IR 05000389/1982036
| ML20027B077 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 08/16/1982 |
| From: | Jape F, Landis K, Taylor P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20027B076 | List: |
| References | |
| 50-389-82-36, NUDOCS 8209160334 | |
| Download: ML20027B077 (3) | |
Text
I O
'
- "'%,k UNITED STATES NUCLEAR REGULATORY COMMISSION
+
E\\
REGION 11 g
,
E 101 MARIETTA ST., N.W, SUITE 3100 o'
f ATLANTA, GEORGIA 30303 s...../
Report No. 50-389/82-36 Licensee:
Florida Power and Light Company P. O. Box 529100 Miami, FL 33152 Facility Name:
St. Lucie Unit 2 Docket No. 50-389 License No. CPPR-144 Inspection at St. Lucie site near Fort Pierce, Florida E A. TaylYr[$<
C 9-/6-$1 Inspectors: v
)
Date Signed M_
(L)
N W l6 03'
'
.
K. Landi s.
Date 'Si gned F. Jape', $sction Chief f
-
' C [k Approved by:~
, fLf n cf;/
'
D6te Sfgned Engineering Inspection Branc[h/f Division of Engineering and Technical Programs SUMMARY Inspection on August 2-6, 1982 Areas Inspected This routine, unannounced inspection involved 62 inspector-hours on site in the areas of preoperational test procedure review; evaluation of test results; plant tour and verification that tests are evaluated by the licensee.
Results Of the four areas inspected, no violations or deviations were identified.
8209160334 820817 PDR ADOCK 05000389 G
_ _ _ _ - _
_
'
.
REPORT DETAILS 1.
Persons Contacted Licensee Employees
- C. M. Wethy, Plant Manager, Unit 1
- B. J. Escue, Site Manager, Unit 2
- G. J. Boissy, Startup Superintendent
- N. Roos, Quality Control Supervisor R. F. Dawson, Lead Mechanical Engineer H. Bishop, Lead Electrical Engineer W. S. Windecker, Planning and Scheduling Supervisor G. Kozlowski, Vault Custodian Other Organizations
- G. E. Grace, EBASCO, Licensing Engineer
- G. H. Krauss, EBASCO, Project Engineer NRC Resident Inspector
- S. Elrod, Senior Resident Inspector
- Attended exit interview 2.
Exit Interview The inspection scope and findings were summarized on August 6,1982, with those persons indicated in paragraph 1 above. The licensee acknowledged the inspection findings.
3.
Licensee Action on Previous Enforcement Matters Not inspected.
4.
Unresolved Items Unresolved items were not identified during this inspection.
5.
Preoperational Test Procedure Review (70303)
The inspector reviewed the following preoperational test procedures:
2-0030190, Rev. 0
-
Remote Cold Shutdown Demonstration 2-0700081, Rev. 0
-
Auxiliary Feedwater System Functional Test 2-0120087, Rev. 1
-
Quench Tank Preoperational Test 2-0310081, Rev. 0
-
Component Cooling Water Pump Initial Run 2-0410084, Rev. 1
-
High Pressure Safety Injection System Pump Initial Run
'
_
_-
=..e
2-1010080, Rev. 0
-
Instrument Air System Preoperational and Functional Test 2-1560081, Rev. 0
-
Primary Water Pumps Initial Operation These procedures were reviewed to verify that they were consistent with FSAR Chapter 14 - and Regulatory Guide 1.68 commitments and that the procedures contain the required committee reviews, management approval, specified format, precautions and acceptance criteria.
Within the areas inspected no violations or deviations were identified.
6.
Preoperational Test Data Evaluation (70320)(70329)
The inspectors reviewed use following completed test procedures:
2-1560081, Rev. 0
-
Primary Water Pump Initial Operation 2-0120087,-Rev. 1
-
Quench Tank Preoperational Test 2-1010080, Rev. 0
-
Instrument Air System Preoperational and Functional Test 2-0310081, Rev. 0
-
Component Cooling Water Pump Initial Run 2-0410084, Rev. 1
-
High Pressure Safety Injection System Pump Initial Run The inspectors reviewed the results of the above completed test procedure to'
verify that:
-
The test results met system design criteria as described in the vendor's technical manual and applicable section of the FSAR.
-
Test steps, data sheets were initialed and dated as required.
-
Revisions to procedures were issued in accordance with administrative controls.
-
Deficiencies identified during the test were evaluated and corrective action identified as required.
-
The licensee has evaluated the test results as required by administra-tive controls.
Within the areas inspected, no violations or deviations were identified.
7.
Plant Tour (71302)
The inspector toured the controi room, reactor auxiliary building, contain-ment building and the diesel generator building to observe work activities in progress, housekeeping, and tag centrols on equipment.
Within the areas inspected no violations or deviations were identified.