MONTHYEARIR 05000335/19990111999-10-0808 October 1999
[Table view]Partially Deleted Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-08 (Ref 10CFR73.21).No Violations Noted. Major Areas Inspected:Plant Support Re Physical Security Program for Power Reactors IR 05000335/19960221996-11-14014 November 1996 Insp Repts 50-335/96-22 & 50-389/96-22 on 961114.No Violations Noted.Major Areas Inspected:Aspects of Licensee Configuration Mgt & 10CFR50.59 Programs IR 05000335/19940021994-03-11011 March 1994 Partially Withheld Insp Repts 50-335/94-02 & 50-389/94-02 on 940207-11.No Violations Identified.Major Areas Inspected:Mgt Support,Physical Security Program for Power Reactors,Audits & Alarm Stations & Communications IR 05000335/19920231992-12-14014 December 1992 Partially Withheld Insp Repts 50-335/92-23 & 50-389/92-23 on 921130-1204 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Vital Area Barriers & Alarms, Lighting,Assessment & Testing,Maint & Compensatory Measures IR 05000335/19910131991-07-11011 July 1991 Insp Repts 50-335/91-13 & 50-389/91-13 on 910610-14.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program for Nuclear Power Reactors,Mgt,Plans, Audits,Barriers,Detection & Assessment Aids IR 05000335/19910041991-04-15015 April 1991 Insp Repts 50-335/91-04 & 50-389/91-04 on 910123-0318.No Violations Noted.Major Areas Inspected:Plant Operations Review,Maint & Surveillance Observations,Review of Special Repts & Review of Nonroutine Events IR 05000335/19900251990-11-0707 November 1990 Partially Withheld Insp Repts 50-335/90-25 & 50-389/90-25 on 901009-12.Noncited Violation Noted.Major Areas Inspected: Records & Repts,Alarm Stations,Communication & Training IR 05000335/19900261990-10-31031 October 1990 Insp Repts 50-335/90-26 & 50-389/90-26 on 901022-26.No Violations or Deviations Noted.Major Areas Inspected: Isi,Including Review of Unit 1 Plan for Outage & Associated ISI Administration Procedures IR 05000335/19890111989-05-15015 May 1989 Partially Withheld Safeguards Insp Repts 50-335/89-11 & 50-389/89-11 on 890327-31 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plan Audits & Protected & Vital Area Barriers IR 05000335/19880231988-11-0202 November 1988 Insp Repts 50-335/88-23 & 50-389/88-23 on 880925-30.No Violations Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness & Security Organization.Details Withheld (Ref 10CFR2.790(d) & 73.21) ML20151Y6841988-08-16016 August 1988 Partially Withheld Insp Repts 50-335/88-20 & 50-389/88-20 on 880803 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected:Circumstances Surrounding Failure to Control Access to Vital Area IR 05000335/19880111988-06-14014 June 1988 Insp Repts 50-335/88-11 & 50-389/88-11 on 880523-26.No Violations or Deviations Noted.Major Areas Inspected:Special Nuclear Matl Control & Accounting IR 05000335/19880121988-06-0909 June 1988 Partially Withheld Insp Repts 50-335/88-12 & 50-389/88-12 on 880516-20 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Security Program Audit,Security Sys Power Supply & Communications ML20235J2471987-09-24024 September 1987 Insp Repts 50-335/87-19 & 50-389/87-18 on 870825-0904.No Violations or Deviations Noted.Major Areas Inspected: Evaluation of Annual Emergency Preparedness Exercise. Exercise Scope & Objectives Encl IR 05000335/19870021987-03-20020 March 1987 Partially Withheld Insp Repts 50-335/87-02 & 50-389/87-02 on 870217-26 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Area Inspected:Intrusion Detection Sys Being Employed as Detection Aid in Canal Opening IR 05000335/19870011987-02-26026 February 1987 Insp Repts 50-335/87-01 & 50-389/87-01 on 870113-0207.No Violations or Deviations Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Qa Practices,Station & Corporate Mgt Practices & Overall Plant Operations IR 05000335/19860271987-01-26026 January 1987 Insp Repts 50-335/86-27 & 50-389/86-26 on 861216-870112.No Violations or Deviations Noted.Major Areas Inspected:Onsite Activities for Tech Spec Compliance,Operator Performance, Site Security Procedures & QA Practices ML20207J1891986-12-17017 December 1986 Insp Repts 50-335/86-25 & 50-389/86-24 on 861117-21.No Violations or Deviations Noted.Major Areas Inspected:Maint & Mod Welding,Inservice Testing Program for ASME Class 1,2 & 3 Pumps & Valves & Inspector Followup Items ML20212P2101986-08-26026 August 1986 Partially Withheld Physical Security Insp Repts 50-335/86-19 & 50-389/86-18 on 860804-08 (Ref 10CFR2.790 & 73.21). Violation Noted:Vehicle Control IR 05000335/19860111986-08-0707 August 1986 Partially Withheld Insp Repts 50-335/86-11,50-389/86-10, 50-335/86-17 & 50-389/86-16 on 860414-0625 (Ref 10CFR2.790 & 73.21).Violation Noted:Failure to Provide Access Control to Vital Areas IR 05000335/19850351986-01-17017 January 1986 Physical Security Insp Repts 50-335/85-35 & 50-389/85-35 on 851216-20.No Violations Noted.Major Areas Inspected:Mgt effectiveness-security Program & Security Organization. Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000335/19850211985-10-0808 October 1985 Insp Repts 50-335/85-21 & 50-389/85-21 on 850813-0923.No Violation or Deviation Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Qa Practices & Site Security Procedures IR 05000335/19850241985-10-0101 October 1985 Physical Security Insp Repts 50-335/85-24 & 50-389/85-24 on 850916-20.No Violations Noted.Major Areas Inspected:Mgt Effectiveness & Security Program.Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000387/19850291985-09-23023 September 1985 Meeting Repts 50-387/85-29 & 50-388/85-24 on 850828 Re Rescheduling of Senior Reactor Operator Licensing Exam. Region Agreed to Administer One Instructor Certification & One Senior Operator Exam on 851120 & 21,respectively IR 05000335/19850231985-09-17017 September 1985 Insp Repts 50-335/85-23 & 50-389/85-23 on 850826-30.No Violation or Deviation Noted.Major Areas Inspected:Plant Chemistry & Inservice Testing of Pumps & Valves IR 05000335/19850201985-09-0404 September 1985 Insp Repts 50-335/85-20 & 50-389/85-20 on 850709-0812. Violation Noted:Operating Procedure 2-0960030, DC Ground Isolation, Not Adequately Established & Maintained ML20133N9121985-07-25025 July 1985 Insp Repts 50-335/85-16 & 50-389/85-16 on 850624-28. Violation Noted:Failure to Control Environ Conditions for Calibr of Measuring & Test Equipment IR 05000335/19850171985-07-17017 July 1985 Insp Repts 50-335/85-17 & 50-389/85-17 on 850611-0708. Violation Noted:Unit 2 Plant Mods to Prevent Testing of Relays Not Implemented,Resulting in Plant Transient IR 05000335/19850141985-06-26026 June 1985 Insp Repts 50-335/85-14 & 50-389/85-14 on 850610-14.No Violation or Deviation Noted.Major Areas Inspected:Action on Previous Enforcement Matters,Inservice Testing of Pumps & Valves,Ie Bulletin 80-08 & Inspector Followup Items IR 05000335/19850111985-06-19019 June 1985 Insp Repts 50-335/85-11 & 50-389/85-11 on 850515-0610.No Violation or Deviation Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Overall Plant Operations & QA Practices IR 05000335/19850121985-06-12012 June 1985 Insp Repts 50-335/85-12 & 50-389/85-12 on 850513-17.No Violations or Deviations Noted.Major Areas Inspected:Maint Programs IR 05000335/19850011985-06-0505 June 1985 Safeguards Insp Repts 50-389/85-13 & 50-335/85-01 on 850512-16.No Violations or Deviations Noted.Major Areas Inspected:Security Plan & Implementing Procedures & Security Audit Program.Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000335/19850101985-05-30030 May 1985 Insp Repts 50-335/85-10 & 50-389/85-10 on 850409-0513. Violation Noted:Failure to Have Established Procedure to Properly Realign Instrument Air Portion of Main Feedwater Regulating Valve IR 05000335/19840231984-08-17017 August 1984 Insp Repts 50-335/84-23 & 50-389/84-25 on 840715-0811.No Violations or Deviations Noted.Major Areas Inspected:Plant Operation,Ie Bulletins,Unit 1 Reactor Trip & Previously Identified Items IR 05000335/19820241982-07-21021 July 1982 IE Safety Insp Repts 50-335/82-24 & 50-389/82-30 on 820628- 0701.No Noncompliance Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Training & Qualifications of contractor-supplied Temporary QC Inspectors & Records IR 05000389/19820271982-07-21021 July 1982 IE Insp Rept 50-389/82-27 on 820622-25.No Noncompliance Noted.Major Areas Inspected:Preservice Insp,Welding of Internals,Previous Insp Finding & IE Bulletins IR 05000389/19820311982-07-14014 July 1982 IE Insp Rept 50-389/82-31 on 820630-0702.No Noncompliance Noted.Major Areas Inspected:Methods for Evaluating Plant Emergency,Maint & Operating Procedures & Review of Preoperational Test Program & Plant Tour IR 05000335/19820191982-07-13013 July 1982 IE Insp Repts 50-335/82-19 & 50-389/82-25 on 820614-18.No Noncompliance Noted.Major Areas Inspected:Backfit Program, Site Organization & Onsite Design Activities IR 05000335/19820261982-07-0707 July 1982 IE Inquiry Rept 50-335/82-26 on 820615-17.Inquiry Initiated to Determine Facts Surrounding Observations That Individual of Training Staff Was Talking to Examinees Prior to Reactor Operator & Senior Reactor Operator Exams IR 05000335/19820211982-06-30030 June 1982 IE Insp Repts 50-335/82-21 & 50-389/82-26 on 820515-0610.No Noncompliance Noted.Major Areas Inspected:Maint Observation, Safety Verification,Ie Notices & Circulars & Preoperational Testing IR 05000335/19820201982-06-22022 June 1982 IE Insp Rept 50-335/82-20 on 820601-04.No Noncompliance Noted.Major Areas Inspected:Instrumentation & Equipment, Respiratory Protection,Health Physics Organization & Qualifications & LER Followup IR 05000389/19820231982-06-18018 June 1982 IE Insp Rept 50-389/82-23 on 820525-28.Noncompliance Noted: Failure to Implement QA Requirements Fully IR 05000389/19820241982-06-15015 June 1982 IE Insp Rept 50-389/82-24 on 820525-28.No Noncompliance Noted.Major Areas Inspected:Electrical Components & Sys, Quality Records,Electrical Cables & Terminations,Work & Work Activities & Licensee Identified Items IR 05000389/19820061982-06-14014 June 1982 IE Insp Rept 50-389/82-06 on 820521-26.No Noncompliance Noted.Major Areas Inspected:Followup on Previous Inspector Findings & Witnessing RCS Hydrostatic Test IR 05000335/19820151982-06-11011 June 1982 IE Insp Repts 50-335/82-15 & 50-389/82-21 on 820411-0514. Noncompliance Noted:Failure to Implement Procedure for Locking Safety Valves in Required Position IR 05000335/19820161982-05-28028 May 1982 IE Insp Repts 50-335/82-16 & 50-389/82-18 on 820426-30.No Noncompliance Noted.Major Areas Inspected:Qa Program Design Control Procurement,Const of Facility & Interviews W/ Personnel IR 05000389/19820191982-05-26026 May 1982 IE Insp Rept 50-389/82-19 on 820426-30.No Noncompliance Noted.Major Areas Inspected:Preservice insp,safety-related Structures Outside Containment,Previous Insp Findings & Licensee Identified Items IR 05000335/19820141982-05-20020 May 1982 IE Insp Rept 50-335/82-14 on 820419-22.No Noncompliance Noted.Major Areas Inspected:Qc & Confirmatory Measurements Including Review of Lab QC Program,Chemistry & Radiochemistry Procedures & Airborne Effluent Sampling IR 05000389/19820131982-04-27027 April 1982 IE Insp Rept 50-389/82-13 on 820329-0402.Noncompliance Noted:Use of Incorrect Calibr Block for Psi Ultrasonic Test of Weld 123-2 IR 05000389/19820121982-04-0707 April 1982 IE Insp Rept 50-389/82-12 on 820317-19.Noncompliance Noted: Design & Installation of Fire Protection Yard Piping Sys Not Specified to Meet Requirements of NFPA-24 1999-10-08 Category:NRC-GENERATED MONTHYEARIR 05000335/19990111999-10-0808 October 1999
[Table view]Partially Deleted Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-08 (Ref 10CFR73.21).No Violations Noted. Major Areas Inspected:Plant Support Re Physical Security Program for Power Reactors IR 05000335/19960221996-11-14014 November 1996 Insp Repts 50-335/96-22 & 50-389/96-22 on 961114.No Violations Noted.Major Areas Inspected:Aspects of Licensee Configuration Mgt & 10CFR50.59 Programs IR 05000335/19940021994-03-11011 March 1994 Partially Withheld Insp Repts 50-335/94-02 & 50-389/94-02 on 940207-11.No Violations Identified.Major Areas Inspected:Mgt Support,Physical Security Program for Power Reactors,Audits & Alarm Stations & Communications IR 05000335/19920231992-12-14014 December 1992 Partially Withheld Insp Repts 50-335/92-23 & 50-389/92-23 on 921130-1204 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Vital Area Barriers & Alarms, Lighting,Assessment & Testing,Maint & Compensatory Measures IR 05000335/19910131991-07-11011 July 1991 Insp Repts 50-335/91-13 & 50-389/91-13 on 910610-14.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program for Nuclear Power Reactors,Mgt,Plans, Audits,Barriers,Detection & Assessment Aids IR 05000335/19910041991-04-15015 April 1991 Insp Repts 50-335/91-04 & 50-389/91-04 on 910123-0318.No Violations Noted.Major Areas Inspected:Plant Operations Review,Maint & Surveillance Observations,Review of Special Repts & Review of Nonroutine Events IR 05000335/19900251990-11-0707 November 1990 Partially Withheld Insp Repts 50-335/90-25 & 50-389/90-25 on 901009-12.Noncited Violation Noted.Major Areas Inspected: Records & Repts,Alarm Stations,Communication & Training IR 05000335/19900261990-10-31031 October 1990 Insp Repts 50-335/90-26 & 50-389/90-26 on 901022-26.No Violations or Deviations Noted.Major Areas Inspected: Isi,Including Review of Unit 1 Plan for Outage & Associated ISI Administration Procedures IR 05000335/19890111989-05-15015 May 1989 Partially Withheld Safeguards Insp Repts 50-335/89-11 & 50-389/89-11 on 890327-31 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plan Audits & Protected & Vital Area Barriers IR 05000335/19880231988-11-0202 November 1988 Insp Repts 50-335/88-23 & 50-389/88-23 on 880925-30.No Violations Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness & Security Organization.Details Withheld (Ref 10CFR2.790(d) & 73.21) ML20151Y6841988-08-16016 August 1988 Partially Withheld Insp Repts 50-335/88-20 & 50-389/88-20 on 880803 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected:Circumstances Surrounding Failure to Control Access to Vital Area IR 05000335/19880111988-06-14014 June 1988 Insp Repts 50-335/88-11 & 50-389/88-11 on 880523-26.No Violations or Deviations Noted.Major Areas Inspected:Special Nuclear Matl Control & Accounting IR 05000335/19880121988-06-0909 June 1988 Partially Withheld Insp Repts 50-335/88-12 & 50-389/88-12 on 880516-20 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Security Program Audit,Security Sys Power Supply & Communications ML20235J2471987-09-24024 September 1987 Insp Repts 50-335/87-19 & 50-389/87-18 on 870825-0904.No Violations or Deviations Noted.Major Areas Inspected: Evaluation of Annual Emergency Preparedness Exercise. Exercise Scope & Objectives Encl IR 05000335/19870021987-03-20020 March 1987 Partially Withheld Insp Repts 50-335/87-02 & 50-389/87-02 on 870217-26 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Area Inspected:Intrusion Detection Sys Being Employed as Detection Aid in Canal Opening IR 05000335/19870011987-02-26026 February 1987 Insp Repts 50-335/87-01 & 50-389/87-01 on 870113-0207.No Violations or Deviations Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Qa Practices,Station & Corporate Mgt Practices & Overall Plant Operations IR 05000335/19860271987-01-26026 January 1987 Insp Repts 50-335/86-27 & 50-389/86-26 on 861216-870112.No Violations or Deviations Noted.Major Areas Inspected:Onsite Activities for Tech Spec Compliance,Operator Performance, Site Security Procedures & QA Practices ML20207J1891986-12-17017 December 1986 Insp Repts 50-335/86-25 & 50-389/86-24 on 861117-21.No Violations or Deviations Noted.Major Areas Inspected:Maint & Mod Welding,Inservice Testing Program for ASME Class 1,2 & 3 Pumps & Valves & Inspector Followup Items ML20212P2101986-08-26026 August 1986 Partially Withheld Physical Security Insp Repts 50-335/86-19 & 50-389/86-18 on 860804-08 (Ref 10CFR2.790 & 73.21). Violation Noted:Vehicle Control IR 05000335/19860111986-08-0707 August 1986 Partially Withheld Insp Repts 50-335/86-11,50-389/86-10, 50-335/86-17 & 50-389/86-16 on 860414-0625 (Ref 10CFR2.790 & 73.21).Violation Noted:Failure to Provide Access Control to Vital Areas IR 05000335/19850351986-01-17017 January 1986 Physical Security Insp Repts 50-335/85-35 & 50-389/85-35 on 851216-20.No Violations Noted.Major Areas Inspected:Mgt effectiveness-security Program & Security Organization. Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000335/19850211985-10-0808 October 1985 Insp Repts 50-335/85-21 & 50-389/85-21 on 850813-0923.No Violation or Deviation Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Qa Practices & Site Security Procedures IR 05000335/19850241985-10-0101 October 1985 Physical Security Insp Repts 50-335/85-24 & 50-389/85-24 on 850916-20.No Violations Noted.Major Areas Inspected:Mgt Effectiveness & Security Program.Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000387/19850291985-09-23023 September 1985 Meeting Repts 50-387/85-29 & 50-388/85-24 on 850828 Re Rescheduling of Senior Reactor Operator Licensing Exam. Region Agreed to Administer One Instructor Certification & One Senior Operator Exam on 851120 & 21,respectively IR 05000335/19850231985-09-17017 September 1985 Insp Repts 50-335/85-23 & 50-389/85-23 on 850826-30.No Violation or Deviation Noted.Major Areas Inspected:Plant Chemistry & Inservice Testing of Pumps & Valves IR 05000335/19850201985-09-0404 September 1985 Insp Repts 50-335/85-20 & 50-389/85-20 on 850709-0812. Violation Noted:Operating Procedure 2-0960030, DC Ground Isolation, Not Adequately Established & Maintained ML20133N9121985-07-25025 July 1985 Insp Repts 50-335/85-16 & 50-389/85-16 on 850624-28. Violation Noted:Failure to Control Environ Conditions for Calibr of Measuring & Test Equipment IR 05000335/19850171985-07-17017 July 1985 Insp Repts 50-335/85-17 & 50-389/85-17 on 850611-0708. Violation Noted:Unit 2 Plant Mods to Prevent Testing of Relays Not Implemented,Resulting in Plant Transient IR 05000335/19850141985-06-26026 June 1985 Insp Repts 50-335/85-14 & 50-389/85-14 on 850610-14.No Violation or Deviation Noted.Major Areas Inspected:Action on Previous Enforcement Matters,Inservice Testing of Pumps & Valves,Ie Bulletin 80-08 & Inspector Followup Items IR 05000335/19850111985-06-19019 June 1985 Insp Repts 50-335/85-11 & 50-389/85-11 on 850515-0610.No Violation or Deviation Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Overall Plant Operations & QA Practices IR 05000335/19850121985-06-12012 June 1985 Insp Repts 50-335/85-12 & 50-389/85-12 on 850513-17.No Violations or Deviations Noted.Major Areas Inspected:Maint Programs IR 05000335/19850011985-06-0505 June 1985 Safeguards Insp Repts 50-389/85-13 & 50-335/85-01 on 850512-16.No Violations or Deviations Noted.Major Areas Inspected:Security Plan & Implementing Procedures & Security Audit Program.Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000335/19850101985-05-30030 May 1985 Insp Repts 50-335/85-10 & 50-389/85-10 on 850409-0513. Violation Noted:Failure to Have Established Procedure to Properly Realign Instrument Air Portion of Main Feedwater Regulating Valve IR 05000335/19840231984-08-17017 August 1984 Insp Repts 50-335/84-23 & 50-389/84-25 on 840715-0811.No Violations or Deviations Noted.Major Areas Inspected:Plant Operation,Ie Bulletins,Unit 1 Reactor Trip & Previously Identified Items IR 05000335/19820241982-07-21021 July 1982 IE Safety Insp Repts 50-335/82-24 & 50-389/82-30 on 820628- 0701.No Noncompliance Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Training & Qualifications of contractor-supplied Temporary QC Inspectors & Records IR 05000389/19820271982-07-21021 July 1982 IE Insp Rept 50-389/82-27 on 820622-25.No Noncompliance Noted.Major Areas Inspected:Preservice Insp,Welding of Internals,Previous Insp Finding & IE Bulletins IR 05000389/19820311982-07-14014 July 1982 IE Insp Rept 50-389/82-31 on 820630-0702.No Noncompliance Noted.Major Areas Inspected:Methods for Evaluating Plant Emergency,Maint & Operating Procedures & Review of Preoperational Test Program & Plant Tour IR 05000335/19820191982-07-13013 July 1982 IE Insp Repts 50-335/82-19 & 50-389/82-25 on 820614-18.No Noncompliance Noted.Major Areas Inspected:Backfit Program, Site Organization & Onsite Design Activities IR 05000335/19820261982-07-0707 July 1982 IE Inquiry Rept 50-335/82-26 on 820615-17.Inquiry Initiated to Determine Facts Surrounding Observations That Individual of Training Staff Was Talking to Examinees Prior to Reactor Operator & Senior Reactor Operator Exams IR 05000335/19820211982-06-30030 June 1982 IE Insp Repts 50-335/82-21 & 50-389/82-26 on 820515-0610.No Noncompliance Noted.Major Areas Inspected:Maint Observation, Safety Verification,Ie Notices & Circulars & Preoperational Testing IR 05000335/19820201982-06-22022 June 1982 IE Insp Rept 50-335/82-20 on 820601-04.No Noncompliance Noted.Major Areas Inspected:Instrumentation & Equipment, Respiratory Protection,Health Physics Organization & Qualifications & LER Followup IR 05000389/19820231982-06-18018 June 1982 IE Insp Rept 50-389/82-23 on 820525-28.Noncompliance Noted: Failure to Implement QA Requirements Fully IR 05000389/19820241982-06-15015 June 1982 IE Insp Rept 50-389/82-24 on 820525-28.No Noncompliance Noted.Major Areas Inspected:Electrical Components & Sys, Quality Records,Electrical Cables & Terminations,Work & Work Activities & Licensee Identified Items IR 05000389/19820061982-06-14014 June 1982 IE Insp Rept 50-389/82-06 on 820521-26.No Noncompliance Noted.Major Areas Inspected:Followup on Previous Inspector Findings & Witnessing RCS Hydrostatic Test IR 05000335/19820151982-06-11011 June 1982 IE Insp Repts 50-335/82-15 & 50-389/82-21 on 820411-0514. Noncompliance Noted:Failure to Implement Procedure for Locking Safety Valves in Required Position IR 05000335/19820161982-05-28028 May 1982 IE Insp Repts 50-335/82-16 & 50-389/82-18 on 820426-30.No Noncompliance Noted.Major Areas Inspected:Qa Program Design Control Procurement,Const of Facility & Interviews W/ Personnel IR 05000389/19820191982-05-26026 May 1982 IE Insp Rept 50-389/82-19 on 820426-30.No Noncompliance Noted.Major Areas Inspected:Preservice insp,safety-related Structures Outside Containment,Previous Insp Findings & Licensee Identified Items IR 05000335/19820141982-05-20020 May 1982 IE Insp Rept 50-335/82-14 on 820419-22.No Noncompliance Noted.Major Areas Inspected:Qc & Confirmatory Measurements Including Review of Lab QC Program,Chemistry & Radiochemistry Procedures & Airborne Effluent Sampling IR 05000389/19820131982-04-27027 April 1982 IE Insp Rept 50-389/82-13 on 820329-0402.Noncompliance Noted:Use of Incorrect Calibr Block for Psi Ultrasonic Test of Weld 123-2 IR 05000389/19820121982-04-0707 April 1982 IE Insp Rept 50-389/82-12 on 820317-19.Noncompliance Noted: Design & Installation of Fire Protection Yard Piping Sys Not Specified to Meet Requirements of NFPA-24 1999-10-08 Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS MONTHYEARIR 05000335/19990111999-10-0808 October 1999
[Table view]Partially Deleted Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-08 (Ref 10CFR73.21).No Violations Noted. Major Areas Inspected:Plant Support Re Physical Security Program for Power Reactors PNO-II-99-037D, on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph1999-09-15015 September 1999 PNO-II-99-037D:on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph PNO-II-99-023, on 990601,one CEA Descended Into Reactor Core for Unknown Reasons,With Unit 2 Rated Power.Licensee Noted Voltage Fluctuations on CEA Power Supplies.Licensee Is Continuing to Investigate CEA Problems1999-06-0808 June 1999 PNO-II-99-023:on 990601,one CEA Descended Into Reactor Core for Unknown Reasons,With Unit 2 Rated Power.Licensee Noted Voltage Fluctuations on CEA Power Supplies.Licensee Is Continuing to Investigate CEA Problems ML20217G3081998-03-25025 March 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $88,000.Violation Noted:Licensee Failed to Correctly Translate Design Change Into Procedure ML20202D8761997-02-12012 February 1997 Investigation Rept 2-96-042 on 961106.No Noncompliance Noted.Major Areas Investigated:Allegation of Falsification & Backdating of Emergency Preparedness Document.Partially Deleted IR 05000335/19960221996-11-14014 November 1996 Insp Repts 50-335/96-22 & 50-389/96-22 on 961114.No Violations Noted.Major Areas Inspected:Aspects of Licensee Configuration Mgt & 10CFR50.59 Programs ML20134J2391996-07-31031 July 1996 Investigation Rept 2-95-008 Re Alleged Discrimination Against Instrumentation & Control Technician for Reporting Safety Concerns ML20134N0901996-01-31031 January 1996 Partially Deleted Investigation Rept 2-94-018.Allegation Not Substantiated IR 05000335/19940021994-03-11011 March 1994 Partially Withheld Insp Repts 50-335/94-02 & 50-389/94-02 on 940207-11.No Violations Identified.Major Areas Inspected:Mgt Support,Physical Security Program for Power Reactors,Audits & Alarm Stations & Communications PNO-II-93-001, on 930112,plant Commenced Shutdown Due to RCP Vibration.Unit 2 Being Placed in Cold Shutdown,Mode 5.State of Fl Notified1993-01-13013 January 1993 PNO-II-93-001:on 930112,plant Commenced Shutdown Due to RCP Vibration.Unit 2 Being Placed in Cold Shutdown,Mode 5.State of Fl Notified IR 05000335/19920231992-12-14014 December 1992 Partially Withheld Insp Repts 50-335/92-23 & 50-389/92-23 on 921130-1204 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Vital Area Barriers & Alarms, Lighting,Assessment & Testing,Maint & Compensatory Measures IR 05000335/19910131991-07-11011 July 1991 Insp Repts 50-335/91-13 & 50-389/91-13 on 910610-14.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program for Nuclear Power Reactors,Mgt,Plans, Audits,Barriers,Detection & Assessment Aids IR 05000335/19910041991-04-15015 April 1991 Insp Repts 50-335/91-04 & 50-389/91-04 on 910123-0318.No Violations Noted.Major Areas Inspected:Plant Operations Review,Maint & Surveillance Observations,Review of Special Repts & Review of Nonroutine Events IR 05000335/19900251990-11-0707 November 1990 Partially Withheld Insp Repts 50-335/90-25 & 50-389/90-25 on 901009-12.Noncited Violation Noted.Major Areas Inspected: Records & Repts,Alarm Stations,Communication & Training IR 05000335/19900261990-10-31031 October 1990 Insp Repts 50-335/90-26 & 50-389/90-26 on 901022-26.No Violations or Deviations Noted.Major Areas Inspected: Isi,Including Review of Unit 1 Plan for Outage & Associated ISI Administration Procedures PNO-II-90-048, on 900820,shutdown of Unit 2 in Excess of 48 H.Caused by High Vibration of Main Generator Exciter Bearing.Licensee Expanding Scope of Insp & Root Cause Analysis.Unit Scheduled to Begin Refueling Outage on 9009151990-08-22022 August 1990 PNO-II-90-048:on 900820,shutdown of Unit 2 in Excess of 48 H.Caused by High Vibration of Main Generator Exciter Bearing.Licensee Expanding Scope of Insp & Root Cause Analysis.Unit Scheduled to Begin Refueling Outage on 900915 PNO-II-89-066, licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies1989-09-21021 September 1989 PNO-II-89-066:licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies IR 05000335/19890111989-05-15015 May 1989 Partially Withheld Safeguards Insp Repts 50-335/89-11 & 50-389/89-11 on 890327-31 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plan Audits & Protected & Vital Area Barriers IR 05000335/19880231988-11-0202 November 1988 Insp Repts 50-335/88-23 & 50-389/88-23 on 880925-30.No Violations Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness & Security Organization.Details Withheld (Ref 10CFR2.790(d) & 73.21) ML20151Y6841988-08-16016 August 1988 Partially Withheld Insp Repts 50-335/88-20 & 50-389/88-20 on 880803 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected:Circumstances Surrounding Failure to Control Access to Vital Area IR 05000335/19880111988-06-14014 June 1988 Insp Repts 50-335/88-11 & 50-389/88-11 on 880523-26.No Violations or Deviations Noted.Major Areas Inspected:Special Nuclear Matl Control & Accounting IR 05000335/19880121988-06-0909 June 1988 Partially Withheld Insp Repts 50-335/88-12 & 50-389/88-12 on 880516-20 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Security Program Audit,Security Sys Power Supply & Communications PNO-II-87-069, on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations1987-10-13013 October 1987 PNO-II-87-069:on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations PNO-II-87-066, on 871008,licensee Calculated Leakage Above Required Tech Spec Limits.Cause Could Not Be Identified. Reactor Shut Down Based on Leakage & Results of Containment Insp1987-10-0606 October 1987 PNO-II-87-066:on 871008,licensee Calculated Leakage Above Required Tech Spec Limits.Cause Could Not Be Identified. Reactor Shut Down Based on Leakage & Results of Containment Insp ML20235J2471987-09-24024 September 1987 Insp Repts 50-335/87-19 & 50-389/87-18 on 870825-0904.No Violations or Deviations Noted.Major Areas Inspected: Evaluation of Annual Emergency Preparedness Exercise. Exercise Scope & Objectives Encl ML20215K8951987-06-17017 June 1987 Exam Rept 50-335/OL-87-01 on 870420-22.Exam Results:Six Reactor Operators & Two Senior Reactor Operators Passed Oral & Written Exams.Master Exams Encl IR 05000335/19870021987-03-20020 March 1987 Partially Withheld Insp Repts 50-335/87-02 & 50-389/87-02 on 870217-26 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Area Inspected:Intrusion Detection Sys Being Employed as Detection Aid in Canal Opening PNO-II-87-019, Region II Will Dispatch Augmented Insp Team on 870319 to Review Circumstances Associated W/Problem Re Possible Corrosion Caused by Deposits of Crystalline Boric Acid on Reactor Head & Surrounding Areas1987-03-18018 March 1987 PNO-II-87-019:Region II Will Dispatch Augmented Insp Team on 870319 to Review Circumstances Associated W/Problem Re Possible Corrosion Caused by Deposits of Crystalline Boric Acid on Reactor Head & Surrounding Areas IR 05000335/19870011987-02-26026 February 1987 Insp Repts 50-335/87-01 & 50-389/87-01 on 870113-0207.No Violations or Deviations Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Qa Practices,Station & Corporate Mgt Practices & Overall Plant Operations ML20211H2511987-02-0606 February 1987 Exam Rept 50-335/OL-86-02 on 861117.Exam Results:All Candidates Passed Oral & Written Exams & One Senior Reactor Operator Passed Written Reexam IR 05000335/19860271987-01-26026 January 1987 Insp Repts 50-335/86-27 & 50-389/86-26 on 861216-870112.No Violations or Deviations Noted.Major Areas Inspected:Onsite Activities for Tech Spec Compliance,Operator Performance, Site Security Procedures & QA Practices ML20207J1891986-12-17017 December 1986 Insp Repts 50-335/86-25 & 50-389/86-24 on 861117-21.No Violations or Deviations Noted.Major Areas Inspected:Maint & Mod Welding,Inservice Testing Program for ASME Class 1,2 & 3 Pumps & Valves & Inspector Followup Items IR 05000335/19860131986-12-0101 December 1986 SALP Repts 50-335/86-13 & 50-389/86-12 for Nov 1984 - Apr 1986 PNO-II-86-066, on 860920,leaking Relief Valve on Storage Tube on Hydrogen Trailer Discovered.Other Tubes Isolated from Leak,Area Roped Off & Smoking Prohibited.Event Terminated on 8609211986-09-22022 September 1986 PNO-II-86-066:on 860920,leaking Relief Valve on Storage Tube on Hydrogen Trailer Discovered.Other Tubes Isolated from Leak,Area Roped Off & Smoking Prohibited.Event Terminated on 860921 ML20212P2101986-08-26026 August 1986 Partially Withheld Physical Security Insp Repts 50-335/86-19 & 50-389/86-18 on 860804-08 (Ref 10CFR2.790 & 73.21). Violation Noted:Vehicle Control IR 05000335/19860111986-08-0707 August 1986 Partially Withheld Insp Repts 50-335/86-11,50-389/86-10, 50-335/86-17 & 50-389/86-16 on 860414-0625 (Ref 10CFR2.790 & 73.21).Violation Noted:Failure to Provide Access Control to Vital Areas ML20204H7291986-08-0404 August 1986 EN-86-059:on 860807,notice of Violation & Proposed Imposition of Civil Penalties in Amount of $25,000 Will Be Issued to Licensee Based on Failure to Provide Adequate Barriers to Equipment & Inadequate Security Insps ML20205B1211986-07-25025 July 1986 Exam Rept 50-335/OL-86-01 on 860610-12.Exam Results:Three of Four Senior Reactor Operator Candidates Passed Written Exam & All Four Passed Oral Exam & One Reactor Operator Candidate Failed Oral & Written Exam.Exam Encl PNO-II-86-040, on 860606,util Took Facility Out of Svc to Begin Plugging 17 Degraded Steam Generator Tubes.Unit Will Be Shut Down Approx 2 Wks.Tube Degradation Discovered on 860523 in Eddy Current Data Taken During Oct-Dec 19851986-06-0909 June 1986 PNO-II-86-040:on 860606,util Took Facility Out of Svc to Begin Plugging 17 Degraded Steam Generator Tubes.Unit Will Be Shut Down Approx 2 Wks.Tube Degradation Discovered on 860523 in Eddy Current Data Taken During Oct-Dec 1985 PNO-II-86-032, on 860428,iron Workers Employed by Util Contractor Walked Off Job & Set Up Picket Lines at All Four Entrances to Facility.Union Workers Refusing to Cross Picket Lines.Security Forces & Senior Reactor Operators on Job1986-04-28028 April 1986 PNO-II-86-032:on 860428,iron Workers Employed by Util Contractor Walked Off Job & Set Up Picket Lines at All Four Entrances to Facility.Union Workers Refusing to Cross Picket Lines.Security Forces & Senior Reactor Operators on Job ML20140B6311986-03-11011 March 1986 Exam Rept 50-335/OL-85-02 on 851216-20.Exam Results:All 16 Candidates Administered Oral Exams Passed & 14 of 15 Candidates Administered Written Exams Passed IR 05000335/19850351986-01-17017 January 1986 Physical Security Insp Repts 50-335/85-35 & 50-389/85-35 on 851216-20.No Violations Noted.Major Areas Inspected:Mgt effectiveness-security Program & Security Organization. Details Withheld (Ref 10CFR2.790(d) & 73.21) PNO-II-86-004, on 851203,util Discovered That Individual Cleaning Sludge Out of Steam Generator Received Higher than Expected Exposure in Late Nov/Early Dec.Caused by Lack of whole-body TLD Other than TLD on Upper Arm1986-01-0909 January 1986 PNO-II-86-004:on 851203,util Discovered That Individual Cleaning Sludge Out of Steam Generator Received Higher than Expected Exposure in Late Nov/Early Dec.Caused by Lack of whole-body TLD Other than TLD on Upper Arm PNO-II-85-110A, on 851122,Hurricane Kate Downgraded to Tropical Storm.No Adverse Effects Occurred to Licensed Facilities in Storm Path1985-11-22022 November 1985 PNO-II-85-110A:on 851122,Hurricane Kate Downgraded to Tropical Storm.No Adverse Effects Occurred to Licensed Facilities in Storm Path PNO-II-85-110, on 851119,Hurricane Kate Centered Slightly Inland Over North Central Cuba,About 150 Miles South of Key West,Fl.Diesel Generators at All Three Sites Operable.Turkey Point Declared Unusual Event on 8511181985-11-19019 November 1985 PNO-II-85-110:on 851119,Hurricane Kate Centered Slightly Inland Over North Central Cuba,About 150 Miles South of Key West,Fl.Diesel Generators at All Three Sites Operable.Turkey Point Declared Unusual Event on 851118 PNO-II-85-105A, on 851109,minor Damage to Regular Lifting Rig Identified Following Lifting of Core Internals Upper Guide Structure Free of Reactor Vessel.Unusual Event Declared on 851106 Terminated1985-11-12012 November 1985 PNO-II-85-105A:on 851109,minor Damage to Regular Lifting Rig Identified Following Lifting of Core Internals Upper Guide Structure Free of Reactor Vessel.Unusual Event Declared on 851106 Terminated PNO-II-85-105, on 851106,while Removing Core Internals Upper Guide Structure,One Lifting Rig Attachment Failed.Refueling Operations Halted W/Structure in Apparently Stable Position. NSSS Vendor Being Contacted1985-11-0606 November 1985 PNO-II-85-105:on 851106,while Removing Core Internals Upper Guide Structure,One Lifting Rig Attachment Failed.Refueling Operations Halted W/Structure in Apparently Stable Position. NSSS Vendor Being Contacted IR 05000335/19850211985-10-0808 October 1985 Insp Repts 50-335/85-21 & 50-389/85-21 on 850813-0923.No Violation or Deviation Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Qa Practices & Site Security Procedures IR 05000335/19850241985-10-0101 October 1985 Physical Security Insp Repts 50-335/85-24 & 50-389/85-24 on 850916-20.No Violations Noted.Major Areas Inspected:Mgt Effectiveness & Security Program.Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000387/19850291985-09-23023 September 1985 Meeting Repts 50-387/85-29 & 50-388/85-24 on 850828 Re Rescheduling of Senior Reactor Operator Licensing Exam. Region Agreed to Administer One Instructor Certification & One Senior Operator Exam on 851120 & 21,respectively 1999-09-15 |
Inspection Report - Saint Lucie - 1999011 | |
---|---|
Assessments
|
Text
Y .
'
,
.
itlGUA.' .. . . ai .
.uN
.
EXECUTIVE SUMMARY St. Lucie Nuclear Plant, Units 1 & 2 NRC Inspection Repod Nos. 50-335/99-11,50-389/99-11 This routine, announced inspec0on was conducted in the area of plant support by a Regional Safeguards inspector. The specific area evaluated was the Physical Security Program for Power Reactor .
The licensee appropriately notified employees to report arrests as require The licensee's initial justification for changing response weapons did not contain sufficient information to support making the change under the provisions of 10 CFR 50.S4(p). Adequate justification was subsequently provide Unresolved item 50-335,50-389/99-10-01 was closed based on documentation reviewed that did not substantiate that violations of the Physical Security Plan occurred. A subsequent Operational Safeguards Response Evaluation demonstrated that the licensee had an effective strategy that could protect vital equipment from radiological sabotag .
[eMiransmftted hem
- - :t;rt.Lvounc!:.85fSed 9910220034 991008 "** 8-PDR ADOCK 05000335 G PDR