ML19347F797

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 79-02,Revision 2.All Supports Modified to Meet Requirement of Factor of Safety Greater than or Equal to Five,Per Reanalysis of Design Criteria for Class 15 Pipe Hangers & Supports
ML19347F797
Person / Time
Site: Cooper Entergy icon.png
Issue date: 03/25/1981
From: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
IEB-79-02, IEB-79-2, IEB-79-2-R2, LQA8100132, NUDOCS 8105260356
Download: ML19347F797 (2)


Text

_

C  %

GENERAL OFFICE

]:

Nebraska Public Power District " fel'e'A*ML*WI%A"^ ""'

> =:

LQA8100132 CENTRAL FILES March 25, 1981 PDR:HO

/hi / / r.,a , p-LPDR

%yr8 I

NSIC d .a i 3 STATE 9 t/M 131981
  • rS u.s.gi>lj@^*"
c. y y Mr. Karl V. Seyfrit, Director -

, y U.S. Nuclear Regulatory Commission ,Q 7 p"<'ig'r?

Office of Inspection & Enforcement

Region IV 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76011

Subject:

IE Bulletin No. 79-02 (Revision No. 2)

" Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts"

Reference:

1) Letter J. M. Pilant to K. V. Seyfrit Dated February 5,1980, Same Subject
2) Letter J. M. Pilant to K. V. Seyfrit Dated March 18, 1980, Same Subject
3) Letter L. C. Lessor to G. L. Madsen Dated June 3, 1980, Same Subject

Dear Mr. Seyfrit:

As indicated in References 1 and 2, the original design criteria for Class IS pipe hangers and supports at Cooper Nuclear Station was the operating basis earthquake. Subsequent reanalysis using safe shutdown earthquake loading showed 28 supports did not meet the requirement of a factor of safety greater than or equal to 5. Operation of CNS in the interim was discussed in Reference 3. This letter is written to inform that all of these supports have been modified.

The remaining items discussed in the references were also completed.

Discrepancies found during the inspections are recorded and available at CNS for NRC review (reference NCR's 1174, 1662, 1665 thru 1671, 1673, 1706, 1707, 1712, 1763 thru 1767, 1773, 1774, and 2027).

810526035(o '

Q

Kerl V. S yfrit M2tch 25, 1981 Page 2 1

Approximately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> was used for the preparation of this response.

Sincerely, M d *

. Pilant Director of Licensing and Quality Assurance JMP:JUW:KJD:cmk cc: U.S. Nuclear Regulatory Comriesion Office of Inspection & Enforcement Division of Reactor Operations Inspection Washington, DC 20555 i