IR 05000389/1982006

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-389/82-06 on 820521-26.No Noncompliance Noted.Major Areas Inspected:Followup on Previous Inspector Findings & Witnessing RCS Hydrostatic Test
ML20054M944
Person / Time
Site: Saint Lucie 
Issue date: 06/14/1982
From: Fiedler R, Jape F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20054M939 List:
References
50-389-82-06, 50-389-82-6, NUDOCS 8207150177
Download: ML20054M944 (4)


Text

.

.

.. _ - -

---

__

..

/

'o UNITED STATES g

NUCLEAR REGULATORY COMMISSION o

,

$

A REGION ll

'#

o 101 MARIETTA ST., N.W., SUITE 3100 I

.

ATLANTA, GEORGIA 30303

.....o

.

i

Report No. 50-389/82-06 Licensee:

Florida Power and Light Company 9250 West Flagler Street Miami, FL 33101 Facility Name:

St. Lucie Docket No. 50-389 License No. CPPR-144

i j

Inspection at St. Lucie pite near Ft. Pierce, Florida

'

Inspector:

[- / 9 - 82

R. L. Fiedl r Date Signed 3[tWu d[

/'/

M Approved by:_F. Japd, Section Chief /

Date Signed

'

Engineering Inspection Branch Division of Engineering and Technical Programs SUMMARY

Inspection on May 21-26, 1982 Areas Inspected This routine, unannounced inspection involved 43 inspector-hours on site in the

,

areas of followup on previous inspector findings ano witnessing the reactor

,

coolant system hydrostatic test.

'

Results Of the two areas inspected, no violations or deviations were identified, s

'

8207150177 820618 PDR ADOCK 05000389 G

PDR j

-

.

-

-

-.. --.-

. -,

-

.,. _

- -. -.. -

. - -.

.

._

,

REPORT DETAILS 1.

Persons Contacted Licensee Employees

  • B. J. Escue, Site Manager
  • C. M. Wethy, Plant Manager
  • G. J. Boissy, Startup Superintendent
  • N. G. Roos, QC Supervisor
  • H. S. Ruf f, QC
  • N. Weems, OA
  • J. L. Parker, PQCS R. E. Dawson, Startup Lead Mechanical Engineer W. S. Windecker, Planning and Scheduling Supervisor L. Cornman, Startup D. Stewart, Startup Other licensee employees contacted included construction craftsmen, technicians, and operators.

NRC Resident Inspector

  • S. A. El rod
  • H. E. Bibb
  • Attended exit interview 2.

Exit Interview l

The inspection scope and findings were summarized on May 26, 1982, with j

those person? indicated in paragraph 1 above. The licensee acknowledged the findings aru made no comment.

,

3.

Licensee Action or Previous Inspection Findings Not inspectad.

4.

Unresolved Items

Unresolved items were not identified during this inspection.

5.

Followup on Previously Identified Items a.

(Closed) IFI 389/81-17-02 - Method to coordinate the conduct of testing such as a shift test supervisor located at a central location such as the control room. During the performance of the hydrostatic pressure test of the reactor coolant system the inspector observed that a shift test super.isor was assigned and located in the control room to coordinate testing. This item is closed.

.

-

.

b.

(Closed)

IFI 389/81-17-04 - Documenting satisfactory completion of required retesting on Field Discrepancy Report ( FDR).

The Unit 2 system re-entry request form has been revised to include provisions for documenting completion of retest requirements. A review of currently completed FORs shows that the retesting performed is documented in the comments section of the FDR form. This item is closed.

c.

(Closed) IFI 389/81-17-05 - Administrative procedures do not sp :1fy that revisions to procedures and the results of procedures be reviewed by the same persons which reviewed and approved the original procedure when possible. Even though this is a recommended practice there is no requirement for this action. This item is closed.

d.

(Closed) IFI 389/81-17-07 - Members which make up the Preoperational Test Review Group (PTRG) or their required qualifications are not described in the FSAR.

Amendment 9 to Section 14.2.3 of the FSAR describes the makeup of the PTRG and the qualifications of the members.

This item is closed.

e.

(Closed) IFI 389/81-17-08 - Participation by the NSSS vendor and architect-engineer in reviewing appropriate preoperational test procedures and test results.

Amendment 9 to Section 14.2.2.3 of the FSAR adequately addressed this concern.

The inspector also verified that vendors do participate in both the review of procedures and the review of test results. This item is closed f.

(Closed) IFI 389/81-23-02 - Periodic training in the area cf admin-istrative controls, for personnel involved in the test program. A review of the current training records of the Startup Group shows that test personnel have been receiving periodic training in the startup program. This item is closed.

6.

Witnessing Reactor Coolant System Hydrostatic Test The inspector observed portions of the following preoperational tests:

a.

Hydrostatic Pressure Test of the Reactor Coolant System and High l

l Pressure Portions of Associated Systems 2-0120080, Revision 1.

b.

Reactor Coolant Pump Initial Run 2-0120094, Revision 0

l

'

The above tests were observed by the inspector to verify the following:

a.

That an approved procedure of the appropriate revision was available and in use by all test personnel, b.

That test prerequisites were met.

c.

That special test equipment required by the procedure was calibrated and in service.

l t

t a

e

.

d.

That the test procedure was being followed.

e.

That changes to the procedure were documented and approved as required.

f.

That communications were established as required.

g.

That RT-NDT limitations were complied with, h.

That reactor coolant system water samples were taken and analyzed as required and that chemistry specifications were met, i.

That representatives of quality assurance monitored the conduct of the test.

j.

That personnel involved with the test were knowledgeable of the test requirements and status.

k.

That personnel from the Power Operations Group (future Unit 2 licensed operators) participated in the test.

.

The conduct of the test appeared satisfactory and there were no violations or deviations identified.