Presents Schedule for Submittal of Revs to ECCS Analysis. Westinghouse Has Performed Reanalysis for Unit 2.Unit 1 Will Be Removed from Areas of Concern Raised in Schwencer 780913 Ltr
ML17317A687
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/25/1978
From: Tillinghast J
INDIANA MICHIGAN POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
AEP:NRC:00091, AEP:NRC:91, NUDOCS 7810310090
Download: ML17317A687 (3)


Text

po> I TO INFORMATION DISTRIBUTIO SYSTEM 50-3 DOCKET NB DOC DATE: 781025 RECIPIENT: D ~ ACCESSION NBR: 7810310090 ORIGINATOR". COPIES RECEIVED:

COMPANY: LTR ENCL

SUBJECT:

SIZE:

Per ltr o rev ECC for 050-3

.bISTRl RUTION CObE I NOTARIZED' LICENSEES AQOi DISTRIBUTION TITLE~

GENERAL DISTRIBUTION FOR AFTER OF OPERATING

'SSUANCE NACSE ENCL? FOR ACTION B ~/7 ENCL a ORB01 BC REG F W/ENCL I LE OELD AR W/ENCL W/P ENCl.

l TP ONLY HANAUEP W/ENCL CORE PERFORMANCE BR W/ENCL AO FOR SYS a PROJ W/ENCL ENGINFFRING HP 4/ENCL REACTAP SAFFTY BR W/ENCL PLANT SYSTEHS BR W/ENCl EFB W/ENCL EFFLUENT TREAT SYS W/ENCl.

, J MCGnUGH W/ENCL LPDR W/ENCL TERA W/ENCL NSIC W/ENCl ACRS W/l b ENCL TOTAL NUMBER OF.COP IES REQUIREbi LTR 40 ~

ENCL 39 NOTES: I 6 E 3 cys all material greg

INDIANA II HICHIGAN POWER COMPANY P. O. BOX 18 BOWLING GREEN STATION ('gfPgpp NEW YORK, N. Y. 10004 EEL@IIJ@g@gy(

b~II:

.FPf.gp~

October 25, 1978 AEP'NRC:00091 Donald C. Cook Nuclear Plant Unit Nos. 1 8 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 Scheduled'ates For The Submittal Of The Revised ECCS Anal ses Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Denton:

This letter is in response to Mr. A. Schwencer's letter dated September 13, 1978 in which he requested our schedule for the submittal of revised ECCS analyses for Units 1 and 2 of the Donald C. Cook Nuclear Plant. These re-analyses were required to correct a logical inconsistency observed in the Zirconium water heat'eneration model of the Westinghouse Appendix K (October, 1975) ECCS Evaluation Model.

The Westinghouse Electric Corporation has already performed such a reanalysis for Unit 2 of the above captioned plant. This reanalysis was performed utilizing the corrected Westinghouse "October 1975" ECCS Evaluation Model and it contained the necessary corrections to account for the errors addressed in Mr0 Schwencer's letter0 This revision to the Westinghouse "October 1975" ECCS Evaluation Model was approved by the Nuclear Regulatory Commission on August 29, 1978. The results of the reanalysis, which is now in conformance with the requirements set forth in Appendix K to 10 CFR Part 50, were transmitted to you in our letter dated April 28, 1978.

Unit No. 1 ofOculo the Donald C. Cook Nuclear Plant is currently in its third cycle of operation. At the end of the cycle (April 1979) the fuel supplied by the Westinghouse Electric Corporation will be completely re-moved from this unit. Hence this Unit will be outside the area of concern addressed in Mr. Schwencer's letter. The new fuel 'vendor, the Exxon Nuclear Corporation, did already perform an independent ECCS analysis for this unit using their fuel. Exxon's ECCS evaluation model and bases for calculation techniques were reviewed by the Nuclear 78% 0M. o~

0y

Mr. Harold R. Denton, Director October 25, 1978 Regulatory Commission and ruled to be acceptable.

Furthermore, the Westinghouse Electric Corporation advises us that the earliest date for the submittals of the requested revised ECCS analysis, should they be asked to perform it, would be February 15, 1979. This analysis, by the time it is approved, will not be applicable herein, we re-to the aforesaid unit. In light of the facts presented quest that relief be granted from having to submit the requested Westinghouse reanalysis for Unit No. 1 of the Donald C. Cook Plant.

The matter presented in this letter has been discussed with your staff. During the same discussions the necessary extension for the sub-mittal of this response letter was granted.