Revised Monthly Operating Rept for May 1994 for San Onofre Nuclear Generating Station Unit 3
ML20071H514
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 05/31/1994
From: Kaplan R
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20071H503 List:
References
NUDOCS 9407190274
Download: ML20071H514 (1)


Text

.

Doc 0 ment Control Desk i NRC MONTHLY OPERATING REPORT DOCKET N0: 50-362 UNIT NAME: SONGS - 3 DATE:

COMPLETED BY: R. L. Kaplan TELEPHONE: (714) 368-6834 OPERATING STATUS

1. Unit Name: San Onofre Nuclear Generatina Station. Unit 3  :
2. Reporting Period: May 1994
3. Licensed Thermal Power (MWt): 3390
4. Nameplate Rating (Gross MWe): 1127
5. Design Electrical Rating (Net MWe): 1080
6. Maximum Dependable Capacity (Gross MWe): 1127
7. Maximum Dependable Capacity (Net MWe): 1080 ,
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons: NA

9. Power Level To Which Restricted, If Any (Net MWe): NA
10. Reasons For Restrictions, If Any: NA This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 744.00 3.623.00 89.111.00
12. Number Of Hours Reactor Was Critical 744.00 3.623.00 69.549.45
13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
14. Hours Generator On-Line 744.00 3.609.60 67.906.49
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
16. Gross Thermal Energy Generated (MWH) 2.440.821.97'11.634.584.71 218.306.374.43
17. Gross Electrical Energy Generated (MWH) 831.374.00 3.983.245.00 74.126.652.00
18. Net Electrical Energy Generated (MWH) 786.897.00 3.772.340.00 -70.035.378.94
19. Unit Service Factor 100.00%- 99.63%. 76.20%
20. Unit Availability Factor 100.00% 99.63% 76.20%
21. Unit Capacity Factor (Using MDC Net) 97.93% 96.41% 72.77%
22. Unit Capacity Factor (Using DER Net) 97.93% 96.41% 72.77% ,
23. Unit Forced Outage Rate 0.00% 0.00% 6.54%  ;
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None

25. If Shutdown At End Of Report Period, Estimated Date of Startup: NA
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA l

i 94o7190274 940714. 16 ,

t PDR -ADOCK 05000361 R PDR

, , , - - -