ML20059K522 | 14 September 1990 | Responds to NRC Re Violations Noted in Insp Rept 50-443/90-15.Corrective Actions:Procedure ON1090.04 Revised to Require That Whenever Containment Entry Made,Entry Logged in Action Statement Status Log | |
ML20059K595 | 14 September 1990 | Forwards Endorsement 29 to Nelia Policy NF-296,Endorsement 22 to Maelu Policy MF-127,Endorsement 9 to Nelia Policy N-109 & Maelu Policy M-109 | |
ML20059K105 | 13 September 1990 | Advises of 1990 Biennial Exercise Meeting Scheduled for 900928 at Facility to Discuss Comments Re objectives/extent- of-play Submittal & Present Operational & Radiological Details of Scenario.Suggested Agenda Encl | |
ML20059D697 | 30 August 1990 | Forwards 10CFR50.59 Quarterly Rept for Apr-June 1990 | Safe Shutdown Shutdown Margin Met Tower Temporary Modification Fire Protection Program |
ML20064A400 | 21 August 1990 | Forwards, New Hampshire Yankee Fitness-For-Duty Semiannual Rept,900103-0630 | Fitness for Duty |
ML20059B023 | 21 August 1990 | Forwards Addl Info Re Topics Discussed on 900816 Concerning Licensees Response to Intervenors Emergency Motion to Reopen Record on Adequacy of Staffing of New Hampshire Radiological Emergency Response Plan & Immediate Shutdown | |
ML17348B492 | 15 August 1990 | Forwards Revised Evacuation Time Estimates Incorporating Vehicles Hidden from Aerial Observation,Per ALAB-932 & ASLB Memorandum & Order LBP-90-20.Revised Estimates Will Be Incorporated Into Radiological Emergency Response Plan | |
ML20059A305 | 14 August 1990 | Informs of Closing on United Illuminating Co Sale & Leaseback Transaction on 900809,per Amend 1 to License. Transaction Conforms to Description in Amend Application, ,as Supplemented by 900426 & 0606 Ltrs | |
ML20058L957 | 3 August 1990 | Forwards Rev 1 to Inservice Testing Program for Pumps & Valves,Adding Cold Shutdown Justification | Stroke time Cold shutdown justification Power-Operated Valves |
ML20058M221 | 3 August 1990 | Notifies of Change in Listed Licensed Operator Position. MR Breault Will Continue to Maintain Senior Operator License in New Position Until 900917 | |
ML20055J475 | 26 July 1990 | Confirms That Util Completed Installation & Testing of Facility ATWS Mitigation Sys,Per 890706 Commitment | |
ML20055J027 | 24 July 1990 | Forwards Rev 5 to Facility Security Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21) | |
ML20055H583 | 20 July 1990 | Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) | |
ML20044B186 | 10 July 1990 | Forwards Rev 1.B to Spmc,App H,New Hampshire Yankee Offsite Response Communications Directory & Spmc,App M,New Hampshire Yankee Offsite Response Emergency Resource Manual. | |
ML20044A663 | 25 June 1990 | Responds to NRC 900524 Ltr Re Violations Noted in Insp Rept 50-443/90-10.Corrective Actions:Maint Group Instruction Issued Describing Valve Verification When Valves Not Covered by Procedure & Procedures Written Re Monitoring Skids | |
ML20044A374 | 22 June 1990 | Notifies That United Illuminating Co Received Approval of State of CT Dept of Public Util Control of Sale & Leaseback of Facility | |
ML20043H132 | 18 June 1990 | Forwards New Hampshire Yankee Power Ascension Assessment Self-Assessment Team Phase 2 50% Power Plateau. | |
ML20043G476 | 11 June 1990 | Lists Changes in Status of Licensed Operator Positions at Facility,Per 10CFR50.74 | |
ML20043F579 | 8 June 1990 | Requests That Meeting W/Nrc & Westinghouse Be Held During Wk of 900624 to Further Discuss Intended Cycle 2 Fuel Design Features & Fuel Mgt Strategies | |
ML20043E981 | 6 June 1990 | Forwards Info on Owner Participation & Owner Trustee in United Illuminating Co Sale/Leaseback Transaction, Consisting of Sec Form 10K & Citicorp 1989 Annual Rept. | Incorporated by reference |
ML20043E537 | 6 June 1990 | Responds to NRC 900508 Ltr Re Violations Noted in Insp Rept 50-443/90-08.Corrective Actions:Signs Will Be Placed on Containment Hatches to Remind Personnel That Retest Required After Containment Hatch Use & to Notify Control Room | |
ML20043C525 | 31 May 1990 | Responds to NRC Bulletin 88-010,Suppl 1, Nonconforming Molded Case Circuit Breakers. Util Verified That Certificates of Conformance Issued by Telemecanique for All 305 Telemecanique-supplied Molded Case Circuit Breakers | |
ML20043B729 | 24 May 1990 | Forwards Employee Allegation Resolution Program Radio Communication Transcript Review. Transmissions Did Not Contain Issues of Detrimental Safety Significance to Public or Plant Personnel | |
ML20043C103 | 23 May 1990 | Forwards Revs 53 & 54 to Production Emergency Response Manual. | |
ML20043F707 | 18 May 1990 | Forwards Addl Info Re Status of Licensee Actions in Response to INPO Evaluation Repts of Facility for 1983-1989,including Update of Response to INPO Rept of 1983 Const Project Evaluation & Evaluation of Seabrook Station Const Project. | |
ML20042G251 | 8 May 1990 | Forwards Estimates of Time Impact on Facility Personnel Re Topics Identified in Generic Ltr 90-01.Info Presented in Format of Completed Questionnaire Sheets | |
ML20042G650 | 8 May 1990 | Forwards Rev 10 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) | |
ML20042F747 | 4 May 1990 | Informs of 900430 Election of Le Maglathlin to Replace Jc Duffett as President & Chief Executive Officer | |
ML20042E837 | 30 April 1990 | Forwards Annual Environ Operating Rept 1989, Seabrook Environ Studies 1988,Characterization of Baseline Conditions in Hampton-Seabrook Area,1975-1988,Preoperational Study for Seabrook Station & Seabrook Environ Studies... Rept. | |
ML20012E999 | 30 March 1990 | Suppls Info to 890417 Submittal on Station Blackout Rule (10CFR50.63).Instrumentation Required to Cope W/Station Blackout Is safety-related & Evaluated for Operability at Elevated Temps | Safe Shutdown |
ML20012E988 | 30 March 1990 | Forwards marked-up FSAR Section 13.2 (Training) Descriptive Enhancements,Per 891113 Commitment.Rev Will Be Included in 900415 FSAR | |
ML20042D825 | 30 March 1990 | Requests NRC Participation at 900405 Working Session to Discuss Objectives & Extent of Play for 1990 Biennial Emergency Preparedness Exercise on 901213.Encl Withheld | |
ML20012F034 | 30 March 1990 | Forwards Suppl to, Semiannual Radioactive Release Rept Initial Plant Startup Through Fourth Quarter 1989, Consisting of Dose Calculations | |
ML20012E875 | 29 March 1990 | Advises That Replacement of Rosemount Transmitter from High Failure Fraction Mfg Lot Completed on 900314,per 900312 Commitment | |
ML20012D918 | 21 March 1990 | Forwards Executed Amend 4 to Indemnity Agreement B-106 & Opinion Ltr from Ropes & Gray Re Signature Authority of Util as Agent for Joint Owners of Plant | |
ML20012D968 | 20 March 1990 | Discusses Steam Generator Overfill Protection,Per Generic Ltr 89-19 & USI A-47, Safety Implications of Control Sys in LWR Nuclear Power Plants. Steam Generator Overfill Protection at Plant Meets Recommendations of Generic Ltr | |
ML19324G679 | 15 March 1990 | Provides Info in Response to late-filed Allegations,Per 900314 Telcon | Boric Acid Fitness for Duty Shutdown Margin Reactor Vessel Water Level Commercial Grade Dedication Probabilistic Risk Assessment Coatings Temporary Modification Job Performance Measure |
ML20012B860 | 14 March 1990 | Clarifies 900312 Supplemental Response to Proposed Draft NRC Bulletin on Loss of Fill Oil in Rosemount Transmitters. If More Frequent Calibr Required,Transmitter Will Be Time Response Tested to Operability Acceptance Criteria | |
ML20012B835 | 13 March 1990 | Notifies That Senior Operator License No Longer Required for PD Mccabe & License Considered Expired | |
ML20012B837 | 13 March 1990 | Clarifies Supplemental Response to Proposed Draft NRC Bulletin on Loss of Fill Oil in Rosemount Transmitters,Per 900313 Telcon.Operability Acceptance Test Will Be Performed | |
ML20012B619 | 12 March 1990 | Advises That Licensee Intends to Submit FSAR Amend 63 by 900415 Instead of 900315 | |
ML20012B490 | 8 March 1990 | Forwards Corrected Response Re Allegation by Employees Legal Project Concerning Reactor Coolant Pump Support Leg Anchor Bolts | Earthquake |
ML20012B119 | 7 March 1990 | Responds to NRC 900205 Ltr Re Violations Noted in Insp Rept 50-443/89-17.Corrective Actions:Conduit Seals Installed on Required Solenoids & Operability Completed on 900204 | |
ML20012C252 | 6 March 1990 | Documents Info Provided in Telcon Re Relief & Safety Valve Testing | |
ML20012B363 | 2 March 1990 | Forwards Secondary Chemistry Annual Rept, for 1989.Rept Summarizes & Evaluates 1989 Condensate,Feedwater & Steam Generator Water Chemistry Operating Experience & Repts Total Time Secondary Water Chemistry Parameters Out of Spec | |
ML20012A158 | 1 March 1990 | Submits Annual Rept of Challenges to Pressurizer PORVs & Safety Valves for Initial Criticality Period Through 891231 | |
ML20012A186 | 1 March 1990 | Forwards Seabrook Station 10CFR50.59 Safety Evaluation Quarterly Rept,Oct-Dec 1989. Power Supply Breakers for Containment Lighting Panel XL4 Replaced & Smoke Detector Insp Frequency Changed to at Least Semiannually | Safe Shutdown High Radiation Area Fire Barrier Temporary Modification Fire Protection Program Fire Watch |
ML20012A101 | 26 February 1990 | Responds to Info Notice 89-045, Metalclad Low-Voltage Power Circuit Breakers Refurbished W/Substandard Parts. One molded-case Circuit Breaker Purchased from Satin American in Nov 1989 for Use in Plant Simulator | |
ML20006F540 | 23 February 1990 | Submits Addl Info Re Util Maint Program,Per NRC 900221 Telcon Request.Util Maint Program Includes Preventive, Predictive & Corrective Maint as Well as Implementation of Design Enhancements | Backfit |
ML20006G157 | 21 February 1990 | Forwards Renewal Application for NPDES Permit NH0020338,per App B to License NPF-67.State of Nh EPA Determined That Requested Changes to Discharges 001,022,023 & 024 Will Not Jeopardize Environ When Full Power Operation Begins | Biofouling |