IR 05000528/198903720 September 1989Insp Repts 50-528/89-37,50-529/89-37 & 50-530/89-37 on 890807-25.No Violations or Deviations Noted.Major Areas Inspected:Various Vital Areas & Equipment in Plant & Assessment of Licensee Program for Receipt & Storage
IR 05000528/19890128 September 1989Insp Repts 50-528/89-12,50-529/89-12 & 50-530/89-12 on 890130-0811.No Violations Noted.Major Areas Inspected: Vital Areas,Commercial Grade Procurement & Followup on 2 AllegationsSafe Shutdown
Stroke time
Temporary Modification
Emergency Lighting
IR 05000528/198802012 July 1988Insp Rept 50-528/88-20 on 880525-26,0606-10 & 24.Violation Noted.Major Areas Inspected:Circumstances Surrounding Reactor Startup of Unit on 880514 in Which Reactor Went Critical W/Control Element Assemblies Below Tech Spec LimitShutdown Margin
Condition Adverse to Quality
IR 05000528/198704430 December 1987Insp Repts 50-528/87-44,50-529/87-43 & 50-530/87-46 on 871214-18.No Violations or Deviations Noted.Major Areas Inspected:Licensee QA Program for Startup Testing & Operations & NRC Insp Procedures 30703,35501 & 35701
IR 05000529/198700825 March 1987Corrects Insp Rept 50-530/87-09 on 870223-26 & Transmitted by .Correct Identification Number Is 50-530/87-07 in Conjunction W/Insp Rept 50-529/87-08
IR 05000528/198700920 March 1987Insp Repts 50-528/87-09,50-529/87-10 & 50-530/87-11 on 870302-06.No Violation Noted.Major Areas Inspected:Emergency Preparedness Program for Unit 3,including Plan Training & Retraining of Emergency Response Personnel
IR 05000528/198700419 March 1987Insp Repts 50-528/87-04,50-529/87-05 & 50-530/87-05 on 870203-12 & 25-26.No Items of Noncompliance Identified.Major Areas Inspected:Capability to Perform Required Radioactivity & Chemical Analyses & Adequacy of Selected Measurements
IR 05000529/198603313 March 1987Insp Repts 50-529/86-33 & 50-530/86-27 on 861201-12. Violations Noted:Failure to Properly Protect Safe Shutdown Cables Through Fire Barriers & Test Breakers Mounted in Train B Essential Switch Gear RoomSafe Shutdown
Fire Barrier
Anchor Darling
Fire Protection Program
IR 05000528/198701112 March 1987Insp Repts 50-528/87-11,50-529/87-12 & 50-530/87-10 on 870302-06.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Previously Identified Items
IR 05000530/19870065 March 1987Insp Rept 50-530/87-06 on 870202-20.No Violation or Deviation Noted.Major Areas Inspected:Qa/Qc Administration, Records,Audits,Surveillance & Calibr Control,Maint,Safety Committee Activity,Repts & Document ControlNondestructive Examination
Temporary Modification
IR 05000528/198700827 February 1987Mgt Meeting Repts 50-528/87-08,50-529/87-09 & 50-530/87-09 on 870204.Major Areas Discussed:Util Evaluation of Causes & Implementation of Corrective Actions Re Recent Operational Events.Meeting Agenda EnclEmergency Lighting
IR 05000528/19870069 February 1987Insp Repts 50-528/87-06,50-529/87-07 & 50-530/87-01 on 870105-09.No Violations Noted.Major Areas Inspected: Emergency Preparedness Program & Followup Reviews of Open Items & Info Notices
IR 05000528/198603722 January 1987Insp Repts 50-528/86-37,50-529/86-37 & 50-530/86-31 on 861126-870104.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Plant Tours,Fire Protection,Esf Sys Walkdowns & Surveillance Testing
IR 05000528/198603613 January 1987Insp Repts 50-528/86-36,50-529/86-36 & 50-530/86-36 on 861201-12 & 23.No Violations or Deviations Identified.Major Areas Inspected:Mgt Control,Training & Qualifications & Followup on Info Notices & Generic LtrsHigh Radiation Area
Grab sample
Process Control Program
IR 05000528/19860389 January 1987Mgt Meeting Repts 50-528/86-38,50-529/86-38 & 50-530/86-30 on 861217.Major Areas Discussed:Plant Performance Indicators.Meeting Agenda EnclEmergency Lighting
IR 05000528/198603530 December 1986Partially Withheld Insp Repts 50-528/86-35 & 50-529/86-35 on 861110-13 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Allegation RV-85-A-0068 Re Coverup of Investigation
IR 05000528/198602925 November 1986Insp Repts 50-528/86-29 & 50-529/86-28 on 861027-31.No Significant Deficiencies or Violations Noted.Major Areas Inspected:Emergency Preparedness Exercise & Associated CritiquesSiren
IR 05000528/198602726 September 1986Insp Repts 50-528/86-27,50-529/86-26 & 50-530/86-20 on 860804-0907.No Violations Noted.Major Areas Inspected: Followup of Previously Identified Items,Review of Plant Activities,Plant Tours & Engineered Safety Sys Walkdowns
IR 05000528/19860192 July 1986Insp Repts 50-528/86-19,50-529/86-19 & 50-530/86-13 on 860527-0613.No Violation or Deviation Noted.Major Areas Inspected:Open Items in Units 1 & 2,LERs in Unit 1,IE Bulletins & Generic LtrsContinuous fire watch
Fire Watch
IR 05000528/198601430 April 1986Partially Deleted Enforcement Conference Repts 50-528/86-14 & 50-529/86-14 on 860410.Major Areas Discussed:Violations Re Security Noted in Insp Repts 50-528/86-07 & 50-529/86-06,NRC Concerns & Licensee Corrective Actions
ML20205M5102 April 1986Partially Deleted Insp Repts 50-528/86-07 & 50-529/86-06 on 860211-0313.Noncompliances Noted:Vital Area Not Limited Only to Authorized Individuals,Failure to Respond to Vital Area Alarms & Vital Area Barriers Not Adequately MaintainedTime of Discovery
Fire Watch
IR 05000528/198600121 January 1986Insp Repts 50-528/86-01,50-529/86-01 & 50-530/86-01 on 860106-10.No Violation or Deviation Identified.Major Areas Inspected:Tmi Action Plan Items & Operational Safety in Unit 2 & 100% Load Rejection Test in Unit 1
IR 05000528/198503426 November 1985Insp Repts 50-528/85-34 & 50-529/85-34 on 850927-28 & 0930-1004.No Violation or Deficiencies Noted.Major Areas Inspected:Emergency Preparedness Program,Including Emergency Plan Training,Emergency Facilities & EquipmentHigh Radiation Area
IR 05000528/198504113 November 1985Insp Repts 50-528/85-41,50-529/85-35,50-530/85-25 & 70-2984/85-03 on 851003-04,15-29,07-11 & 30-31.No Noncompliance or Deviation Noted.Major Areas Inspected: Preoperational Test Program for Radiation ProtectionProcess Control Program
IR 05000528/198503713 November 1985Insp Repts 50-528/85-37,50-529/85-37 & 50-530/85-27 on 850923-1104.No Violation or Deviation Noted.Major Areas Inspected:Action on NRC Enforcement Item & Quality Records Re safety-related Piping & Components
IR 05000528/19850407 November 1985Insp Repts 50-528/85-40 & 50-529/85-39 on 851015-1101.No Violations or Deviations Noted.Major Areas Inspected: Operational Staffing,Design Changes,Tmi Action Plan Items, IE circulars,10CFR55.55(e) Items & Surveillance Testing
IR 05000528/198503523 October 1985Matl Control & Accounting Insp Rept 50-528/85-35 on 851007- 10.No Violations Noted.Major Areas Inspected:Followup on Inspector Identified Problem & Unresolved Items.Details Withheld (Ref 10CFR2.790)
IR 05000529/198503618 October 1985Insp Rept 50-529/85-36 on 850930-1004.No Violation or Deviation Noted.Major Areas Inspected:Implementation of TMI Action Plan Items & Followup of 50.55(e) Repts
IR 05000528/198503316 October 1985Insp Repts 50-528/85-33 & 50-529/85-33 on 850916-27.No Violation or Deviation Noted.Major Areas Inspected:Tmi Action Plan Items,Ie Bulletins & Circulars,Action on Inspector Identified Items & Temporary ModsHydrostatic
Temporary Modification
IR 05000529/198503211 October 1985Insp Repts 50-529/85-32 & 50-530/85-24 on 850916-19 & 0930-1004.No Violations or Deviations Noted.Major Areas Inspected:Nde of Piping,Structural Steel & Supports & Review of RCPB Piping RecordsNondestructive Examination
Liquid penetrant
IR 05000529/198502911 October 1985Insp Repts 50-529/85-29 & 50-530/85-23 on 850923-27.No Violations or Deviations Noted.Major Areas Inspected:Qa Program & Implementation W/Emphasis on Changes Made to Program During 1984 & 1985Nondestructive Examination
IR 05000528/19850288 October 1985Insp Repts 50-528/85-28,50-529/85-28 & 50-530/85-22 on 850807-0922.No Violation or Deviation Noted.Major Areas Inspected:Instrument components,safety-related Structures & Closure of Allegation RV-85-A-033Hydrostatic
Nondestructive Examination
IR 05000528/198502625 September 1985Insp Repts 50-528/85-26 & 50-529/85-27 on 850801-0908. Violations Noted:Failure to Properly Verify Closure of Unit 1 Doors & Tech Spec Overtime Limits Exceeded W/O Approval by Plant Manager or DesigneeShutdown Margin
Grab sample
IR 05000530/198502028 August 1985Insp Rept 50-530/85-20 on 850729-0802 & 12-16.No Violation or Deviation Noted.Major Areas Inspected:Activities Re Instrument Components & Sys
IR 05000528/198502728 August 1985Enforcement Conference Rept 50-528/85-27 on 850808.Major Areas Discussed:Problems Associated W/Implementation of post-accident Sampling Sys Required by NUREG-0737,Item II.B.3Time of Discovery
IR 05000528/198502922 August 1985Insp Repts 50-528/85-29,50-529/85-26 & 50-530/85-21 on 850805-16.No Violation or Deviation Noted.Major Areas Inspected:Qa/Qc Administration,Qa Audits,Document Control Maint,Temporary Mods,Tests & ExperimentsTemporary Modification
IR 05000429/200801421 August 1985Insp Rept 50-461/85-26 on 850429-0814.Violation Noted: Unacceptable Methods Used to Identify Nonconforming Conditions Re Installation of Travelers
IR 05000528/198502313 August 1985Insp Repts 50-528/85-23,50-529/85-24 & 50-530/85-18 on 850630-0806.No Violation or Deviation Noted.Major Areas Inspected:Observation of Work Re Electrical Cable Installation & Terminations in Unit 3
IR 05000528/19850209 August 1985Insp Rept 50-528/85-20 on 850603-07.No Violation Noted.Major Areas Inspected:Program Plan,Procedures & Records Re Inservice Testing Program for Pumps & Valves & Insp Procedure 61700Stroke time
IR 05000528/19850218 August 1985Insp Repts 50-528/85-21 & 50-529/85-22 on 850603-0731. Violation Noted:Failure to Submit LER within 30 Days of EventFire Protection Program
Unidentified leakage
IR 05000522/20060056 August 1985Enhanced Team Insp Rept 50-528/85-12 on 850522-0605 & 0716. No Violations Noted.Major Areas Inspected:Operating Crews & Operational Support Activities During Initial Startup & Low Power Testing
IR 05000528/19850251 August 1985Insp Rept 50-528/85-25 on 850624-0724.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Ler/Deficiency Evaluation Rept Interface,Power Ascension Test Data at 20% Power Plateau & Control Room ActivitiesUnidentified leakage
IR 05000428/200602919 July 1985Insp Repts 50-528/85-17,50-529/85-19 & 50-530/85-13 on 850428-0629.No Violation or Deviation Noted.Major Areas inspected:as-built Configuration & Documentation of Unit 2 Main Steam Supply Sys
IR 05000429/200601110 July 1985Insp Rept 50-461/85-27 on 850429-0611.No Violation or Deviation Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings
IR 05000529/19850255 July 1985Insp Repts 50-529/85-25 & 50-530/85-19 on 850624-28.No Violations or Deviations Noted.Major Areas Inspected:Action on IE Circulars,Followup of Previously Identified Items, Const Deficiencies & Observation of Hot Functional Testing
ML20132D5423 July 1985Emergency Preparedness Insp Rept 50-528/85-10 on 850429-0503 & 13-17.Violation Noted:Failure to Provide Initial Training & Annual Retraining to EmployeesUltimate heat sink
IR 05000429/20060022 July 1985Insp Repts 50-528/85-13 & 50-529/85-17 on 850429-0602.No Violation Noted.Major Areas Inspected:Plant Activities, Surveillance Testing,Plant Maint,Preoperational Testing Activities & Allegations & Commitment FollowupFitness for Duty
Post Accident Monitoring
IR 05000528/19850191 July 1985Insp Repts 50-528/85-19,50-529/85-21 & 50-530/85-15 on 850513-17.No Violation or Deviation Noted.Major Areas Inspected:Activities Associated W/Implementation of Selected TMI Action Items & Routine Followup of AllegationsHydrostatic
IR 05000528/198501828 June 1985Insp Repts 50-528/85-18,50-529/85-20 & 50-530/85-14 on 850513-24.No Violation or Deviation Noted.Major Areas Inspected:License Conditions & Commitments,Lers,Const Deficiencies,Ie Bulletins & TMI Action Plan ItemsStroke time
Fire Watch
Loctite
IR 05000429/200600326 June 1985Insp Repts 50-440/85-22 & 50-441/85-12 on 850429-0603.No Violations or Significant Safety Issues Noted.Major Areas Inspected:Previous Insp Findings,Ser Followup Items & Preoperational Test Program ImplementationScram Discharge Volume