Responds to Generic Ltr 88-02 Re Isap Ii.Due to Cost Concern of Implementing Isap,Util Declines Participation in Program Until Evaluation of Prudent Course to Follow Completed
ML17325A614
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/18/1988
From: Alexich M
AMERICAN ELECTRIC POWER SERVICE CORP.
To: Murley T
NRC, NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
AEP:NRC:0938A, AEP:NRC:938A, GL-88-02, GL-88-2, NUDOCS 8802220262
Download: ML17325A614 (5)


Text

AC CE~>RATED D1STRSUTJON DEMONSTRXTSN SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8802220262 DOC.DATE: 88/02/18 NOTARIZED- NO DOCKET FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana 6 05000315 50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana 6 05000316 AUTH. NAME AUTHOR AFFILIATION ALEXICH,M.P. American Electric Power Co., Inc.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Declines participation in ISAP Ltr 88-02 response format encl.

II starting in 1988.Generic DISTRIBUTION CODE: A062D COPIES RECEIVED:LTR ~NCL ASSIZE: I TITLE: OR Licensing Submittal: Integrated Safety Assessment Program D

NOTES 8

ID RECIPIENT CODE/NAME PD3-3 LA PD3-3 PD COPIES LTTR ENCL 1

5 0

5.

ID NRR RECIPIENT CODE/NAME MILLER,M WIGGINGTON,D COPIES LTTR ENCL 1

1 1

1 j

A INTERNAL: ARM/DAF/LFMB 1 0 NRR/DEST/ADS 7E 1 1 NRR/DEST/CEB 8H 1 1 NRR/DEST/MTB 9H 1 1 NRR/DEST/RSB 8E 1 1 NRR/DOEA/TSBllF 1 1 NRR PMAS ILRB12 1 1 OGC 15-B-18 1 0 G -FIL 01 1 1 RES/DE/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR NSIC 1 1 8

j A

TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 18

American Electric Power Service Corporation 1 Riverside Plaza Columbus, OH 43215 614 223 1000 AEP:NRC:0938A Donald C. Cook Nuclear Plant Units 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 GENERIC LETTER 88-02 INTEGRATED SAFETY ASSESSMENT PROGRAM II (ISAP II)

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Attn: T. E. Hurley February 18, 1988

Dear Dr. Murley:

This letter is in response to Generic Letter (GL) 88-02, dated January 20, 1988 on the Integrated Safety Assessment: Program II.

On the GL 88-02 Respo'nse Format, attached to'.,this letter, we have

'marked item 2, "We believe that an industry/NRC,seminar ~

consistin'g of a brief disc'ussion by NRC followed by a question and answer period would be beneficial prior to making a decision."

We have reviewed GL 88-02 carefully and we are conducting a further study of all the ramifications of an ISAP II. The cost of implementing the ISAP II is a concern. We are now in the final stages of completing many of the post-Three Mile Island and Salem ATWS-related requirements'hese projects have been expensive, and, when coupled with our own improvements such as the Steam Generator Replacement project, have placed a great burden on the consumer in the cost of generated power.

We appreciate the fact that commitment: to ISAP II would ameliorate the impact of the Individual Plant Evaluation (IPE).

However, since the specific requirements for an IPE have not yet been established, we are unable to evaluate the practical and cost benefit of participating in an ISAP II versus confining our immediate efforts to performing an IPE.

Therefore, until we can complete our evaluation of the, most prudent course for us to follow, we 'respectfully. decline participation in the ISAP 'II starting in 1988.

'8802220262 880218 PDR P

ADOC,. 050003i5

~C.D

C h ~\

Dr. T. E. Murley AEP:NRC:0938A This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.

Sincerely, M. . Alexi Vice Presi ent Attachment cc: D. H. Williams, Jr.

W. G. Smith, Jr. - Bridgman R. C. Callen G, Bruchmann G. Charnoff NRC Resident Inspector - Bridgman A. B. Davis - Region III

-ATTACHMENT TO AEP:NRC:0938A Enclosure 2 Inte rated Safet Assessment Pro ram ISAF'I Res onse Format to Generic Letter 88-02 Facility Name: Cook Nuclear Plant I.'tility: Indiana Michigan Power/'AEP Individual Contact Name: J. G. Feinstein Phone Number: 6l4-223-2oao An expression of interest will not be considered a commitment tc participate on the part of the utility.

1. Would you be interested in participating in ISAP II?, If so, ir. what time frame?

We are conducting a study on the benefits and cost of ISAP II.

2. Oo you believe that an industry/NRC seminar consisting of a brief discuss. on by NRC followed by a question and answer period would be beneficial prior to making a decision?

Yes we would be interested in a seminar prior to making a final decision on future participation.

3. Would you be interested in a one-on-one meeting with the NPC to discuss your particular facility or facilities?

A one-on-one meeting with the NRC to discuss the Cook Nuclear Plant specifics would be vital.

4. If you remain undecided regarding participation, what additional information do you need in order to make a decision?

As indicated in the cover letter, additional information concerning essential. IPE requirements, and how ISAP II would fulfillthese requirements, is

5. Oo you have any potential concerns about participating ir !SAP II?

We are especially concerned with a cost-benefits analysis.

6. Oo you have any suggesticrs for program improvements or changes?

None at. this time.