Text
(AR 880 UNITED STATES 0g[o NUCLEAR REGULATORY COMMISSION e,,
q
\\
O
,
o REGloN II
,
O%
'- c 101 F ARIE FTA STRE ET. N.W.
ATLANTA. GEORGIA 30303 o
%
..+ /
+
Report No. 50-389/82-31 Licensee:
Florida Power and Ligat Company P. O. Box 529100 Miami, FL 33152 Facility Name:
St. Lucie Unit 2 Docket No. 50-389 License No. CPPR-144 Inspection at St. Lucie site near Fort Pierce, Florida
/1 b
Inspector:.P. A. Taylo,r)
Date Signed 7-/Y-F2_
Accompanying Personnel:
F. Jape, USNRC, RII
//(6+L d s2 C
[D Approved by:_F. Jape, Section Chief//
/
' Date Signed Engineering Inspection BMnch Division of Enginee-ing and Technical Programs SUMMARY Inspection on June 30 - July 2,1982 Areas Inspected This routine, unannounced inspection involved 30 inspector-hours onsite in the areas of methods for evaluating plant emergency; maintenance and operating procedures; review of the preoperational test program and plant tour.
Results Of the three areas inspected, no violations or deviations were identified.
8208030459 820715 PDR ADOCK 05000389 G
,
l l
__
-
_ _ _ _ -
_ _ _ _ _ _ _ _ _ _ _ _ _
..
.
-
REPORT DETAILS 1.
Persons Contacted Licensee Employees
- C. M. Wethy, Plant Manager
- G. J. Boissy, Startup Superintendent R. E. Dawson, Lead Mechanical Engineer J. H. Barrow, Operating Superintendent NRC Resident Inspector S. Elrod, Senior Resident Inspector H. Bibb, Resident Inspector
- Attended exit interview 2.
Exit Interview The inspection scope and findings were summarized on July 2,1982, with those persons indicated in paragraph 1 above. Licensee management acknowl-edged the inspection findings without significant comment.
3.
Licensee Action on Previous Inspection Findings Not inspected.
4.
Unresolved Items Unresolved items were not identified during this inspection.
5.
Plant Tour (713028)
The inspector toured the control room, auxiliary building, containment building, and the diesel generator building to observe work activities in progress, housekeeping and tag controls on equipment. -
Within the areas inspected no violations or deviations were identified.
6.
Preoperational Test Program (70302B)
The inspector held discussions with the Startup Superintendent and members of his staff concerning the status of plant system turnover, test sched-uling,. test procedure issuance and the schedule for integrated hot func-tional testing.
The licensee indicated that an early September 1982 time frame is planned to start hot functional testing.
I
____
_
.
. _ _
-
r
..
.
The inspector reviewed portions of the licensee's Startup Manual regarding the startup organization, training requirements, and the startup program administrative controls.
Within the area reviewed no violations or deviations were identified.
7.
Emergency Operating Procedures (424528)
A discussion was held with licensee inanagement on the status of emergency operating procedures (EOP) for St. Lucie Unit 2.
The licensee explained that E0Ps are being prepared, but approval is being held until the technical guidelines and a writer's guide are issued. The E0Ps being prepared will comply with action item IC1, NUREG 0737 Clarification of TMI Action Plan Requirements.
Procedures for St. Lucie Unit 2 are currently being prepared using QI 5-PR/PSL-1. This instruction provides guidance for procedure preparation, revision, and approval to comply with Regulatory Guides 1.33 and 1.68.
A format and technical content are described within this instruction.
Licensee management stated that it is their intention to have E0Ps issued with sufficient time for operator training and NRC inspector review.