ML18018B845

From kanterella
Jump to navigation Jump to search
Submits Addl Info Re Detailed Control Room Design Review (Dcrdr) in Response to SER Open Item 14,SSER 1 (NUREG-1038) & 840810 Ltr.Dcrdr Summary Rept Will Be Submitted by 850330. Actions Currently Underway Discussed
ML18018B845
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/11/1985
From: Cutter A
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-NUREG-1038 NLS-84-518, NUDOCS 8501150060
Download: ML18018B845 (6)


Text

REGULA INFORMATION DISTR IBUTIO( 1'STEM (RIDS)

ACCESSION NBR:8501150060 DOC DATE: 85/01/11 NOTARIZED: NO DOCKET FACIL:50 400 Shearon Harris Nuclear Power Plant~ Unit 1< Carolina 05000400 AUTH'AME" AUTHOR AFFILIATION CUTTERiA ~ BE Carolina Power 8 Light Co, RECIP ~ NAME< RECIPIENT AFFILIATION DKNTONgH ~ RE Office of Nuclear Reactor Regulationp Director

SUBJECT:

- Submits addi,info re- detailed control room design review (DCRDR) in response to SER Open Item 14iSSER 1 (NUREG. 1038) 8 840810 ltd DCRDR summary rept will be submitted by 850330 currently underway 'ctions discussed'ISTRIBUTION CODE: A003D COPIES RECEIVED:LT'R ENCL SIZE:

TITLE!'R/Licensing, Submittal: Suppl 1 to NUREG 0737(Gener ic Ltr 82 33)

NOTES:

RECIPIENT COPIES REC IP IKNT ,COPIES ID CODE/NAME, LTTR EN L ID CODE/NAME LTTR ENCL NRR LB3 BC 7 INTERNAL: ADM/LFMB 1 IE/DEPER/EPB NRR PAULSONpl< 1 NRR/DHFS/HFEB NRR/DHFS/PSRB 1= NRR/DI /ORAB NRR/DL/ORB5 5 NRR/DSI/CPB NRR/DS I/I C SB

-/.RAQ 1

1 NRR/DSI/METB NRR/DS I/RSB REGS I~S~

RG 2/DRSS/KPRPB 1.

1-RGN2 EXTERNALS LPDR NRC PDR NSIC TOTAL NUMBER OF COPIES REQUIRED: LTTR 35 ENCL

h" i lt I 1I o

IL i I 4 8 i g ~ e l

'I W

N Y b'~ r 1

1 5

1I 0 f I II II

RIME Carolina Power & Light Company SERIAL: NLS-84-518 JAN 1 1'>~8$

Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 DOCKET NO. 50-400 DETAILED CONTROL ROOM DESIGN REVIEW

Dear Mr. Denton:

SRMARY Carolina Power & Light Company hereby submits additional information concerning the Detailed Control Room Design Review (DCRDR). This information is submitted in response to Safety Evaluation Report Open Item No. 1 4.

BACKGROUND Supplement No. 1 to NUREG-1038, "Safety Evaluation Report Related to the Operation of Shearon Harris Nuclear Power Plant (SHNPP), Unit No. 1," (June 1984) requested that additional information be submitted to the NRC staff concerning the SHNPP Detailed Control Room Design Review DCRDR at least six months before fuel load. Additionally, an NRC letter dated on August 10, 1984 requested additional information relative to the DCRDR be submitted by January 1, 1985.

DISCUSSION AND CONCLUSION Since receiving these documents, the SHNPP construction schedule has been revised and fuel load is now scheduled for March 1986. We are now planning to provide the additional information requested by March 30, 1985, in accordance with the requirement to submit information at least six months prior to fuel load. However, the following is a brief discussion of actions which are currently underway:

1. CP&L has contracted an outside consultant to prepare the DCRDR summary report. CP&L will work directly with the consultant in the preparation of the summary report.
2. A comparison will be made between the DCRDR requirements of NUREG/CR-1580 and those of NUREG-0700.

8501150060 850111 PDR ADOCK 05000400 '

PDR 411 Fayettevilte Street o P. O. Box 1551 o Raleigh, N. C. 27602

~

'5 if

'I I

y If

'I y

4 yf

Hr. Harold R. Den

3. The summary report will contain the program plan and include those items already accomplished and those items remaining. This report will be submitted to the NRC by March 30, 1985 to address the above in accordance with NUREG-0 73 7, Supplement 1. For those items not yet completed, the summary report will include specific commitments for resolution.

If you have any questions concerning this matter, please contact Ms. Carol Love of our Harris Licensing Unit staff at (919) 836-81 66.

Yours very t y, A. B. Cutter Vice President Nuclear Engineering & Licensing CGL/crs (9 71GAS) cc: Mr. B. C. Buckley (NRC) Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP) Mr. John D. Runkle Mr. J. P. O'Reilly (NRC-RII) Dr. Richard D. Wilson Mr. R. Ramiriz (NRC-HFEB) Mr. G. 0. Bright (ASLB)