0 506 20 MSin Electnc mea coursur 231 W. MICHIGAN, P.O. BOX 2046. MILWAUKEE. WI 53201 April 25, 1980 Mr. J. G. Keppler, Regional Director Office of Inspection and Enforcement, Region III U. S. NUCLEAR REGULATORY COMMISSION 799 Roosevelt Road

, Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

DOCKET NO. 50-266 LICENSEE EVENT REPORT NO. 80-004/03L-0 POINT BEACH NUCLEAR PLANT UNIT 1 Enclosed is Licensee Event Report No. 80-004/03L-0 (a 30-day report) with an attachment which provides a description of an event reportable in accordance with Technical Specification 15.6.9.2.B.2, " Conditions leading to operation in a degraded mode permitted by a limiting condition for operation or plant shut-down required by a limiting condition for operation".

When this event occurred, it was interpreted as requiring "immediate" NRC notification and a follow-up 24-hour written report.

Both were filed on April 9, 1980. However, based on a complete evaluation which could not be done in the "immediate notification" time frame, this event is reportable per the requirements delineated above. This event did not require immediate notification or a 24-hour report. gg very traly yours, 5

//

l' C - ', 3 C. W. Fay, Director Nuclear Power Department Enclosure 4pg 2s )ggq