ML20071H499

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for June 1994 for San Onofre Nuclear Generating Station Units 2 & 3 & Revised Repts for Apr & May 1994
ML20071H499
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 07/14/1994
From: Marsh W
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20071H503 List:
References
NUDOCS 9407190261
Download: ML20071H499 (1)


Text

.

w??"

y s a.

Southem Califomia Edison Company 23 PARKEH ST REET ARVINE, CAL IFORNIA 92718 wAu en c. uAnsn July 14, 1994 . , , , , , , , , , l MANAGE H OF NtK'.t E AH F4E UULAYOHV AFF AdHS (714) 48b4 4403 U. S. Nuclear Regulatory Commission  !

Attention: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

Docket Nos. 50-361 and 50-362 Monthly Operating Reports for June 1994 ,

San Onofre Nuclear Generating Station, Units 2 and 3 Technical Specification 6.9.1.10 of Facility Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires SCE to provide a Monthly Operating Report for each Unit, which includes: routine operating statistics and shutdown experience; all challenges to safety valves; any changes to the Offsite Dose Calculation Manual (0DCM); and any major changes to the radioactive waste treatment system. All covered activities are reported monthly, except for ODCM changes, which are reported within 90 days from the time the changes were made effective.

This letter transmits the June 1994 Monthly Operating Reports for Units 2 and 3, respectively. There were no challenges to safety valves, and no major changes to the Units 2 and 3 radioactive waste treatment systems during the reporting period. Additionally this report includes a revision to the Unit 3 generator on-line hours for the months of April and May.

This change is also reflected in the shutdown duration for the shutdown reported in April.

If you require any additional information, please let me know.

Sincerely, weJ d Enclosures cc: L. J. Callan, Regional Administrator, NRC Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV M. B. Fields, NRC Project Manager, Units 2 and 3 J. A. Sloan, Senior NRC Resident Inspector, San Onofre Units 1, 2 & 3 9407190261 940714

  • r ' I PDR ADOCK 05000361 ,

iu-

R PDR