ML17276B594

From kanterella
Jump to navigation Jump to search
Forwards Corporate Organizational Changes Effective 820810. Changes Will Be Reflected in Future Revisions to FSAR & Operational QA Program Description
ML17276B594
Person / Time
Site: Columbia, Washington Public Power Supply System, Satsop  Energy Northwest icon.png
Issue date: 08/16/1982
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Novak T
Office of Nuclear Reactor Regulation
References
GO2-82-682, NUDOCS 8208200090
Download: ML17276B594 (10)


Text

REGULATO NFORMiAT ION DISTRIBUTION i EN ('RIDS)

ACCESSION NBR;8208200090 DOC PATE 82/08/16 NOTARIZED ~ NO D FACIL:50-397 NPPSS Nuclear Project< Unit 2E blashington Public Powe STN"50-508 l<PPSS Nuclear Pr ojectE Unit 3P Nashington 'Public 0500+)8 Docket Unknown 040AW44 AUTH ~ NAME AUTHOR AFFILIATION BOUCHEY<G,O, 'ashington Public Power "Supply System

>RECIP ~ NANiE RECIPIENT AFFILIATION NOVAKET AH, Assistant Director for Licensing ~ g

SUBJECT:

Forwar ds cor porate organizational changes -ef'fective 820810, Changes wil l be reflected in future r evisions 'to QA program descr'iption j

pSARperational

~

DISTRIBUTION CODE: NOOSE TITLE: Changes of Per sonnet/Address COPIES RECEIVED:LTR.,ENCL /. SIZE: .

1 i NOTES:Standardized Plant, 05000508 1

RECIPIENT COPIES RECIPIENT, COPIES ID CODE/NAME LTTR ENCL ID CODE/NANiE LTTR ENCL A/D LICENSNG 12 1 1 LIC BR 02. BC 1 0 LIC BFt 03 BC 1, 0 LIC BR N2 LA 04 1 1 LIC BR 03 LA 04 1 1 AULUCKER ~ 01 1 1 I'NHEELERELN 01 1

, INTERNAL; ADM DISILVEST 1 1 ASLAP 10 1 1 ASLB 09 1 1 ELD/HDS2 06 1 1 ELD DS1 06 1 1 NRR/DL DIR 1'

04 1 1 RGN5 1 1 RN/OOANI/MI B 08 1 1 SECY/DSB 1 1 EXTERNALS ACRS 13 1 INPOEJ ~ STARNES 1 LPDR 03 2 2 NRC PDR 02 1 1 NTIS 05 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR ?3 ENCL 21

II

,yl lf 1

F 1

A

, fl n

V n

t SaOSa000VO SaOSSS PDR ADOCK 05000397 H PDR Was ington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 August 16, 1982 G02-82-682 Docket Nos. '0-460 50-.397 50-508 Mr. Thomas H. Novak Assistant Director for Licensing Division of Licensing Nuclear Regulatory Comission 7920 Norfolk Avenue Washington, DC 20555

Dear Mr. Novak:

Subject:

CORPORATE ORGANIZATIONAL CHANGES Effective August 10, 1982, the Supply System management structure was realigned as shown in the attachment to this letter. We will submit modifications which reflect these recent organizational changes in future revisions to the FSARs for WNP-1, WNP-2 and WNP-3, and the Operational guality Assurance Program Description.

The major changes in the organizational responsibilities relative to those described in the current revision of the Operational guality Assurance Program Description are as follows:

1) 'he Director of 0 erations .reports to the Managing Director and is responsible for safe and successful construction and operation of all Supply System nuclear facilities.
2) The Director, Su ort Services reports to the Managing Director and provides administrative, records management, security, health physics, chemistry, radiological protection, emergency preparedness, industrial safety, fire protection and technical training support services for Supply System plants.
3) The Director, Licensin and Assurance reports to the Managing Director and provides quality assurance programs, nuclear safety assurance programs and licensing support for Supply System plants.

J i'. )1 Thomas H. Novak Page 2 August 16, 1982 CORPORATE ORGANIZATIONAL CHANGES

4) The Director, Power Generation reports to the Director of Operations and his responsibilities are unchanged.
5) The Pro ram Directors for WNP-l, WNP-2 and WNP-3 report to the Director of'perations and their responsibilities are unchanged.
6) The Director Technolo reports to the Director of Operations and his responsibilities are unchanged.

Yery truly yours, G. D. Bouchey, nager Nuclear, Safety and Licensing GDB/rch Attachment cc: R Auluck NRC RH Engelken NRC RO V WP Haas NRC RW Hernan NRC NS Reynolds D&L D Wheeler NRC

1 $

II I f t: P 4'

t r"

WASHINGTON PUBLIC POWER SUPPLY SYSTEM MANAGING DIRECTOR R. L. FERGUSON D. A. THORESEN J. R. HONEKAMP EXEC. ASSISTANT TECH. SPECIALIST DEPUTY MANAGING DIRECTOR A. SQUIRE LEGAL INTERNAL AUDITING G. E. C. DOUPE'HIEF J. J. NENTZ COUNSEL MANAGER LICENSING & PUBLIC AFFAIRS & CHIEF FINANCIAL HUMAN RESOURCES OPERATIONS SUPPORT SERVICES ASSURANCE INFORMATION OFFICER J. M. HARDING D. W. MAZUR J. Y4. SHANNON R. B. GLASSCOCK T. E. HUNT DIRECTOR DIRECTOR J. D. PERKO DIRECTOR DIRECTOR DIRECTOR ACTING

P WASHINGTON PUBLIC POWE R SUPPLY SYSTEM OPERATIONS D. W. MAZUR DIRECTOR A. KOHLER JR.

SPECIAL PROJECTS POWER WNPQ/5 TERMINATION GENERATION PROGRAM WNP.3 PROGRAM WNP-2 PROGRAM WNP-1 PROGRAM TECHNOLOGY W. C. BIBB R. A. DELORENZO R. S. I.EDDICK R. G. MATLOCK R. W. ROOT P. K. SHEN DIRECTOR DIRECTOR DIRECTOR DIRECTOR DIRECTOR DIRECTOR

t A

[l k