IR 05000335/1990010

From kanterella
Jump to navigation Jump to search
Partially Withheld Insp Repts 50-335/90-10 & 50-389/90-10 on 900319-23 (Ref 10CFR2.790 & 73.21).Major Areas Inspected: Physical Security Program,Including Security Mgt,Program Plans,Audits & Protected & Vital Area Barriers
ML20042E043
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 04/06/1990
From: Mcguire D, Tillman A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20042E042 List:
References
50-335-90-10, 50-389-90-10, NUDOCS 9004190102
Download: ML20042E043 (1)


Text

--

-

_

..

SAFEGUM,RSJh!FORMATl0N

,[p..%*o NUCLEA] CEGULATORY COMMISSION

[

REGION il c

y

{

101 MARIETT A ST RE ET. N.W.

ATLANT A, G EORGI A 30323

\\.....le l

l Report Nos.:

50-335/90-10 and 50-389/90-10 Licensee:

Florida Power and Light Company 9250 West Flagler Street Miami, FL 33102 Docket Nos.: 50-335 and 50-389 License Nos.:

DPR-67 and NPF-16 Facility Name: St. Lucie 1 and 2 Inspection Conduc ed: March 19-23, 1990 Inspector:

(/ W h d 4 k h h~N A. Tillman, Sdfeguards ins @ctor Date Signed

<

Approved by:

s3

4 D.'R W Guire, Chief Dste/ Signed

,

Safeguards Section Nuclear Materails Safety and Safeguards Branch Division of Radiation Safety and. Safeguards SUMMARY Scope:

This routine, unannounced inspection was conducted in the areas of Physical Security Program for Power Reactors:

Specifically, Security Management, Security Program Plans, and Audits; Protected and Vital Area Barriers, Detection and Assessment Aids; Protected and Vital Area Access Control of Personnel, Packages and Vehicles; Alarm Stations and Communications; Testing, Maintenance, and Compensatory measures.

,

Results:

In the areas inspected, no cited violations of regulatory requirements were identified...However, one licensee identified, noncited violation relating to a potential unprotected pathway into the protected area was confirmed.

inspection results indicate continued efforts to upgrade and enhance the effectiveness of the security program as evidenced by the recent upgrade of the intrusion detection equipment on the protected area perimeter adjacent to the discharge canal and the programmed installation of. underwater intrusion detection equipment at the intake canal.

Security personnel contacted during the inspection demonstrated professionalism and a high level of job knowledge.

9004190102 900406 PDR ADOCK 05000333 Q

PDC

.

n

,,y,

BAFEGUARDS INFORUtATIONgyMg%