Forwards LER 82-016/03L-0.Detailed Event Analysis Encl
ML20042B203
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 03/19/1982
From: Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Kepper J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20042B204 List:
References
NUDOCS 8203250086
Download: ML20042B203 (2)


Text

'

. . F,'

.s 4

. ~

} "s~

y; $)

~~"

,, INDIANA & MICHIGAN ELECTRIC _ COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman. Michigan 49100 (616) 465-5901- ~ '% N,, N

~ //

N g March 19, 1982 b/ ry'162'

,  ! 9B2." T3

- - ,3 s.

G-

- $9S.9 t

4 4 3 --

s' m i s .s . - -

1 Mr. J.G. Keppler, Regional Administra' tor :4 1

{**

United States Nuclear Regulatory Combission' Region III .

v #

799 Roosevelt Road Glen Ellyn, IL 60137 ,

~

'7 Operating License DPR-74 Docket No. 50-316

Dear Mr. Keppl ar:

.s Pursuant to the requirements of tF ' 7ndix A Techqical Specifications, the following report /s are submi , N .-"

R0 82-016/03L-0.

Singrely, 3

a y N- ' '

W.G. Smith, Jr.

Plant Manager .

/bab ,

cc: J.E. Dolan R.S. Hunter '

R.W.iJurgensen R.F. Kroeger '

K.J. Vehstedt E. Swanson/N. DuBry RJ:III -- ' '

R.C. Callen MPSC \ 's i G. Charnoff, Esq. '

J.M. Hennigan W. Lavallee EPRI

INP0 u s PNSRC _

J.F. Stietzel s

s Ei. Towrrieyn c -s N i

\ .Dir., IE-(30 copies)

'- ~ ~ ' ' Dir., MIPC (3 copies) ,

s- ~ , s

\. t m ,Q 2 2 82032500Ei6 820319 \\

PDR ADOCK.05000316 ,

m S ,

PDR

[h[

Og SUPPLEMENT TO LER # 82-016/05L CAUSE DESCRIPTION AND CORRECTIVE ACTIONS (27)

A CRACK WAS FOUND IN THE AREA 0F THE PINHOLE AND IT WAS REMOVED ~

i BY GRINDING AND REWELDING. THE PIPING WAS THEN SUCCESSFULLY 4

HYDR 0 STATICALLY TESTED. NO ANALYSIS OF.THE CAUSE WAS MADE AT THIS TIME BUT IT IS ASSUMED THAT IT RESULTED FROM FATIGUE SIMILAR TO THE RECENT LER ON THE SAME PIPING (LER 82-003/01T-0). THE EVENT-

,, WAS NOT IDENTIFIED AS REPORTABLE AT THE TIME AS A CONDITION REPORT

"'WAS NOT INITIATED TO ANALYZE THE EVENT FOR REPORTABILITY . THE OPERATOR WA'S NOT AWARE OF THE SEVERITY OF THE LEAK WHICH HE HAD NOTED AS " PINHOLE". IT HAS BEEN A PLANT PRACTICE TO INITIATE A CONDITION REPORT WHEN TECHNICAL SPECIFICATION EQUIPMENT IS REMOVED FROM SERVICE FOR OTHER THAN PREVENTIVE MAINTENANCE OR~ SURVEILLANCE TESTING. TO ENSURE THAT IN.THE FUTURE REPORTABLE CONDITIONS ARE NOT MISSED, THIS PRACTICE HAS BEEN INCORPORATED INTO THE PLANT PROCEDURE ON EQUIPMENT CONTROL AND THE CHANGE.T0 Tile PROCEDURE IS BEING CIRCULATED TO ALL LICENSED PERSONNEL.