IR 05000335/1993006
| ML20044E253 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 05/12/1993 |
| From: | Mcguire D, Stansberry W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20044E246 | List: |
| References | |
| 50-335-93-06, 50-335-93-6, 50-389-93-06, 50-389-93-6, NUDOCS 9305240107 | |
| Download: ML20044E253 (1) | |
Text
.- [/ NQ[o UNITED STATES NUCLEAR REGULATORY COMMisslON g
n REGION ll
)
$o
. $
101 MARIETTA STREET.N.W.
"2 AT LANT A, GEORGI A 30323
%,
f
- ...+
Report Nos. 50-335/93-06 and 50-389/93-06
Licensee:
Florida Power and Light Company
9250 West Flagler Street Miami, FL 33102 Docket Nos. 50-335 and 50-389 License Nos. DPR-67 and NPF-16 Facility Name:
St. Lucie 1 and 2 Inspection Conducted: April 12 - 16, 1993 Inspector:
$%r1[h I
[
E/>f8 W. W. Stanisbe y, Safegukrdf Inspector Date Signed Approved by:
t
.
6 /2 73 D. R. McGuire, Chief Date S(gned Safeguards Section Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards j
SUMMARY
Scope:
This routine, unannounced inspection was conducted in the areas of the Physical Security Program.for Power Reactors.
Specific areas evaluated were Management Support; Security Program Plans, Audits; Protected and Vital Area
.
Barriers; Detection Aids; Assessment Aids; Protected and Vital Areas Access Control - Packages, Personnel, and Vehicles; Alarm Stations and Communications; Power Supply; Testing, Maintenance and Compensatory Measures; and Security Training and Qualifications.
i Results:
In the areas inspected, violations or deviations were not identified.
The
licensee continues to provide appropriate security of vital equipment as designated in the commitments of the Physical Security Plan and regulatory requirements. A protected area perimeter issue was reviewed and is discussed in Paragraph 2d.
4 5240107 930533 ADOCK 05000335 JTIMOIITWTNf$ b@ffWf N O
" " " * " "
' " ' * - * * " " -
" "
"~"
ment is cetWW SAFEGUARDS lNFORMATl0N evbwet ins dru i
!
.