Category:INSPECTION REPORT
MONTHYEARIR 05000335/19990111999-10-0808 October 1999 Partially Deleted Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-08 (Ref 10CFR73.21).No Violations Noted. Major Areas Inspected:Plant Support Re Physical Security Program for Power Reactors IR 05000335/19960221996-11-14014 November 1996 Insp Repts 50-335/96-22 & 50-389/96-22 on 961114.No Violations Noted.Major Areas Inspected:Aspects of Licensee Configuration Mgt & 10CFR50.59 Programs IR 05000335/19940021994-03-11011 March 1994 Partially Withheld Insp Repts 50-335/94-02 & 50-389/94-02 on 940207-11.No Violations Identified.Major Areas Inspected:Mgt Support,Physical Security Program for Power Reactors,Audits & Alarm Stations & Communications IR 05000335/19930061993-05-12012 May 1993 Partially Withheld Insp Repts 50-335/93-06 & 50-389/93-06 on 930412-16.No Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans,Audits,Protected & Vital Area Barriers,Detection & Assessment Aids (Ref 10CFR73.21) IR 05000335/19920231992-12-14014 December 1992 Partially Withheld Insp Repts 50-335/92-23 & 50-389/92-23 on 921130-1204 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Vital Area Barriers & Alarms, Lighting,Assessment & Testing,Maint & Compensatory Measures IR 05000335/19910131991-07-11011 July 1991 Insp Repts 50-335/91-13 & 50-389/91-13 on 910610-14.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program for Nuclear Power Reactors,Mgt,Plans, Audits,Barriers,Detection & Assessment Aids IR 05000335/19910041991-04-15015 April 1991 Insp Repts 50-335/91-04 & 50-389/91-04 on 910123-0318.No Violations Noted.Major Areas Inspected:Plant Operations Review,Maint & Surveillance Observations,Review of Special Repts & Review of Nonroutine Events IR 05000335/19900251990-11-0707 November 1990 Partially Withheld Insp Repts 50-335/90-25 & 50-389/90-25 on 901009-12.Noncited Violation Noted.Major Areas Inspected: Records & Repts,Alarm Stations,Communication & Training IR 05000335/19900261990-10-31031 October 1990 Insp Repts 50-335/90-26 & 50-389/90-26 on 901022-26.No Violations or Deviations Noted.Major Areas Inspected: Isi,Including Review of Unit 1 Plan for Outage & Associated ISI Administration Procedures IR 05000335/19900101990-04-0606 April 1990 Partially Withheld Insp Repts 50-335/90-10 & 50-389/90-10 on 900319-23 (Ref 10CFR2.790 & 73.21).Major Areas Inspected: Physical Security Program,Including Security Mgt,Program Plans,Audits & Protected & Vital Area Barriers IR 05000335/19890111989-05-15015 May 1989 Partially Withheld Safeguards Insp Repts 50-335/89-11 & 50-389/89-11 on 890327-31 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plan Audits & Protected & Vital Area Barriers IR 05000335/19880231988-11-0202 November 1988 Insp Repts 50-335/88-23 & 50-389/88-23 on 880925-30.No Violations Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness & Security Organization.Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000335/19880201988-08-16016 August 1988 Partially Withheld Insp Repts 50-335/88-20 & 50-389/88-20 on 880803 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected:Circumstances Surrounding Failure to Control Access to Vital Area IR 05000335/19880111988-06-14014 June 1988 Insp Repts 50-335/88-11 & 50-389/88-11 on 880523-26.No Violations or Deviations Noted.Major Areas Inspected:Special Nuclear Matl Control & Accounting IR 05000335/19880121988-06-0909 June 1988 Partially Withheld Insp Repts 50-335/88-12 & 50-389/88-12 on 880516-20 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Security Program Audit,Security Sys Power Supply & Communications IR 05000335/19870191987-09-24024 September 1987 Insp Repts 50-335/87-19 & 50-389/87-18 on 870825-0904.No Violations or Deviations Noted.Major Areas Inspected: Evaluation of Annual Emergency Preparedness Exercise. Exercise Scope & Objectives Encl IR 05000335/19870021987-03-20020 March 1987 Partially Withheld Insp Repts 50-335/87-02 & 50-389/87-02 on 870217-26 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Area Inspected:Intrusion Detection Sys Being Employed as Detection Aid in Canal Opening IR 05000335/19870011987-02-26026 February 1987 Insp Repts 50-335/87-01 & 50-389/87-01 on 870113-0207.No Violations or Deviations Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Qa Practices,Station & Corporate Mgt Practices & Overall Plant Operations IR 05000335/19860271987-01-26026 January 1987 Insp Repts 50-335/86-27 & 50-389/86-26 on 861216-870112.No Violations or Deviations Noted.Major Areas Inspected:Onsite Activities for Tech Spec Compliance,Operator Performance, Site Security Procedures & QA Practices IR 05000335/19860251986-12-17017 December 1986 Insp Repts 50-335/86-25 & 50-389/86-24 on 861117-21.No Violations or Deviations Noted.Major Areas Inspected:Maint & Mod Welding,Inservice Testing Program for ASME Class 1,2 & 3 Pumps & Valves & Inspector Followup Items ML20212P2101986-08-26026 August 1986 Partially Withheld Physical Security Insp Repts 50-335/86-19 & 50-389/86-18 on 860804-08 (Ref 10CFR2.790 & 73.21). Violation Noted:Vehicle Control IR 05000335/19860111986-08-0707 August 1986 Partially Withheld Insp Repts 50-335/86-11,50-389/86-10, 50-335/86-17 & 50-389/86-16 on 860414-0625 (Ref 10CFR2.790 & 73.21).Violation Noted:Failure to Provide Access Control to Vital Areas IR 05000335/19850351986-01-17017 January 1986 Physical Security Insp Repts 50-335/85-35 & 50-389/85-35 on 851216-20.No Violations Noted.Major Areas Inspected:Mgt effectiveness-security Program & Security Organization. Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000335/19850211985-10-0808 October 1985 Insp Repts 50-335/85-21 & 50-389/85-21 on 850813-0923.No Violation or Deviation Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Qa Practices & Site Security Procedures IR 05000335/19850241985-10-0101 October 1985 Physical Security Insp Repts 50-335/85-24 & 50-389/85-24 on 850916-20.No Violations Noted.Major Areas Inspected:Mgt Effectiveness & Security Program.Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000387/19850291985-09-23023 September 1985 Meeting Repts 50-387/85-29 & 50-388/85-24 on 850828 Re Rescheduling of Senior Reactor Operator Licensing Exam. Region Agreed to Administer One Instructor Certification & One Senior Operator Exam on 851120 & 21,respectively IR 05000335/19850231985-09-17017 September 1985 Insp Repts 50-335/85-23 & 50-389/85-23 on 850826-30.No Violation or Deviation Noted.Major Areas Inspected:Plant Chemistry & Inservice Testing of Pumps & Valves IR 05000335/19850201985-09-0404 September 1985 Insp Repts 50-335/85-20 & 50-389/85-20 on 850709-0812. Violation Noted:Operating Procedure 2-0960030, DC Ground Isolation, Not Adequately Established & Maintained ML20133N9121985-07-25025 July 1985 Insp Repts 50-335/85-16 & 50-389/85-16 on 850624-28. Violation Noted:Failure to Control Environ Conditions for Calibr of Measuring & Test Equipment IR 05000335/19850171985-07-17017 July 1985 Insp Repts 50-335/85-17 & 50-389/85-17 on 850611-0708. Violation Noted:Unit 2 Plant Mods to Prevent Testing of Relays Not Implemented,Resulting in Plant Transient IR 05000335/19850141985-06-26026 June 1985 Insp Repts 50-335/85-14 & 50-389/85-14 on 850610-14.No Violation or Deviation Noted.Major Areas Inspected:Action on Previous Enforcement Matters,Inservice Testing of Pumps & Valves,Ie Bulletin 80-08 & Inspector Followup Items IR 05000335/19850111985-06-19019 June 1985 Insp Repts 50-335/85-11 & 50-389/85-11 on 850515-0610.No Violation or Deviation Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Overall Plant Operations & QA Practices IR 05000335/19850121985-06-12012 June 1985 Insp Repts 50-335/85-12 & 50-389/85-12 on 850513-17.No Violations or Deviations Noted.Major Areas Inspected:Maint Programs IR 05000335/19850011985-06-0505 June 1985 Safeguards Insp Repts 50-389/85-13 & 50-335/85-01 on 850512-16.No Violations or Deviations Noted.Major Areas Inspected:Security Plan & Implementing Procedures & Security Audit Program.Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000335/19850101985-05-30030 May 1985 Insp Repts 50-335/85-10 & 50-389/85-10 on 850409-0513. Violation Noted:Failure to Have Established Procedure to Properly Realign Instrument Air Portion of Main Feedwater Regulating Valve IR 05000335/19840231984-08-17017 August 1984 Insp Repts 50-335/84-23 & 50-389/84-25 on 840715-0811.No Violations or Deviations Noted.Major Areas Inspected:Plant Operation,Ie Bulletins,Unit 1 Reactor Trip & Previously Identified Items IR 05000335/19830211983-06-16016 June 1983 IE Insp Repts 50-335/83-21 & 50-389/83-45 on 830516-18. Noncompliance Noted:Consigning Radioactive Matl for Land Burial Containing Liquid to Person Not Authorized to Receive Liquids IR 05000389/19830261983-05-31031 May 1983 IE Insp Rept 50-389/83-26 on 830329-0402.Noncompliance Noted:Failure to Follow Procedure for Visual Insp of LPSI & Containment Spray Pump Support Welds IR 05000389/19820481982-10-0707 October 1982 IE Insp Rept 50-389/82-48 on 820920-24.No Noncompliance Noted.Major Areas Inspected:Preoperational Test Program Implementation,Preoperational Test Witnessing & Plant Tour IR 05000389/19820361982-08-16016 August 1982 IE Insp Rept 50-389/82-36 on 820802-06.No Noncompliance Noted.Major Areas Inspected:Preoperational Test Procedure Review,Evaluation of Test Results,Plant Tour & Verification That Tests Evaluated by Licensee IR 05000389/19820281982-07-27027 July 1982 IE Insp Rept 50-389/82-28 on 820621-25.Noncompliance Noted: Measures to Control Welding Inadequate & Failure to Follow Procedures,Drawings & Instructions for Hanger/Support Insp IR 05000389/19820271982-07-21021 July 1982 IE Insp Rept 50-389/82-27 on 820622-25.No Noncompliance Noted.Major Areas Inspected:Preservice Insp,Welding of Internals,Previous Insp Finding & IE Bulletins IR 05000335/19820241982-07-21021 July 1982 IE Safety Insp Repts 50-335/82-24 & 50-389/82-30 on 820628- 0701.No Noncompliance Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Training & Qualifications of contractor-supplied Temporary QC Inspectors & Records IR 05000389/19820311982-07-14014 July 1982 IE Insp Rept 50-389/82-31 on 820630-0702.No Noncompliance Noted.Major Areas Inspected:Methods for Evaluating Plant Emergency,Maint & Operating Procedures & Review of Preoperational Test Program & Plant Tour IR 05000335/19820191982-07-13013 July 1982 IE Insp Repts 50-335/82-19 & 50-389/82-25 on 820614-18.No Noncompliance Noted.Major Areas Inspected:Backfit Program, Site Organization & Onsite Design Activities IR 05000335/19820261982-07-0707 July 1982 IE Inquiry Rept 50-335/82-26 on 820615-17.Inquiry Initiated to Determine Facts Surrounding Observations That Individual of Training Staff Was Talking to Examinees Prior to Reactor Operator & Senior Reactor Operator Exams IR 05000335/19820211982-06-30030 June 1982 IE Insp Repts 50-335/82-21 & 50-389/82-26 on 820515-0610.No Noncompliance Noted.Major Areas Inspected:Maint Observation, Safety Verification,Ie Notices & Circulars & Preoperational Testing IR 05000335/19820201982-06-22022 June 1982 IE Insp Rept 50-335/82-20 on 820601-04.No Noncompliance Noted.Major Areas Inspected:Instrumentation & Equipment, Respiratory Protection,Health Physics Organization & Qualifications & LER Followup IR 05000389/19820201982-06-21021 June 1982 IE Insp Rept 50-389/82-20 on 820511-14.Noncompliance Noted: Failure to Follow Procedure for Marking & Insp of Pipe Engagement Into Socket Fitting IR 05000389/19820231982-06-18018 June 1982 IE Insp Rept 50-389/82-23 on 820525-28.Noncompliance Noted: Failure to Implement QA Requirements Fully 1999-10-08
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000335/19990111999-10-0808 October 1999 Partially Deleted Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-08 (Ref 10CFR73.21).No Violations Noted. Major Areas Inspected:Plant Support Re Physical Security Program for Power Reactors IR 05000335/19960221996-11-14014 November 1996 Insp Repts 50-335/96-22 & 50-389/96-22 on 961114.No Violations Noted.Major Areas Inspected:Aspects of Licensee Configuration Mgt & 10CFR50.59 Programs IR 05000335/19940021994-03-11011 March 1994 Partially Withheld Insp Repts 50-335/94-02 & 50-389/94-02 on 940207-11.No Violations Identified.Major Areas Inspected:Mgt Support,Physical Security Program for Power Reactors,Audits & Alarm Stations & Communications IR 05000335/19930061993-05-12012 May 1993 Partially Withheld Insp Repts 50-335/93-06 & 50-389/93-06 on 930412-16.No Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans,Audits,Protected & Vital Area Barriers,Detection & Assessment Aids (Ref 10CFR73.21) IR 05000335/19920231992-12-14014 December 1992 Partially Withheld Insp Repts 50-335/92-23 & 50-389/92-23 on 921130-1204 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Vital Area Barriers & Alarms, Lighting,Assessment & Testing,Maint & Compensatory Measures IR 05000335/19910131991-07-11011 July 1991 Insp Repts 50-335/91-13 & 50-389/91-13 on 910610-14.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program for Nuclear Power Reactors,Mgt,Plans, Audits,Barriers,Detection & Assessment Aids IR 05000335/19910041991-04-15015 April 1991 Insp Repts 50-335/91-04 & 50-389/91-04 on 910123-0318.No Violations Noted.Major Areas Inspected:Plant Operations Review,Maint & Surveillance Observations,Review of Special Repts & Review of Nonroutine Events IR 05000335/19900251990-11-0707 November 1990 Partially Withheld Insp Repts 50-335/90-25 & 50-389/90-25 on 901009-12.Noncited Violation Noted.Major Areas Inspected: Records & Repts,Alarm Stations,Communication & Training IR 05000335/19900261990-10-31031 October 1990 Insp Repts 50-335/90-26 & 50-389/90-26 on 901022-26.No Violations or Deviations Noted.Major Areas Inspected: Isi,Including Review of Unit 1 Plan for Outage & Associated ISI Administration Procedures IR 05000335/19900101990-04-0606 April 1990 Partially Withheld Insp Repts 50-335/90-10 & 50-389/90-10 on 900319-23 (Ref 10CFR2.790 & 73.21).Major Areas Inspected: Physical Security Program,Including Security Mgt,Program Plans,Audits & Protected & Vital Area Barriers IR 05000335/19890111989-05-15015 May 1989 Partially Withheld Safeguards Insp Repts 50-335/89-11 & 50-389/89-11 on 890327-31 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plan Audits & Protected & Vital Area Barriers IR 05000335/19880231988-11-0202 November 1988 Insp Repts 50-335/88-23 & 50-389/88-23 on 880925-30.No Violations Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness & Security Organization.Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000335/19880201988-08-16016 August 1988 Partially Withheld Insp Repts 50-335/88-20 & 50-389/88-20 on 880803 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected:Circumstances Surrounding Failure to Control Access to Vital Area IR 05000335/19880111988-06-14014 June 1988 Insp Repts 50-335/88-11 & 50-389/88-11 on 880523-26.No Violations or Deviations Noted.Major Areas Inspected:Special Nuclear Matl Control & Accounting IR 05000335/19880121988-06-0909 June 1988 Partially Withheld Insp Repts 50-335/88-12 & 50-389/88-12 on 880516-20 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Security Program Audit,Security Sys Power Supply & Communications IR 05000335/19870191987-09-24024 September 1987 Insp Repts 50-335/87-19 & 50-389/87-18 on 870825-0904.No Violations or Deviations Noted.Major Areas Inspected: Evaluation of Annual Emergency Preparedness Exercise. Exercise Scope & Objectives Encl IR 05000335/19870021987-03-20020 March 1987 Partially Withheld Insp Repts 50-335/87-02 & 50-389/87-02 on 870217-26 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Area Inspected:Intrusion Detection Sys Being Employed as Detection Aid in Canal Opening IR 05000335/19870011987-02-26026 February 1987 Insp Repts 50-335/87-01 & 50-389/87-01 on 870113-0207.No Violations or Deviations Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Qa Practices,Station & Corporate Mgt Practices & Overall Plant Operations IR 05000335/19860271987-01-26026 January 1987 Insp Repts 50-335/86-27 & 50-389/86-26 on 861216-870112.No Violations or Deviations Noted.Major Areas Inspected:Onsite Activities for Tech Spec Compliance,Operator Performance, Site Security Procedures & QA Practices IR 05000335/19860251986-12-17017 December 1986 Insp Repts 50-335/86-25 & 50-389/86-24 on 861117-21.No Violations or Deviations Noted.Major Areas Inspected:Maint & Mod Welding,Inservice Testing Program for ASME Class 1,2 & 3 Pumps & Valves & Inspector Followup Items ML20212P2101986-08-26026 August 1986 Partially Withheld Physical Security Insp Repts 50-335/86-19 & 50-389/86-18 on 860804-08 (Ref 10CFR2.790 & 73.21). Violation Noted:Vehicle Control IR 05000335/19860111986-08-0707 August 1986 Partially Withheld Insp Repts 50-335/86-11,50-389/86-10, 50-335/86-17 & 50-389/86-16 on 860414-0625 (Ref 10CFR2.790 & 73.21).Violation Noted:Failure to Provide Access Control to Vital Areas IR 05000335/19850351986-01-17017 January 1986 Physical Security Insp Repts 50-335/85-35 & 50-389/85-35 on 851216-20.No Violations Noted.Major Areas Inspected:Mgt effectiveness-security Program & Security Organization. Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000335/19850211985-10-0808 October 1985 Insp Repts 50-335/85-21 & 50-389/85-21 on 850813-0923.No Violation or Deviation Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Qa Practices & Site Security Procedures IR 05000335/19850241985-10-0101 October 1985 Physical Security Insp Repts 50-335/85-24 & 50-389/85-24 on 850916-20.No Violations Noted.Major Areas Inspected:Mgt Effectiveness & Security Program.Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000387/19850291985-09-23023 September 1985 Meeting Repts 50-387/85-29 & 50-388/85-24 on 850828 Re Rescheduling of Senior Reactor Operator Licensing Exam. Region Agreed to Administer One Instructor Certification & One Senior Operator Exam on 851120 & 21,respectively IR 05000335/19850231985-09-17017 September 1985 Insp Repts 50-335/85-23 & 50-389/85-23 on 850826-30.No Violation or Deviation Noted.Major Areas Inspected:Plant Chemistry & Inservice Testing of Pumps & Valves IR 05000335/19850201985-09-0404 September 1985 Insp Repts 50-335/85-20 & 50-389/85-20 on 850709-0812. Violation Noted:Operating Procedure 2-0960030, DC Ground Isolation, Not Adequately Established & Maintained ML20133N9121985-07-25025 July 1985 Insp Repts 50-335/85-16 & 50-389/85-16 on 850624-28. Violation Noted:Failure to Control Environ Conditions for Calibr of Measuring & Test Equipment IR 05000335/19850171985-07-17017 July 1985 Insp Repts 50-335/85-17 & 50-389/85-17 on 850611-0708. Violation Noted:Unit 2 Plant Mods to Prevent Testing of Relays Not Implemented,Resulting in Plant Transient IR 05000335/19850141985-06-26026 June 1985 Insp Repts 50-335/85-14 & 50-389/85-14 on 850610-14.No Violation or Deviation Noted.Major Areas Inspected:Action on Previous Enforcement Matters,Inservice Testing of Pumps & Valves,Ie Bulletin 80-08 & Inspector Followup Items IR 05000335/19850111985-06-19019 June 1985 Insp Repts 50-335/85-11 & 50-389/85-11 on 850515-0610.No Violation or Deviation Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Overall Plant Operations & QA Practices IR 05000335/19850121985-06-12012 June 1985 Insp Repts 50-335/85-12 & 50-389/85-12 on 850513-17.No Violations or Deviations Noted.Major Areas Inspected:Maint Programs IR 05000335/19850011985-06-0505 June 1985 Safeguards Insp Repts 50-389/85-13 & 50-335/85-01 on 850512-16.No Violations or Deviations Noted.Major Areas Inspected:Security Plan & Implementing Procedures & Security Audit Program.Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000335/19850101985-05-30030 May 1985 Insp Repts 50-335/85-10 & 50-389/85-10 on 850409-0513. Violation Noted:Failure to Have Established Procedure to Properly Realign Instrument Air Portion of Main Feedwater Regulating Valve IR 05000335/19840231984-08-17017 August 1984 Insp Repts 50-335/84-23 & 50-389/84-25 on 840715-0811.No Violations or Deviations Noted.Major Areas Inspected:Plant Operation,Ie Bulletins,Unit 1 Reactor Trip & Previously Identified Items IR 05000335/19830211983-06-16016 June 1983 IE Insp Repts 50-335/83-21 & 50-389/83-45 on 830516-18. Noncompliance Noted:Consigning Radioactive Matl for Land Burial Containing Liquid to Person Not Authorized to Receive Liquids IR 05000389/19830261983-05-31031 May 1983 IE Insp Rept 50-389/83-26 on 830329-0402.Noncompliance Noted:Failure to Follow Procedure for Visual Insp of LPSI & Containment Spray Pump Support Welds IR 05000389/19820481982-10-0707 October 1982 IE Insp Rept 50-389/82-48 on 820920-24.No Noncompliance Noted.Major Areas Inspected:Preoperational Test Program Implementation,Preoperational Test Witnessing & Plant Tour IR 05000389/19820361982-08-16016 August 1982 IE Insp Rept 50-389/82-36 on 820802-06.No Noncompliance Noted.Major Areas Inspected:Preoperational Test Procedure Review,Evaluation of Test Results,Plant Tour & Verification That Tests Evaluated by Licensee IR 05000389/19820281982-07-27027 July 1982 IE Insp Rept 50-389/82-28 on 820621-25.Noncompliance Noted: Measures to Control Welding Inadequate & Failure to Follow Procedures,Drawings & Instructions for Hanger/Support Insp IR 05000389/19820271982-07-21021 July 1982 IE Insp Rept 50-389/82-27 on 820622-25.No Noncompliance Noted.Major Areas Inspected:Preservice Insp,Welding of Internals,Previous Insp Finding & IE Bulletins IR 05000335/19820241982-07-21021 July 1982 IE Safety Insp Repts 50-335/82-24 & 50-389/82-30 on 820628- 0701.No Noncompliance Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Training & Qualifications of contractor-supplied Temporary QC Inspectors & Records IR 05000389/19820311982-07-14014 July 1982 IE Insp Rept 50-389/82-31 on 820630-0702.No Noncompliance Noted.Major Areas Inspected:Methods for Evaluating Plant Emergency,Maint & Operating Procedures & Review of Preoperational Test Program & Plant Tour IR 05000335/19820191982-07-13013 July 1982 IE Insp Repts 50-335/82-19 & 50-389/82-25 on 820614-18.No Noncompliance Noted.Major Areas Inspected:Backfit Program, Site Organization & Onsite Design Activities IR 05000335/19820261982-07-0707 July 1982 IE Inquiry Rept 50-335/82-26 on 820615-17.Inquiry Initiated to Determine Facts Surrounding Observations That Individual of Training Staff Was Talking to Examinees Prior to Reactor Operator & Senior Reactor Operator Exams IR 05000335/19820211982-06-30030 June 1982 IE Insp Repts 50-335/82-21 & 50-389/82-26 on 820515-0610.No Noncompliance Noted.Major Areas Inspected:Maint Observation, Safety Verification,Ie Notices & Circulars & Preoperational Testing IR 05000335/19820201982-06-22022 June 1982 IE Insp Rept 50-335/82-20 on 820601-04.No Noncompliance Noted.Major Areas Inspected:Instrumentation & Equipment, Respiratory Protection,Health Physics Organization & Qualifications & LER Followup IR 05000389/19820201982-06-21021 June 1982 IE Insp Rept 50-389/82-20 on 820511-14.Noncompliance Noted: Failure to Follow Procedure for Marking & Insp of Pipe Engagement Into Socket Fitting IR 05000389/19820231982-06-18018 June 1982 IE Insp Rept 50-389/82-23 on 820525-28.Noncompliance Noted: Failure to Implement QA Requirements Fully 1999-10-08
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000335/19990111999-10-0808 October 1999 Partially Deleted Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-08 (Ref 10CFR73.21).No Violations Noted. Major Areas Inspected:Plant Support Re Physical Security Program for Power Reactors IR 05000335/19960221996-11-14014 November 1996 Insp Repts 50-335/96-22 & 50-389/96-22 on 961114.No Violations Noted.Major Areas Inspected:Aspects of Licensee Configuration Mgt & 10CFR50.59 Programs IR 05000335/19940021994-03-11011 March 1994 Partially Withheld Insp Repts 50-335/94-02 & 50-389/94-02 on 940207-11.No Violations Identified.Major Areas Inspected:Mgt Support,Physical Security Program for Power Reactors,Audits & Alarm Stations & Communications IR 05000335/19930061993-05-12012 May 1993 Partially Withheld Insp Repts 50-335/93-06 & 50-389/93-06 on 930412-16.No Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans,Audits,Protected & Vital Area Barriers,Detection & Assessment Aids (Ref 10CFR73.21) IR 05000335/19920231992-12-14014 December 1992 Partially Withheld Insp Repts 50-335/92-23 & 50-389/92-23 on 921130-1204 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Vital Area Barriers & Alarms, Lighting,Assessment & Testing,Maint & Compensatory Measures IR 05000335/19910131991-07-11011 July 1991 Insp Repts 50-335/91-13 & 50-389/91-13 on 910610-14.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program for Nuclear Power Reactors,Mgt,Plans, Audits,Barriers,Detection & Assessment Aids IR 05000335/19910041991-04-15015 April 1991 Insp Repts 50-335/91-04 & 50-389/91-04 on 910123-0318.No Violations Noted.Major Areas Inspected:Plant Operations Review,Maint & Surveillance Observations,Review of Special Repts & Review of Nonroutine Events IR 05000335/19900251990-11-0707 November 1990 Partially Withheld Insp Repts 50-335/90-25 & 50-389/90-25 on 901009-12.Noncited Violation Noted.Major Areas Inspected: Records & Repts,Alarm Stations,Communication & Training IR 05000335/19900261990-10-31031 October 1990 Insp Repts 50-335/90-26 & 50-389/90-26 on 901022-26.No Violations or Deviations Noted.Major Areas Inspected: Isi,Including Review of Unit 1 Plan for Outage & Associated ISI Administration Procedures IR 05000335/19900101990-04-0606 April 1990 Partially Withheld Insp Repts 50-335/90-10 & 50-389/90-10 on 900319-23 (Ref 10CFR2.790 & 73.21).Major Areas Inspected: Physical Security Program,Including Security Mgt,Program Plans,Audits & Protected & Vital Area Barriers IR 05000335/19890111989-05-15015 May 1989 Partially Withheld Safeguards Insp Repts 50-335/89-11 & 50-389/89-11 on 890327-31 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plan Audits & Protected & Vital Area Barriers IR 05000335/19880231988-11-0202 November 1988 Insp Repts 50-335/88-23 & 50-389/88-23 on 880925-30.No Violations Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness & Security Organization.Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000335/19880201988-08-16016 August 1988 Partially Withheld Insp Repts 50-335/88-20 & 50-389/88-20 on 880803 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected:Circumstances Surrounding Failure to Control Access to Vital Area IR 05000335/19880111988-06-14014 June 1988 Insp Repts 50-335/88-11 & 50-389/88-11 on 880523-26.No Violations or Deviations Noted.Major Areas Inspected:Special Nuclear Matl Control & Accounting IR 05000335/19880121988-06-0909 June 1988 Partially Withheld Insp Repts 50-335/88-12 & 50-389/88-12 on 880516-20 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Security Program Audit,Security Sys Power Supply & Communications IR 05000335/19870191987-09-24024 September 1987 Insp Repts 50-335/87-19 & 50-389/87-18 on 870825-0904.No Violations or Deviations Noted.Major Areas Inspected: Evaluation of Annual Emergency Preparedness Exercise. Exercise Scope & Objectives Encl IR 05000335/19870021987-03-20020 March 1987 Partially Withheld Insp Repts 50-335/87-02 & 50-389/87-02 on 870217-26 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Area Inspected:Intrusion Detection Sys Being Employed as Detection Aid in Canal Opening IR 05000335/19870011987-02-26026 February 1987 Insp Repts 50-335/87-01 & 50-389/87-01 on 870113-0207.No Violations or Deviations Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Qa Practices,Station & Corporate Mgt Practices & Overall Plant Operations IR 05000335/19860271987-01-26026 January 1987 Insp Repts 50-335/86-27 & 50-389/86-26 on 861216-870112.No Violations or Deviations Noted.Major Areas Inspected:Onsite Activities for Tech Spec Compliance,Operator Performance, Site Security Procedures & QA Practices IR 05000335/19860251986-12-17017 December 1986 Insp Repts 50-335/86-25 & 50-389/86-24 on 861117-21.No Violations or Deviations Noted.Major Areas Inspected:Maint & Mod Welding,Inservice Testing Program for ASME Class 1,2 & 3 Pumps & Valves & Inspector Followup Items ML20212P2101986-08-26026 August 1986 Partially Withheld Physical Security Insp Repts 50-335/86-19 & 50-389/86-18 on 860804-08 (Ref 10CFR2.790 & 73.21). Violation Noted:Vehicle Control IR 05000335/19860111986-08-0707 August 1986 Partially Withheld Insp Repts 50-335/86-11,50-389/86-10, 50-335/86-17 & 50-389/86-16 on 860414-0625 (Ref 10CFR2.790 & 73.21).Violation Noted:Failure to Provide Access Control to Vital Areas IR 05000335/19850351986-01-17017 January 1986 Physical Security Insp Repts 50-335/85-35 & 50-389/85-35 on 851216-20.No Violations Noted.Major Areas Inspected:Mgt effectiveness-security Program & Security Organization. Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000335/19850211985-10-0808 October 1985 Insp Repts 50-335/85-21 & 50-389/85-21 on 850813-0923.No Violation or Deviation Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Qa Practices & Site Security Procedures IR 05000335/19850241985-10-0101 October 1985 Physical Security Insp Repts 50-335/85-24 & 50-389/85-24 on 850916-20.No Violations Noted.Major Areas Inspected:Mgt Effectiveness & Security Program.Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000387/19850291985-09-23023 September 1985 Meeting Repts 50-387/85-29 & 50-388/85-24 on 850828 Re Rescheduling of Senior Reactor Operator Licensing Exam. Region Agreed to Administer One Instructor Certification & One Senior Operator Exam on 851120 & 21,respectively IR 05000335/19850231985-09-17017 September 1985 Insp Repts 50-335/85-23 & 50-389/85-23 on 850826-30.No Violation or Deviation Noted.Major Areas Inspected:Plant Chemistry & Inservice Testing of Pumps & Valves IR 05000335/19850201985-09-0404 September 1985 Insp Repts 50-335/85-20 & 50-389/85-20 on 850709-0812. Violation Noted:Operating Procedure 2-0960030, DC Ground Isolation, Not Adequately Established & Maintained ML20133N9121985-07-25025 July 1985 Insp Repts 50-335/85-16 & 50-389/85-16 on 850624-28. Violation Noted:Failure to Control Environ Conditions for Calibr of Measuring & Test Equipment IR 05000335/19850171985-07-17017 July 1985 Insp Repts 50-335/85-17 & 50-389/85-17 on 850611-0708. Violation Noted:Unit 2 Plant Mods to Prevent Testing of Relays Not Implemented,Resulting in Plant Transient IR 05000335/19850141985-06-26026 June 1985 Insp Repts 50-335/85-14 & 50-389/85-14 on 850610-14.No Violation or Deviation Noted.Major Areas Inspected:Action on Previous Enforcement Matters,Inservice Testing of Pumps & Valves,Ie Bulletin 80-08 & Inspector Followup Items IR 05000335/19850111985-06-19019 June 1985 Insp Repts 50-335/85-11 & 50-389/85-11 on 850515-0610.No Violation or Deviation Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Overall Plant Operations & QA Practices IR 05000335/19850121985-06-12012 June 1985 Insp Repts 50-335/85-12 & 50-389/85-12 on 850513-17.No Violations or Deviations Noted.Major Areas Inspected:Maint Programs IR 05000335/19850011985-06-0505 June 1985 Safeguards Insp Repts 50-389/85-13 & 50-335/85-01 on 850512-16.No Violations or Deviations Noted.Major Areas Inspected:Security Plan & Implementing Procedures & Security Audit Program.Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000335/19850101985-05-30030 May 1985 Insp Repts 50-335/85-10 & 50-389/85-10 on 850409-0513. Violation Noted:Failure to Have Established Procedure to Properly Realign Instrument Air Portion of Main Feedwater Regulating Valve IR 05000335/19840231984-08-17017 August 1984 Insp Repts 50-335/84-23 & 50-389/84-25 on 840715-0811.No Violations or Deviations Noted.Major Areas Inspected:Plant Operation,Ie Bulletins,Unit 1 Reactor Trip & Previously Identified Items IR 05000335/19830211983-06-16016 June 1983 IE Insp Repts 50-335/83-21 & 50-389/83-45 on 830516-18. Noncompliance Noted:Consigning Radioactive Matl for Land Burial Containing Liquid to Person Not Authorized to Receive Liquids IR 05000389/19830261983-05-31031 May 1983 IE Insp Rept 50-389/83-26 on 830329-0402.Noncompliance Noted:Failure to Follow Procedure for Visual Insp of LPSI & Containment Spray Pump Support Welds IR 05000389/19820481982-10-0707 October 1982 IE Insp Rept 50-389/82-48 on 820920-24.No Noncompliance Noted.Major Areas Inspected:Preoperational Test Program Implementation,Preoperational Test Witnessing & Plant Tour IR 05000389/19820361982-08-16016 August 1982 IE Insp Rept 50-389/82-36 on 820802-06.No Noncompliance Noted.Major Areas Inspected:Preoperational Test Procedure Review,Evaluation of Test Results,Plant Tour & Verification That Tests Evaluated by Licensee IR 05000389/19820281982-07-27027 July 1982 IE Insp Rept 50-389/82-28 on 820621-25.Noncompliance Noted: Measures to Control Welding Inadequate & Failure to Follow Procedures,Drawings & Instructions for Hanger/Support Insp IR 05000389/19820271982-07-21021 July 1982 IE Insp Rept 50-389/82-27 on 820622-25.No Noncompliance Noted.Major Areas Inspected:Preservice Insp,Welding of Internals,Previous Insp Finding & IE Bulletins IR 05000335/19820241982-07-21021 July 1982 IE Safety Insp Repts 50-335/82-24 & 50-389/82-30 on 820628- 0701.No Noncompliance Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Training & Qualifications of contractor-supplied Temporary QC Inspectors & Records IR 05000389/19820311982-07-14014 July 1982 IE Insp Rept 50-389/82-31 on 820630-0702.No Noncompliance Noted.Major Areas Inspected:Methods for Evaluating Plant Emergency,Maint & Operating Procedures & Review of Preoperational Test Program & Plant Tour IR 05000335/19820191982-07-13013 July 1982 IE Insp Repts 50-335/82-19 & 50-389/82-25 on 820614-18.No Noncompliance Noted.Major Areas Inspected:Backfit Program, Site Organization & Onsite Design Activities IR 05000335/19820261982-07-0707 July 1982 IE Inquiry Rept 50-335/82-26 on 820615-17.Inquiry Initiated to Determine Facts Surrounding Observations That Individual of Training Staff Was Talking to Examinees Prior to Reactor Operator & Senior Reactor Operator Exams IR 05000335/19820211982-06-30030 June 1982 IE Insp Repts 50-335/82-21 & 50-389/82-26 on 820515-0610.No Noncompliance Noted.Major Areas Inspected:Maint Observation, Safety Verification,Ie Notices & Circulars & Preoperational Testing IR 05000335/19820201982-06-22022 June 1982 IE Insp Rept 50-335/82-20 on 820601-04.No Noncompliance Noted.Major Areas Inspected:Instrumentation & Equipment, Respiratory Protection,Health Physics Organization & Qualifications & LER Followup IR 05000389/19820201982-06-21021 June 1982 IE Insp Rept 50-389/82-20 on 820511-14.Noncompliance Noted: Failure to Follow Procedure for Marking & Insp of Pipe Engagement Into Socket Fitting IR 05000389/19820231982-06-18018 June 1982 IE Insp Rept 50-389/82-23 on 820525-28.Noncompliance Noted: Failure to Implement QA Requirements Fully 1999-10-08
[Table view] Category:UTILITY
MONTHYEARIR 05000335/19900251990-11-0707 November 1990 Partially Withheld Insp Repts 50-335/90-25 & 50-389/90-25 on 901009-12.Noncited Violation Noted.Major Areas Inspected: Records & Repts,Alarm Stations,Communication & Training IR 05000335/19900261990-10-31031 October 1990 Insp Repts 50-335/90-26 & 50-389/90-26 on 901022-26.No Violations or Deviations Noted.Major Areas Inspected: Isi,Including Review of Unit 1 Plan for Outage & Associated ISI Administration Procedures IR 05000335/19900101990-04-0606 April 1990 Partially Withheld Insp Repts 50-335/90-10 & 50-389/90-10 on 900319-23 (Ref 10CFR2.790 & 73.21).Major Areas Inspected: Physical Security Program,Including Security Mgt,Program Plans,Audits & Protected & Vital Area Barriers IR 05000335/19890111989-05-15015 May 1989 Partially Withheld Safeguards Insp Repts 50-335/89-11 & 50-389/89-11 on 890327-31 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plan Audits & Protected & Vital Area Barriers IR 05000335/19880231988-11-0202 November 1988 Insp Repts 50-335/88-23 & 50-389/88-23 on 880925-30.No Violations Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness & Security Organization.Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000335/19880201988-08-16016 August 1988 Partially Withheld Insp Repts 50-335/88-20 & 50-389/88-20 on 880803 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected:Circumstances Surrounding Failure to Control Access to Vital Area IR 05000335/19880111988-06-14014 June 1988 Insp Repts 50-335/88-11 & 50-389/88-11 on 880523-26.No Violations or Deviations Noted.Major Areas Inspected:Special Nuclear Matl Control & Accounting IR 05000335/19880121988-06-0909 June 1988 Partially Withheld Insp Repts 50-335/88-12 & 50-389/88-12 on 880516-20 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Security Program Audit,Security Sys Power Supply & Communications IR 05000335/19870191987-09-24024 September 1987 Insp Repts 50-335/87-19 & 50-389/87-18 on 870825-0904.No Violations or Deviations Noted.Major Areas Inspected: Evaluation of Annual Emergency Preparedness Exercise. Exercise Scope & Objectives Encl IR 05000335/19870021987-03-20020 March 1987 Partially Withheld Insp Repts 50-335/87-02 & 50-389/87-02 on 870217-26 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Area Inspected:Intrusion Detection Sys Being Employed as Detection Aid in Canal Opening IR 05000335/19870011987-02-26026 February 1987 Insp Repts 50-335/87-01 & 50-389/87-01 on 870113-0207.No Violations or Deviations Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Qa Practices,Station & Corporate Mgt Practices & Overall Plant Operations IR 05000335/19860271987-01-26026 January 1987 Insp Repts 50-335/86-27 & 50-389/86-26 on 861216-870112.No Violations or Deviations Noted.Major Areas Inspected:Onsite Activities for Tech Spec Compliance,Operator Performance, Site Security Procedures & QA Practices IR 05000335/19860251986-12-17017 December 1986 Insp Repts 50-335/86-25 & 50-389/86-24 on 861117-21.No Violations or Deviations Noted.Major Areas Inspected:Maint & Mod Welding,Inservice Testing Program for ASME Class 1,2 & 3 Pumps & Valves & Inspector Followup Items ML20212P2101986-08-26026 August 1986 Partially Withheld Physical Security Insp Repts 50-335/86-19 & 50-389/86-18 on 860804-08 (Ref 10CFR2.790 & 73.21). Violation Noted:Vehicle Control IR 05000335/19860111986-08-0707 August 1986 Partially Withheld Insp Repts 50-335/86-11,50-389/86-10, 50-335/86-17 & 50-389/86-16 on 860414-0625 (Ref 10CFR2.790 & 73.21).Violation Noted:Failure to Provide Access Control to Vital Areas IR 05000335/19850351986-01-17017 January 1986 Physical Security Insp Repts 50-335/85-35 & 50-389/85-35 on 851216-20.No Violations Noted.Major Areas Inspected:Mgt effectiveness-security Program & Security Organization. Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000335/19850211985-10-0808 October 1985 Insp Repts 50-335/85-21 & 50-389/85-21 on 850813-0923.No Violation or Deviation Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Qa Practices & Site Security Procedures IR 05000335/19850241985-10-0101 October 1985 Physical Security Insp Repts 50-335/85-24 & 50-389/85-24 on 850916-20.No Violations Noted.Major Areas Inspected:Mgt Effectiveness & Security Program.Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000387/19850291985-09-23023 September 1985 Meeting Repts 50-387/85-29 & 50-388/85-24 on 850828 Re Rescheduling of Senior Reactor Operator Licensing Exam. Region Agreed to Administer One Instructor Certification & One Senior Operator Exam on 851120 & 21,respectively IR 05000335/19850231985-09-17017 September 1985 Insp Repts 50-335/85-23 & 50-389/85-23 on 850826-30.No Violation or Deviation Noted.Major Areas Inspected:Plant Chemistry & Inservice Testing of Pumps & Valves IR 05000335/19850201985-09-0404 September 1985 Insp Repts 50-335/85-20 & 50-389/85-20 on 850709-0812. Violation Noted:Operating Procedure 2-0960030, DC Ground Isolation, Not Adequately Established & Maintained ML20133N9121985-07-25025 July 1985 Insp Repts 50-335/85-16 & 50-389/85-16 on 850624-28. Violation Noted:Failure to Control Environ Conditions for Calibr of Measuring & Test Equipment IR 05000335/19850171985-07-17017 July 1985 Insp Repts 50-335/85-17 & 50-389/85-17 on 850611-0708. Violation Noted:Unit 2 Plant Mods to Prevent Testing of Relays Not Implemented,Resulting in Plant Transient IR 05000335/19850141985-06-26026 June 1985 Insp Repts 50-335/85-14 & 50-389/85-14 on 850610-14.No Violation or Deviation Noted.Major Areas Inspected:Action on Previous Enforcement Matters,Inservice Testing of Pumps & Valves,Ie Bulletin 80-08 & Inspector Followup Items IR 05000335/19850111985-06-19019 June 1985 Insp Repts 50-335/85-11 & 50-389/85-11 on 850515-0610.No Violation or Deviation Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Overall Plant Operations & QA Practices IR 05000335/19850121985-06-12012 June 1985 Insp Repts 50-335/85-12 & 50-389/85-12 on 850513-17.No Violations or Deviations Noted.Major Areas Inspected:Maint Programs IR 05000335/19850011985-06-0505 June 1985 Safeguards Insp Repts 50-389/85-13 & 50-335/85-01 on 850512-16.No Violations or Deviations Noted.Major Areas Inspected:Security Plan & Implementing Procedures & Security Audit Program.Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000335/19840231984-08-17017 August 1984 Insp Repts 50-335/84-23 & 50-389/84-25 on 840715-0811.No Violations or Deviations Noted.Major Areas Inspected:Plant Operation,Ie Bulletins,Unit 1 Reactor Trip & Previously Identified Items IR 05000335/19830211983-06-16016 June 1983 IE Insp Repts 50-335/83-21 & 50-389/83-45 on 830516-18. Noncompliance Noted:Consigning Radioactive Matl for Land Burial Containing Liquid to Person Not Authorized to Receive Liquids IR 05000389/19830261983-05-31031 May 1983 IE Insp Rept 50-389/83-26 on 830329-0402.Noncompliance Noted:Failure to Follow Procedure for Visual Insp of LPSI & Containment Spray Pump Support Welds IR 05000389/19820481982-10-0707 October 1982 IE Insp Rept 50-389/82-48 on 820920-24.No Noncompliance Noted.Major Areas Inspected:Preoperational Test Program Implementation,Preoperational Test Witnessing & Plant Tour IR 05000389/19820361982-08-16016 August 1982 IE Insp Rept 50-389/82-36 on 820802-06.No Noncompliance Noted.Major Areas Inspected:Preoperational Test Procedure Review,Evaluation of Test Results,Plant Tour & Verification That Tests Evaluated by Licensee IR 05000389/19820281982-07-27027 July 1982 IE Insp Rept 50-389/82-28 on 820621-25.Noncompliance Noted: Measures to Control Welding Inadequate & Failure to Follow Procedures,Drawings & Instructions for Hanger/Support Insp IR 05000389/19820271982-07-21021 July 1982 IE Insp Rept 50-389/82-27 on 820622-25.No Noncompliance Noted.Major Areas Inspected:Preservice Insp,Welding of Internals,Previous Insp Finding & IE Bulletins IR 05000335/19820241982-07-21021 July 1982 IE Safety Insp Repts 50-335/82-24 & 50-389/82-30 on 820628- 0701.No Noncompliance Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Training & Qualifications of contractor-supplied Temporary QC Inspectors & Records IR 05000389/19820311982-07-14014 July 1982 IE Insp Rept 50-389/82-31 on 820630-0702.No Noncompliance Noted.Major Areas Inspected:Methods for Evaluating Plant Emergency,Maint & Operating Procedures & Review of Preoperational Test Program & Plant Tour IR 05000335/19820191982-07-13013 July 1982 IE Insp Repts 50-335/82-19 & 50-389/82-25 on 820614-18.No Noncompliance Noted.Major Areas Inspected:Backfit Program, Site Organization & Onsite Design Activities IR 05000335/19820261982-07-0707 July 1982 IE Inquiry Rept 50-335/82-26 on 820615-17.Inquiry Initiated to Determine Facts Surrounding Observations That Individual of Training Staff Was Talking to Examinees Prior to Reactor Operator & Senior Reactor Operator Exams IR 05000335/19820211982-06-30030 June 1982 IE Insp Repts 50-335/82-21 & 50-389/82-26 on 820515-0610.No Noncompliance Noted.Major Areas Inspected:Maint Observation, Safety Verification,Ie Notices & Circulars & Preoperational Testing IR 05000335/19820201982-06-22022 June 1982 IE Insp Rept 50-335/82-20 on 820601-04.No Noncompliance Noted.Major Areas Inspected:Instrumentation & Equipment, Respiratory Protection,Health Physics Organization & Qualifications & LER Followup IR 05000389/19820201982-06-21021 June 1982 IE Insp Rept 50-389/82-20 on 820511-14.Noncompliance Noted: Failure to Follow Procedure for Marking & Insp of Pipe Engagement Into Socket Fitting IR 05000389/19820231982-06-18018 June 1982 IE Insp Rept 50-389/82-23 on 820525-28.Noncompliance Noted: Failure to Implement QA Requirements Fully IR 05000389/19820241982-06-15015 June 1982 IE Insp Rept 50-389/82-24 on 820525-28.No Noncompliance Noted.Major Areas Inspected:Electrical Components & Sys, Quality Records,Electrical Cables & Terminations,Work & Work Activities & Licensee Identified Items IR 05000389/19820061982-06-14014 June 1982 IE Insp Rept 50-389/82-06 on 820521-26.No Noncompliance Noted.Major Areas Inspected:Followup on Previous Inspector Findings & Witnessing RCS Hydrostatic Test IR 05000335/19820151982-06-11011 June 1982 IE Insp Repts 50-335/82-15 & 50-389/82-21 on 820411-0514. Noncompliance Noted:Failure to Implement Procedure for Locking Safety Valves in Required Position IR 05000335/19820161982-05-28028 May 1982 IE Insp Repts 50-335/82-16 & 50-389/82-18 on 820426-30.No Noncompliance Noted.Major Areas Inspected:Qa Program Design Control Procurement,Const of Facility & Interviews W/ Personnel IR 05000389/19820191982-05-26026 May 1982 IE Insp Rept 50-389/82-19 on 820426-30.No Noncompliance Noted.Major Areas Inspected:Preservice insp,safety-related Structures Outside Containment,Previous Insp Findings & Licensee Identified Items IR 05000335/19820141982-05-20020 May 1982 IE Insp Rept 50-335/82-14 on 820419-22.No Noncompliance Noted.Major Areas Inspected:Qc & Confirmatory Measurements Including Review of Lab QC Program,Chemistry & Radiochemistry Procedures & Airborne Effluent Sampling IR 05000389/19820171982-05-10010 May 1982 IE Insp Rept 50-389/82-17 on 820419-23.No Noncompliance Noted.Major Areas Inspected:Electrical Work,Instrumentation of Components & Sys Work Activities & Quality Records IR 05000335/19820131982-04-29029 April 1982 IE Insp Repts 50-335/82-13 & 50-389/82-15 on 820412-16.No Noncompliance Noted.Major Areas Inspected:Followup on Previous Insp Findings,Witnessing Preoperational Testing & Unit 2 Tour 1990-04-06
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000335/19990111999-10-0808 October 1999 Partially Deleted Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-08 (Ref 10CFR73.21).No Violations Noted. Major Areas Inspected:Plant Support Re Physical Security Program for Power Reactors PNO-II-99-037D, on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph1999-09-15015 September 1999 PNO-II-99-037D:on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph PNO-II-99-023, on 990601,one CEA Descended Into Reactor Core for Unknown Reasons,With Unit 2 Rated Power.Licensee Noted Voltage Fluctuations on CEA Power Supplies.Licensee Is Continuing to Investigate CEA Problems1999-06-0808 June 1999 PNO-II-99-023:on 990601,one CEA Descended Into Reactor Core for Unknown Reasons,With Unit 2 Rated Power.Licensee Noted Voltage Fluctuations on CEA Power Supplies.Licensee Is Continuing to Investigate CEA Problems ML20217G3081998-03-25025 March 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $88,000.Violation Noted:Licensee Failed to Correctly Translate Design Change Into Procedure ML20202D8761997-02-12012 February 1997 Investigation Rept 2-96-042 on 961106.No Noncompliance Noted.Major Areas Investigated:Allegation of Falsification & Backdating of Emergency Preparedness Document.Partially Deleted IR 05000335/19960221996-11-14014 November 1996 Insp Repts 50-335/96-22 & 50-389/96-22 on 961114.No Violations Noted.Major Areas Inspected:Aspects of Licensee Configuration Mgt & 10CFR50.59 Programs ML20134J2391996-07-31031 July 1996 Investigation Rept 2-95-008 Re Alleged Discrimination Against Instrumentation & Control Technician for Reporting Safety Concerns ML20134N0901996-01-31031 January 1996 Partially Deleted Investigation Rept 2-94-018.Allegation Not Substantiated IR 05000335/19940021994-03-11011 March 1994 Partially Withheld Insp Repts 50-335/94-02 & 50-389/94-02 on 940207-11.No Violations Identified.Major Areas Inspected:Mgt Support,Physical Security Program for Power Reactors,Audits & Alarm Stations & Communications PNO-II-93-023, on 930521,facility Was Manually Tripped from 72% Power.Caused by Multiple Electrical Grounds Affecting at Least Three Ceas.State of Florida Informed1993-05-24024 May 1993 PNO-II-93-023:on 930521,facility Was Manually Tripped from 72% Power.Caused by Multiple Electrical Grounds Affecting at Least Three Ceas.State of Florida Informed IR 05000335/19930061993-05-12012 May 1993 Partially Withheld Insp Repts 50-335/93-06 & 50-389/93-06 on 930412-16.No Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans,Audits,Protected & Vital Area Barriers,Detection & Assessment Aids (Ref 10CFR73.21) PNO-II-93-001, on 930112,plant Commenced Shutdown Due to RCP Vibration.Unit 2 Being Placed in Cold Shutdown,Mode 5.State of Fl Notified1993-01-13013 January 1993 PNO-II-93-001:on 930112,plant Commenced Shutdown Due to RCP Vibration.Unit 2 Being Placed in Cold Shutdown,Mode 5.State of Fl Notified IR 05000335/19920231992-12-14014 December 1992 Partially Withheld Insp Repts 50-335/92-23 & 50-389/92-23 on 921130-1204 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Vital Area Barriers & Alarms, Lighting,Assessment & Testing,Maint & Compensatory Measures PNO-II-92-080, on 921124,unplanned Shutdown Occurred to Repair Two of Three Pressurizer Sv.Caused by an Operator Error.Licensee Intends to Test & Inspect Removed Valves at Wylie Labs1992-11-25025 November 1992 PNO-II-92-080:on 921124,unplanned Shutdown Occurred to Repair Two of Three Pressurizer Sv.Caused by an Operator Error.Licensee Intends to Test & Inspect Removed Valves at Wylie Labs IR 05000335/19910131991-07-11011 July 1991 Insp Repts 50-335/91-13 & 50-389/91-13 on 910610-14.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program for Nuclear Power Reactors,Mgt,Plans, Audits,Barriers,Detection & Assessment Aids IR 05000335/19910041991-04-15015 April 1991 Insp Repts 50-335/91-04 & 50-389/91-04 on 910123-0318.No Violations Noted.Major Areas Inspected:Plant Operations Review,Maint & Surveillance Observations,Review of Special Repts & Review of Nonroutine Events IR 05000335/19900251990-11-0707 November 1990 Partially Withheld Insp Repts 50-335/90-25 & 50-389/90-25 on 901009-12.Noncited Violation Noted.Major Areas Inspected: Records & Repts,Alarm Stations,Communication & Training IR 05000335/19900261990-10-31031 October 1990 Insp Repts 50-335/90-26 & 50-389/90-26 on 901022-26.No Violations or Deviations Noted.Major Areas Inspected: Isi,Including Review of Unit 1 Plan for Outage & Associated ISI Administration Procedures PNO-II-90-048, on 900820,shutdown of Unit 2 in Excess of 48 H.Caused by High Vibration of Main Generator Exciter Bearing.Licensee Expanding Scope of Insp & Root Cause Analysis.Unit Scheduled to Begin Refueling Outage on 9009151990-08-22022 August 1990 PNO-II-90-048:on 900820,shutdown of Unit 2 in Excess of 48 H.Caused by High Vibration of Main Generator Exciter Bearing.Licensee Expanding Scope of Insp & Root Cause Analysis.Unit Scheduled to Begin Refueling Outage on 900915 IR 05000335/19900101990-04-0606 April 1990 Partially Withheld Insp Repts 50-335/90-10 & 50-389/90-10 on 900319-23 (Ref 10CFR2.790 & 73.21).Major Areas Inspected: Physical Security Program,Including Security Mgt,Program Plans,Audits & Protected & Vital Area Barriers PNO-II-89-066, licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies1989-09-21021 September 1989 PNO-II-89-066:licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies IR 05000335/19890111989-05-15015 May 1989 Partially Withheld Safeguards Insp Repts 50-335/89-11 & 50-389/89-11 on 890327-31 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plan Audits & Protected & Vital Area Barriers IR 05000335/19880231988-11-0202 November 1988 Insp Repts 50-335/88-23 & 50-389/88-23 on 880925-30.No Violations Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness & Security Organization.Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000335/19880201988-08-16016 August 1988 Partially Withheld Insp Repts 50-335/88-20 & 50-389/88-20 on 880803 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected:Circumstances Surrounding Failure to Control Access to Vital Area IR 05000335/19880111988-06-14014 June 1988 Insp Repts 50-335/88-11 & 50-389/88-11 on 880523-26.No Violations or Deviations Noted.Major Areas Inspected:Special Nuclear Matl Control & Accounting IR 05000335/19880121988-06-0909 June 1988 Partially Withheld Insp Repts 50-335/88-12 & 50-389/88-12 on 880516-20 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Security Program Audit,Security Sys Power Supply & Communications PNO-II-87-069, on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations1987-10-13013 October 1987 PNO-II-87-069:on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations PNO-II-87-066, on 871008,licensee Calculated Leakage Above Required Tech Spec Limits.Cause Could Not Be Identified. Reactor Shut Down Based on Leakage & Results of Containment Insp1987-10-0606 October 1987 PNO-II-87-066:on 871008,licensee Calculated Leakage Above Required Tech Spec Limits.Cause Could Not Be Identified. Reactor Shut Down Based on Leakage & Results of Containment Insp IR 05000335/19870191987-09-24024 September 1987 Insp Repts 50-335/87-19 & 50-389/87-18 on 870825-0904.No Violations or Deviations Noted.Major Areas Inspected: Evaluation of Annual Emergency Preparedness Exercise. Exercise Scope & Objectives Encl ML20215K8951987-06-17017 June 1987 Exam Rept 50-335/OL-87-01 on 870420-22.Exam Results:Six Reactor Operators & Two Senior Reactor Operators Passed Oral & Written Exams.Master Exams Encl IR 05000335/19870021987-03-20020 March 1987 Partially Withheld Insp Repts 50-335/87-02 & 50-389/87-02 on 870217-26 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Area Inspected:Intrusion Detection Sys Being Employed as Detection Aid in Canal Opening PNO-II-87-019, Region II Will Dispatch Augmented Insp Team on 870319 to Review Circumstances Associated W/Problem Re Possible Corrosion Caused by Deposits of Crystalline Boric Acid on Reactor Head & Surrounding Areas1987-03-18018 March 1987 PNO-II-87-019:Region II Will Dispatch Augmented Insp Team on 870319 to Review Circumstances Associated W/Problem Re Possible Corrosion Caused by Deposits of Crystalline Boric Acid on Reactor Head & Surrounding Areas IR 05000335/19870011987-02-26026 February 1987 Insp Repts 50-335/87-01 & 50-389/87-01 on 870113-0207.No Violations or Deviations Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Qa Practices,Station & Corporate Mgt Practices & Overall Plant Operations ML20211H2511987-02-0606 February 1987 Exam Rept 50-335/OL-86-02 on 861117.Exam Results:All Candidates Passed Oral & Written Exams & One Senior Reactor Operator Passed Written Reexam IR 05000335/19860271987-01-26026 January 1987 Insp Repts 50-335/86-27 & 50-389/86-26 on 861216-870112.No Violations or Deviations Noted.Major Areas Inspected:Onsite Activities for Tech Spec Compliance,Operator Performance, Site Security Procedures & QA Practices IR 05000335/19860251986-12-17017 December 1986 Insp Repts 50-335/86-25 & 50-389/86-24 on 861117-21.No Violations or Deviations Noted.Major Areas Inspected:Maint & Mod Welding,Inservice Testing Program for ASME Class 1,2 & 3 Pumps & Valves & Inspector Followup Items IR 05000335/19860131986-12-0101 December 1986 SALP Repts 50-335/86-13 & 50-389/86-12 for Nov 1984 - Apr 1986 PNO-II-86-066, on 860920,leaking Relief Valve on Storage Tube on Hydrogen Trailer Discovered.Other Tubes Isolated from Leak,Area Roped Off & Smoking Prohibited.Event Terminated on 8609211986-09-22022 September 1986 PNO-II-86-066:on 860920,leaking Relief Valve on Storage Tube on Hydrogen Trailer Discovered.Other Tubes Isolated from Leak,Area Roped Off & Smoking Prohibited.Event Terminated on 860921 ML20212P2101986-08-26026 August 1986 Partially Withheld Physical Security Insp Repts 50-335/86-19 & 50-389/86-18 on 860804-08 (Ref 10CFR2.790 & 73.21). Violation Noted:Vehicle Control IR 05000335/19860111986-08-0707 August 1986 Partially Withheld Insp Repts 50-335/86-11,50-389/86-10, 50-335/86-17 & 50-389/86-16 on 860414-0625 (Ref 10CFR2.790 & 73.21).Violation Noted:Failure to Provide Access Control to Vital Areas ML20204H7291986-08-0404 August 1986 EN-86-059:on 860807,notice of Violation & Proposed Imposition of Civil Penalties in Amount of $25,000 Will Be Issued to Licensee Based on Failure to Provide Adequate Barriers to Equipment & Inadequate Security Insps ML20205B1211986-07-25025 July 1986 Exam Rept 50-335/OL-86-01 on 860610-12.Exam Results:Three of Four Senior Reactor Operator Candidates Passed Written Exam & All Four Passed Oral Exam & One Reactor Operator Candidate Failed Oral & Written Exam.Exam Encl PNO-II-86-040, on 860606,util Took Facility Out of Svc to Begin Plugging 17 Degraded Steam Generator Tubes.Unit Will Be Shut Down Approx 2 Wks.Tube Degradation Discovered on 860523 in Eddy Current Data Taken During Oct-Dec 19851986-06-0909 June 1986 PNO-II-86-040:on 860606,util Took Facility Out of Svc to Begin Plugging 17 Degraded Steam Generator Tubes.Unit Will Be Shut Down Approx 2 Wks.Tube Degradation Discovered on 860523 in Eddy Current Data Taken During Oct-Dec 1985 PNO-II-86-032, on 860428,iron Workers Employed by Util Contractor Walked Off Job & Set Up Picket Lines at All Four Entrances to Facility.Union Workers Refusing to Cross Picket Lines.Security Forces & Senior Reactor Operators on Job1986-04-28028 April 1986 PNO-II-86-032:on 860428,iron Workers Employed by Util Contractor Walked Off Job & Set Up Picket Lines at All Four Entrances to Facility.Union Workers Refusing to Cross Picket Lines.Security Forces & Senior Reactor Operators on Job ML20140B6311986-03-11011 March 1986 Exam Rept 50-335/OL-85-02 on 851216-20.Exam Results:All 16 Candidates Administered Oral Exams Passed & 14 of 15 Candidates Administered Written Exams Passed IR 05000335/19850351986-01-17017 January 1986 Physical Security Insp Repts 50-335/85-35 & 50-389/85-35 on 851216-20.No Violations Noted.Major Areas Inspected:Mgt effectiveness-security Program & Security Organization. Details Withheld (Ref 10CFR2.790(d) & 73.21) PNO-II-86-004, on 851203,util Discovered That Individual Cleaning Sludge Out of Steam Generator Received Higher than Expected Exposure in Late Nov/Early Dec.Caused by Lack of whole-body TLD Other than TLD on Upper Arm1986-01-0909 January 1986 PNO-II-86-004:on 851203,util Discovered That Individual Cleaning Sludge Out of Steam Generator Received Higher than Expected Exposure in Late Nov/Early Dec.Caused by Lack of whole-body TLD Other than TLD on Upper Arm PNO-II-85-110A, on 851122,Hurricane Kate Downgraded to Tropical Storm.No Adverse Effects Occurred to Licensed Facilities in Storm Path1985-11-22022 November 1985 PNO-II-85-110A:on 851122,Hurricane Kate Downgraded to Tropical Storm.No Adverse Effects Occurred to Licensed Facilities in Storm Path PNO-II-85-110, on 851119,Hurricane Kate Centered Slightly Inland Over North Central Cuba,About 150 Miles South of Key West,Fl.Diesel Generators at All Three Sites Operable.Turkey Point Declared Unusual Event on 8511181985-11-19019 November 1985 PNO-II-85-110:on 851119,Hurricane Kate Centered Slightly Inland Over North Central Cuba,About 150 Miles South of Key West,Fl.Diesel Generators at All Three Sites Operable.Turkey Point Declared Unusual Event on 851118 PNO-II-85-105A, on 851109,minor Damage to Regular Lifting Rig Identified Following Lifting of Core Internals Upper Guide Structure Free of Reactor Vessel.Unusual Event Declared on 851106 Terminated1985-11-12012 November 1985 PNO-II-85-105A:on 851109,minor Damage to Regular Lifting Rig Identified Following Lifting of Core Internals Upper Guide Structure Free of Reactor Vessel.Unusual Event Declared on 851106 Terminated 1999-09-15
[Table view] |
Text
-
-
.
jaa Morf, UNITED STATES
'o# ~
NUCLEAR REGULATORY COMMISSION
3h
'
REGloN 88 k,.
I 101 MARIETTA STREET, N.W.
- c ATLANTA, GEORGI A 30323
.
Y
'%#
o
Report Nos.: 50-335/85-12 and 50-389/85-12 Licensee:
Florida Power and Light Company 9250 West Flagler Street Miami, FL 33102 Docket Nos.: 50-335 and 50-389 License Nos.: DPR-67 and NPF-16 Facility Name: St. Lucie 1 and 2 Inspection Conducted: May 13-17, 1985 Inspectors:
.
r (0-12 - 8 3 D. Y.' Falcor er Date Signed h -/4" $2l w
H0. Christensen Date Signed
L
/t
~A
.
.M.
6 -l 3 -8 5~
S.
0'. Stadler'
Date Signed
/ M Approved by:
(
-
-
C. Julian, Section Cfiief
'IIate ' Signed Division of Reactor Safety SUMMARY Scope: This routine, unannounced inspection entailed 105 inspector-hours on site in the area of maintenance programs.
Results:
Within the areas inspected, no violations or deviations were identified.
l 8507100171 850617 PDR ADOCK 05000335 G
PDR
.
-
_ _ _
.
-
-
-
.
\\
REPORT DETAILS 1.
Per. sons Contacted Licensee Employees K. Harris, Vice President
- D. A. Sager, Plant Manager
- C. A. Pell, Technical Staff
- D. L. Newberry, Mechanical Maintenance
- J. Scarola, Electrical Maintenance
- B. Sculthorpe, Electrical Maintenance
- C. G. Crider, Mechanical Maintenance
- J. J. Walls, Quality Control
- N. G. Roos, Quality Control Other licensee employees contacted included technicians and mechanics.
-
NRC Resident Inspectors
- R. V. Crlenjak, Senior Resident Inspector
- H. E. Bibb, Resident Inspector
- Attended exit interview 2.
Exit Interview The inspection scope and findings were summarized on May 17, 1985, with those persons indicated in paragraph 1 above. The licensee did not identify as proprietary any of the materials provided to or reviewed by the inspectors during this inspection.
3.
Licensee Action on Previous Enforcement Matters (Closed) Violation 335/84-09-01, 389/84-12-01: The licensee has utilized the estimation techniques provided in 232 NFPA-1975 to calculate the adequacy of one-hour fire rated cabinets for the storage of training docu-mentation.
(Closed) Unresolved Item 335/84-26-02, 389/84-28-02: The inspector reviewed previous inspection reports and interviewed selected plant personnel to verify that training on mitigating core damage had been provided to all applicable plant personnel.
4.
Unresolved Items Unresolved items were not identified during this inspection.
_
-
.
5.
Inspector Followup Items (0 pen) Inspector Followup Item 335/84-09-02, 389/84-12-02: A draft revision of QP 17.1 correcting the reference to 232 NFPA in Section 5.3 b is in the approval chain.
Pending implementation, this item will remain open.
(Closed) Inspector Followup Item 335/84-09-03, 389/84-12-03: AP 0005720 has been revised to require that all control manipulations be performed annually.
6.
Corrective Maintenance The inspector reviewed the corrective maintenance program for conformance to applicable regulatory criteria and licensee commitments.
Administrative Procedure 0010432, Plant Work Orders, defines the initiation, approval, and implemention of plant work orders.
Once a plant work order (PWO) is written, it is routed through the appropriate department supervisor to the mechanical, electrical or instrumentation and control planners / coordinators.
The planners process the plant work order, and make several determinations including:
a.
if the PWO is nuclear safety-related; b.
if a radiation work permit (RWP) is required; c.
if a written procedure or vendors manual is required; d.
what priority should be assigned; e.
if post-testing is required; f.
if a clearance is required; g.
if fire prevention precautions are required such as a hot work permit or fire watch.
l The determination of nuclear safety-related is made informally by the
!
planners utilizing drawings, valve listings, and experience. Administrative
'
Procedure 0010432, Section 8.4.1.A, states that the determination of whether
,
a PWO is safety-related should be made per Quality Instruction 2 PR/PSL-1.
'
This quality instruction defines the Quality Assurance Program, and in Appendix A, contains a list of equipment and activities which fall under QA jurisdiction.
The instruction does not address the determination of safety-related, and the licensee has not established a "Q list" for this purpose. The methods utilized by the licensee to determine whether a PWO is safety-related should be proceduralized for consistency, and to' ensure that a safety-related component is not inadvertently designated as non-safety-i l
related.
t l
r
l
-
,
,
,
.
.
i Indeterminingwhetheraradiationdarkpermit(RWP)isrequiredforaPWO, the planners utilize plant drawings and " common sense". Of three planners
.'
interviewed, none were familiar with the guidance provided in. health physics procedure HP-1, Section 4, for deciding if an RWP is required. Although the.j.
- inspector observed no areas where the planners had been non-conservative in making this RWP determination, they should all be familiar with and able to
^
- implement these procedural requirements. This is particularly important f f the planner designates no RWP required because the health physics personnel are then removed from_ the PWO review chain. The proceduralization of the proce'ss for determining whether a PW0.is safety-related, and utilization of HPal, Section 4, for determining if an RWP is required, will be an Inspector Followup Item (335,389/85-12-01).
The work packages assembled by the planners for a PWO appeared to be very
-
comprehensive and provided ' excellent guidance for craft personnel.
A controlled copy of the latest revision of the applicable procedure or vendor's manual was attached, as well as applicable P& ids and drawings. The t
inspector noted that since considerable time may elapse before a Pbo is actually worked, there should be a procedural requirement that the procedure
,
I and drawing revisions be reverified just prior to begirning the work. If a planner determines that post-maintenance testing will be required for a PWO, a post-maintenance test form, QI-11, is attached to the work package. This form designates the ttesting to be completed, and provides an initial block-
"
for-the performer and a signature block for the return to service.
If special fire precautions are required, aGit work permit is also attached to the work oackage.
One area of concern 'wa, noted by the inspector.
In addition to determining if a PWO is safety : elated, the planner determines if a clearance (protection) will be required.
If a;PWO is marked as non-
safety-related, review by the shift supervisor is not required. If the same PWO was marked such that no clearance was required, it. appears that work could begin on a secondary system without the cognizance of the shift i
supervisor. This potential problem could be resolved by requiring.that all
'
PW0s be approved by the shift supervisor, or that all PW0s have a clea'ance r
provided.
>
Per Administrative Procedure AP 0010432,Ca11 specific PW0s are f'rwarded to o
Quality Control for review. PW0s which are not nuclear safety-related may be stamped "N0 QC REQUIRED" and returned to the planner. If the PWO is nuclear. safety-related, QC reviews 'the package and places any special
' js
- requirements, including " witness points", on the PWO.
Section 8.10 allows work to be performed under emergency conditions without a complete PWO
+
package.
Section 8.10, Item 3, requires that a quality control supervisor evaluate the emergency and indicate necessary requirements. In'the abrence p
of a QC supervisor on back shifts and weekends, the shift supervisor (NPS)
_
actually performs this QC evaluation. This exception should be provided for in the body of the procedure.'
,
'
When a PWO.is written, a numbered green PWO tag is placed on or near the specific piece ^of equipment in need of repair, and the bottom tab-is removed and attached to the PWO. The green PWO tag provides informaticn to other personnel that a work request has already been generated on the deficiency,
-
i f
f'
.
.
...- - --
-- -. - -.
.,.. - - - -
--,--,----.,-.n.
- - - -
- - - - ~,,,
-
.
s E
and prevents duplfcate PW0s.
The PWO tag also helps to ensure that personnel performing 'the work are working on the correct equipment.
One problem noted by the inspector was that the PWO tag number does not coincide
'
'
with the PWO number.
A number of PWO tags which were quite old were
.
observed hanging on various plant components.
The licensee could not
readily determine, by the PWO. tag number, whether these PW0s were still active or whether they had been completed and the tags not removed. One PWO tag (06993), dated October 6, 1984, was traced back to a safety-related PWO which had not been worked. This PWO was written on the 1-A emergency diesel generator soak-back pump leaking oil. This pump is utilized in the standby mode to circulate oil, and to keep the diesel warmed-up and ready to start.
The PWO priority sheet assigns a number code from 1, which is one day to start, to a 5, which is 30 days to start. This PWO had been open for over seven months with no work' performed. Another PWO, 391378, was written on November 3, 1984, on the
"A" diesel generator governor losing oil.
According to the PWO, oil was being added two times per week to replace the lost oil.
The priority assigned to the PWO was a C-3.
A "C" rating, according to the priority sheet, is equipment important to unit availability such as heaters and cooling water pumps.
It appears that the priority assigned to this PWO should have been an "A",
which is equipment vital to plant safety. The "3" assigned, according to the priority sheet, meant work theuld have started within seven days. Work was not started until March 25, 1985, nearly five months later.
Another PWO tag was observed by the
~
inspector on the denineralized water make-up valve to the 1-A diesel generator. This PWO was written in February 1984, nearly a year and a half ago.
The primary reason provided by the licensee for these excessively overdue PW0s on safety-related equipment %as a shortage of maintenance personnel.
In addition to a general long-term shortage, St. Lucie has loaned maintenance personnel to Turkey Point to support a refueling outage.
The timely performance of maintenance on safety-related systems and supporting equipment will be an Inspector Followup Item (335,389/85-12-02).
The inspector reviewed two PW0s written on safety-related equipment to ensure that maintenance records were beingt properly retained.
PW0s 396311 on the "A" boric acid pump, and 391378 on the "A" diesel generator, were reviewed.
Both PWO records were complete; containing all required approvals, a QC review, a description of the work performed, recommendations ifor future planning, and the names of personnel performing the work.
Parts requisitions, procedures, vendor drawings, and the completed post-test Q-11 forms were also attached.
The clearances associated with these PW0s were
filed separately.
They were complete; including a list of protection provided, and independent verification for restoration of breakers and
"
'
valves to the required positions.
St. Lucie Technical Specification 6.10.1.b requires records and logs of principal maintenance activities, inspections, repairs and replace' ment of equipment related to nuclear safety,
'
i to be retained at least five years. Clearances contain records of safety-related valves and breakers repositioned, the names of personnel performing *
l tagging, and a trecord of restoration and independent verification.
This documentation should be retained five years. According to the record vault
,
index, the five year retention is occurring, but operating procedure OP-0010122, Section 7.2, requires clearance orders to be retained for only
?
,
%
f
,l
--
-
.-
- _ _
- _ _.
_ _ ___________ _ _ _ _
_
.
one year.
The revision of this procedure to conform with the Technical Specification will be an Inspector Followup Item (335,389/85-12-03).
The inspector observed several maintenance tasks in progress; including
,
modification and repair of a condensate pump on Unit 2, troubleshooting of I
the 1-A diesel generator, and the erecting of pipe hangers. In general, all work appeared to conform to applicable procedures and safety requirements.
I The condensate pump was lifted outside of the building in order to remove flow vanes which were breaking off.
The inspector physically verified all protection tagging for the clearance order covering this work.
Since the l
pump had to be lifted over safety-related cable trays, approval was obtained
!
from the Facility Review Group (FRG).
The 1-A diesel generator was l
experiencing a 100 KW oscillation every four minutes and extensive trouble-shooting over a two-week period had failed to resolve the problem. The inspector observed a coordinated effort between plant engineers, FP&L i
corporate trouble specialists, and vendor personnel to resolve the problem.
'
The effort appeared well organized and planned, including a very systematic isolation of possible causes and replacement of components such as relays and the frequency controller.
The inspector verified that the required Technical Specification surveillance testing was performed on the 1-B diesel generator during this 1-A diesel outage period.
For the pipe hanger erection work, the inspector reviewed the posted hot work permit. No fire watch was required, but a fire extinguisher was provided as stipulated by the hot work permit during the welding.
7.
Feedback of Operational and Maintenance Experience The inspector reviewed the disposition of several I&E Information Notices at St. Lucie. The Notices are distributed by FP&L to the plants for further action.
The plant Technical Group is responsible for determining which plant groups should receive the information and for establishing a file for each I&E Notice. The Notices are then distributed by the Technical Group with a due date for response.
Acministrative Procedure AP 0005724, Operating Experience Feedback, requires the technical staff to followup and verify that " priority" items are comp 1eted as scheduled.
The file for I&E Information Notice 84-58, Inadvertent Defeat of Safety Function Caused by Human Error Involving Wrong Unit, Wrong Train, or Wrong Systems, was reviewed by the inspector. The records indicated that this Notice was not sent to mechanical, electrical, or I&C. The wrong unit, wrong train, wrong system Notice is definitely applicable to all of these groups, as evidenced by increasing numbers of LERs generated by utilities involving personnel error. The response by the operations group to this priority I&E Notice appeared to be very poor, considering the following chronology of events:
a.
July 25, 1984 - Notice issued by the NRC b.
July 30,1984 - FP&L Licensing receives Notice c.
August 6, 1984 - Distributed to plant with a due date of October 1, 1984
..
.
.
.
-
_ - _ _ _ _ _ _ _
___
-
.
l d.
October 8, 1984 - Sent to Operations November 4, 1984 - Second request for response from Operations e.
f.
April 30, 1985 - Third request for response from Technical Group (
to Operations g.
May 16, 1985 - Still active and open with no documented response This particular I&E Notice utilized, as an example, an event at the FP&L
{
Turkey Point facility in which an operator mistakenly valved-out the containment spray pumps on an operating unit.
There is no documented evidence in the I&E Notice file that the licensee has taken adequate action to ensure that the contributing causes to this event have been resolved at St. Lucie including:
the same access keys for both units
-
identical identification tags on both units
-
the operator did not carry the tag sheet (clearance) with him while
-
performing valve isolations no independent verification was performed
-
The inspector also reviewed the file for I&E Notice 84-66, Undetected Unavailability of the Turbine Driven Auxiliary Feedwater Train, issued by the NRC on August 17, 1984. This Notice was provided to the licensee with a corporate due date of October 30, 1984, and a plant due date of November 15, 1984. The response to the corrective actions listed in Table I of the I&E Notice was not received by the due date, and another request was issued by the Technical Group to Operations on April 30, 1985.
I&E Notice 84-42, Equipment Availability for Conditions During Outages Not Covered by Technical Specifications, was issued by the NRC on June 5, 1984, and received by FP&L on June 11, 1984. The Notice was distributed on June 16,
.
1984, with a due date of August 14, 1984. The Technical Group distributed (
the Notice to the QC, Training, and Operations Groups. QC responded on
October 11, 1984, stating that the Notice had been reviewed with Operations
!
inspectors.
Training responded on September 14, 1984, stating that the information had been incorporated into the license requalification program.
Operations did not respond until April 25, 1985, and the response was that i
the shift supervisors were aware of the system interrelationships.
There l
was no indication that the corrective actions listed in the Notice were individually addressed and resolved including:
-
A review of the management control of equipment for plant conditions not coverad by the requirements of the Technical Specifications. The review will specifically address electrical system requirements during cold shutdown to ensure sufficient equipment remains available to maintain the plant in a safe condition and to meet the commitments of the Site Emergency, Security, and Fire Frotection Plans.
l
\\
_ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _
_
_
_
_
. _ _.
-
.
Establishing minimum equipment availability for specific conditions not
-
covered by the Technical Specifications.
Provide classroom training for all operators on the use and intent of
-
the Site Emergency Plan.
'
Integrate the use of the Site Emergency Plan into simulator training.
-
Discuss the need for strict adherence to operating procedures with all
-
operations personnel.
'
The NRC issues Information Notices in order to alert licensees of problems occurring at facilities, and to help avoid repetition. Although no specific; response is required, it is expected that the recipients will review the information for applicability and consider actions to preclude similar
problems at their facilities. FP&L and St. Lucie have established a program for this purpose, but it does not appear that the implementation is adequate. The responses are not timely enough to avoid potential repeti-tion, and do not provide sufficient detail to ensure that all corrective
<
actions have been evaluated for applicability.
In addition, the plant distribution for some I&E Notices such as 84-58, Wrong Unit / Wrong Train, is too limited and should include mechanical, electrical and I&C personnel.
The distribution and review of I&E Notices and the incorporation, as
necessary, of the information into procedures, training courses, and/or required reading will be an Inspector Followup Item (335,389/85-12-04).
i ANSI Standard N18.7,1976, states that the causes of malfunctions shall be determined, evaluated, and recorded.
Experience with the malfunctioning equipment. and similar components shall be' reviewed and evaluated to deter-mine whether a replacement component of the same type can be expected to perform its function reliably. Currently, the control of this evaluation process at St. Lucie is informal.
Documentation of both corrective and preventive maintenance activities are maintained in component files. These
,
files are available for historical review of component maintenance on an
,
as-needed basis.
Identification of adverse maintenance trends is not
'
administrative 1y controlled. in the licensee's ' program.
However, the licensee is developing a computerized equipment data base that will improve the overall documentation, evaluation, trending and control of maintenance activities. Pending the establishment of formal administrative controls for
'
the evaluation of component maintenance histories to identify. yetitive
,
failures and adverse trends, this item will be identified as er laspector
Followup Item (335,389/85-12-05).
8.
Preventive Maintenance Program (PM)
.
The inspector conducted a review of the licensee's implemented preventive
j maintenance program (PM). This review consisted of reviewing the licensee's
'
admini strative, quality, and maintenance department procedures, numerous completed preventive maintenance work orders, and interviewing the PM planners for each maintenance department.
Additionally, the inspector ascertained whether the licensee's program is in conformance with Technical
i
,
. -,
y em... -
... _ -
._
_m.
3_._,_.y.,c_
..e
_,. - _ -.,.,
,,
-
. - -., - - -
-, -,
-v
-
.
'
,
.
Specifications and commitments made to applicable regulatory guides and i
industry standards.
The licensee's PM program is implemented by Administrative Procedure 0010431, Preventative Maintenance Program. This procedure places overall responsibility for implementation and administration of the PM program with the maintenance superintendent. Additionally, the appropriate maintenance department heads are responsible for ensuring that the PMs are completed within the allotted time.
Each department is assigned a planner, who is responsible for maintaining the Schedule and frequency records, issuing PM work orders, and maintaining a followup system.
The mechanical, electrical, and instrumentation and control planners have organized the scheduling and tracking of PMs differently, but in conformance with the implemented administrative procedures. The PM program consists of a manual scheduling and tracking system. At the first of each month, the planners review the PM schedule and make up work order packages on each PM that is due. The packages consist of a work order with instructions, a copy of the appropriate procedure, and a retest data sheet, if needed. Having a planner develop the work packages for the maintenance shops is nelpful and time saving.
The inspector noted a potential problem concerning the use of current procedures. After the planner makes up a PM work package using controlled procedure copies, it is given to the shops for completion. The PM may not be worked in a timely manner, and the licensee has no requirement for a journeyman to verify and document that the procedure he will use is still current. The journeyman could perform the PM using an outdated procedure and the mistake may not be caught until the post-work review. Additionally, the inspector noted that the electrical planner was assembling PM work packages using "information only" procedures, with no indication that they had been verified to be correct and current.
One other area of concern is the lack of timeliness in completing numerous safety-related PMs.
Examples of this are:
Unit 2, Charging Pumps "B" and "C" Lube Oil Change is a semi-annual PM,
-
which was issued on December 1, 1984, and had not been completed as of
,
May 6, 1985.
Unit 2, Diesel "B" Fuel Oil Transfer Pump PM is a semi-annual PM, which
-
was issued on December 1, 1984, and had not been completed as of May 6, 1985.
-
Unit 2, Diesel Generator "B" Air Line Strainer PM is a semi-annual PM, which was issued on December 1, 1984, and had not been completed as of May 6, 1985.
-
Unit 2, Charging Pump
"C" Accumulator PM is a weekly PM which was issued on January 18, 1985, and had not been completed as of May 6, 1985.
. _ _ -
-
.
_
_
....
..-.
-
.
Unit 1, "1C" 125V DC Charger PM, issued on February 28, 1985, had
-
not been completed as of May 3, 1985.
The licensee's administrative procedure on PMs requires the planners to submit a report to their appropriate assistant maintenance superintendents on all PM work orders not completed within 30 days of issuance. St. Lucie's PM program lacks guidance on the maximum time for completing PM work packages.
With the exception of the above concerns, the St. Lucie PM program appears to be adequate in meeting the requirements and commitments made in Technical Specifications, applicable regulatory guides, and industry standards.
9.
Special Processes The inspector reviewed the licensee's maintenance and QA programs to ensure that special processes are administratively controlled and accomplished with qualified procedures in accordance with applicable codes, standards, and specifications.
The inspector verified that for applicable special processes, the licensee maintained current and proper certifications and qualifications of personnel designated to perform these functions. Selected special processes underway in the plant were observed by the inspector and several completed plant work orders were reviewed to verify that they had been accomplished in accordance with the licensee's program.
Topical Quality Assurance Report (TQR) - 9.0, Control of Special Processes, administratively implements the regulatory requiremente -for special processes at St. Lucie.
Provisions for the contro; of specific processes are contained in various plant Quality Instructions (QIs).
QI 9 PR/PSL-3, Welding Control, provides the requirements for the control of materials, procedure qualification, training, personnel qualification, quality control, examination and verification of welding and related activities.
The inspector observed several welding-related activities and verified that they were accomplished by qualified personnel utilizing approved procedures.
The inspector also verified that appropriate burn permits were obtained and properly posted at the work location.
QI 9 PR/PSL-2, Control of Nondestructive Examination, provides the require-ments for training, qualification and certification of NDE personnel. The instruction requires that all NDE activities be accomplished in accordance with approved procedures and by certified personnel. The inspector reviewed documentation of several completed maintenance activities that required visual examinations and verified that they had been accomplished.
QI 13 PR/PSL-2, Cleanliness Control Methods, provides the requirements and acceptance criteria for cleanliness during maintenance on applicable systems and components.
The instruction describes cleanliness classifications, approved solvents, barrier materials, types and flushing methods.
The inspector noted that the instruction addresses material accountability only for work being performed in the vicinity of the refueling cavity with the
..
.
.
head removed. The licensee was informed that the requirements for material accountability are applicable for all maintenance on safety-related systems and components when misplaced tools, equipment, or materials could be detrimental to a safety function.
,,
r 4