Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20059K52214 September 1990Responds to NRC Re Violations Noted in Insp Rept 50-443/90-15.Corrective Actions:Procedure ON1090.04 Revised to Require That Whenever Containment Entry Made,Entry Logged in Action Statement Status Log
ML20059K59514 September 1990Forwards Endorsement 29 to Nelia Policy NF-296,Endorsement 22 to Maelu Policy MF-127,Endorsement 9 to Nelia Policy N-109 & Maelu Policy M-109
ML20059K10513 September 1990Advises of 1990 Biennial Exercise Meeting Scheduled for 900928 at Facility to Discuss Comments Re objectives/extent- of-play Submittal & Present Operational & Radiological Details of Scenario.Suggested Agenda Encl
ML20059D69730 August 1990Forwards 10CFR50.59 Quarterly Rept for Apr-June 1990Safe Shutdown
Shutdown Margin
Met Tower
Temporary Modification
Fire Protection Program
ML20064A40021 August 1990Forwards, New Hampshire Yankee Fitness-For-Duty Semiannual Rept,900103-0630Fitness for Duty
ML20059B02321 August 1990Forwards Addl Info Re Topics Discussed on 900816 Concerning Licensees Response to Intervenors Emergency Motion to Reopen Record on Adequacy of Staffing of New Hampshire Radiological Emergency Response Plan & Immediate Shutdown
ML17348B49215 August 1990Forwards Revised Evacuation Time Estimates Incorporating Vehicles Hidden from Aerial Observation,Per ALAB-932 & ASLB Memorandum & Order LBP-90-20.Revised Estimates Will Be Incorporated Into Radiological Emergency Response Plan
ML20059A30514 August 1990Informs of Closing on United Illuminating Co Sale & Leaseback Transaction on 900809,per Amend 1 to License. Transaction Conforms to Description in Amend Application, ,as Supplemented by 900426 & 0606 Ltrs
ML20058L9573 August 1990Forwards Rev 1 to Inservice Testing Program for Pumps & Valves,Adding Cold Shutdown JustificationStroke time
Cold shutdown justification
Power-Operated Valves
ML20058M2213 August 1990Notifies of Change in Listed Licensed Operator Position. MR Breault Will Continue to Maintain Senior Operator License in New Position Until 900917
ML20055J47526 July 1990Confirms That Util Completed Installation & Testing of Facility ATWS Mitigation Sys,Per 890706 Commitment
ML20055J02724 July 1990Forwards Rev 5 to Facility Security Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21)
ML20055H58320 July 1990Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21)
ML20044B18610 July 1990Forwards Rev 1.B to Spmc,App H,New Hampshire Yankee Offsite Response Communications Directory & Spmc,App M,New Hampshire Yankee Offsite Response Emergency Resource Manual.
ML20044A66325 June 1990Responds to NRC 900524 Ltr Re Violations Noted in Insp Rept 50-443/90-10.Corrective Actions:Maint Group Instruction Issued Describing Valve Verification When Valves Not Covered by Procedure & Procedures Written Re Monitoring Skids
ML20044A37422 June 1990Notifies That United Illuminating Co Received Approval of State of CT Dept of Public Util Control of Sale & Leaseback of Facility
ML20043H13218 June 1990Forwards New Hampshire Yankee Power Ascension Assessment Self-Assessment Team Phase 2 50% Power Plateau.
ML20043G47611 June 1990Lists Changes in Status of Licensed Operator Positions at Facility,Per 10CFR50.74
ML20043F5798 June 1990Requests That Meeting W/Nrc & Westinghouse Be Held During Wk of 900624 to Further Discuss Intended Cycle 2 Fuel Design Features & Fuel Mgt Strategies
ML20043E9816 June 1990Forwards Info on Owner Participation & Owner Trustee in United Illuminating Co Sale/Leaseback Transaction, Consisting of Sec Form 10K & Citicorp 1989 Annual Rept.Incorporated by reference
ML20043E5376 June 1990Responds to NRC 900508 Ltr Re Violations Noted in Insp Rept 50-443/90-08.Corrective Actions:Signs Will Be Placed on Containment Hatches to Remind Personnel That Retest Required After Containment Hatch Use & to Notify Control Room
ML20043C52531 May 1990Responds to NRC Bulletin 88-010,Suppl 1, Nonconforming Molded Case Circuit Breakers. Util Verified That Certificates of Conformance Issued by Telemecanique for All 305 Telemecanique-supplied Molded Case Circuit Breakers
ML20043B72924 May 1990Forwards Employee Allegation Resolution Program Radio Communication Transcript Review. Transmissions Did Not Contain Issues of Detrimental Safety Significance to Public or Plant Personnel
ML20043C10323 May 1990Forwards Revs 53 & 54 to Production Emergency Response Manual.
ML20043F70718 May 1990Forwards Addl Info Re Status of Licensee Actions in Response to INPO Evaluation Repts of Facility for 1983-1989,including Update of Response to INPO Rept of 1983 Const Project Evaluation & Evaluation of Seabrook Station Const Project.
ML20042G2518 May 1990Forwards Estimates of Time Impact on Facility Personnel Re Topics Identified in Generic Ltr 90-01.Info Presented in Format of Completed Questionnaire Sheets
ML20042G6508 May 1990Forwards Rev 10 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21)
ML20042F7474 May 1990Informs of 900430 Election of Le Maglathlin to Replace Jc Duffett as President & Chief Executive Officer
ML20042E83730 April 1990Forwards Annual Environ Operating Rept 1989, Seabrook Environ Studies 1988,Characterization of Baseline Conditions in Hampton-Seabrook Area,1975-1988,Preoperational Study for Seabrook Station & Seabrook Environ Studies... Rept.
ML20012E99930 March 1990Suppls Info to 890417 Submittal on Station Blackout Rule (10CFR50.63).Instrumentation Required to Cope W/Station Blackout Is safety-related & Evaluated for Operability at Elevated TempsSafe Shutdown
ML20012E98830 March 1990Forwards marked-up FSAR Section 13.2 (Training) Descriptive Enhancements,Per 891113 Commitment.Rev Will Be Included in 900415 FSAR
ML20042D82530 March 1990Requests NRC Participation at 900405 Working Session to Discuss Objectives & Extent of Play for 1990 Biennial Emergency Preparedness Exercise on 901213.Encl Withheld
ML20012F03430 March 1990Forwards Suppl to, Semiannual Radioactive Release Rept Initial Plant Startup Through Fourth Quarter 1989, Consisting of Dose Calculations
ML20012E87529 March 1990Advises That Replacement of Rosemount Transmitter from High Failure Fraction Mfg Lot Completed on 900314,per 900312 Commitment
ML20012D91821 March 1990Forwards Executed Amend 4 to Indemnity Agreement B-106 & Opinion Ltr from Ropes & Gray Re Signature Authority of Util as Agent for Joint Owners of Plant
ML20012D96820 March 1990Discusses Steam Generator Overfill Protection,Per Generic Ltr 89-19 & USI A-47, Safety Implications of Control Sys in LWR Nuclear Power Plants. Steam Generator Overfill Protection at Plant Meets Recommendations of Generic Ltr
ML19324G67915 March 1990Provides Info in Response to late-filed Allegations,Per 900314 TelconBoric Acid
Fitness for Duty
Shutdown Margin
Reactor Vessel Water Level
Commercial Grade Dedication
Probabilistic Risk Assessment
Coatings
Temporary Modification
Job Performance Measure
ML20012B86014 March 1990Clarifies 900312 Supplemental Response to Proposed Draft NRC Bulletin on Loss of Fill Oil in Rosemount Transmitters. If More Frequent Calibr Required,Transmitter Will Be Time Response Tested to Operability Acceptance Criteria
ML20012B83513 March 1990Notifies That Senior Operator License No Longer Required for PD Mccabe & License Considered Expired
ML20012B83713 March 1990Clarifies Supplemental Response to Proposed Draft NRC Bulletin on Loss of Fill Oil in Rosemount Transmitters,Per 900313 Telcon.Operability Acceptance Test Will Be Performed
ML20012B61912 March 1990Advises That Licensee Intends to Submit FSAR Amend 63 by 900415 Instead of 900315
ML20012B4908 March 1990Forwards Corrected Response Re Allegation by Employees Legal Project Concerning Reactor Coolant Pump Support Leg Anchor BoltsEarthquake
ML20012B1197 March 1990Responds to NRC 900205 Ltr Re Violations Noted in Insp Rept 50-443/89-17.Corrective Actions:Conduit Seals Installed on Required Solenoids & Operability Completed on 900204
ML20012C2526 March 1990Documents Info Provided in Telcon Re Relief & Safety Valve Testing
ML20012B3632 March 1990Forwards Secondary Chemistry Annual Rept, for 1989.Rept Summarizes & Evaluates 1989 Condensate,Feedwater & Steam Generator Water Chemistry Operating Experience & Repts Total Time Secondary Water Chemistry Parameters Out of Spec
ML20012A1581 March 1990Submits Annual Rept of Challenges to Pressurizer PORVs & Safety Valves for Initial Criticality Period Through 891231
ML20012A1861 March 1990Forwards Seabrook Station 10CFR50.59 Safety Evaluation Quarterly Rept,Oct-Dec 1989. Power Supply Breakers for Containment Lighting Panel XL4 Replaced & Smoke Detector Insp Frequency Changed to at Least SemiannuallySafe Shutdown
High Radiation Area
Fire Barrier
Temporary Modification
Fire Protection Program
Fire Watch
ML20012A10126 February 1990Responds to Info Notice 89-045, Metalclad Low-Voltage Power Circuit Breakers Refurbished W/Substandard Parts. One molded-case Circuit Breaker Purchased from Satin American in Nov 1989 for Use in Plant Simulator
ML20006F54023 February 1990Submits Addl Info Re Util Maint Program,Per NRC 900221 Telcon Request.Util Maint Program Includes Preventive, Predictive & Corrective Maint as Well as Implementation of Design EnhancementsBackfit
ML20006G15721 February 1990Forwards Renewal Application for NPDES Permit NH0020338,per App B to License NPF-67.State of Nh EPA Determined That Requested Changes to Discharges 001,022,023 & 024 Will Not Jeopardize Environ When Full Power Operation BeginsBiofouling