 13 -

19ve 24ev 1 1 0 0 PT-40.10 MEAT RkMOVAL DEMONSTATION HFT 20SEP85 20SEP35 90CT85 00CT55 13 ,

197v2 70 1 1 0 0 PT =0.11 CONT T PENLTR COOL G CAP HFT 23SEP85 235EP85 100Cid5 100CT85 13 9SEPd5 13SEP85 40CT85 100CT95 19 '

'14/92471 5 3 0 0 PT *1 INTEGRATED PLANT HEATUP HFT -

19vs2472 5 5 0 0 PT-42 INTEGRATED C00DN (HFT) nFT 30CTe5 90CT85 40CT85 100CT85 1 Iv9,2 35 19 19 0 1 PT-43 RLACTOR POST HOT FUNCT INSPECTION 110CTd5 7NOV55 150CT85 SNOV45 1 tv, slots 20 20 0 1 PT -44 PLANT VENTILATIO.4 SYS FILTER TESTING 19JUNuS 17JULS5 26NOV85 24DECS5 110 - "

.g q 19 o3393 13 10 0 0 PT-45 PAH VENT SYS PAH-1 1APRa5 12APR$5 TJUN85 29JUN35 47 I:

'i

- _ . . g:

J eJ 6 8e

, . . . _ . - . , _ _ . _ ~ _ . . . _.-_. _ _ - - . _ _ . - _ . _ . . _ . . . _ ._ _ _ , , , . , . , , __ , , . _ _ , . . . _ , , , , , , _ , _ _ , _ , ,

t 1

= -

_ . . _ . _ . - A k N

i

. __..._ _..___- .... _ . _ . _ _ . . _ _ - ._ Q, 1

, . . . , ._._.._...._,m ., . . _ . . . . . , . . _ , . .

~

//l Ef1GINEERING STATilS IINIT 1 Af!D CPTV'Off DRAWIfjGS 987 C0tiPLETE SPECIFICATI0flS 987 f.0MP H J -l

_N

N7  !

[ SEABROOK STATION UNIT 1 AND COMMON FACILITIES ENGINEERING AND DESIGN STATUS DRAWINGS TOTAL TOTAL PERCENT REQUIRED ISSUED ISSUED

  • DISCIPLINE STRUCTURAL 1,035 1,017 98%

SUPPORIS . 58 56 97%

MECHANICAL 420 419 99%

124 99%

SUPPORTS. MS ELECTRICAL .854 806- 94%

Iac 2,301 2.300- 99% ~ ,

Iscs WICAL SERVICES 258 253 ,

982 SUFF0EIS 55 55 100%

NUCLEAR 1,299 . I,223 942 SUPPORTS 718 695 97%

SUBSTATION 155 147 95%

ARCHITECTURAL 235 235 100%

TOTAL 7,513 7,330 982 O

i e

FEBRUARY ,20, 1984 III-2 f

1 I

  • l

+ ~ - . . . . - - - - . .

1 l

t I -

]

[/[

SEABROOK STATION UNIT 1 AND COMMON FACILITIES ,

i ENGINEERING AND DESIGN STATUS ,

l l

SPECIFICATIONS TOTAL TOTAL PERCENT DISCIPLIE REQUIRED ISSUED ISSUED -

STRUCTURAL , 89 86 97%

IECHANICAL 54 54 100%

ELECTRICAL 48 48 100%

I&C .

76 76 100% ,

NECHANICAL SERVICES 50 49 98%

NUCLEAR 71 70 99%

SUBSTATION- 11 11 100%

ARCHITECTURAL 40 40 100%

PIPING 35 32 91% -

CONSTRUCTION 17 17 100%

PROJ. STANDARD DOCURENTS 32 32 100%

TOTAL 523 515 98%

9 e

i 1

l FEBRUARY 20, 1984 III-1 I

, l

  • ~

Y - y

//1 SEABROOKSTATION UNIT 1 AND C0Fim FACILITIES SOEDULAR l! PACT OF TMI EQUIPBENTS (NUREG-0737) AND CURRENT LICENSING ISSLES o CRITERIA FOR CONSIDEPATION OF NUREG-0737 ITB IN CFP o f'AJOR CONSTRUCTION (DUE T0 f!ATUPE OF ITB) o EQUIPtBIT AVAILABILITY o NUREG-0737 ITBS CONSIDERED FOR CFP (54E AS RR 11/82 CFP) o TECiflICAL SUPPORT CENTER o EERGENCY OPERATIONS FACILITY o SAFETY PAP #ETER DISPLAY SYSTEM .

o POST-ACCIDENT SAPLING SYSTB o PLANT SHIELDING REVIB1 o REACTOR VESSEL K AD VENT o SEABROOK ACTIVITY AND SOEDULAR INFLlBICE OF NUEG-0737 ITEMS (DNSIDERED (CURRENT STATUS OF ITEMS (DNSIDERED AT 11/82 CFP) o OTER LICENSING ACTIVITY 00NSEDERED FOR CFP AND SEABROOK SOEDUlAR INFLLENCE (SAT AS mR 11/82 CFP) o ENVIRDffENTAL QUALIFICATION OF E0VIPffNT

1. NSSS - EECTRICAL
2. BOP - EECTRICAL
3. W HCANICAL o APPENDIX R (FIRE PROTECTION) o APPENDIX E (E - PUMING) o RVLIS 9-I

/M EINIIMBffAL QUALIFICATION OF SAFETY-fFLATED EnUlfiBIT ELECTRICAL EQUIRFilT f6SS bl USERS GROUP 95% Q1PLETE PLANT SKCIFIC REVIEW 60% 01PLETE NO EXPECTED IMPACT ON C0f6TRUCTION -

DOE 85% C0tPLETE NO EXPECTED IPPACT ON CONSTRUCTION IE01ANICAL EQUIRBfT REVIBfGPRflE x NOIIPACTON(riSTRUCTION

\

9-2

. m

... . -. . . .= . . - . . ..

' /;t/

l I

l SEISMIC QUALIFICATION OF SAFETY-RELATED EQUIPMENT o 70% EQUIPMENT FULLY QUALIFIED o 30% ADDITIONAL VERIFICATION' REQUIRED i o -

ARS VERIFICAlION PROGRAM RESOLVING CONCERNS 9

o SQRT AUDIT SUMMARIES - UPDATING

o TO NRC MID 1984 1 o NO AUDIT SCHEDULED e

l 1

9 .3

$ w 9 D

4 I

/22- 1 t

i l

4 5

j SCllEDULAR IMPALT OF 10CFR50.55(E) DEFICIEilCIES o 19 ITEMS REPORTED SINCE 11/82 CFP .

o 6 ITEMS CLOSED o 5 ITEMS SCHEDULED To BE COMPLETED

o 8 ITEMS UNDER EVALUAT!oN o No FORESEEABLE SCHEDULAR IMPACT J

4 s

i 10

+

- - . . , ---,-e , , , p -

y

/23 i

4 t

6

)

i i

k -

1 I (

i i 1

i ,

l ATWS l l

0 RULEMAKING NoT SCHEDULED r

o No NRR REQUIREMENTS o WOG'ilANDLING 6ENERICALLY.

l o PoSSIELY No PRE-FUEL LOAD REQUIREMENTS. i i

] ,,

h i

1

.I i

1 1

I l 2

i 12A .

IAY IllGil BERGY Life BRERK KRCBIT EXPECTED IfPACT m ENGINEERED C0fPLETION CONSTRlCTinN PI E 14lIP 95 JitE,1984 Note IDBITIFIED JET IFPIfEBBfT Sq JULY,1934 NOTE 1 FLOODING 83 JLEE,1984 MnTE2 Eff'IR0ffEiTAL E0 JilLY,1984 f0TE 3 EFECTS INDUCED 70 JUIE,1984 f0TE4' TPA!EIENTS NOTE 1: SOE CABLES HILL iMVE TO E E-RnUTED AND S0rE IfflNGBBIT SHIELOS INS NOTE 2: PROPABLE ORNGES - UPGPADE INSTRIBfTATION, EVIBf DPAINS, DIRLIFIED SFP PltPS.

[01E 3: PROBABE 01%GES - INRADE INSTRllBITATION, ADDITI0fML 000RS, f1If0R STRUCTUPAL CIWlGES.

NOTE 4: C0flTR011ED CLOSURE GECK VALES TO PE IfSTALLEO Ofl EA01 FEDMTER LIE SEVERAL PIE SJPPORTS TO E PDDIFIED. B0 EW SlPPPORTS TO E ADED.

1%

- /.25 s .

l 4

9 t

2 l

PIPE STRESS (AS-BUILT) ANALYSIS .

o CAD SYSTEM OPEP.ATIONAL

- o' ,F,EEDWATER LINE S-BUILT AND ANALYZED lllTH CAD SYSTEM o--REMAINDER BEINrt RESCHEDULED PER BASE-LINE SCHEDULE r

, s use 4

/

% +

E 4 gs '

'w

'. f [

T

'.% - 12c-

.2, -

/E N-STAMP CERTIFICATION PROGRA!1 0 COMPONENTS ,

O SHOP STAMPED O STEAM GENERATORS - AFTER RCS llYDRO O FIELD FABRICATION FIRST N-5 DATA FORMS UNDER PREPARATION 112D

a -- . . . , - ... .

/27

~

~

UPDATING DPAWlfE Na SRCIFICATIONS TO AS-P>lllLT CONDITIONS o AS-BUILT DRAWIflGS DEFINED IN AP-39 NO LISTED NO SCHEDULED BY TP-11 o -STATUS TOTAL ESTIMATE COlFRACTOR SUMITTED DR@!ING TOTAL FM 98 ILT GRINNELL 9 81 HAH 384 29m .

JCI 26 450 IERINI 11 5 / 1172 flonlER 153 153-pin 243 255' P.H. J53 11000 TOTAL 2728 ,v J7090

.o UE8C DESIGN DRAWIfE AND SPECIFICATIONS - CONTINUALLY (180 DAY MXIPUI DELAY)

~ '

o PROGP#i(NDER CONTIfEe G'IEW S

m s

er em i ,

9N

, i

~

. .% a r' -
y '

, - ,, t I.'- 's

fo2 Y 1

PRESSlJRIZER RELIEF VALVE o PIPING DESIGN MEETS LATEST EPRI TEST CRITERIA -

o VALVES ON SITE o PIPING EING INSTAUID o VALVE SOEULED TO E INSTALLED BY 4-I-84 i

4 h

I

l u

H"

/dlf 1

SOLID WASTE HANDLING SYSTEM o VOLUME REDUC 1 ION AND SOLIDIFY LIQUIDS o ENCAPSULATE AND SOLIDIFY FILTER CARTRIDGES & ,

MISCELLANEOUS ITEMS o PROVIDE FOR MOBILE PROCESSING SERVICES o OPERATIONAL PRIOR TO FUEL LOAD o AMENDMENT 52 DESCRIBES CONTRACT SERVICES o 95% EQUIPMENT PURCHASED .

o 30% DRAWINGS COMPLETED.

F

. l .2. i

+: -

.- .. . - = . -. .- . . ..

/$() j i

l THERNAL' BARRIER COOLING SYSTEM EQUIPMENT

.ALL EQUIPMENT SHIPPED EXCEPT:

SURGE TANK - EXPECTED' DELIVERY JUNE, 1984 PUMPS - EXPECTED DELIVERY MARCH 16, 1984 PIPING I

I ALL EQUIPMENT SHIPPED- ,

PIPE SUPPORTS APPROXIMATELY 50% COMPLETE AND DELIVERED t

CONSTRUCTION

HEAT EXHANGERS ARE SET. PUMPS SCHEDULED TO BE INSTALLED BY-MARCH 31, 1984. BASELINE SCHEDULE SHOWS AN EARLY FINISH DATE OF FEBRUARY, 1985, 1

4 f 1 112J

/3/

?

s S'EISMfC CATF60RY ll/l REVIEW COVERED UNDER TECHNICAL PROCEDURE - 4 (TP-10 REVIEW IS UNDER WAY LhST ISSllE dF REPORT REV.111ATED 12/21/83 ,

9 6

ys 9

e O

4 e

i e

2

, ~ . . -- =, ws u.=--_ ~-2~ s - a r-- -+--w

/

BL

< SEABROOK STATION UNIT I AND COMMON FACILITIES OPERATING PROCEDURES REQUIRED FOR NOT IN PREPARATION APPROVED

  • FUEL LOADING STARTED & APPROVAL ADMINISTRATIVE 176 19 36 121 OPERATIONAL 556 48 146 362 SURVEILLANCE 388 95 213 80 MAINTENANCE 580 115 317 148 EMERGENCY 155 16 47 92 TOTAL 1855 293 759 803 TOTAL % 100 16 41 43 4

APPROVED MEANS APPROVED AT THE DEPARTMENT SUPERVISOR LEVEL OR AB0VE-3/1/84

a

/3.3 SEABROOK STAT 10ll UlllT I STAFF TRAlfilNG 52% 68% 74% 84% 53% 70% 46%

EQUIVALENT % OF '

Oil ED I h N k h j GR S q (h@ [ 4 /$

N lilTRODUCTORY X X X X X X X 12/84 FUNDAi1ENTALS X X X X X X X 12/84 PLANT SYSTEtis X X X X X X X 12/84

-TECHillCAL SKILLS X X X X X X X 12/84 11AtlAGEliEllT SKILLS X 12/84 G.E.T. X X X X X X X- 9/85.

3/1/84 1

, Aff SEABROOK STATION UNIT I STAFFING STATION ORGANIZATION EMPLOYEED AS OF PROJECTED AUTHORIZED 3/1/84 ONE UNIT TWO UNITS NUCLEAR ENERGY FUNCTIONAL UNIT EXECUTIVES 3 3 3 NUCLEAR CONSTRUCTION 4

CONSTRUCTION MANAGEMENT

  • 16 16 16 SITE MANAGEMENT
  • 9 -9 9 HUCLEAR PRODUCTION SEABROOK STATION 411 485 515 SEABROOK STARTUP TEST DEPARTMENT
  • 11 11 11 NUCLEAR PROJECTS 15 16 16 SEABROOK TRAINING CENTER 1!7 33 33 NUCLEAR SERVICES GROUP 16 18 17 NUCLEAR ENGINEERING GP.0VP 4 7 6 NUCLEAR QUALITY GROUP 16 28 28 NUCLEAR INFORMATION SYSTEMS GROUP 17 -19 19 TOTAL 545 645 673 1

FIGURES INDICATE.PSNH EMPLOYEES ONLY-THESE FUNCTIONAL UNITS' INCLUDE.

NON-PSNH MEMBERS.

(.

/ES SEABROOK STATION UNIT I STAFFING STATION ORGANIZATION EMPLOYEED AS OF PROJECTED AUTHORIZED 3/1/84 1 TAI. ION MANAGEMENT & STAFF 19 19 19 ADMINISTRATIVE SERVICES 75 93 93 TECHNICAL SERVICES 248 288 288 QP_ERATIONS TOTAL 411 485 485 OPERATOR AND SENIOR OPERATOR LICENSES ONSITE CONTRACTED PROJECTED REQUIRED SR0 20* 0 18 8 R0 24' 0 30 8 l

PREVIOUS LICENSES; THERE ARE CURRENTLY NO SEABROOK LICENSES ISSUED-i

/