ML17349A475

From kanterella
Jump to navigation Jump to search
LER 92-011-00:on 921008,Unit 3 Source Range Neutron Detector N-31 Declared Out of Svc.Caused by Lack of Design Info/Plant Procedures Which Dictate Proper Gasket Matl.Source Range Neutron Detectors N-31 & N-32 replaced.W/921112 Ltr
ML17349A475
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 11/12/1992
From: Plunkett T, Tomonto R
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-92-309, LER-92-011-01, LER-92-11-1, NUDOCS 9211170357
Download: ML17349A475 (8)


Text

ACCELERATED DI BUTION DEMONS XTION SYSTEM REGULATO INFORMATION DISTRIBUTION STEM (RIDS) ll ACCESSION NBR:9211170357 DOC.DATE: 92/11/12 NOTARIZED: NO DOCKET ¹ FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 AUTH. NAME AUTHOR AFFILIATION TOMONTO,R.J. Florida Power & Light Co.

PLUNKETT.,T.F. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION i

SUBJECT:

LER 92-011-00:on 921008,Unit 3 source range neutron detector N-31 declared out of svc.Caused by lack of design info/plant procedures which dictate proper gasket matl.Source range neutron dectors N-31 & N-32 replaced.W/921112 ltr.

D DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR ENCL SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.

NOTES:NRR RAGHAVANiL 05000250 A

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 1 PD2-2 PD 1 1 AULUCK,R 1 1 D INTERNAL: ACNW 2 2 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 AEOD/ROAB/DSP 2 2 NRR/DET/EMEB 7E 1 1 NRR/DLPQ/LHFB10 1 1 NRR/DLPQ/LPEB10 NRR/DREP/PRPBll NRR/DST/SICB8H3

.NRR/DST/SRXB 8E RES/DSIR/EIB 1

2 1

1 1

1 2

1 1

1 NRR/DOEA/OEAB NRR/DST/SELB 8D NR~R-DSTJSPLB8Dl

~G~~R5 RGN2 FILE 01 02 l,l 1

1 1

1 1

1 1

1 EXTERNAL EG&G BRYCE i J ~ H 2 2 L ST LOBBY WARD 1 1 NRC PDR 1 1 NSIC MURPHY,G.A 1 1' NSIC POOREiW. 1 1 NUDOCS FULL TXT 1 NOTES: 1 1 NOTE TO ALL RIDS" RECIPIENTS:

PI.EASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

FULL TEXT, CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 30 ENCL 30

.. Box 029100,~ Miami, FL,~ 33102-9100 NOY 12'QSZ L-92-309 10 CFR 50.73 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Unit 3 Docket No 50-250

~

Reportable Event: 92-011 Date of Event: October 14, 1992 Failure of Source Ran e Neutron Detectors The attached Licensee Event Report 250-92-011 is provided, pursuant to the requirements of 10 CFR 50.73, to provide information on the subject event.

Ve y t ly yours, 7H'

~ F. Plunket Vice President Turkey Point Nuclear TFPKRJThrt Attachment cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9211170357 92iii2 05000250 PDR ADOCK S PDR an FPL Group company

LICENSEE EVENT REPORT (LER)

SAC(LITT NAKE (ll DOCKET )n)NAEE (I) ~ ACE ()l TURKEY 'POINT UNIT 3 05000250 1 OF 4 FAILURE OF SOURCE RANGE NEUTRON DETECTORS ttT DATE (I) OTXEA SAC ILI TIES I)IV. (5)

EVENT DATE (5) LER NUMBER (6)

DAT SEC l Xl DOCKET I (5)

MON YR 10 14 92 92 011 00 11 12 92 OTEAATINC SCOE (5) 10 CFR 50.73 a 2 B Re uef ling (S(ssc)IT )n Absttsct )ss)oe snd in test)

LICENSEE CONTACT FOR THIS LER (12)

Robert J. Tomonto, Licensing Engineer TELETNCNE lenttn 305-246-7327 CONTLETt ONE LINE SOA tACN CONTONENT TAILOAE DESCAISED IN TRIS XETOAT (ll)

STSTE)l CAUS t B IG DET W120 EXT ECTED SOTTLENENTAL St)OAT EXTECTED ()() 5 O)N(I 5 SION MONTH DAY YEAR DATt (1$ )

(11 Tes, cceo)ete EXTECTTD SOSNISSION tart)

ASSTAACT (l()

On October 8, 1992 at approximately 0425 EDT, with Turkey Point Unit 3 in Mode 6 (REFUELING) and Unit 4 in Mode 5 (COLD SHUTDOWN), Unit 3 source range neutron detector N-31 was declared out-of-service due to high count rate greater than 1500 counts per second (cps). Primary source range detector N-32 was used for audio and one backup source range flux monitor was used to meet the minimum equipment requirements of Technical Specification (T.S.)

3. 9.2. At approximately 0606 EDT on October 9, 1992, Unit 3 completed the coze offload. At approximately 0814 EDT on October 9, 1992, primary source range detector N-32 was declared out-of-service, due to a continued high count rate (> 400 cps) following offload.

On October 14, 1992, FPL determined that both primary source range neutron detectors had degraded to the point. of failure. Degradation of the N-32 detector was gradual over several days, raising the possibility that during the last steps in the. core offload procedure, Unit 3 had performed CORE ALTERATIONS not in accordance with T.S. 3.9.2.

LICENSEE ENT REPORT (LER) TEXT (ITZNURTION FACILITY NAME DOCKET NUMBER LER NUMBER PAGE NO.

TURKEY POINT UNIT 3 05000250 92-011-00 02 oF 04 I. DESCRIPTION OF THE EVENT The following sequence of events was derived from the Reactor Operator's log, the equipment out-of-service log and the Emergency Response Data Acquisition and Display System (ERDADS) log.

0300 10/07/92 'nit 3 in Mode 6 (REFUELING) and Unit 4 in Mode 5 (COLD SHUTDOWN)

Unit 3 initiated core offload 0425 10/08/92 With fuel offload in progress, the Unit 3= "Source Range High Flux at Shutdown" alarm and the Unit 3 "Containment Evacuation" alarm experienced spurious annunciation. FPL declared primary source range detector N-31 out-of-service due to high count rate (>

1500 cps) .

No change was observed in eithez N-32 or the backup source range neutron flux monitors (gammametrics) .

N-32 was used for audio and one backup source range flux monitor was used to meet the minimum equipment requirements of Technical Specification 3.9.2.

0109 10/09/92 Fuel Assembly DD-16 with secondary source assembly (SS-1) is offloaded from the core 0130 10/09/92 FPL noticed no audio count rate and could not re-establish an audio indication. Fuel movement was suspended.

0156 10/09/92 Performed procedure 3-OSP-59. 6, Hi Flux at Shutdown.

0215 10/09/92 Audio count rate was re-established, recommenced fuel movement.

0606 10/09/92 Unit 3 enters defueled mode 0814 10/09/92 Primary source range detector N-32 was declared out-of-service =due to high count rate (> 400 cps) reading when < 10 cps expected following coze offload.

Technical Specification 3.9.2, Refueling Operations Instrumentation, LIMITING CONDITION OF OPERATION states the following:

"As a minimum, one primary Source Range Neutron Flux Monitor with continuous visual indication in the control room and audible indication in the containment and control zoom, and one of the remaining three Source Range Neutron Flux Monitors (one primary or one of the two backup monitors) with continuous visual indication in the contxol room shall be OPERABLE.

The corresponding ACTION statements are as follows:

a. With one of the above required monitors inoperable or not operating, immediately suspend all operations involving CORE ALTERATIONS or positive reactivity changes.

l~l LICENSEE IENT REPORT (LER) TEXT QiTINURTION

.FACILITY NAME DOCKET NUMBER LER NUMBER PAGE NO.

TURKEY POINT UNIT 3 05000250 92-011-00 03 oF 04 T

b. With both of the above required monitors inoperable or not operating, determine the boron concentration of the Reactor Coolant System at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

As of 0425 EDT on October 8, 1992, the monitoring capability was mai.ntained by N-32 primary Source Range Neutron Flux Monitor and backup gammametric-B Source Range Neutron Flux Monitor.

Duri.ng some point in the offload, the N-32 source range indication increased to approximately 500 cps. This value was less than the setpoint limit on the "SOURCE RANGE HI FLUX AT SHUTDOWN" alarm, and as

-a result the alarm did not annunciate. The fact that the detector had failed was only discovered after the offload was completed and the detector count rate had not dropped off.

Following the offload, the Source Range Flux Monitor data was trended.

The ERDADS trend report from 1023 EDT on October 6, 1992 to 1024 EDT on October 8, 1992 showed N-32 gradually trending upward from approximately 250 cps to approximately 500 cps. N-31 shows a similar increase in detector response. N-32 count rate leveled off at approximately 500 cps at approximately 1000.EDT on October 8, 1992.

The count rate remained at approximately 500 cps during the remainder of the fuel offload.

Based on the fact the audio indication on detector N-32 was lost almost immediately after the only fuel assembly in the core with a secondary source assembly (Fuel assembly DD-16) was discharged, FPL believes that the N-32 detector was operable up to this point. EDT on Therefore, the period from 0215 EDT on October 9, 1992 to 0606

.October 9, 1992, represents the -only time interval the operability of the N-32 detector is in question. Based on the core offload pattern and the relative assembly power and buznup conditions of the remaining assemblies, minimum reactivity changes would be expected during that interval.

ZZ. CAUSE OF THE EVENT Following the offload, the N-31 and N-32 detectors were removed from their wells, inspected and tested. Both detectors were found to be wet as a result of the failure of the detector cover gaskets during the refueling operation. In addition, evidence of some bori.c acid crystals were present. The presence of moisture in the detector assembly is believed to be the cause for the detector failure.

FPL has determined that the gaskets to the Nuclear Instrumentation System (NIS) access covers had been installed with the wrong gasket material'. The matezial used was EPDM Rubber with Aramid Fiber/Synthetic, which was too hard a material to seal Rubber effectively.

The material which should have been installed was EPDM Gasket material.

The root cause of the event was a lack of design information/plant procedures which dictate the proper gasket material and gasket installation procedures (i.e., mounting hardware, torque requirements, RTV applications) and a failure by plant personnel to specify the proper gasket material.

x,xczzszz %m zzpozz {xxz) zzzz czxzvmxaz FACILITY NAME DOCKET NUMBER *. LER NUMBER PAGE NO.

TURKEY POINT UNIT 3 05000250 92-011-00 04 oF 04 ZII. ANALYSIS OP THE EVENT Testing included electrical checks, neutron source checks, integral bias curves and preamplifier, gain per procedure MP 12707.1, Excore Nuclear Instrumentation Pze-Installation and Post-Installation.

Inspections and Test of Detectors. The electrical continuity and

=

insulation checks were reported satisfactory. The. Integral Bias curves indicated very high energy level pulses from each detector whether or not in the presence of a neutron field. The vendor was contacted and based. upon the symptoms, initially postulated that the most likely failuze mode was a pin hole air in-leakage to the detectors caused by failure of the detector aluminum housings due to exposure to the corrosive effects of boric acid.

Upon reviewing the results of Proportional Counter D.C. Current Characteristic Tests which'ere performed on each detector, the vendor revised his root cause determination to be.moisture ingress into the cable or detectors. The detector failures were non-catastrophic, taking place over a period of several days due to the wet condition of the detector. As the performance of the detector degraded, the noise level increased and the detectors'ensitivity to neutrons decreased.

'Technical Specification 3/4.9.2 Bases, Refueling Operations-Instzumentation, states that "the OPERABILITY of the Source Range Neutron Flux Monitors ensures that redundant monitoring capability is available to detect changes in the reactivity condition of the core."

Since the detector degradation was gradual over several days, FPL is unable,to definitively state that'-32 was unable to perform its ,

intended function of detecting changes in reactivity. During the time interval when the operability of the N-32 detector was in question, both backup source range neutron flux monitors (gammametfics) were operable.

Since during the time interval in question the backup source range gammametric detectors were operable and no positive reactivity changes were p'ossible, the health and safety of the public were not.adversely affected.

ZV. CORRECTIVE ACTIONS Source range neutron detectozs N-31 and N-32 were replaced prior to the Unit 3 core reload. In addition, the NIS detector access covers were installed with the proper EPDM rubber gasket

'aterial.

2. Revise plant procedure MP 12707.2, Excore Nuclear Instrumentatio'n Installation of Detectors, to reflect proper gasket material, mounting hardware, torque requirements, RTV application and RTV cure time. The procedure revision will be completed. by February 1, 1993.

Revise plant drawing 5610-C-209, Reactor Refueling Pit Liner Plate Details, to reflect proper gasket material, mounting hardware, torque requiiements, RTV application and RTV cure time; The drawing revision will be completed by February 1, 1993.

V. ADDITIONAL INFORMATION No similar LERs have been identified.

l