May 22, 2006 LICENSEE: Nuclear Management Company FACILITY: Monticello Nuclear Generating Plant

SUBJECT:

SUMMARY

OF THE MAY 17, 2006, PUBLIC MEETING TO DISCUSS THE MONTICELLO NUCLEAR GENERATING PLANT END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On May 17, 2006, the Nuclear Regulatory Commission (NRC) held a public meeting at the Monticello Community Center in Monticello, MN. The meeting was between NRC Region III management and Nuclear Management Company representatives to discuss the NRCs assessment of the Monticello Nuclear Generating Plants safety performance for the period from January 1 through December 31, 2005. The meeting notice can be found in ADAMS as Accession Number ML060750479. A list of meeting participants and the NRC presentation slides can be found in the attached Enclosures.

The NRC began the meeting with an overview of the NRCs Reactor Oversight Process (ROP),

national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of the Monticello Nuclear Generating Plants performance in calendar year 2005, which was documented in the March 2, 2006, end-of-cycle assessment letter recorded in ADAMS as Accession Number ML060750518. The NRC also discussed upcoming inspections and activities at the Monticello Nuclear Generating Plant.

As part of this regulatory performance meeting, Nuclear Management Company responded to the NRCs assessment and discussed Monticello Nuclear Generating Plants plans for future improvements. Although this was a public meeting, there were no members of the public in attendance.

/RA/

Bruce Burgess, Chief Branch 2 Division of Reactor Projects Docket No. 50-263 License No. DPR-22 : Public Meeting Attendees : NRC Presentation Slides DISTRIBUTION:

See next page

May 22, 2006 LICENSEE: Nuclear Management Company FACILITY: Monticello Nuclear Generating Plant

SUBJECT:

SUMMARY

OF THE MAY 17, 2006, PUBLIC MEETING TO DISCUSS THE MONTICELLO NUCLEAR GENERATING PLANT END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On May 17, 2006, the Nuclear Regulatory Commission (NRC) held a public meeting at the Monticello Community Center in Monticello, MN. The meeting was between NRC Region III management and Nuclear Management Company representatives to discuss the NRCs assessment of the Monticello Nuclear Generating Plants safety performance for the period from January 1 through December 31, 2005. The meeting notice can be found in ADAMS as Accession Number ML060750479. A list of meeting participants and the NRC presentation slides can be found in the attached Enclosures.

The NRC began the meeting with an overview of the NRCs Reactor Oversight Process (ROP),

national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of the Monticello Nuclear Generating Plants performance in calendar year 2005, which was documented in the March 2, 2006, end-of-cycle assessment letter recorded in ADAMS as Accession Number ML060750518. The NRC also discussed upcoming inspections and activities at the Monticello Nuclear Generating Plant.

As part of this regulatory performance meeting, Nuclear Management Company responded to the NRCs assessment and discussed Monticello Nuclear Generating Plants plans for future improvements. Although this was a public meeting, there were no members of the public in attendance.

/RA/

Bruce Burgess, Chief Branch 2 Division of Reactor Projects Docket No. 50-263 License No. DPR-22 : Public Meeting Attendees : NRC Presentation Slides DISTRIBUTION:

See next page DOCUMENT NAME:E:\Filenet\ML061430263.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME BBurgess for SSheldon:sls BBurgess DATE 05/22/2006 06/22/2006 OFFICIAL RECORD COPY

Nuclear Management Company cc w/encl: M. Sellman, Chief Executive Officer and Chief Nuclear Officer Manager, Nuclear Safety Assessment J. Rogoff, Vice President, Counsel, and Secretary Nuclear Asset Manager, Xcel Energy, Inc.

Commissioner, Minnesota Department of Health R. Nelson, President Minnesota Environmental Control Citizens Association (MECCA)

Commissioner, Minnesota Pollution Control Agency D. Gruber, Auditor/Treasurer, Wright County Government Center Commissioner, Minnesota Department of Commerce Manager - Environmental Protection Division Minnesota Attorney Generals Office

Nuclear Management Company ADAMS Distribution:

JLD PST RidsNrrDirsIrib GEG KGO CST CAA1 DRPIII DRSIII PLB1 JRK1

PUBLIC MEETING PRINCIPAL ATTENDEES May 17, 2006 NRC Bruce Burgess Chief, Branch 2, Division of Reactor Projects Christopher Thomas Senior Resident Inspector, Monticello Nuclear Generating Plant Robert Orlikowski Resident Inspector, Monticello Nuclear Generating Plant Nuclear Management Company John Conway Site Vice President, Monticello Nuclear Generating Plant Rick Jacobs Site Director, Monticello Nuclear Generating Plant John Grubb Engineering Director, Monticello Nuclear Generating Plant Others Members of the Public None Enclosure 1