Category:LICENSEE EVENT REPORT (SEE ALSO AO RO)
MONTHYEAR05000348/LER-1990-0041990-07-27027 July 1990 LER 90-004-00:on 900628,determined That Procedural Inadequacy Caused Improper Surveillance of Accumulators. Sample Purge Time Too Short to Ensure Representative Sample. Procedures revised.W/900727 Ltr ML20246P8221989-07-12012 July 1989 LER 89-S02-00:on 890619,determined That Situation Existed That Could Have Allowed Unauthorized or Undetected Entry Into Svc Water Intake Structure.No Barrier Existed on Either End of Line to Prevent Access.Security Posted 05000364/LER-1984-002, Revised LER 84-002-01:on 840124,hourly Firewatch Patrol in Train B Auxiliary Bldg Battery Charger Room Not Performed at Specified Times.Caused by Personnel Error.Personnel Counseled & Firewatch Patrol Immediately Performed1984-02-27027 February 1984 Revised LER 84-002-01:on 840124,hourly Firewatch Patrol in Train B Auxiliary Bldg Battery Charger Room Not Performed at Specified Times.Caused by Personnel Error.Personnel Counseled & Firewatch Patrol Immediately Performed 05000364/LER-1983-054, Updated LER 83-054/03X-1:on 831028 & 1103,instrumentation Channel Associated W/Flow Transmitter FT-496 Declared Inoperable Due to Erroneous Indication.Cause unknown.FT-496 Instrumentation Channel Operable on 831029 & 11041983-12-13013 December 1983 Updated LER 83-054/03X-1:on 831028 & 1103,instrumentation Channel Associated W/Flow Transmitter FT-496 Declared Inoperable Due to Erroneous Indication.Cause unknown.FT-496 Instrumentation Channel Operable on 831029 & 1104 05000348/LER-1981-010, Updated LER 81-010/03X-1:on 810429 & 30,containment Atmosphere Radioactivity Monitoring Sys R-11 Declared Inoperable When Filter Paper Did Not Advance.Caused by Paper Spool Slipping on Shaft.Drive Shaft Adjusted1983-01-0606 January 1983 Updated LER 81-010/03X-1:on 810429 & 30,containment Atmosphere Radioactivity Monitoring Sys R-11 Declared Inoperable When Filter Paper Did Not Advance.Caused by Paper Spool Slipping on Shaft.Drive Shaft Adjusted 05000364/LER-1982-047, Corrected LER 82-047/03X-1:on 821124,determined FNP-2-STP-63.0 (Area Temp Monitoring) Not Performing Per Tech Specs.Caused by Personnel Error.Procedure FNP-2-STP-1.0 Revised.Area Temp Monitoring Completed1982-12-28028 December 1982 Corrected LER 82-047/03X-1:on 821124,determined FNP-2-STP-63.0 (Area Temp Monitoring) Not Performing Per Tech Specs.Caused by Personnel Error.Procedure FNP-2-STP-1.0 Revised.Area Temp Monitoring Completed 05000364/LER-1982-049, Corrected LER 82-049/03L-0:on 821201,containment Atmosphere Activity Monitor R-11 & R-12 Declared Inoperable When Vacuum Pump Tripped Due to Erroneous High Flow Signal. Caused by Defective High Flow Relay.Relay Replaced1982-12-23023 December 1982 Corrected LER 82-049/03L-0:on 821201,containment Atmosphere Activity Monitor R-11 & R-12 Declared Inoperable When Vacuum Pump Tripped Due to Erroneous High Flow Signal. Caused by Defective High Flow Relay.Relay Replaced 05000364/LER-1982-027, Corrected LER 82-027/03L-0:on 820622,steam Jet Air Ejector Noble Gas Activity Monitor Declared Inoperable When Pegged High While All Other Indications Normal.Caused by Faulty Detector.Detector Replaced & Declared Operable on 821982-07-12012 July 1982 Corrected LER 82-027/03L-0:on 820622,steam Jet Air Ejector Noble Gas Activity Monitor Declared Inoperable When Pegged High While All Other Indications Normal.Caused by Faulty Detector.Detector Replaced & Declared Operable on 820622 05000364/LER-1982-029, Corrected LER 82-029/03L-0:on 820623,7 River Water Pump Declared Inoperable When Motor Tripped.Caused by Ground Fault on Phase C Power Supply Cable.Defective Cable Replaced & Declared Operable on 8206261982-07-12012 July 1982 Corrected LER 82-029/03L-0:on 820623,7 River Water Pump Declared Inoperable When Motor Tripped.Caused by Ground Fault on Phase C Power Supply Cable.Defective Cable Replaced & Declared Operable on 820626 05000348/LER-1982-0311982-06-30030 June 1982 LER 82-031/03L-0:on 820531,surveillance Requirement for Radiation Monitor R-60A Not Performed Per Tech Specs.Caused by Personnel Error.Surveillance Performed.Personnel Instructed 05000348/LER-1982-0241982-06-30030 June 1982 LER 82-024/03L-0:on 820601,containment Atmosphere Activity Monitors R-11 & R-12 Declared Inoperable When Inboard & Outboard Pumps Tripped Due to Erroneous Low Flow Signal. Caused by Setpoint Drift.Setpoints Adjusted 05000348/LER-1982-0291982-06-30030 June 1982 LER 82-029/03L-0:on 820605,containment Airlock Declared Inoperable When Airlock Outer Door Could Not Be Shut.Caused by Broken Door Shaft.Shaft Repaired 05000348/LER-1982-0281982-06-30030 June 1982 LER 82-028/03L-0:on 820605,during Performance of FNP-1-STP-22.16,turbine Driven Auxiliary Feedwater Pump Failed to Start.Caused by Faulty Limit Switch on Valve HV-3226.Limit Switch Replaced 05000348/LER-1982-0231982-06-25025 June 1982 LER 82-023/03L-0:on 820528,determined That FNP-2-STP-19.3 Not Performed within Time Interval Specified by Tech Spec 4.0.5.Caused by Personnel error.FNP-2-STP-19.3 Satisfactorily Performed 05000348/LER-1982-0271982-06-25025 June 1982 LER 82-027/03L-0:on 820526,turbine Driven Auxiliary Feedwater Pump Declared Inoperable When Main Control Board Annunciator Indicated Trip Throttle Valve Closed.Cause Unknown.Valve Reopened 05000348/LER-1982-0251982-06-11011 June 1982 LER 82-025/03L-0:on 820519, a Train Chlorine Detector Declared Inoperable When Alarm Sounded & Would Not Reset. Caused by Faulty Photocell Light Bulbs.Bulbs Replaced & Detector Returned to Svc 05000348/LER-1982-0221982-06-11011 June 1982 LER 82-022/03L-0:on 820519,during Performance of FNP-2-STP-4.7,charging Pump 2A Would Not Start.Caused by Failure of Breaker DF06 to Close Due to Misaligned Microswitch Arm.Arm Repaired 05000348/LER-1982-0191982-06-0202 June 1982 LER 82-019/03L-0:on 820508,exhaust Fan Failed to Start, Rendering B Train Penetration Room Filtration Sys Inoperable.Caused by Worn Fan Belts Which Slipped Off Pulleys.Belts Replaced 05000348/LER-1982-0201982-06-0202 June 1982 LER 82-020/03L-0:on 820504,snubber 2MS-R-530 Declared Inoperable Since Reservoir Devoid of Fluid.Caused by Fluid Leak on Improperly Installed O Rings.O Rings Replaced & Snubber Declared Operable 05000364/LER-1982-0191982-05-27027 May 1982 LER 82-019/03L-0:on 820430,pressurizer Pressure Fell Below Tech Spec Limit.Caused by Transient in Pressurizer Pressure Transmitter PT-444 Opening Spray Valve.Pressure Restored 05000364/LER-1982-0171982-05-27027 May 1982 LER 82-017/03L-0:on 820427,during Full Length Control Rod Operability test,FNP-2-STP-5.0 Group 1 & Control Banks a, Group 1 & B,Group 1 Control Rods Declared Inoperable.Caused by Faulty Slave Cycler Counter Card.Card Replaced 05000348/LER-1982-0121982-04-0202 April 1982 LER 82-012/03L-0:on 820318,boron Injection Tank Train a Heat Tracing Inoperable Due to Failure of Two Circuits in Train. Caused by Electronic Failure Due to Heat Buildup in Electronic Cabinets.Controller Cards Replaced 05000348/LER-1982-0111982-04-0202 April 1982 LER 82-011/03L-0:on 820316,120-volt Ac Vital Bus B de-energized When Inverter 2B Tripped.Caused by Failed Inverter 2B Due to Blown Fuse in Voltage Regulator Circuit. Fuse Replaced 05000348/LER-1982-0101982-04-0202 April 1982 LER 82-010/03L-0:on 820304,during RCS Leakage Test, Unidentified RCS Leak Rate Exceeded Tech Spec Limit.Caused by Packing Leak from Flow Control Valve FCV 122.Packing Adjusted 05000348/LER-1982-0091982-04-0202 April 1982 LER 82-009/03L-0:on 820312,instrumentation Loop Associated W/Pressurizer Pressure Transmitter PT-455 Declared Inoperable When Transmitter Failed Low.Caused by Faulty Power Supply Card.Card Replaced 05000348/LER-1982-0081982-04-0202 April 1982 LER 82-008/03L-0:on 820307,instrumentation Loop Associated W/Steam Flow Transmitter FT-476 Declared Inoperable When Transmitter Failed Low.Caused by Faulty Power Supply Card. Card Replaced & Calibr 05000348/LER-1982-0071982-04-0202 April 1982 LER 82-007/03L-0:on 820305,remote Shutdown Panel Pressurizer Level Indicator LI-459Z Declared Inoperable When Failed High.Caused by Faulty Transmitter Amplifier Board.Board Replaced & Transmitter Calibr ML20064H8871978-12-22022 December 1978 /03L-0 on 781125:Train a River Water Pumps Were Found in Tripped Condition & Could Not Be Started from Control Room.Cause of Occurrence Is Undetermined ML20064H9331978-12-21021 December 1978 /03L-0 on 781221:vibration Readings Taken on River Water Pump 4 Exceeded Acceptable Limits.Work on Pump Bedplate,Adjustment of Impeller Lift & Pump/Motor Realignment Restored Vibration to W/In Acceptable Range ML20064H9191978-12-21021 December 1978 /03L-0 on 781221:both Trains of Component Cooling Water Were Discovered to Be cross-connected at Charging Pump 1B.FNP-1-STP-23.7 Was Rev to Show Alignment of Charging Pump 1B to Either Train ML20064H9281978-12-20020 December 1978 /03L-0 on 781120:train a River Water(Rw)Pump 9 Secured Due to Vibration.Tech Specs Req at Least 2 Independent RW Loops to Be Operable.Caused by Bearing Damage Due to Fouling of Lube/Cooling Piping ML20064H4111978-12-15015 December 1978 /03L-0 on 781114:both Containment Atmosphere Particulate (R-11) & Gaseous (R-12) Radioactivity Monitoring Sys Were Declared Inoperable After Vacuum Pump Tripped & Would Not Restart,Due to Broken Wire in low-flow Relay ML20064G3771978-12-0404 December 1978 /03L-0 on 781102:noted That FNP-1-STP-41.2 Specified IR Neutron Flux High Level Trip Setpoint Limits Were Less Conservative than Tech Spec Limits.Caused by Failure to Revise FNP-1-STP-41.2 to Reflect New Setpoint ML20064F6111978-11-27027 November 1978 /01T-0 on 781114:water Levels in Fire Protec Sys Water Storage Tanks Were Approx 135,000 Gallons Less than Prescribed Minimum,Due to Constr Personnel Diverting Water to Unit 2 Condenser for Hydrostatic Test ML20064F1251978-11-22022 November 1978 /03L-0 on 781025:B Train Penetration Room Filtration Sys Inoperable.Caused by Low Spring Tension on Filter Support Assembly ML20064F2791978-11-20020 November 1978 /03X-1 on 780527:during Unit Startup,B S/G Code Safety Valve Lifted Causing Tavg to Drop Below 541 Degrees F in Violaion of T/S3.1.1.5.Caused by Broken Lower Adjusting Ring Locking Pin.Valve Was Replaced ML20064F2741978-11-20020 November 1978 /03L-0 on 781102:during Surveillance Test FNP-0- STP-15.0,exterior Door Seals Were Leaking.Caused by Dirty Air Lock Exterior Door Seals.Seals Cleaned & Retested Satisfactorily ML20064F2711978-11-20020 November 1978 /03L-0 on 781027:while in Mode 1,the Steam Line Pressure Instru Assoc W/Pressure Transmitter PT-484 Failed Low.Caused by Failure of Loop Pwr Supply isolated/non- Isolated(Nlp)Card POY-484 ML20064E7251978-11-13013 November 1978 /03L-0 on 781016:the a Train Undervoltage Relay 27-1 on RCP 1A Failed to Trip at Required Setpoint During Test Procedure FNP-1-612.0 Due to Setpoint Drift ML20064D8241978-11-0202 November 1978 /03L-0 on 781003:during FNP-1-STP-40.3,the 1C Diesel Generator Output Breaker Failed to Close on 4160V Bus 1H After D/G auto-started,due to Incorrect Landing of Jumper Installed for Unit 1/Unit 2 Separation ML20064D8171978-11-0202 November 1978 /03L-0 on 781003:train a River Water Pumps Found in Tripped Condition & Could Not Be Started from Control Room,Caused by Low Level Reed Switch Failure in Pond Level Switch LS511 ML20064D8091978-11-0202 November 1978 /03X-1 on 780914:inspec of Diesel Generator Bldg Noted Lb D/G Air Start Sys Air Reservoir 1A,1B Pressures Were 210 PSIG & 80 Psig,Due to 1B Air Compressor Relief Valve/Check Valve Leakage ML20064D8051978-11-0202 November 1978 /03X-1 on 780909:during Surveillance Test FNP-1- STP-22.0,the Turbine Driven Auxiliary Feedwater Pump Failed to Start When Trip/Throttle Valve Tripped Shut & Control Was Lost on Valves 3228A,B,C,due to Failed Tdafpcircuit Relay ML20147B3631978-10-0202 October 1978 /01T-0 on 780922:during Inspec of Class I & II Pipe Restraints/Snubbers,Noted That Main Feedwater Line Lateral Seismic Restraint FW-R49 Was Not in Place.Reason or Date of Removal Not Determined;Unit Reinstalled ML20147B3181978-10-0202 October 1978 /03L-0 on 780905:failure of 1-2A Diesel Generator to Respond to Voltage/Speed Control in Auto Due to Failure of Motorized Potentiometer(Failed Diodes)Causing the 125V DC Supply Fuses to Blow 1990-07-27
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217P0761999-10-0606 October 1999 Non-proprietary, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217G0361999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20212E7451999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Hcgs,Unit 1.With Summary of Changes,Tests & Experiments Implemented During Aug 1999.With ML20216E4941999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Jmfnp.With ML20210T2161999-08-0606 August 1999 Draft SE Supporting Proposed Conversion of Current TS to ITS for Plant ML20211B2011999-08-0404 August 1999 Informs Commission About Results of NRC Staff Review of Kaowool Fire Barriers at Farley Nuclear Plant,Units 1 & 2 & Staff Plans to Address Technical Issues with Kaowool & FP-60 Barriers ML20210R6031999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20196J3791999-06-30030 June 1999 Safety Evaluation of TR WCAP-14750, RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop Pwrs. Rept Acceptable ML20209G0661999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-267, Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-023, Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with ML20206G7471999-05-0404 May 1999 Safety Evaluation Accepting Corrective Actions Taken by SNC to Ensure That Valves Perform Intended Safety Functions & Concluding That SNC Adequately Addressed Requested Actions in GL 95-07 L-99-020, Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20206C9461999-04-30030 April 1999 1:Final Cycle 16 Freespan ODSCC Operational Assessment L-99-161, Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20205N0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20204D7271999-03-15015 March 1999 ISI Refueling 15,Interval 2,Period 3,Outage 3 for Jm Farley Nuclear Generating Plant,Unit 1 ML20207M6421999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20203A2651999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20199D8611999-01-12012 January 1999 SER Accepting Relief Request for Inservice Insp Program for Plant,Units 1 & 2 ML20199E6591998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20206C8081998-12-31031 December 1998 Alabama Power 1998 Annual Rept ML20198K4091998-12-18018 December 1998 COLR for Jm Farley,Unit 1 Cycle 16 ML20198B2561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20195E2281998-11-16016 November 1998 Safety Evaluation Authorizing Relief Request for Second 10-year ISI Program Relief Request 56 for Plant,Unit 1 ML20195C9681998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20155E0271998-10-29029 October 1998 SER Approving & Denying in Part Inservice Testing Program Relief Requests for Plant.Relief Requests Q1P16-RR-V-3 & Q2P16-RR-V Denied Since Requests Do Not Meet Size Requirement of GL 89-04 ML20154B6121998-10-0101 October 1998 Safety Evaluation Granting Second 10-year ISI Requests for Relief RR-13 & RR-49 Through RR-55 for Jm Farley NPP Unit 1 ML20151V8341998-09-30030 September 1998 Non-proprietary Rev 2 to NSA-SSO-96-525, Jm Farley Nuclear Plant Safety Analysis IR Neutron Flux Reactor Trip Setpoint Change ML20154H6001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20154H0121998-09-30030 September 1998 Submittal-Only Screening Review of Farley Nuclear Plant IPEEE (Seismic Portion) ML20197C8991998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20237C5471998-08-20020 August 1998 Suppl to SE Re Amends 137 & 129 to Licenses NPF-2 & NPF-8, Respectively.Se Being Supplemented to Incorporate Clarifications/Changes & Revise Commitment for Insp of SG U-bends in Rows 1 & 2 for Unit 2 Only ML20236Y1121998-07-31031 July 1998 Voltage-Based Repair Criteria 90-Day Rept ML20237B1891998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20237A2181998-07-24024 July 1998 Jm Farley Unit 2 ISI Rept Interval 2,Period 3 Outage 1, Refueling Outage 12 ML20236U6141998-07-23023 July 1998 Safety Evaluation Authorizing Use of Alternative Alloy 690 Welds (Inco 52 & 152) as Substitute for Other Weld Metal ML20236R8671998-07-0909 July 1998 Safety Evaluation Concluding That Southern Nuclear Operating Co USI A-46 Implementation Program Has Met Purpose & Intent of Criteria in GIP-2 & Staff SSER-2 on GIP-2 for Resolution of USI A-46 ML20236M5981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20154H0461998-06-30030 June 1998 Technical Evaluation Rept on Review of Farley Nuclear Plant IPEEE Submittal on High Winds,Flood & Other External Events (Hfo) ML20248M3121998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20247F3631998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20217D2591998-04-21021 April 1998 Safety Evaluation Accepting Licensee Proposed Alternative Re Augmented Exam of Reactor Vessel Shell Welds for Plant ML20247E8851998-03-31031 March 1998 FNP Unit 2 Cycle 13 Colr ML20217H3191998-03-31031 March 1998 Safety Evaluation Accepting Proposed Changes to Plant Matl Surveillance Programs ML20216D5941998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20217D4081998-03-24024 March 1998 Safety Evaluation Accepting Proposed Changes to Maintain Calibration Info Required by ANSI N45.2.4-1972 ML20216H6731998-03-17017 March 1998 SER Accepting Quality Assurance Program Description Change for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20216J6851998-03-16016 March 1998 Revised Pages 58 & 59 to Fnp,Units 1 & 2,Power Uprate Project BOP Licensing Rept ML20216D9811998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Jm Farley Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |