Responds to Notice of Violations Noted in Insp Repts 50-237/92-28 & 50-249/92-28.Corective Actions:Identified Ground Has Cleared W/O Any Action by Station Personnel & Operations Personnel Were Counseled on Procedure AdherenceML18037A087 |
Person / Time |
---|
Site: |
Dresden |
---|
Issue date: |
02/19/1993 |
---|
From: |
Farrar D COMMONWEALTH EDISON CO. |
---|
To: |
NRC |
---|
Shared Package |
---|
ML18037A086 |
List: |
---|
References |
---|
NUDOCS 9303240061 |
Download: ML18037A087 (14) |
|
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210L1061999-08-0202 August 1999 Forwards Insp Rept 50-010/99-13 on 990702-27.No Violations Noted.Insp Examined Activities in Areas of Facility Management & Control & Radiological Safety ML20210D2961999-07-20020 July 1999 Forwards Corrected Info for DNPS Unit 3 MOR for June 1999. Year-to Date Forced Outage Hours Should Have Read 70 Hours Instead of 0 on Page 8.Error Also Affected Cumulative Forced Outage Hours Which Should Have Been 24,761 ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20196K3231999-06-30030 June 1999 Informs That Effective 990703,NRC Project Management Responsibility for Dresden,Unit 1 Station Will Be Transferred to P Ray ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes ML20196D3491999-06-18018 June 1999 Forwards Insp Repts 50-237/99-08 & 50-249/99-08 on 990408-0521.Four Non-Cited Violations Noted.Maint on safety- Related Emergency CR Not Performed Well.Low Impact Issues Re Communications Present in Operations,Maint & Security ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20195E3451999-06-0707 June 1999 Forwards 3.5 Inch Computer Diskette Containing Revised File Format for Annual Dose Rept for 1998,per 990520 Telcon Request from Nrc.Each Station Data Is Preceded by Header Record,Which Provides Info Necessary to Identify Data ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs ML20207G2571999-06-0303 June 1999 Informs That Effective 990328,NRC Ofc of NRR Underwent Reorganization.Within Framework of Reorganization,Division of Licensing Project Management Created ML20195B2301999-05-19019 May 1999 Requests Approval of Proposed Changes to QA Topical Rept CE-1-A,rev 66a.Attachment a Describes Changes,Reason for Change & Basis for Concluding That Revised QAP Incorporating Proposed Changes Continues to Satisfy 10CFR50AppB ML20206Q3111999-05-18018 May 1999 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety ML20206P2431999-05-13013 May 1999 Forwards Insp Rept 50-010/99-09 on 990325-0506.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20206F5381999-04-30030 April 1999 Forwards Magnetic Tape Containing Annual Dose Repts for 1998 for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR20.2206(c).Without Magnetic Tape ML20206B1501999-04-22022 April 1999 Forwards 1998 Occupational Radiation Exposure for Dresden Nuclear Power Station,Units 1,2 & 3. Rept Was Revised to Rept Only Individual Radiation Exposures Greater than 100 Mrem ML20206B2471999-04-20020 April 1999 Informs That SE Kuczynski Has Been Transferred to Position No Longer Requiring SRO License.Cancel License SOP-31030-1, Effective 990412 ML20205K5521999-04-0202 April 1999 Forwards Partially Withheld Security Insp Repts 50-010/99-07,50-237/99-07 & 50-249/99-07 on 990308-12.Two non-cited Violations Identified Involving Failure of Security Personnel to Implement Required Measures ML20205K5841999-03-31031 March 1999 Submits Rept on Status of Decommissioning Funding for Reactors Owned by Comm Ed.Attachment 1 Contains Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) ML20196K7001999-03-31031 March 1999 Forwards Dresden Nuclear Power Station,Units 1,2 & 3 Radioactive Effluent Release Rept,Jan-Dec 1998. ODCM Was Submitted by Ltr in Accordance with Dresden TS 6.9.A.4 of Dresden Tech Specs Section 6.14.A.3 ML20205D7231999-03-26026 March 1999 Informs That Region III Emergency Preparedness Inspector Will Be Provided Copy of Comed Exercise Manual for 990526 Annual Exercise at DNPS ML20205B4241999-03-23023 March 1999 Provides Results of drive-in Drill Conducted on 990208,as Well as Augmentation Phone Drills Conducted Since 981015,as Committed to in Util ML20207L7141999-03-0808 March 1999 Discusses Transmitting Changes Identified as Rev 59 to Security Plan for Dresden Nuclear Power Station,Units 1,2 & 3.Staff Determined That No NRC Approval Required in Accordance with 10CFR50.54(p) ML20207D6831999-03-0101 March 1999 Forwards fitness-for-duty Program Performance Data for Each Comed Nuclear Power Station & Corporate Support Employees for Six Month Period Ending 981231,per 10CFR26.71(d) ML20207E0931999-02-26026 February 1999 Informs That Region III EP Inspectors Will Be Provided One Copy of Exercise Evaluation Objectives for 990526 Annual Exercise at Dresden Station as Enclosure to Ltr for Review. Proprietary Encl Withheld ML20203F2541999-02-10010 February 1999 Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function ML20203G3631999-02-10010 February 1999 Forwards Insp Rept 50-010/99-02 on 981218-990129.No Violations Noted.During Insp,Activities in Area of Facility Mgt & Control,Decommissioning Support Activities & Radiological Safety Were Examined ML20203C7001999-02-0202 February 1999 Informs That Mhb Technical Associates No Longer Wishes to Receive Us Region III Docket Info Re Comed Nuclear Facilities.Please Remove Following Listing from Service List ML20202G0621999-01-25025 January 1999 Forwards 1998 Revs to Commitments Rept Made in Docketed Correspondence for Dresden Nuclear Power Station ML20199F3291999-01-14014 January 1999 Ack Receipt of Ltr Dtd 981230,transmitting Changes Identified as Rev 59 to Plant Security Plan,Submitted Under Provisions of 10CFR50.54(p) ML20199E0201999-01-12012 January 1999 Forwards Change to Bases of Dnps,Unit 1 TS Section 3.10, Fuel Handling & Storage. Change Eliminates Reference to Initiation of Generating Station EP Action That Is Incorrect & Not Part of Reason for Min FSP Water Level TS ML20199C8851999-01-11011 January 1999 Forwards Monthly Operating Repts for Dec 1998 for Dnps,Units 1,2 & 3,as Required by TS 6.9.A.5.Year-to-date Generator Hours for Unit 2 for Oct 1998 & Nov 1998 Corrected in Rept ML20206P7411999-01-0707 January 1999 Informs of Delay in Implementation of Strategic Reform Initiative Action Steps.Util Mgt Now Preceeding to Implement Succession Planning Steps for Corporate Ofc & Expects Completion of Action Steps 2 & 3 by 990128 ML20198N7691998-12-30030 December 1998 Forwards Rev 59 to Security Plan for Dresden Nuclear Power Station,In Accordance with 10CFR50.4(b)(4).Rev Withheld ML20198A2531998-12-10010 December 1998 Ack Receipt of Which Transmitted Changes Identified as Rev 57 to Plant Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20198A2511998-12-10010 December 1998 Ack Receipt of ,Which Transmitted Changes Identified as Rev 58 to Plant Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20196E2371998-11-27027 November 1998 Discusses Licensee ,Requesting That Agreement in Be Changed to Reflect Latest NRC Conditions Requiring Licensees to Notify NRC of Transfer of Assets to Affiliates Imposed in Connection with Approval of Transfer ML20196B5871998-11-20020 November 1998 Requests That Svc List for All NRC Correspondence Re Any of Six Comed Nuclear Stations Be Modified Per Attached List.All Other Names Previously Listed Should Be Removed ML20196A4121998-11-19019 November 1998 Forwards Safety Evaluation Accepting Proposed Changes to QA TR CE-1-A,Rev 66,by ,As Modified by Ltrs & 1027.Proposed QA Tr,Rev 66 Continues to Comply with Criteria of 10CFR50,App B ML20195J4271998-11-13013 November 1998 Forwards Insp Repts 50-010/98-18,50-237/98-27 & 50-249/98-27 on 981013-16 & Notice of Violation.Mgt Activities Were Focused Toward Maintaining Effective Security Program ML20195E6451998-11-12012 November 1998 Provides Results of drive-in Drill Conducted on 981007,as Well as Augmentation Phone Drill Conducted on 980917 ML20195F3461998-11-10010 November 1998 Forwards Rev 58 of DNPS Security Plan,Including Listed Changes,Iaw 10CFR50.4(b)(4).Encl Withheld Ref 10CFR73.21 ML20155D2701998-10-27027 October 1998 Forwards Changed Pages from 980423 Submittal Providing Addl Info Marked with Revision Bars & Revised Pages to QA Topical Rept Section 18,for Review ML20154P9051998-10-20020 October 1998 Ack Receipt of 980821 Submittal,Per 10CFR50.54(a),requesting Review & Approval of Proposed Changes That Reduce Commitments in QA TR,CE-1-A.Util Should Refrain from Implementing Subj Changes Until Formal Notification Given 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210D2961999-07-20020 July 1999 Forwards Corrected Info for DNPS Unit 3 MOR for June 1999. Year-to Date Forced Outage Hours Should Have Read 70 Hours Instead of 0 on Page 8.Error Also Affected Cumulative Forced Outage Hours Which Should Have Been 24,761 ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes ML20195E3451999-06-0707 June 1999 Forwards 3.5 Inch Computer Diskette Containing Revised File Format for Annual Dose Rept for 1998,per 990520 Telcon Request from Nrc.Each Station Data Is Preceded by Header Record,Which Provides Info Necessary to Identify Data ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs ML20195B2301999-05-19019 May 1999 Requests Approval of Proposed Changes to QA Topical Rept CE-1-A,rev 66a.Attachment a Describes Changes,Reason for Change & Basis for Concluding That Revised QAP Incorporating Proposed Changes Continues to Satisfy 10CFR50AppB ML20206F5381999-04-30030 April 1999 Forwards Magnetic Tape Containing Annual Dose Repts for 1998 for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR20.2206(c).Without Magnetic Tape ML20206B1501999-04-22022 April 1999 Forwards 1998 Occupational Radiation Exposure for Dresden Nuclear Power Station,Units 1,2 & 3. Rept Was Revised to Rept Only Individual Radiation Exposures Greater than 100 Mrem ML20206B2471999-04-20020 April 1999 Informs That SE Kuczynski Has Been Transferred to Position No Longer Requiring SRO License.Cancel License SOP-31030-1, Effective 990412 ML20205K5841999-03-31031 March 1999 Submits Rept on Status of Decommissioning Funding for Reactors Owned by Comm Ed.Attachment 1 Contains Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) ML20196K7001999-03-31031 March 1999 Forwards Dresden Nuclear Power Station,Units 1,2 & 3 Radioactive Effluent Release Rept,Jan-Dec 1998. ODCM Was Submitted by Ltr in Accordance with Dresden TS 6.9.A.4 of Dresden Tech Specs Section 6.14.A.3 ML20205D7231999-03-26026 March 1999 Informs That Region III Emergency Preparedness Inspector Will Be Provided Copy of Comed Exercise Manual for 990526 Annual Exercise at DNPS ML20205B4241999-03-23023 March 1999 Provides Results of drive-in Drill Conducted on 990208,as Well as Augmentation Phone Drills Conducted Since 981015,as Committed to in Util ML20207D6831999-03-0101 March 1999 Forwards fitness-for-duty Program Performance Data for Each Comed Nuclear Power Station & Corporate Support Employees for Six Month Period Ending 981231,per 10CFR26.71(d) ML20207E0931999-02-26026 February 1999 Informs That Region III EP Inspectors Will Be Provided One Copy of Exercise Evaluation Objectives for 990526 Annual Exercise at Dresden Station as Enclosure to Ltr for Review. Proprietary Encl Withheld ML20203C7001999-02-0202 February 1999 Informs That Mhb Technical Associates No Longer Wishes to Receive Us Region III Docket Info Re Comed Nuclear Facilities.Please Remove Following Listing from Service List ML20202G0621999-01-25025 January 1999 Forwards 1998 Revs to Commitments Rept Made in Docketed Correspondence for Dresden Nuclear Power Station ML20199E0201999-01-12012 January 1999 Forwards Change to Bases of Dnps,Unit 1 TS Section 3.10, Fuel Handling & Storage. Change Eliminates Reference to Initiation of Generating Station EP Action That Is Incorrect & Not Part of Reason for Min FSP Water Level TS ML20199C8851999-01-11011 January 1999 Forwards Monthly Operating Repts for Dec 1998 for Dnps,Units 1,2 & 3,as Required by TS 6.9.A.5.Year-to-date Generator Hours for Unit 2 for Oct 1998 & Nov 1998 Corrected in Rept ML20206P7411999-01-0707 January 1999 Informs of Delay in Implementation of Strategic Reform Initiative Action Steps.Util Mgt Now Preceeding to Implement Succession Planning Steps for Corporate Ofc & Expects Completion of Action Steps 2 & 3 by 990128 ML20198N7691998-12-30030 December 1998 Forwards Rev 59 to Security Plan for Dresden Nuclear Power Station,In Accordance with 10CFR50.4(b)(4).Rev Withheld ML20196B5871998-11-20020 November 1998 Requests That Svc List for All NRC Correspondence Re Any of Six Comed Nuclear Stations Be Modified Per Attached List.All Other Names Previously Listed Should Be Removed ML20195E6451998-11-12012 November 1998 Provides Results of drive-in Drill Conducted on 981007,as Well as Augmentation Phone Drill Conducted on 980917 ML20195F3461998-11-10010 November 1998 Forwards Rev 58 of DNPS Security Plan,Including Listed Changes,Iaw 10CFR50.4(b)(4).Encl Withheld Ref 10CFR73.21 ML20155D2701998-10-27027 October 1998 Forwards Changed Pages from 980423 Submittal Providing Addl Info Marked with Revision Bars & Revised Pages to QA Topical Rept Section 18,for Review ML20154M4291998-10-15015 October 1998 Forwards 1998 Third Quarter 10CFR50.59 Rept of Completed Changes,Tests & Experiments.Completed SEs Compared to Previous Quarterly Repts as Docketed ML20154J4951998-10-0707 October 1998 Forwards Revised Security Plans for CE Listed Nuclear Power Stations,Per 10CFR50.4(b)(4).Changes Do Not Decrease Effectiveness of Station Security Plans.Encl Withheld ML20151Y5101998-09-11011 September 1998 Provides Results of drive-in-drill Conducted on 980804 & Augmentation Phone Drills Conducted Between 980601 & 0831 ML20151Y2931998-09-0909 September 1998 Notifies NRC of Results of Feasiblity Study of Seismically Qualified or Verified Path to Obtain Water from Ultimate Heat Sink & Deliver It to Shell of Isolation Condenser for Each Unit ML20238F7571998-08-28028 August 1998 Forwards fitness-for-duty Program Performance Data for Each of Util Nuclear Power Stations for Six Month Period Ending 980630 ML20237D9771998-08-21021 August 1998 Forwards Proposed Changes to Quality Assurance Topical Rept (QATR) CE-1-A,rev 66,modifying Ref Submittal & Clarifying Certain Changes to QATR Proposed in Util .Page A-1, 6 of 6 of Incoming Submittal Not Included ML20237A8611998-08-0707 August 1998 Requests Approval of Enclosed Qualified Unit 1 Supervisor Initial & Continuing Training Program, Which Ensures That Qualifications of Personnel Are Commensurate W/Tasks to Be Performed & Conditions Requiring Response ML20237A8871998-08-0707 August 1998 Documents Completion of Util Action Items Discussed at 980529 Meeting W/Nrc.Updated Proposal to Consolidate Near Site Emergency Operations Facilities Into Single Central Emergency Operations Facility,Provided ML20236W1311998-07-27027 July 1998 Forwards Response to NRC Re Violations Noted in Insp Repts 50-010/98-15,50-237/98-18 & 50-249/98-18, Respectively.Encl Withheld ML20236T7241998-07-24024 July 1998 Forwards Revised Epips,Including CEPIP-2000 Series Table of Contents & Rev 7 to CEPIP-2121-01, Augmentation Caller Instructions ML20236R2531998-07-16016 July 1998 Summarizes Results of drive-in Drill as Well as Preceeding call-in Drills Conducted Between Each drive-in Drill,As Committed to in 980326 Meeting Between Util & NRC ML20236F8041998-06-29029 June 1998 Forwards Rev 0 to Defueled SAR Dresden Nuclear Power Station Unit 1 Commonwealth Edison Co, Per Requirements of 10CFR50.71(e)(4).Decommissioning Program Plan Is Being Reformatted & Revised Into Defueled SAR SVP-98-170, Advises That AL Misak,License SOP-30832-1,is No Longer Required to Maintain Operator License1998-05-0101 May 1998 Advises That AL Misak,License SOP-30832-1,is No Longer Required to Maintain Operator License ML20247B6521998-04-30030 April 1998 Forwards 1997 Repts for Braidwood,Byron,Dresden,Lasalle,Quad Cities & Zion Nuclear Power Stations.Repts Being Submitted Electronically on Magnetic Tape.W/O Encl ML20217G8841998-04-23023 April 1998 Forwards Proposed Changes to QATR CE 1-A,rev 66.Change Constitutes Major Programmatic Rev to Onsite & Offsite Review Processes as Presently Described in Rept ML20246Q1391998-04-20020 April 1998 Provides Response to Violations Noted in Insp Repts 50-010/98-08,50-237/98-08 & 50-249/98-08.Corrective Actions: Described in Attachment Which Contains Safeguards Matl.Encl Withheld ML20217N3461998-03-31031 March 1998 Provides Basis for Plant Conclusion That Dam Failure Coincident W/Loca Is Beyond Design Basis of Dresden,Units 2 & 3.Licensing Amend Is Not Necessary & Clarifications to UFSAR May Be Made Through Provisions of 10CFR50.59 ML20216H4041998-03-13013 March 1998 Forwards Revs to Byron,Dresden,Lasalle & Zion Station OCDM, Current as of 971231,ODCM Manual & Summary of Changes Included ML20203L2911998-02-27027 February 1998 Provides Revised Schedule for Hazardous Matl Response Drill Described in 971121 Response to Insp Repts 50-010/97-13,50-237/97-13,50-249/97-13 & NOV 1999-09-30
[Table view] |
Text
Commonwealth Edison 1400 Opus Place
' Downers Grove, Illinois 60515 February 19, 1993 V.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention; Document Control Desk
Subject:
Dresden Nuclear Power Station Units 2 and 3 Response to Notice of Violation Inspection Report 50-237/92028; 50-249/92028 NRC Docket Numbers 50-237 and 50-249
Reference:
T.O. Martin letter to L.O. Delseorge, dated January 20, 1993, transmitting inspection Report 50-237/92028; 50-249/92028 Enclosed is Commonwealth Edison Company's (CECo) response to the Notice of Violation {NOV) which was transmitted with the referenced letter. The NOV cited two Severity Level IV violations requiring a written response. The response to these violations is provided in the attachment, lf your staff has any questions or comments concerning this letter, please refer them to Denise Saccomando, Compliance Engineer at {708) 663-7285.
Sincerely,
~
c3.W D. Farrar Nuclear Regulatory Services Manager Attachment cc: A. B. Davis, Regional Administrator - Region III J. Stand, Project Manager - NRR M. N. Leach, Senior Resident Inspector - Dresden 930324006i 9303i8 PDR ADQCK 05000237 F<B S g 8 PDR 199~
ZNLD/2112/13
ArrACHMENT RESPONSE TO NOTlCE OF VIOLATlON NRC INSPECTlON REPORT 50-237/92028, 50-249/92028
~gllj~2~72 'I 249%2I!2JULll 10 CFR 50, Appendix B, Criterion V, requires that activities affecting quality shall be prescribed by document instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings.
k Procedure DOP 6900-07, Revision 9, "125Vdc Ground Detections", required that the procedure be immediately performed at DC system grounds above 60Vdc, and a B1 Work Request be submitted once the ground was located.
Furthermore, the procedure required, at grounds above 115Vdc, initiation of a 14 time clock (administrative Limiting Condition for Operation {LCO)) to locate 'ay and remove the ground and preparation of a Justification for Continued Operation (JCO) if the ground could not be located or isolated within 14 days.
Procedure DAP 07-05, Revision 9, "Operating Logs and Records", Paragraph B.5, required that when a LCO entry occurs, the event must be logged in the LCO Log.
Contrary to the above:
- 1. On Seotember 26, 1992, when a 125Vdc system ground was present in Unit 3, the Licensee failed to initiate actions to locate and remove the ground. In addition, the Licensee failed to initiate an administrative LCO and document the event in the LCO Log.
- 2. On November 3, 1992, when 125Vdc grounds were present in both Units 2 and 3, an administrative LCO was initiated and logged in the LCO Log for Unit 3 only. The Licensee could not provide evidence that actions were taken to identify and remove the grounds in either unit.
- 3. On November 12, 1992, when a 125Vdc ground was present in Unit 3, the licensee failed to initiate actions to locate and remove the ground.
ZNLD/2112/14
ATIACHMENT RESPONSE TO NOTICE OF VIOLATION NRC INSPECTION REPORT 50-237/92028, 50-249/92028 NF T E VIO3A~QH; Dresden Station concurs with item 1 of the violation as written. Dresden Station procedures provide clear guidance on required actions upon identification of dc grounds. It is clear that personnel failed to meet management's expectations.
Investigation of the events indicated that personnel failed to follow established station procedures.
With the issuance of the violation Dresden Station initiated an investigation which revealed that station did take appropriate actions on November 3 and November 12th In regard to the November 3, 1992, ground involving Unit 3 (example 2), action was taken to identify and remove the ground. The Unit 3 Log entry states that a ground check was performed at 1857 tlours for a -155V ground on the 125Ydc system. The ground was identified on bus 3A-2 circuit number 16 and Work Request D-13836 was written for investigation and repair of the circuit. Electrical Maintenance identified and replaced a broken terminal block. Further testing revealed that the auxiliary transformer 31 fire protection circuit was grounded.
Work Request 15077 was written to implement repairs.
In regard to the November 3, 1992, ground involving Unit 2 (example 2), action was taken to identify and remove the ground. Work Request D-13806 was written for investigation of the ground; however, the ground cleared before Electrical Maintenance personnel could begin work, The Unit 2 ground was not documented in the LCO Log since it never reached the required 115 volts, as specified in DOP 6900-06, 125Vdc Ground Detection".
ln regard to the November 12, 1992, ground involvinq Unit 3 (example 3), action was taken to locate and remove the ground. The Unit Operator logged the -115Y ground, the ground checking, and the LCO in the Unit Log Book. The ground was located on bus 3A-2. No work request was written since Work Requests D-13836 and D-15077 were already open to investigate the ground on bus 3A-2. On November 16, 1992, Work Request D-14129 was written to document a -90V ground on the Unit 3 125Vdc system. Electrical Maintenance personnel investiaated and resolved the ground under work requests D-13836 and D-1 5077. The ground was monitored until January 2, 1993, and never returned.
D For examole 1, the identified ground has cleared without any action by station personnel. Operations personnel involved in the September 26, 1992, event were counseled by Operations's senior management with regards to the importance of procedure adherence.
ZNLD/2112/15
ATI ACHMENT RESPONSE TO NOTICE OF VIOLATION NRG INSPECTION REPORT 50-237/92028, 50-249/92028 E TIVE E K T D E VI The Operations Manager has discussed failure to follow established procedures with the Shift Engineers. Beginning on February 10, 1993, the Shift Engineers tailgated with their respective crews the importance of following procedures.
They were reminded that adherence to procedures is a basic expectation and is required to ensure safe, reliable operations.
DATE F LL MP AN E Full compliance was achieved when the individual was counseled.
ZNLD/2112/16
ATlACHMENT RESPONSE TO NOTICE OF YIOLAllON NRC INSPECTION REPORT 50-237/92028, 50-249/92028 10CFR50, Appendix B, Criterion XVI, requires that measures shall be established to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment; and nonconformance are promptly identified and corrected.
Contrary to the above, in February and April 1992, the licensee identified oversized fuses in various safety related circuits including the Emergency Diesel Generator exciters and Low Pressure Coolant circuitry. As of December, 1992, this condition adverse to quality had not been corrected.
RE F RT EVI The fuse verification program identified fuses that were inadequately sized.
These discrepancies were noted on Technical Problem Reports (TPRs) and forwarded to Corporate Engineering for resolution. The Engineering evaluation of the fuse in the Unit 2 Low Pressure Coolant injection (LPCI) circuitry states that, "the currently installed 20A fuse, Bussmann Type MIN, in Panel 902-32, provides adequate protection for the circuit," and that the "existing installed 20A fuse protects the circuit." The evaluation also indicated that the fuse may not coordinate with the upstream 30A circuit breaker. No safety significance or operability concerns were attributed to this potential lack of fuse coordination.
Engineering did, however, recommend replacement of the fuse. When the evaluation arrived at Dresden, the fuse coordinator prioritized replacement of the LPCI fuse commensurate with its lack of safety significance and operability concerns. No specific due date was assigned for the fuse replacement.
Engineering's operability assessment of the fuses in the Unit 2 diesel generator excitation cabinets recommended no compensatory actions to ensure operability (i.e. the system is operable with the currently installed fuses). Two 30A fuses and one 40A fuse were installed in the Unit 2 excitation cabinet, instead of the 25A fuses presented in the system drawing. The evaluation again included a recommendation to replace the subject fuses. It stated that during an abnormal fault condition, the fuses may not protect the primary windings of control transformers. The recommendation was based on guidance from GE Bulletin GET-3039G, "How to Select an Apply Power Fuses, Types EJ-1 and EJ0-1." An Action Due Date for fuse replacement of February 28, 1993, was assigned by Engineering. The reasoning behind the assigned due date was based upon the engineering judgment that any expected fault condition that a 26A fuse could protect against would also be protected by a 30A or 40A fuse.
ZNLD/2112/17
ATIACHMENT RESPONSE TO NOTICE OF VIOLATION NRC INSPECTION REPORT 50-237/92028, 50-249/92028 Since identification of the diesel fuse discrepancy in April, 1992, Dresden Station has taken numerous actions to address Engineering's fuse replacement recommendation. Most significant of these actions was a more detailed engineering calculation that supported continued operation with the currently installed diesel generator fuses. This calculation states that "GE 25A, 30A, and 40A fuses, Type EJ0-1, will clear the fault before any damage is done to the primary windings of the transformer or the circuit." This evaluation confirmed Engineering's previous operability assessment and the engineering judgment of the fuse coord nator.
Dresden Station believes that the LPCI fuses were not replaced prior to the inspection period because no safety or operability concern exists with the currently installed fuse. For the diesel generator fuses, numerous actions were taken to replace and procure the fuses and fuse clips prior to the assigned Action Due Date of February 28, 1993. Dresden does acknowledge, however, that Engineering's recommendations should have been dispositioned in a more timely manner.
Dresden identified the need for additional administrative controls for fuses identified for replacement under the fuse upgrade program. Examination of the current Dresden Administrative Procedure (DAP) 11-27, "Control and Maintenance of Fuses and the Fuse List," indicated that it did not provide direction for dispositioning of TPRs issued prior to October, 1992.
RR TIVE P T E D E V 0 The Unit 2 LPCl fuse was changed out on February 19, 1993. The Unit 3 LPCI system has also been inspecte8. The Unit 3 LPGI fuse has the correct amperage, but is a MIN-type fuse rather than the recommended KTN-type fuse.
While no operability concerns have been raised, Dresden will still replace the Unit 3 LPCI fuse the next time LPCI is out-of-service.
For good engineering practice, the one 40A diesel generator fuse on Unit 2 will be replaced with a 30A fuse by April 30, 1993. A Document Change Request was submitted on February 19, 1993 to update the amperage on all related drawings to 30 amps.
To augment administrative controls until DAP 11-27 is revised, the Modification Implementation Supervisor has issued a memorandum to the fuse coordinator incorporating direction for fuse replacements identified in Technical Problem Reports issued prior to October, 1992.
ZNLD/2112/1 8
ATTACHMENT RESPONSE TO NOTICE OF VIOLATION NRG INSPECTION REPORT 50-237/92028, 50-249/92028 RECTIYE TEP KE T V ID ER DAP 11-27, will be revised by March 31, 1993, to incorporate the interim directions described in the above memorandum.
DTE F LL PLIN E Full compliance was achieved with the issuance a memorandum to the fuse coordinator incorporating direction for fuse replacements identified in Technical Problem Reports issued prior to October, 1992.
ZNLD/2112/3 9