Monthly Operating Rept for Oct 1982
ML20071P991
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 11/15/1982
From: Iyer J
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20071P986 List:
References
NUDOCS 8212290181
Download: ML20071P991 (5)


Text

,

o ,'

AC40 RA

?

NRC MONTHLY OPERATING REPORT DOCKET NO 50-361 DATE 1982 COMPLETED BY .19 Ivor TELEPilONE /4?-7700 OPERATING STATUS

. 6208

1. Unit Name: San Onofre Nuclear Generating station, Unit 2
2. Reporting Period: 1 October 1982 throuch 31_0ctober 1982
3. Licensed Thermal Power (Mwil: 3390
4. Nameplate Rating (Gross MWe): 1127 -
5. Design Electrical Rating (Net MWe): 1087
6. Maximum Dependable Capacity (Gross MWe): Il27
7. Maximum Dependable Capacity (Net MWe): 1087
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

NA

9. Power Level To which Restricted.lf Any (Net MWe): NA
10. Reasons For Restrictions.lf Any: .

This Month Yr.-to.Dat e Cumubtise

11. Hours In Reporting Period 745 6.192 6,192
12. Number Of Hours Reactor was Critical 234.7 1,006 1,006
13. Reactor Resene Shutdown Houn ~

0 0 0

14. Hours Generator On-Line 185 194 194
15. Unit Resene Shutdown Ilours 0 0 0 i
16. Gross Thermal Energy dencrated (MWH) 139,128 180,046 160,u46 17 Cross Electrical Energy Generated (MWH) 'R 1A9 10 AA9 la 667
18. Net Electrical Energy Generated (MWH) nn 0.0 0.0
19. Unit Service Factor NA NA NA
20. Unit Availability Factor NA NA NA

' 21. Unit Capacity Factor IUsing MDC Net) NA NA NA

22. Unit Capacity Factor IUsing DER Net) NA -

NA NA

23. Unit Forced Outage Rate NA NA NA

, 24. Shetdowns Scheduled Oser Nest 6 Month,4T.spc. Date.and Duration of Each t:

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup: NA
26. Units in Test Status IPrior to Commercial Operationi: Forecast Achiesed INITI A L CRITICALITY 7/17/82 __

7/26/82 INITI A L ELECTRICITY 9/82 '/20/82 COMMERCIAL OPER ATioN Under Review i 8212290181 821115 PDR ADOCK 05000361 R PDR l A psso(s) srs ses e e/te

, e, ,

DOCKET NO.52-361 .'

UNIT SilUIDOWNS AND POWER REDUCTIONS UNIT NAME SONGS - 2 ,

DATE .

OCTOBER COMPLETED BY 1 S- Ivar REPORT MON.01 11ELEPHONE 71d/aQ'? 77nn Fx. 56208 i.

i .

No. DJt e

-, 3? 3 $ I.icensee ,E-t,

_h',? Cause & Corrective y, 5g 4 2s5 I vent u 'f E Action to

$5 E 55g Report # '8 0 v

E' Prevent Recurrente Q

l 10/1/82 S 503 B 1 NA CA VALVEX Shutdown to repair packing leak in pressurizer spray valve i

e i

1 2 1 4 i: Forced Reason : Metimd: I:xtohii F. Instructions S Schednled A I.quipment Failure (Explain) 1 Manual hir Preparation of Data it.M.notenance or Test 2 Manual Scram. 1.ntrs Sheets for I.icemee r.Reincling 4 Automatic Scram. I veisi Repuit il l RiI~ile tNURI G.

D Regulators Restriction 4-Ot her ( E xplam) 01611 I -Opeulor Trammy A l.it ense 1.samniation F. Ad nu rmira t i .e 5 j (, Operational I s tor ll splain) I'sinhiill- Same Source 7 11 Othei11 splami a

mot.) in . . .ir.

. e J

AVER 4GL DAILY UNIT PeriER LEVEL DOCKET NO. 50-361 UNIT SONGS - 2 i

DATE COMPLETED BY d S IYOP TELEPHONE 714/492-7700 Ext. 56208 MONTH October i

DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE dally POWER LEVEL iMWe-NetI (MWe-Net l l 1 0 37 0 2 0 is 0 3 0 in 0 4 0 20 0 s 0 21 0 6 0 22 0 7 0 23 0 8 0 24 38 1

9 0 25 58 .

10 0 26 56 ,

4 is 0 2- 21 12 0 :s 55 1'

13 0 29 55 14 0 3o 54 i 15 0 3 54 l t

i 1h 0 ,

i i 1

4

[

t i  !

Psso(s) srs ser w arre *

[

f 1

x :_ _ _:.,s.

4

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH

. DOCKET NO. 50-361 UNIT SONGS - 2 DATE COMPLETED BY J. S. Iyer TELEPHONE 714/494-7700 Ex. 56208 October 1 0001 Unit is in Mode 5. The R.C.S. is d' rained to -72" below Reactor Vessel Flange. Outage work is in progress.

October 7 2352 Entered Mode 4, outage work is complete.

October 9 1540 Entered Mode 5 for repair of Steam Generator E-088 east manway cover, and at 2150 entered Mode 4, fill of both Steam Generators is complete.

October 10 1115 Entered Mode 5 due to leakage discovered at Steam Generator E-088 east manway.

October 16 0605 Entered Mode 4. Steam Generator manways are repaired and heatup is in progress.

October 18 1500 Entered Mode 3.

October 21 2040 Entered Mode 2. Reactor critical at 2239 hours0.0259 days <br />0.622 hours <br />0.0037 weeks <br />8.519395e-4 months <br />.

Octobe- 22 0140 through 1513 Performed eighteen (18) operator training reactor startups.

October 23 0520 Entered Mode 1.

October 24 0045 Synchronized generator and applied block load of 55MWe.

October 26 1559 Received system separation due to inadvertent manual initiation of 2/3HS-1703. Control Operator was cleaning adhesive from around 2/3HS-1703 and switch was depressed enough to actuate separation. System ties were restored at 1624.

October 27 0435 Main turbine trip due to loss of vacuum caused by improper lining up of the #3 feedwater heater for normal service following a repair of leak on the 3rd point heater drain pump.

October 27 1051 Synchronized generator and applied block load at 100MWe.

October 31 2359 Unit is in Mode 1 at 20% +/ .5% power (99MWe).

! ..til,n . .n.

l

<m.. . . _ - ~ . .. .

[ REFUELING INFORMATION DOCKET NO.52-361 UNIT SONGS - 2 DATE COMPLETED BY J. S. Iyer TELEFHONE 714/492-7700 Ext. 56208

1. Scheduled date for next refueling shutdown Not yet determined *
2. Scheduled date for restart following refueling.

Not yet determined

3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Not yet determined What will these be?

Not yet determined

4. Scheduled date for submitting proposed licensing action and supporting information.

Not yet determined

5. Important licensing considerations associated with refueling, e.g.

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.  ;

Not yet determined b

. 6. The number of fuel assemblies. j a) In the core 217

(

b) In the spent fuel storage pool. 0 .

7. Licensed spent fuel storage capacity. 800  ;

Intended change in spent fuel storage capacity. NA  ;

8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

NA i