Responds to NRC 800710 Ltr Re Violations Noted in IE Insp Repts 50-315/80-08 & 50-316/80-07.Corrective Actions:Events Entered in Required Logbooks & Responsible Persons Reminded of Maintaining Accurate Logs
ML17319A622
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/04/1980
From: Hunter R
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML17319A621 List:
References
AEP:NRC:00447, AEP:NRC:447, NUDOCS 8009290444
Download: ML17319A622 (5)


Text

INDIANA II MICHIGAN ELECTRIC COMPANY P. O. BOX 18 BOWLING GREEH STATION HEW YORK, H. Y. 10004 August 4, l980 AEP: NRC: 00447 Donald C. Cook Nuclear Plant Unit Nos. 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74

SUBJECT:

IE INSPECTION REPORT NOS. 50-315/80-08 and 50-316/80-07 ITEMS IN NONCOMPLIANCE Mr. James G. Keppler, Director Office of Inspection and Enforcement Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

This letter and its attachment are our response to Mr. Heishman's letter dated July 10, 1980 requesting responses to the three infractions listed in IE Inspection Report Nos. 50-315/80-08 and 50-316/80-07. We received Mr. Heishman's letter on July 15, 1980.

One of these infractions (Item 1 of the "Notice of Violation" ) does not require a response since it is stated in the report that this item was satisfactorily resolved during the inspection.

t uly yours, ter Vice President Attachment cc: R. C. Callen C. Charnoff John E. Dolan R. W. Jurgensen D. V. Shaller - Bridgman AUB VI 886

f gN

.C' i

l

ATTACHMENT TO AEP:NRC:00447 RESPONSE TO INFRACTION NO. 1 The inspector considers this item closed with no reply necessary.

RESPONSE TO INFRACTION NO. 2 Although the events described in Item 2 of the "Notice of Violation" were recognized as being of sufficient importance for the on-duty Shift Operations Engineer to report them by telephone to the NRC Operations Center and to the Resident Inspector, the Unit Shift Supervisor and the Shift Operating Engineer failed to enter them in the applicable log-books.

As soon as the matter was brought to the attention of the Operations Superintendent by the Resident Inspector, "Late Entries" of these events were made in the required logbooks.

To prevent recurrence, the Shift Supervisor and the Unit Supervisor involved, were reminded of the requirement and importance of maintaining complete and accurate logs. In addition, a memo has been issued to all licensed operators restating the requirement and importance of main-taining accurate logs of all significant shift activities.

RESPONSE TO INFRACTION NO. 3 EXPLANATION Surveillance testing of the auxiliary feedwater pumps is performed to satisfy the requirements of both Technical Specification Section 4.7.1.2 and the Inservice Inspection (ISI) Program as specified in Section XI of the ASME Boiler and Pressure Vessel Code.

On May 6, 1980, surveillance testing was performed on Unit 2's turbine driven auxiliary feedwater pump (TDAFP). The test results satisified the requirements of Technical Specification 4.7.1.2; however, the pump discharge pressure was higher than the previous test results which placed the pump in the ISI test program "alert range" requiring an increase in the testing frequency.

Normally, the ISI Program required data are obtained from the Operations Department monthly surveillance test procedure which 'covers all auxiliary feedwater system surveillance requirements. This procedure, when. completed, requires review and signoff by the Shift Operating Engineer (SOE).

Attachme'nt W2& AEP:NRC:00447 r

0 On May 20, 1980, when the extra ISI program test was due, only pump Shoal, pump vibration and, pump suction and'discharge pressures readings were required. These readings were recorded, using the applicable data sheet from the auxiliary feedwater system procedure. Since these data were required specifically for the ISI program and were to be forwarded to the plant performance section for review and evaluation, the SOE did not review the data obtained. The special test data did satisfy the ISI program

'acceptance criteria but, this time on the low side "alert range". The signfA'cance of the fact that the discharge pressure was below Technical Specification Section 4.?.1.2, minimum requirements was not recognized by the Operations Superintendent's office. Consequently, the pump was considered operable.

On May 27, 1980, the NRC Resident Inspector informed the plant Operations Superintendent of the TDAFP situation and that he considered the pump inoperable. Since the Action Statement Technical Specification Section 3.7.1.2 had been exceeded, Technical Specification Section 3.0.3

~

was in effect. Retesting of the pump was started, immediately. Power reduction was also started to place the reactor in hot standby within one hour should this become necessary. The pump was successfully retested within the one hour and the power reduction terminated. Since the previous testing of this pump, there had been no work performed on

-have affected the pump performance.

it that would The discrepancies with the discharge pressure readings have been attributed to failure to properly measure the turbine speed at the required test conditions. At no time during the period since Hay 6, 1980 was the TDAFP actually inoperable. The entire roblem was a failure to proper ly conduct the test and evaluate the test esults.

CORRECTIVE ACTION The ISI test data'sheet" has been ) evised to assure that the-Technical Specification discharge pressure requirement supersedes the operability requirements of the ASNE Boiler and Pressure Vessel Code.