Category:INSPECTION REPORT
MONTHYEARIR 05000335/19990111999-10-0808 October 1999 Partially Deleted Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-08 (Ref 10CFR73.21).No Violations Noted. Major Areas Inspected:Plant Support Re Physical Security Program for Power Reactors IR 05000335/19960221996-11-14014 November 1996 Insp Repts 50-335/96-22 & 50-389/96-22 on 961114.No Violations Noted.Major Areas Inspected:Aspects of Licensee Configuration Mgt & 10CFR50.59 Programs IR 05000335/19940021994-03-11011 March 1994 Partially Withheld Insp Repts 50-335/94-02 & 50-389/94-02 on 940207-11.No Violations Identified.Major Areas Inspected:Mgt Support,Physical Security Program for Power Reactors,Audits & Alarm Stations & Communications IR 05000335/19920231992-12-14014 December 1992 Partially Withheld Insp Repts 50-335/92-23 & 50-389/92-23 on 921130-1204 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Vital Area Barriers & Alarms, Lighting,Assessment & Testing,Maint & Compensatory Measures IR 05000335/19910131991-07-11011 July 1991 Insp Repts 50-335/91-13 & 50-389/91-13 on 910610-14.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program for Nuclear Power Reactors,Mgt,Plans, Audits,Barriers,Detection & Assessment Aids IR 05000335/19910041991-04-15015 April 1991 Insp Repts 50-335/91-04 & 50-389/91-04 on 910123-0318.No Violations Noted.Major Areas Inspected:Plant Operations Review,Maint & Surveillance Observations,Review of Special Repts & Review of Nonroutine Events IR 05000335/19900251990-11-0707 November 1990 Partially Withheld Insp Repts 50-335/90-25 & 50-389/90-25 on 901009-12.Noncited Violation Noted.Major Areas Inspected: Records & Repts,Alarm Stations,Communication & Training IR 05000335/19900261990-10-31031 October 1990 Insp Repts 50-335/90-26 & 50-389/90-26 on 901022-26.No Violations or Deviations Noted.Major Areas Inspected: Isi,Including Review of Unit 1 Plan for Outage & Associated ISI Administration Procedures IR 05000335/19890111989-05-15015 May 1989 Partially Withheld Safeguards Insp Repts 50-335/89-11 & 50-389/89-11 on 890327-31 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plan Audits & Protected & Vital Area Barriers IR 05000335/19880231988-11-0202 November 1988 Insp Repts 50-335/88-23 & 50-389/88-23 on 880925-30.No Violations Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness & Security Organization.Details Withheld (Ref 10CFR2.790(d) & 73.21) ML20151Y6841988-08-16016 August 1988 Partially Withheld Insp Repts 50-335/88-20 & 50-389/88-20 on 880803 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected:Circumstances Surrounding Failure to Control Access to Vital Area IR 05000335/19880111988-06-14014 June 1988 Insp Repts 50-335/88-11 & 50-389/88-11 on 880523-26.No Violations or Deviations Noted.Major Areas Inspected:Special Nuclear Matl Control & Accounting IR 05000335/19880121988-06-0909 June 1988 Partially Withheld Insp Repts 50-335/88-12 & 50-389/88-12 on 880516-20 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Security Program Audit,Security Sys Power Supply & Communications ML20235J2471987-09-24024 September 1987 Insp Repts 50-335/87-19 & 50-389/87-18 on 870825-0904.No Violations or Deviations Noted.Major Areas Inspected: Evaluation of Annual Emergency Preparedness Exercise. Exercise Scope & Objectives Encl IR 05000335/19870021987-03-20020 March 1987 Partially Withheld Insp Repts 50-335/87-02 & 50-389/87-02 on 870217-26 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Area Inspected:Intrusion Detection Sys Being Employed as Detection Aid in Canal Opening IR 05000335/19870011987-02-26026 February 1987 Insp Repts 50-335/87-01 & 50-389/87-01 on 870113-0207.No Violations or Deviations Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Qa Practices,Station & Corporate Mgt Practices & Overall Plant Operations IR 05000335/19860271987-01-26026 January 1987 Insp Repts 50-335/86-27 & 50-389/86-26 on 861216-870112.No Violations or Deviations Noted.Major Areas Inspected:Onsite Activities for Tech Spec Compliance,Operator Performance, Site Security Procedures & QA Practices ML20207J1891986-12-17017 December 1986 Insp Repts 50-335/86-25 & 50-389/86-24 on 861117-21.No Violations or Deviations Noted.Major Areas Inspected:Maint & Mod Welding,Inservice Testing Program for ASME Class 1,2 & 3 Pumps & Valves & Inspector Followup Items ML20212P2101986-08-26026 August 1986 Partially Withheld Physical Security Insp Repts 50-335/86-19 & 50-389/86-18 on 860804-08 (Ref 10CFR2.790 & 73.21). Violation Noted:Vehicle Control IR 05000335/19860111986-08-0707 August 1986 Partially Withheld Insp Repts 50-335/86-11,50-389/86-10, 50-335/86-17 & 50-389/86-16 on 860414-0625 (Ref 10CFR2.790 & 73.21).Violation Noted:Failure to Provide Access Control to Vital Areas IR 05000335/19850351986-01-17017 January 1986 Physical Security Insp Repts 50-335/85-35 & 50-389/85-35 on 851216-20.No Violations Noted.Major Areas Inspected:Mgt effectiveness-security Program & Security Organization. Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000335/19850211985-10-0808 October 1985 Insp Repts 50-335/85-21 & 50-389/85-21 on 850813-0923.No Violation or Deviation Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Qa Practices & Site Security Procedures IR 05000335/19850241985-10-0101 October 1985 Physical Security Insp Repts 50-335/85-24 & 50-389/85-24 on 850916-20.No Violations Noted.Major Areas Inspected:Mgt Effectiveness & Security Program.Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000387/19850291985-09-23023 September 1985 Meeting Repts 50-387/85-29 & 50-388/85-24 on 850828 Re Rescheduling of Senior Reactor Operator Licensing Exam. Region Agreed to Administer One Instructor Certification & One Senior Operator Exam on 851120 & 21,respectively IR 05000335/19850231985-09-17017 September 1985 Insp Repts 50-335/85-23 & 50-389/85-23 on 850826-30.No Violation or Deviation Noted.Major Areas Inspected:Plant Chemistry & Inservice Testing of Pumps & Valves IR 05000335/19850201985-09-0404 September 1985 Insp Repts 50-335/85-20 & 50-389/85-20 on 850709-0812. Violation Noted:Operating Procedure 2-0960030, DC Ground Isolation, Not Adequately Established & Maintained ML20133N9121985-07-25025 July 1985 Insp Repts 50-335/85-16 & 50-389/85-16 on 850624-28. Violation Noted:Failure to Control Environ Conditions for Calibr of Measuring & Test Equipment IR 05000335/19850171985-07-17017 July 1985 Insp Repts 50-335/85-17 & 50-389/85-17 on 850611-0708. Violation Noted:Unit 2 Plant Mods to Prevent Testing of Relays Not Implemented,Resulting in Plant Transient IR 05000335/19850141985-06-26026 June 1985 Insp Repts 50-335/85-14 & 50-389/85-14 on 850610-14.No Violation or Deviation Noted.Major Areas Inspected:Action on Previous Enforcement Matters,Inservice Testing of Pumps & Valves,Ie Bulletin 80-08 & Inspector Followup Items IR 05000335/19850111985-06-19019 June 1985 Insp Repts 50-335/85-11 & 50-389/85-11 on 850515-0610.No Violation or Deviation Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Overall Plant Operations & QA Practices IR 05000335/19850121985-06-12012 June 1985 Insp Repts 50-335/85-12 & 50-389/85-12 on 850513-17.No Violations or Deviations Noted.Major Areas Inspected:Maint Programs IR 05000335/19850011985-06-0505 June 1985 Safeguards Insp Repts 50-389/85-13 & 50-335/85-01 on 850512-16.No Violations or Deviations Noted.Major Areas Inspected:Security Plan & Implementing Procedures & Security Audit Program.Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000335/19850101985-05-30030 May 1985 Insp Repts 50-335/85-10 & 50-389/85-10 on 850409-0513. Violation Noted:Failure to Have Established Procedure to Properly Realign Instrument Air Portion of Main Feedwater Regulating Valve IR 05000335/19840231984-08-17017 August 1984 Insp Repts 50-335/84-23 & 50-389/84-25 on 840715-0811.No Violations or Deviations Noted.Major Areas Inspected:Plant Operation,Ie Bulletins,Unit 1 Reactor Trip & Previously Identified Items IR 05000335/19820241982-07-21021 July 1982 IE Safety Insp Repts 50-335/82-24 & 50-389/82-30 on 820628- 0701.No Noncompliance Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Training & Qualifications of contractor-supplied Temporary QC Inspectors & Records IR 05000389/19820271982-07-21021 July 1982 IE Insp Rept 50-389/82-27 on 820622-25.No Noncompliance Noted.Major Areas Inspected:Preservice Insp,Welding of Internals,Previous Insp Finding & IE Bulletins IR 05000389/19820311982-07-14014 July 1982 IE Insp Rept 50-389/82-31 on 820630-0702.No Noncompliance Noted.Major Areas Inspected:Methods for Evaluating Plant Emergency,Maint & Operating Procedures & Review of Preoperational Test Program & Plant Tour IR 05000335/19820191982-07-13013 July 1982 IE Insp Repts 50-335/82-19 & 50-389/82-25 on 820614-18.No Noncompliance Noted.Major Areas Inspected:Backfit Program, Site Organization & Onsite Design Activities IR 05000335/19820261982-07-0707 July 1982 IE Inquiry Rept 50-335/82-26 on 820615-17.Inquiry Initiated to Determine Facts Surrounding Observations That Individual of Training Staff Was Talking to Examinees Prior to Reactor Operator & Senior Reactor Operator Exams IR 05000335/19820211982-06-30030 June 1982 IE Insp Repts 50-335/82-21 & 50-389/82-26 on 820515-0610.No Noncompliance Noted.Major Areas Inspected:Maint Observation, Safety Verification,Ie Notices & Circulars & Preoperational Testing IR 05000335/19820201982-06-22022 June 1982 IE Insp Rept 50-335/82-20 on 820601-04.No Noncompliance Noted.Major Areas Inspected:Instrumentation & Equipment, Respiratory Protection,Health Physics Organization & Qualifications & LER Followup IR 05000389/19820231982-06-18018 June 1982 IE Insp Rept 50-389/82-23 on 820525-28.Noncompliance Noted: Failure to Implement QA Requirements Fully IR 05000389/19820241982-06-15015 June 1982 IE Insp Rept 50-389/82-24 on 820525-28.No Noncompliance Noted.Major Areas Inspected:Electrical Components & Sys, Quality Records,Electrical Cables & Terminations,Work & Work Activities & Licensee Identified Items IR 05000389/19820061982-06-14014 June 1982 IE Insp Rept 50-389/82-06 on 820521-26.No Noncompliance Noted.Major Areas Inspected:Followup on Previous Inspector Findings & Witnessing RCS Hydrostatic Test IR 05000335/19820151982-06-11011 June 1982 IE Insp Repts 50-335/82-15 & 50-389/82-21 on 820411-0514. Noncompliance Noted:Failure to Implement Procedure for Locking Safety Valves in Required Position IR 05000335/19820161982-05-28028 May 1982 IE Insp Repts 50-335/82-16 & 50-389/82-18 on 820426-30.No Noncompliance Noted.Major Areas Inspected:Qa Program Design Control Procurement,Const of Facility & Interviews W/ Personnel IR 05000389/19820191982-05-26026 May 1982 IE Insp Rept 50-389/82-19 on 820426-30.No Noncompliance Noted.Major Areas Inspected:Preservice insp,safety-related Structures Outside Containment,Previous Insp Findings & Licensee Identified Items IR 05000335/19820141982-05-20020 May 1982 IE Insp Rept 50-335/82-14 on 820419-22.No Noncompliance Noted.Major Areas Inspected:Qc & Confirmatory Measurements Including Review of Lab QC Program,Chemistry & Radiochemistry Procedures & Airborne Effluent Sampling IR 05000389/19820131982-04-27027 April 1982 IE Insp Rept 50-389/82-13 on 820329-0402.Noncompliance Noted:Use of Incorrect Calibr Block for Psi Ultrasonic Test of Weld 123-2 IR 05000389/19820121982-04-0707 April 1982 IE Insp Rept 50-389/82-12 on 820317-19.Noncompliance Noted: Design & Installation of Fire Protection Yard Piping Sys Not Specified to Meet Requirements of NFPA-24 1999-10-08
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000335/19990111999-10-0808 October 1999 Partially Deleted Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-08 (Ref 10CFR73.21).No Violations Noted. Major Areas Inspected:Plant Support Re Physical Security Program for Power Reactors IR 05000335/19960221996-11-14014 November 1996 Insp Repts 50-335/96-22 & 50-389/96-22 on 961114.No Violations Noted.Major Areas Inspected:Aspects of Licensee Configuration Mgt & 10CFR50.59 Programs IR 05000335/19940021994-03-11011 March 1994 Partially Withheld Insp Repts 50-335/94-02 & 50-389/94-02 on 940207-11.No Violations Identified.Major Areas Inspected:Mgt Support,Physical Security Program for Power Reactors,Audits & Alarm Stations & Communications IR 05000335/19920231992-12-14014 December 1992 Partially Withheld Insp Repts 50-335/92-23 & 50-389/92-23 on 921130-1204 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Vital Area Barriers & Alarms, Lighting,Assessment & Testing,Maint & Compensatory Measures IR 05000335/19910131991-07-11011 July 1991 Insp Repts 50-335/91-13 & 50-389/91-13 on 910610-14.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program for Nuclear Power Reactors,Mgt,Plans, Audits,Barriers,Detection & Assessment Aids IR 05000335/19910041991-04-15015 April 1991 Insp Repts 50-335/91-04 & 50-389/91-04 on 910123-0318.No Violations Noted.Major Areas Inspected:Plant Operations Review,Maint & Surveillance Observations,Review of Special Repts & Review of Nonroutine Events IR 05000335/19900251990-11-0707 November 1990 Partially Withheld Insp Repts 50-335/90-25 & 50-389/90-25 on 901009-12.Noncited Violation Noted.Major Areas Inspected: Records & Repts,Alarm Stations,Communication & Training IR 05000335/19900261990-10-31031 October 1990 Insp Repts 50-335/90-26 & 50-389/90-26 on 901022-26.No Violations or Deviations Noted.Major Areas Inspected: Isi,Including Review of Unit 1 Plan for Outage & Associated ISI Administration Procedures IR 05000335/19890111989-05-15015 May 1989 Partially Withheld Safeguards Insp Repts 50-335/89-11 & 50-389/89-11 on 890327-31 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plan Audits & Protected & Vital Area Barriers IR 05000335/19880231988-11-0202 November 1988 Insp Repts 50-335/88-23 & 50-389/88-23 on 880925-30.No Violations Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness & Security Organization.Details Withheld (Ref 10CFR2.790(d) & 73.21) ML20151Y6841988-08-16016 August 1988 Partially Withheld Insp Repts 50-335/88-20 & 50-389/88-20 on 880803 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected:Circumstances Surrounding Failure to Control Access to Vital Area IR 05000335/19880111988-06-14014 June 1988 Insp Repts 50-335/88-11 & 50-389/88-11 on 880523-26.No Violations or Deviations Noted.Major Areas Inspected:Special Nuclear Matl Control & Accounting IR 05000335/19880121988-06-0909 June 1988 Partially Withheld Insp Repts 50-335/88-12 & 50-389/88-12 on 880516-20 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Security Program Audit,Security Sys Power Supply & Communications ML20235J2471987-09-24024 September 1987 Insp Repts 50-335/87-19 & 50-389/87-18 on 870825-0904.No Violations or Deviations Noted.Major Areas Inspected: Evaluation of Annual Emergency Preparedness Exercise. Exercise Scope & Objectives Encl IR 05000335/19870021987-03-20020 March 1987 Partially Withheld Insp Repts 50-335/87-02 & 50-389/87-02 on 870217-26 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Area Inspected:Intrusion Detection Sys Being Employed as Detection Aid in Canal Opening IR 05000335/19870011987-02-26026 February 1987 Insp Repts 50-335/87-01 & 50-389/87-01 on 870113-0207.No Violations or Deviations Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Qa Practices,Station & Corporate Mgt Practices & Overall Plant Operations IR 05000335/19860271987-01-26026 January 1987 Insp Repts 50-335/86-27 & 50-389/86-26 on 861216-870112.No Violations or Deviations Noted.Major Areas Inspected:Onsite Activities for Tech Spec Compliance,Operator Performance, Site Security Procedures & QA Practices ML20207J1891986-12-17017 December 1986 Insp Repts 50-335/86-25 & 50-389/86-24 on 861117-21.No Violations or Deviations Noted.Major Areas Inspected:Maint & Mod Welding,Inservice Testing Program for ASME Class 1,2 & 3 Pumps & Valves & Inspector Followup Items ML20212P2101986-08-26026 August 1986 Partially Withheld Physical Security Insp Repts 50-335/86-19 & 50-389/86-18 on 860804-08 (Ref 10CFR2.790 & 73.21). Violation Noted:Vehicle Control IR 05000335/19860111986-08-0707 August 1986 Partially Withheld Insp Repts 50-335/86-11,50-389/86-10, 50-335/86-17 & 50-389/86-16 on 860414-0625 (Ref 10CFR2.790 & 73.21).Violation Noted:Failure to Provide Access Control to Vital Areas IR 05000335/19850351986-01-17017 January 1986 Physical Security Insp Repts 50-335/85-35 & 50-389/85-35 on 851216-20.No Violations Noted.Major Areas Inspected:Mgt effectiveness-security Program & Security Organization. Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000335/19850211985-10-0808 October 1985 Insp Repts 50-335/85-21 & 50-389/85-21 on 850813-0923.No Violation or Deviation Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Qa Practices & Site Security Procedures IR 05000335/19850241985-10-0101 October 1985 Physical Security Insp Repts 50-335/85-24 & 50-389/85-24 on 850916-20.No Violations Noted.Major Areas Inspected:Mgt Effectiveness & Security Program.Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000387/19850291985-09-23023 September 1985 Meeting Repts 50-387/85-29 & 50-388/85-24 on 850828 Re Rescheduling of Senior Reactor Operator Licensing Exam. Region Agreed to Administer One Instructor Certification & One Senior Operator Exam on 851120 & 21,respectively IR 05000335/19850231985-09-17017 September 1985 Insp Repts 50-335/85-23 & 50-389/85-23 on 850826-30.No Violation or Deviation Noted.Major Areas Inspected:Plant Chemistry & Inservice Testing of Pumps & Valves IR 05000335/19850201985-09-0404 September 1985 Insp Repts 50-335/85-20 & 50-389/85-20 on 850709-0812. Violation Noted:Operating Procedure 2-0960030, DC Ground Isolation, Not Adequately Established & Maintained ML20133N9121985-07-25025 July 1985 Insp Repts 50-335/85-16 & 50-389/85-16 on 850624-28. Violation Noted:Failure to Control Environ Conditions for Calibr of Measuring & Test Equipment IR 05000335/19850171985-07-17017 July 1985 Insp Repts 50-335/85-17 & 50-389/85-17 on 850611-0708. Violation Noted:Unit 2 Plant Mods to Prevent Testing of Relays Not Implemented,Resulting in Plant Transient IR 05000335/19850141985-06-26026 June 1985 Insp Repts 50-335/85-14 & 50-389/85-14 on 850610-14.No Violation or Deviation Noted.Major Areas Inspected:Action on Previous Enforcement Matters,Inservice Testing of Pumps & Valves,Ie Bulletin 80-08 & Inspector Followup Items IR 05000335/19850111985-06-19019 June 1985 Insp Repts 50-335/85-11 & 50-389/85-11 on 850515-0610.No Violation or Deviation Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Overall Plant Operations & QA Practices IR 05000335/19850121985-06-12012 June 1985 Insp Repts 50-335/85-12 & 50-389/85-12 on 850513-17.No Violations or Deviations Noted.Major Areas Inspected:Maint Programs IR 05000335/19850011985-06-0505 June 1985 Safeguards Insp Repts 50-389/85-13 & 50-335/85-01 on 850512-16.No Violations or Deviations Noted.Major Areas Inspected:Security Plan & Implementing Procedures & Security Audit Program.Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000335/19850101985-05-30030 May 1985 Insp Repts 50-335/85-10 & 50-389/85-10 on 850409-0513. Violation Noted:Failure to Have Established Procedure to Properly Realign Instrument Air Portion of Main Feedwater Regulating Valve IR 05000335/19840231984-08-17017 August 1984 Insp Repts 50-335/84-23 & 50-389/84-25 on 840715-0811.No Violations or Deviations Noted.Major Areas Inspected:Plant Operation,Ie Bulletins,Unit 1 Reactor Trip & Previously Identified Items IR 05000335/19820241982-07-21021 July 1982 IE Safety Insp Repts 50-335/82-24 & 50-389/82-30 on 820628- 0701.No Noncompliance Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Training & Qualifications of contractor-supplied Temporary QC Inspectors & Records IR 05000389/19820271982-07-21021 July 1982 IE Insp Rept 50-389/82-27 on 820622-25.No Noncompliance Noted.Major Areas Inspected:Preservice Insp,Welding of Internals,Previous Insp Finding & IE Bulletins IR 05000389/19820311982-07-14014 July 1982 IE Insp Rept 50-389/82-31 on 820630-0702.No Noncompliance Noted.Major Areas Inspected:Methods for Evaluating Plant Emergency,Maint & Operating Procedures & Review of Preoperational Test Program & Plant Tour IR 05000335/19820191982-07-13013 July 1982 IE Insp Repts 50-335/82-19 & 50-389/82-25 on 820614-18.No Noncompliance Noted.Major Areas Inspected:Backfit Program, Site Organization & Onsite Design Activities IR 05000335/19820261982-07-0707 July 1982 IE Inquiry Rept 50-335/82-26 on 820615-17.Inquiry Initiated to Determine Facts Surrounding Observations That Individual of Training Staff Was Talking to Examinees Prior to Reactor Operator & Senior Reactor Operator Exams IR 05000335/19820211982-06-30030 June 1982 IE Insp Repts 50-335/82-21 & 50-389/82-26 on 820515-0610.No Noncompliance Noted.Major Areas Inspected:Maint Observation, Safety Verification,Ie Notices & Circulars & Preoperational Testing IR 05000335/19820201982-06-22022 June 1982 IE Insp Rept 50-335/82-20 on 820601-04.No Noncompliance Noted.Major Areas Inspected:Instrumentation & Equipment, Respiratory Protection,Health Physics Organization & Qualifications & LER Followup IR 05000389/19820231982-06-18018 June 1982 IE Insp Rept 50-389/82-23 on 820525-28.Noncompliance Noted: Failure to Implement QA Requirements Fully IR 05000389/19820241982-06-15015 June 1982 IE Insp Rept 50-389/82-24 on 820525-28.No Noncompliance Noted.Major Areas Inspected:Electrical Components & Sys, Quality Records,Electrical Cables & Terminations,Work & Work Activities & Licensee Identified Items IR 05000389/19820061982-06-14014 June 1982 IE Insp Rept 50-389/82-06 on 820521-26.No Noncompliance Noted.Major Areas Inspected:Followup on Previous Inspector Findings & Witnessing RCS Hydrostatic Test IR 05000335/19820151982-06-11011 June 1982 IE Insp Repts 50-335/82-15 & 50-389/82-21 on 820411-0514. Noncompliance Noted:Failure to Implement Procedure for Locking Safety Valves in Required Position IR 05000335/19820161982-05-28028 May 1982 IE Insp Repts 50-335/82-16 & 50-389/82-18 on 820426-30.No Noncompliance Noted.Major Areas Inspected:Qa Program Design Control Procurement,Const of Facility & Interviews W/ Personnel IR 05000389/19820191982-05-26026 May 1982 IE Insp Rept 50-389/82-19 on 820426-30.No Noncompliance Noted.Major Areas Inspected:Preservice insp,safety-related Structures Outside Containment,Previous Insp Findings & Licensee Identified Items IR 05000335/19820141982-05-20020 May 1982 IE Insp Rept 50-335/82-14 on 820419-22.No Noncompliance Noted.Major Areas Inspected:Qc & Confirmatory Measurements Including Review of Lab QC Program,Chemistry & Radiochemistry Procedures & Airborne Effluent Sampling IR 05000389/19820131982-04-27027 April 1982 IE Insp Rept 50-389/82-13 on 820329-0402.Noncompliance Noted:Use of Incorrect Calibr Block for Psi Ultrasonic Test of Weld 123-2 IR 05000389/19820121982-04-0707 April 1982 IE Insp Rept 50-389/82-12 on 820317-19.Noncompliance Noted: Design & Installation of Fire Protection Yard Piping Sys Not Specified to Meet Requirements of NFPA-24 1999-10-08
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000335/19990111999-10-0808 October 1999 Partially Deleted Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-08 (Ref 10CFR73.21).No Violations Noted. Major Areas Inspected:Plant Support Re Physical Security Program for Power Reactors IR 05000335/19960221996-11-14014 November 1996 Insp Repts 50-335/96-22 & 50-389/96-22 on 961114.No Violations Noted.Major Areas Inspected:Aspects of Licensee Configuration Mgt & 10CFR50.59 Programs IR 05000335/19940021994-03-11011 March 1994 Partially Withheld Insp Repts 50-335/94-02 & 50-389/94-02 on 940207-11.No Violations Identified.Major Areas Inspected:Mgt Support,Physical Security Program for Power Reactors,Audits & Alarm Stations & Communications IR 05000335/19920231992-12-14014 December 1992 Partially Withheld Insp Repts 50-335/92-23 & 50-389/92-23 on 921130-1204 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Vital Area Barriers & Alarms, Lighting,Assessment & Testing,Maint & Compensatory Measures IR 05000335/19910131991-07-11011 July 1991 Insp Repts 50-335/91-13 & 50-389/91-13 on 910610-14.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program for Nuclear Power Reactors,Mgt,Plans, Audits,Barriers,Detection & Assessment Aids IR 05000335/19910041991-04-15015 April 1991 Insp Repts 50-335/91-04 & 50-389/91-04 on 910123-0318.No Violations Noted.Major Areas Inspected:Plant Operations Review,Maint & Surveillance Observations,Review of Special Repts & Review of Nonroutine Events IR 05000335/19900251990-11-0707 November 1990 Partially Withheld Insp Repts 50-335/90-25 & 50-389/90-25 on 901009-12.Noncited Violation Noted.Major Areas Inspected: Records & Repts,Alarm Stations,Communication & Training IR 05000335/19900261990-10-31031 October 1990 Insp Repts 50-335/90-26 & 50-389/90-26 on 901022-26.No Violations or Deviations Noted.Major Areas Inspected: Isi,Including Review of Unit 1 Plan for Outage & Associated ISI Administration Procedures IR 05000335/19890111989-05-15015 May 1989 Partially Withheld Safeguards Insp Repts 50-335/89-11 & 50-389/89-11 on 890327-31 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plan Audits & Protected & Vital Area Barriers IR 05000335/19880231988-11-0202 November 1988 Insp Repts 50-335/88-23 & 50-389/88-23 on 880925-30.No Violations Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness & Security Organization.Details Withheld (Ref 10CFR2.790(d) & 73.21) ML20151Y6841988-08-16016 August 1988 Partially Withheld Insp Repts 50-335/88-20 & 50-389/88-20 on 880803 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected:Circumstances Surrounding Failure to Control Access to Vital Area IR 05000335/19880111988-06-14014 June 1988 Insp Repts 50-335/88-11 & 50-389/88-11 on 880523-26.No Violations or Deviations Noted.Major Areas Inspected:Special Nuclear Matl Control & Accounting IR 05000335/19880121988-06-0909 June 1988 Partially Withheld Insp Repts 50-335/88-12 & 50-389/88-12 on 880516-20 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Security Program Audit,Security Sys Power Supply & Communications ML20235J2471987-09-24024 September 1987 Insp Repts 50-335/87-19 & 50-389/87-18 on 870825-0904.No Violations or Deviations Noted.Major Areas Inspected: Evaluation of Annual Emergency Preparedness Exercise. Exercise Scope & Objectives Encl IR 05000335/19870021987-03-20020 March 1987 Partially Withheld Insp Repts 50-335/87-02 & 50-389/87-02 on 870217-26 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Area Inspected:Intrusion Detection Sys Being Employed as Detection Aid in Canal Opening IR 05000335/19870011987-02-26026 February 1987 Insp Repts 50-335/87-01 & 50-389/87-01 on 870113-0207.No Violations or Deviations Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Qa Practices,Station & Corporate Mgt Practices & Overall Plant Operations IR 05000335/19860271987-01-26026 January 1987 Insp Repts 50-335/86-27 & 50-389/86-26 on 861216-870112.No Violations or Deviations Noted.Major Areas Inspected:Onsite Activities for Tech Spec Compliance,Operator Performance, Site Security Procedures & QA Practices ML20207J1891986-12-17017 December 1986 Insp Repts 50-335/86-25 & 50-389/86-24 on 861117-21.No Violations or Deviations Noted.Major Areas Inspected:Maint & Mod Welding,Inservice Testing Program for ASME Class 1,2 & 3 Pumps & Valves & Inspector Followup Items ML20212P2101986-08-26026 August 1986 Partially Withheld Physical Security Insp Repts 50-335/86-19 & 50-389/86-18 on 860804-08 (Ref 10CFR2.790 & 73.21). Violation Noted:Vehicle Control IR 05000335/19860111986-08-0707 August 1986 Partially Withheld Insp Repts 50-335/86-11,50-389/86-10, 50-335/86-17 & 50-389/86-16 on 860414-0625 (Ref 10CFR2.790 & 73.21).Violation Noted:Failure to Provide Access Control to Vital Areas IR 05000335/19850351986-01-17017 January 1986 Physical Security Insp Repts 50-335/85-35 & 50-389/85-35 on 851216-20.No Violations Noted.Major Areas Inspected:Mgt effectiveness-security Program & Security Organization. Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000335/19850211985-10-0808 October 1985 Insp Repts 50-335/85-21 & 50-389/85-21 on 850813-0923.No Violation or Deviation Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Qa Practices & Site Security Procedures IR 05000335/19850241985-10-0101 October 1985 Physical Security Insp Repts 50-335/85-24 & 50-389/85-24 on 850916-20.No Violations Noted.Major Areas Inspected:Mgt Effectiveness & Security Program.Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000387/19850291985-09-23023 September 1985 Meeting Repts 50-387/85-29 & 50-388/85-24 on 850828 Re Rescheduling of Senior Reactor Operator Licensing Exam. Region Agreed to Administer One Instructor Certification & One Senior Operator Exam on 851120 & 21,respectively IR 05000335/19850231985-09-17017 September 1985 Insp Repts 50-335/85-23 & 50-389/85-23 on 850826-30.No Violation or Deviation Noted.Major Areas Inspected:Plant Chemistry & Inservice Testing of Pumps & Valves IR 05000335/19850201985-09-0404 September 1985 Insp Repts 50-335/85-20 & 50-389/85-20 on 850709-0812. Violation Noted:Operating Procedure 2-0960030, DC Ground Isolation, Not Adequately Established & Maintained ML20133N9121985-07-25025 July 1985 Insp Repts 50-335/85-16 & 50-389/85-16 on 850624-28. Violation Noted:Failure to Control Environ Conditions for Calibr of Measuring & Test Equipment IR 05000335/19850171985-07-17017 July 1985 Insp Repts 50-335/85-17 & 50-389/85-17 on 850611-0708. Violation Noted:Unit 2 Plant Mods to Prevent Testing of Relays Not Implemented,Resulting in Plant Transient IR 05000335/19850141985-06-26026 June 1985 Insp Repts 50-335/85-14 & 50-389/85-14 on 850610-14.No Violation or Deviation Noted.Major Areas Inspected:Action on Previous Enforcement Matters,Inservice Testing of Pumps & Valves,Ie Bulletin 80-08 & Inspector Followup Items IR 05000335/19850111985-06-19019 June 1985 Insp Repts 50-335/85-11 & 50-389/85-11 on 850515-0610.No Violation or Deviation Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Overall Plant Operations & QA Practices IR 05000335/19850121985-06-12012 June 1985 Insp Repts 50-335/85-12 & 50-389/85-12 on 850513-17.No Violations or Deviations Noted.Major Areas Inspected:Maint Programs IR 05000335/19850011985-06-0505 June 1985 Safeguards Insp Repts 50-389/85-13 & 50-335/85-01 on 850512-16.No Violations or Deviations Noted.Major Areas Inspected:Security Plan & Implementing Procedures & Security Audit Program.Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000335/19850101985-05-30030 May 1985 Insp Repts 50-335/85-10 & 50-389/85-10 on 850409-0513. Violation Noted:Failure to Have Established Procedure to Properly Realign Instrument Air Portion of Main Feedwater Regulating Valve IR 05000335/19840231984-08-17017 August 1984 Insp Repts 50-335/84-23 & 50-389/84-25 on 840715-0811.No Violations or Deviations Noted.Major Areas Inspected:Plant Operation,Ie Bulletins,Unit 1 Reactor Trip & Previously Identified Items IR 05000335/19820241982-07-21021 July 1982 IE Safety Insp Repts 50-335/82-24 & 50-389/82-30 on 820628- 0701.No Noncompliance Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Training & Qualifications of contractor-supplied Temporary QC Inspectors & Records IR 05000389/19820271982-07-21021 July 1982 IE Insp Rept 50-389/82-27 on 820622-25.No Noncompliance Noted.Major Areas Inspected:Preservice Insp,Welding of Internals,Previous Insp Finding & IE Bulletins IR 05000389/19820311982-07-14014 July 1982 IE Insp Rept 50-389/82-31 on 820630-0702.No Noncompliance Noted.Major Areas Inspected:Methods for Evaluating Plant Emergency,Maint & Operating Procedures & Review of Preoperational Test Program & Plant Tour IR 05000335/19820191982-07-13013 July 1982 IE Insp Repts 50-335/82-19 & 50-389/82-25 on 820614-18.No Noncompliance Noted.Major Areas Inspected:Backfit Program, Site Organization & Onsite Design Activities IR 05000335/19820261982-07-0707 July 1982 IE Inquiry Rept 50-335/82-26 on 820615-17.Inquiry Initiated to Determine Facts Surrounding Observations That Individual of Training Staff Was Talking to Examinees Prior to Reactor Operator & Senior Reactor Operator Exams IR 05000335/19820211982-06-30030 June 1982 IE Insp Repts 50-335/82-21 & 50-389/82-26 on 820515-0610.No Noncompliance Noted.Major Areas Inspected:Maint Observation, Safety Verification,Ie Notices & Circulars & Preoperational Testing IR 05000335/19820201982-06-22022 June 1982 IE Insp Rept 50-335/82-20 on 820601-04.No Noncompliance Noted.Major Areas Inspected:Instrumentation & Equipment, Respiratory Protection,Health Physics Organization & Qualifications & LER Followup IR 05000389/19820231982-06-18018 June 1982 IE Insp Rept 50-389/82-23 on 820525-28.Noncompliance Noted: Failure to Implement QA Requirements Fully IR 05000389/19820241982-06-15015 June 1982 IE Insp Rept 50-389/82-24 on 820525-28.No Noncompliance Noted.Major Areas Inspected:Electrical Components & Sys, Quality Records,Electrical Cables & Terminations,Work & Work Activities & Licensee Identified Items IR 05000389/19820061982-06-14014 June 1982 IE Insp Rept 50-389/82-06 on 820521-26.No Noncompliance Noted.Major Areas Inspected:Followup on Previous Inspector Findings & Witnessing RCS Hydrostatic Test IR 05000335/19820151982-06-11011 June 1982 IE Insp Repts 50-335/82-15 & 50-389/82-21 on 820411-0514. Noncompliance Noted:Failure to Implement Procedure for Locking Safety Valves in Required Position IR 05000335/19820161982-05-28028 May 1982 IE Insp Repts 50-335/82-16 & 50-389/82-18 on 820426-30.No Noncompliance Noted.Major Areas Inspected:Qa Program Design Control Procurement,Const of Facility & Interviews W/ Personnel IR 05000389/19820191982-05-26026 May 1982 IE Insp Rept 50-389/82-19 on 820426-30.No Noncompliance Noted.Major Areas Inspected:Preservice insp,safety-related Structures Outside Containment,Previous Insp Findings & Licensee Identified Items IR 05000335/19820141982-05-20020 May 1982 IE Insp Rept 50-335/82-14 on 820419-22.No Noncompliance Noted.Major Areas Inspected:Qc & Confirmatory Measurements Including Review of Lab QC Program,Chemistry & Radiochemistry Procedures & Airborne Effluent Sampling IR 05000389/19820131982-04-27027 April 1982 IE Insp Rept 50-389/82-13 on 820329-0402.Noncompliance Noted:Use of Incorrect Calibr Block for Psi Ultrasonic Test of Weld 123-2 IR 05000389/19820121982-04-0707 April 1982 IE Insp Rept 50-389/82-12 on 820317-19.Noncompliance Noted: Design & Installation of Fire Protection Yard Piping Sys Not Specified to Meet Requirements of NFPA-24 1999-10-08
[Table view] Category:UTILITY
MONTHYEARIR 05000335/19900251990-11-0707 November 1990 Partially Withheld Insp Repts 50-335/90-25 & 50-389/90-25 on 901009-12.Noncited Violation Noted.Major Areas Inspected: Records & Repts,Alarm Stations,Communication & Training IR 05000335/19900261990-10-31031 October 1990 Insp Repts 50-335/90-26 & 50-389/90-26 on 901022-26.No Violations or Deviations Noted.Major Areas Inspected: Isi,Including Review of Unit 1 Plan for Outage & Associated ISI Administration Procedures IR 05000335/19890111989-05-15015 May 1989 Partially Withheld Safeguards Insp Repts 50-335/89-11 & 50-389/89-11 on 890327-31 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plan Audits & Protected & Vital Area Barriers IR 05000335/19880231988-11-0202 November 1988 Insp Repts 50-335/88-23 & 50-389/88-23 on 880925-30.No Violations Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness & Security Organization.Details Withheld (Ref 10CFR2.790(d) & 73.21) ML20151Y6841988-08-16016 August 1988 Partially Withheld Insp Repts 50-335/88-20 & 50-389/88-20 on 880803 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected:Circumstances Surrounding Failure to Control Access to Vital Area IR 05000335/19880111988-06-14014 June 1988 Insp Repts 50-335/88-11 & 50-389/88-11 on 880523-26.No Violations or Deviations Noted.Major Areas Inspected:Special Nuclear Matl Control & Accounting IR 05000335/19880121988-06-0909 June 1988 Partially Withheld Insp Repts 50-335/88-12 & 50-389/88-12 on 880516-20 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Security Program Audit,Security Sys Power Supply & Communications ML20235J2471987-09-24024 September 1987 Insp Repts 50-335/87-19 & 50-389/87-18 on 870825-0904.No Violations or Deviations Noted.Major Areas Inspected: Evaluation of Annual Emergency Preparedness Exercise. Exercise Scope & Objectives Encl IR 05000335/19870021987-03-20020 March 1987 Partially Withheld Insp Repts 50-335/87-02 & 50-389/87-02 on 870217-26 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Area Inspected:Intrusion Detection Sys Being Employed as Detection Aid in Canal Opening IR 05000335/19870011987-02-26026 February 1987 Insp Repts 50-335/87-01 & 50-389/87-01 on 870113-0207.No Violations or Deviations Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Qa Practices,Station & Corporate Mgt Practices & Overall Plant Operations IR 05000335/19860271987-01-26026 January 1987 Insp Repts 50-335/86-27 & 50-389/86-26 on 861216-870112.No Violations or Deviations Noted.Major Areas Inspected:Onsite Activities for Tech Spec Compliance,Operator Performance, Site Security Procedures & QA Practices ML20207J1891986-12-17017 December 1986 Insp Repts 50-335/86-25 & 50-389/86-24 on 861117-21.No Violations or Deviations Noted.Major Areas Inspected:Maint & Mod Welding,Inservice Testing Program for ASME Class 1,2 & 3 Pumps & Valves & Inspector Followup Items ML20212P2101986-08-26026 August 1986 Partially Withheld Physical Security Insp Repts 50-335/86-19 & 50-389/86-18 on 860804-08 (Ref 10CFR2.790 & 73.21). Violation Noted:Vehicle Control IR 05000335/19860111986-08-0707 August 1986 Partially Withheld Insp Repts 50-335/86-11,50-389/86-10, 50-335/86-17 & 50-389/86-16 on 860414-0625 (Ref 10CFR2.790 & 73.21).Violation Noted:Failure to Provide Access Control to Vital Areas IR 05000335/19850351986-01-17017 January 1986 Physical Security Insp Repts 50-335/85-35 & 50-389/85-35 on 851216-20.No Violations Noted.Major Areas Inspected:Mgt effectiveness-security Program & Security Organization. Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000335/19850211985-10-0808 October 1985 Insp Repts 50-335/85-21 & 50-389/85-21 on 850813-0923.No Violation or Deviation Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Qa Practices & Site Security Procedures IR 05000335/19850241985-10-0101 October 1985 Physical Security Insp Repts 50-335/85-24 & 50-389/85-24 on 850916-20.No Violations Noted.Major Areas Inspected:Mgt Effectiveness & Security Program.Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000387/19850291985-09-23023 September 1985 Meeting Repts 50-387/85-29 & 50-388/85-24 on 850828 Re Rescheduling of Senior Reactor Operator Licensing Exam. Region Agreed to Administer One Instructor Certification & One Senior Operator Exam on 851120 & 21,respectively IR 05000335/19850231985-09-17017 September 1985 Insp Repts 50-335/85-23 & 50-389/85-23 on 850826-30.No Violation or Deviation Noted.Major Areas Inspected:Plant Chemistry & Inservice Testing of Pumps & Valves IR 05000335/19850201985-09-0404 September 1985 Insp Repts 50-335/85-20 & 50-389/85-20 on 850709-0812. Violation Noted:Operating Procedure 2-0960030, DC Ground Isolation, Not Adequately Established & Maintained ML20133N9121985-07-25025 July 1985 Insp Repts 50-335/85-16 & 50-389/85-16 on 850624-28. Violation Noted:Failure to Control Environ Conditions for Calibr of Measuring & Test Equipment IR 05000335/19850171985-07-17017 July 1985 Insp Repts 50-335/85-17 & 50-389/85-17 on 850611-0708. Violation Noted:Unit 2 Plant Mods to Prevent Testing of Relays Not Implemented,Resulting in Plant Transient IR 05000335/19850141985-06-26026 June 1985 Insp Repts 50-335/85-14 & 50-389/85-14 on 850610-14.No Violation or Deviation Noted.Major Areas Inspected:Action on Previous Enforcement Matters,Inservice Testing of Pumps & Valves,Ie Bulletin 80-08 & Inspector Followup Items IR 05000335/19850111985-06-19019 June 1985 Insp Repts 50-335/85-11 & 50-389/85-11 on 850515-0610.No Violation or Deviation Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Overall Plant Operations & QA Practices IR 05000335/19850121985-06-12012 June 1985 Insp Repts 50-335/85-12 & 50-389/85-12 on 850513-17.No Violations or Deviations Noted.Major Areas Inspected:Maint Programs IR 05000335/19850011985-06-0505 June 1985 Safeguards Insp Repts 50-389/85-13 & 50-335/85-01 on 850512-16.No Violations or Deviations Noted.Major Areas Inspected:Security Plan & Implementing Procedures & Security Audit Program.Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000335/19840231984-08-17017 August 1984 Insp Repts 50-335/84-23 & 50-389/84-25 on 840715-0811.No Violations or Deviations Noted.Major Areas Inspected:Plant Operation,Ie Bulletins,Unit 1 Reactor Trip & Previously Identified Items IR 05000335/19820241982-07-21021 July 1982 IE Safety Insp Repts 50-335/82-24 & 50-389/82-30 on 820628- 0701.No Noncompliance Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Training & Qualifications of contractor-supplied Temporary QC Inspectors & Records IR 05000389/19820271982-07-21021 July 1982 IE Insp Rept 50-389/82-27 on 820622-25.No Noncompliance Noted.Major Areas Inspected:Preservice Insp,Welding of Internals,Previous Insp Finding & IE Bulletins IR 05000389/19820311982-07-14014 July 1982 IE Insp Rept 50-389/82-31 on 820630-0702.No Noncompliance Noted.Major Areas Inspected:Methods for Evaluating Plant Emergency,Maint & Operating Procedures & Review of Preoperational Test Program & Plant Tour IR 05000335/19820191982-07-13013 July 1982 IE Insp Repts 50-335/82-19 & 50-389/82-25 on 820614-18.No Noncompliance Noted.Major Areas Inspected:Backfit Program, Site Organization & Onsite Design Activities IR 05000335/19820261982-07-0707 July 1982 IE Inquiry Rept 50-335/82-26 on 820615-17.Inquiry Initiated to Determine Facts Surrounding Observations That Individual of Training Staff Was Talking to Examinees Prior to Reactor Operator & Senior Reactor Operator Exams IR 05000335/19820211982-06-30030 June 1982 IE Insp Repts 50-335/82-21 & 50-389/82-26 on 820515-0610.No Noncompliance Noted.Major Areas Inspected:Maint Observation, Safety Verification,Ie Notices & Circulars & Preoperational Testing IR 05000335/19820201982-06-22022 June 1982 IE Insp Rept 50-335/82-20 on 820601-04.No Noncompliance Noted.Major Areas Inspected:Instrumentation & Equipment, Respiratory Protection,Health Physics Organization & Qualifications & LER Followup IR 05000389/19820231982-06-18018 June 1982 IE Insp Rept 50-389/82-23 on 820525-28.Noncompliance Noted: Failure to Implement QA Requirements Fully IR 05000389/19820241982-06-15015 June 1982 IE Insp Rept 50-389/82-24 on 820525-28.No Noncompliance Noted.Major Areas Inspected:Electrical Components & Sys, Quality Records,Electrical Cables & Terminations,Work & Work Activities & Licensee Identified Items IR 05000389/19820061982-06-14014 June 1982 IE Insp Rept 50-389/82-06 on 820521-26.No Noncompliance Noted.Major Areas Inspected:Followup on Previous Inspector Findings & Witnessing RCS Hydrostatic Test IR 05000335/19820151982-06-11011 June 1982 IE Insp Repts 50-335/82-15 & 50-389/82-21 on 820411-0514. Noncompliance Noted:Failure to Implement Procedure for Locking Safety Valves in Required Position IR 05000335/19820161982-05-28028 May 1982 IE Insp Repts 50-335/82-16 & 50-389/82-18 on 820426-30.No Noncompliance Noted.Major Areas Inspected:Qa Program Design Control Procurement,Const of Facility & Interviews W/ Personnel IR 05000389/19820191982-05-26026 May 1982 IE Insp Rept 50-389/82-19 on 820426-30.No Noncompliance Noted.Major Areas Inspected:Preservice insp,safety-related Structures Outside Containment,Previous Insp Findings & Licensee Identified Items IR 05000335/19820141982-05-20020 May 1982 IE Insp Rept 50-335/82-14 on 820419-22.No Noncompliance Noted.Major Areas Inspected:Qc & Confirmatory Measurements Including Review of Lab QC Program,Chemistry & Radiochemistry Procedures & Airborne Effluent Sampling IR 05000389/19820131982-04-27027 April 1982 IE Insp Rept 50-389/82-13 on 820329-0402.Noncompliance Noted:Use of Incorrect Calibr Block for Psi Ultrasonic Test of Weld 123-2 IR 05000389/19820121982-04-0707 April 1982 IE Insp Rept 50-389/82-12 on 820317-19.Noncompliance Noted: Design & Installation of Fire Protection Yard Piping Sys Not Specified to Meet Requirements of NFPA-24 IR 05000335/19820011982-04-0202 April 1982 IE Insp Repts 50-335/82-01 & 50-389/82-01 on 820309-12. Noncompliance Noted:Installation of Masonry Wall Expansion Anchors Inadequately Inspected 1990-11-07
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000335/19990111999-10-0808 October 1999 Partially Deleted Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-08 (Ref 10CFR73.21).No Violations Noted. Major Areas Inspected:Plant Support Re Physical Security Program for Power Reactors PNO-II-99-037D, on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph1999-09-15015 September 1999 PNO-II-99-037D:on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph PNO-II-99-023, on 990601,one CEA Descended Into Reactor Core for Unknown Reasons,With Unit 2 Rated Power.Licensee Noted Voltage Fluctuations on CEA Power Supplies.Licensee Is Continuing to Investigate CEA Problems1999-06-0808 June 1999 PNO-II-99-023:on 990601,one CEA Descended Into Reactor Core for Unknown Reasons,With Unit 2 Rated Power.Licensee Noted Voltage Fluctuations on CEA Power Supplies.Licensee Is Continuing to Investigate CEA Problems ML20217G3081998-03-25025 March 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $88,000.Violation Noted:Licensee Failed to Correctly Translate Design Change Into Procedure ML20202D8761997-02-12012 February 1997 Investigation Rept 2-96-042 on 961106.No Noncompliance Noted.Major Areas Investigated:Allegation of Falsification & Backdating of Emergency Preparedness Document.Partially Deleted IR 05000335/19960221996-11-14014 November 1996 Insp Repts 50-335/96-22 & 50-389/96-22 on 961114.No Violations Noted.Major Areas Inspected:Aspects of Licensee Configuration Mgt & 10CFR50.59 Programs ML20134J2391996-07-31031 July 1996 Investigation Rept 2-95-008 Re Alleged Discrimination Against Instrumentation & Control Technician for Reporting Safety Concerns ML20134N0901996-01-31031 January 1996 Partially Deleted Investigation Rept 2-94-018.Allegation Not Substantiated IR 05000335/19940021994-03-11011 March 1994 Partially Withheld Insp Repts 50-335/94-02 & 50-389/94-02 on 940207-11.No Violations Identified.Major Areas Inspected:Mgt Support,Physical Security Program for Power Reactors,Audits & Alarm Stations & Communications PNO-II-93-001, on 930112,plant Commenced Shutdown Due to RCP Vibration.Unit 2 Being Placed in Cold Shutdown,Mode 5.State of Fl Notified1993-01-13013 January 1993 PNO-II-93-001:on 930112,plant Commenced Shutdown Due to RCP Vibration.Unit 2 Being Placed in Cold Shutdown,Mode 5.State of Fl Notified IR 05000335/19920231992-12-14014 December 1992 Partially Withheld Insp Repts 50-335/92-23 & 50-389/92-23 on 921130-1204 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Vital Area Barriers & Alarms, Lighting,Assessment & Testing,Maint & Compensatory Measures IR 05000335/19910131991-07-11011 July 1991 Insp Repts 50-335/91-13 & 50-389/91-13 on 910610-14.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program for Nuclear Power Reactors,Mgt,Plans, Audits,Barriers,Detection & Assessment Aids IR 05000335/19910041991-04-15015 April 1991 Insp Repts 50-335/91-04 & 50-389/91-04 on 910123-0318.No Violations Noted.Major Areas Inspected:Plant Operations Review,Maint & Surveillance Observations,Review of Special Repts & Review of Nonroutine Events IR 05000335/19900251990-11-0707 November 1990 Partially Withheld Insp Repts 50-335/90-25 & 50-389/90-25 on 901009-12.Noncited Violation Noted.Major Areas Inspected: Records & Repts,Alarm Stations,Communication & Training IR 05000335/19900261990-10-31031 October 1990 Insp Repts 50-335/90-26 & 50-389/90-26 on 901022-26.No Violations or Deviations Noted.Major Areas Inspected: Isi,Including Review of Unit 1 Plan for Outage & Associated ISI Administration Procedures PNO-II-90-048, on 900820,shutdown of Unit 2 in Excess of 48 H.Caused by High Vibration of Main Generator Exciter Bearing.Licensee Expanding Scope of Insp & Root Cause Analysis.Unit Scheduled to Begin Refueling Outage on 9009151990-08-22022 August 1990 PNO-II-90-048:on 900820,shutdown of Unit 2 in Excess of 48 H.Caused by High Vibration of Main Generator Exciter Bearing.Licensee Expanding Scope of Insp & Root Cause Analysis.Unit Scheduled to Begin Refueling Outage on 900915 PNO-II-89-066, licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies1989-09-21021 September 1989 PNO-II-89-066:licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies IR 05000335/19890111989-05-15015 May 1989 Partially Withheld Safeguards Insp Repts 50-335/89-11 & 50-389/89-11 on 890327-31 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plan Audits & Protected & Vital Area Barriers IR 05000335/19880231988-11-0202 November 1988 Insp Repts 50-335/88-23 & 50-389/88-23 on 880925-30.No Violations Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness & Security Organization.Details Withheld (Ref 10CFR2.790(d) & 73.21) ML20151Y6841988-08-16016 August 1988 Partially Withheld Insp Repts 50-335/88-20 & 50-389/88-20 on 880803 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected:Circumstances Surrounding Failure to Control Access to Vital Area IR 05000335/19880111988-06-14014 June 1988 Insp Repts 50-335/88-11 & 50-389/88-11 on 880523-26.No Violations or Deviations Noted.Major Areas Inspected:Special Nuclear Matl Control & Accounting IR 05000335/19880121988-06-0909 June 1988 Partially Withheld Insp Repts 50-335/88-12 & 50-389/88-12 on 880516-20 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Security Program Audit,Security Sys Power Supply & Communications PNO-II-87-069, on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations1987-10-13013 October 1987 PNO-II-87-069:on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations PNO-II-87-066, on 871008,licensee Calculated Leakage Above Required Tech Spec Limits.Cause Could Not Be Identified. Reactor Shut Down Based on Leakage & Results of Containment Insp1987-10-0606 October 1987 PNO-II-87-066:on 871008,licensee Calculated Leakage Above Required Tech Spec Limits.Cause Could Not Be Identified. Reactor Shut Down Based on Leakage & Results of Containment Insp ML20235J2471987-09-24024 September 1987 Insp Repts 50-335/87-19 & 50-389/87-18 on 870825-0904.No Violations or Deviations Noted.Major Areas Inspected: Evaluation of Annual Emergency Preparedness Exercise. Exercise Scope & Objectives Encl ML20215K8951987-06-17017 June 1987 Exam Rept 50-335/OL-87-01 on 870420-22.Exam Results:Six Reactor Operators & Two Senior Reactor Operators Passed Oral & Written Exams.Master Exams Encl IR 05000335/19870021987-03-20020 March 1987 Partially Withheld Insp Repts 50-335/87-02 & 50-389/87-02 on 870217-26 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Area Inspected:Intrusion Detection Sys Being Employed as Detection Aid in Canal Opening PNO-II-87-019, Region II Will Dispatch Augmented Insp Team on 870319 to Review Circumstances Associated W/Problem Re Possible Corrosion Caused by Deposits of Crystalline Boric Acid on Reactor Head & Surrounding Areas1987-03-18018 March 1987 PNO-II-87-019:Region II Will Dispatch Augmented Insp Team on 870319 to Review Circumstances Associated W/Problem Re Possible Corrosion Caused by Deposits of Crystalline Boric Acid on Reactor Head & Surrounding Areas IR 05000335/19870011987-02-26026 February 1987 Insp Repts 50-335/87-01 & 50-389/87-01 on 870113-0207.No Violations or Deviations Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Qa Practices,Station & Corporate Mgt Practices & Overall Plant Operations ML20211H2511987-02-0606 February 1987 Exam Rept 50-335/OL-86-02 on 861117.Exam Results:All Candidates Passed Oral & Written Exams & One Senior Reactor Operator Passed Written Reexam IR 05000335/19860271987-01-26026 January 1987 Insp Repts 50-335/86-27 & 50-389/86-26 on 861216-870112.No Violations or Deviations Noted.Major Areas Inspected:Onsite Activities for Tech Spec Compliance,Operator Performance, Site Security Procedures & QA Practices ML20207J1891986-12-17017 December 1986 Insp Repts 50-335/86-25 & 50-389/86-24 on 861117-21.No Violations or Deviations Noted.Major Areas Inspected:Maint & Mod Welding,Inservice Testing Program for ASME Class 1,2 & 3 Pumps & Valves & Inspector Followup Items IR 05000335/19860131986-12-0101 December 1986 SALP Repts 50-335/86-13 & 50-389/86-12 for Nov 1984 - Apr 1986 PNO-II-86-066, on 860920,leaking Relief Valve on Storage Tube on Hydrogen Trailer Discovered.Other Tubes Isolated from Leak,Area Roped Off & Smoking Prohibited.Event Terminated on 8609211986-09-22022 September 1986 PNO-II-86-066:on 860920,leaking Relief Valve on Storage Tube on Hydrogen Trailer Discovered.Other Tubes Isolated from Leak,Area Roped Off & Smoking Prohibited.Event Terminated on 860921 ML20212P2101986-08-26026 August 1986 Partially Withheld Physical Security Insp Repts 50-335/86-19 & 50-389/86-18 on 860804-08 (Ref 10CFR2.790 & 73.21). Violation Noted:Vehicle Control IR 05000335/19860111986-08-0707 August 1986 Partially Withheld Insp Repts 50-335/86-11,50-389/86-10, 50-335/86-17 & 50-389/86-16 on 860414-0625 (Ref 10CFR2.790 & 73.21).Violation Noted:Failure to Provide Access Control to Vital Areas ML20204H7291986-08-0404 August 1986 EN-86-059:on 860807,notice of Violation & Proposed Imposition of Civil Penalties in Amount of $25,000 Will Be Issued to Licensee Based on Failure to Provide Adequate Barriers to Equipment & Inadequate Security Insps ML20205B1211986-07-25025 July 1986 Exam Rept 50-335/OL-86-01 on 860610-12.Exam Results:Three of Four Senior Reactor Operator Candidates Passed Written Exam & All Four Passed Oral Exam & One Reactor Operator Candidate Failed Oral & Written Exam.Exam Encl PNO-II-86-040, on 860606,util Took Facility Out of Svc to Begin Plugging 17 Degraded Steam Generator Tubes.Unit Will Be Shut Down Approx 2 Wks.Tube Degradation Discovered on 860523 in Eddy Current Data Taken During Oct-Dec 19851986-06-0909 June 1986 PNO-II-86-040:on 860606,util Took Facility Out of Svc to Begin Plugging 17 Degraded Steam Generator Tubes.Unit Will Be Shut Down Approx 2 Wks.Tube Degradation Discovered on 860523 in Eddy Current Data Taken During Oct-Dec 1985 PNO-II-86-032, on 860428,iron Workers Employed by Util Contractor Walked Off Job & Set Up Picket Lines at All Four Entrances to Facility.Union Workers Refusing to Cross Picket Lines.Security Forces & Senior Reactor Operators on Job1986-04-28028 April 1986 PNO-II-86-032:on 860428,iron Workers Employed by Util Contractor Walked Off Job & Set Up Picket Lines at All Four Entrances to Facility.Union Workers Refusing to Cross Picket Lines.Security Forces & Senior Reactor Operators on Job ML20140B6311986-03-11011 March 1986 Exam Rept 50-335/OL-85-02 on 851216-20.Exam Results:All 16 Candidates Administered Oral Exams Passed & 14 of 15 Candidates Administered Written Exams Passed IR 05000335/19850351986-01-17017 January 1986 Physical Security Insp Repts 50-335/85-35 & 50-389/85-35 on 851216-20.No Violations Noted.Major Areas Inspected:Mgt effectiveness-security Program & Security Organization. Details Withheld (Ref 10CFR2.790(d) & 73.21) PNO-II-86-004, on 851203,util Discovered That Individual Cleaning Sludge Out of Steam Generator Received Higher than Expected Exposure in Late Nov/Early Dec.Caused by Lack of whole-body TLD Other than TLD on Upper Arm1986-01-0909 January 1986 PNO-II-86-004:on 851203,util Discovered That Individual Cleaning Sludge Out of Steam Generator Received Higher than Expected Exposure in Late Nov/Early Dec.Caused by Lack of whole-body TLD Other than TLD on Upper Arm PNO-II-85-110A, on 851122,Hurricane Kate Downgraded to Tropical Storm.No Adverse Effects Occurred to Licensed Facilities in Storm Path1985-11-22022 November 1985 PNO-II-85-110A:on 851122,Hurricane Kate Downgraded to Tropical Storm.No Adverse Effects Occurred to Licensed Facilities in Storm Path PNO-II-85-110, on 851119,Hurricane Kate Centered Slightly Inland Over North Central Cuba,About 150 Miles South of Key West,Fl.Diesel Generators at All Three Sites Operable.Turkey Point Declared Unusual Event on 8511181985-11-19019 November 1985 PNO-II-85-110:on 851119,Hurricane Kate Centered Slightly Inland Over North Central Cuba,About 150 Miles South of Key West,Fl.Diesel Generators at All Three Sites Operable.Turkey Point Declared Unusual Event on 851118 PNO-II-85-105A, on 851109,minor Damage to Regular Lifting Rig Identified Following Lifting of Core Internals Upper Guide Structure Free of Reactor Vessel.Unusual Event Declared on 851106 Terminated1985-11-12012 November 1985 PNO-II-85-105A:on 851109,minor Damage to Regular Lifting Rig Identified Following Lifting of Core Internals Upper Guide Structure Free of Reactor Vessel.Unusual Event Declared on 851106 Terminated PNO-II-85-105, on 851106,while Removing Core Internals Upper Guide Structure,One Lifting Rig Attachment Failed.Refueling Operations Halted W/Structure in Apparently Stable Position. NSSS Vendor Being Contacted1985-11-0606 November 1985 PNO-II-85-105:on 851106,while Removing Core Internals Upper Guide Structure,One Lifting Rig Attachment Failed.Refueling Operations Halted W/Structure in Apparently Stable Position. NSSS Vendor Being Contacted IR 05000335/19850211985-10-0808 October 1985 Insp Repts 50-335/85-21 & 50-389/85-21 on 850813-0923.No Violation or Deviation Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Qa Practices & Site Security Procedures IR 05000335/19850241985-10-0101 October 1985 Physical Security Insp Repts 50-335/85-24 & 50-389/85-24 on 850916-20.No Violations Noted.Major Areas Inspected:Mgt Effectiveness & Security Program.Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000387/19850291985-09-23023 September 1985 Meeting Repts 50-387/85-29 & 50-388/85-24 on 850828 Re Rescheduling of Senior Reactor Operator Licensing Exam. Region Agreed to Administer One Instructor Certification & One Senior Operator Exam on 851120 & 21,respectively 1999-09-15
[Table view] |
Text
/
. .
- 4# UNITED STATES 8 1, NUCLEAR REGULATORY COMMISSION t c REGION ll e # . 101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303
Report No. 50-389/82-19 Licensee: Florida Power and Light Company P. O. Box 529100 Miami, FL 33152 Facility Name: St. Lucie Docket No. 50-389 License No. CPPR-144 Inspection at St. Lucie site near Fort Pierce, Florida A_ . .
ff M 1 Inspectors:~B . R . C rowl ey,__ _ / Date Signed
,~ >ll J
-
. W. Yo.k L
+ ruv r,c sfM V 4 ate digned
'~
M c7ta7n (
Approved by:h3ck Ecortomos, Acting Section Chief
- 4'IV
/ Dat4 Signed Engineering Inspection Branch Division of Engineering and Technical Programs SUMMARY Inspection on April 26-30, 1982 l
Areas Inspected This routine, unannounced inspection involved 56 inspector-hours on site in the areas of preservice inspection (PSI), safety related structures outside con-I tainment, previous inspection findings, and licensee identified (50.55e) item Results No violations or deviations were identified.
l l
l l
i 8206220348 820528 i PDR ADOCK 05000389 0 PDR t
-
. .
REPORT DETAILS Persons Contacted Licensee Employees
- B. J. Escue, Site Manager N. T. Weems, Assistant Manager QA-PSL G. E. Crowell, Site Engineering Supervisor
- J. L. Parker, Project QC Supervisor
- P. W. Heycock, PSI Site Supervisor-PNS
- R. A. Symes, Supervising QA Engineer
- W. F. Jackson, Welding Superintendent F. T. Carr, NDE Supervisor, PNS
- E. W. Sherman, QA Engineer
- J. R. Luke, QA Engineer W. H. Black, QA Engineer Other licensee employees contacted included construction craf tsmen, QC inspectors, NDE examiners, security force members, and office personne Other Organizations
- D. L. Jones, NDE Engineering Consultants, In *J. C. Orlowski, CE-Licensing NRC Resident Inspector
"S. El rod
- Attended exit interview Exit Interview The inspection scope and findings were summarized on April 30, 1982, with
.
those persons indicated in paragraph 1 above. The inspectors described the areas inspected and discussed in detail the inspection findings listed belo (Open) Inspector Followup Item 389/82-19-01, Issue of FP&L PSI Program and Plan Descriptions paragraph (0 pen) Inspector Followup Item 389/82-19-02, Disposition of UT Indications in Welds RC-112-1, RC-123-1 and RC-121-6 paragraph (0 pen) Unresolved Item 389/82-19-03, Clarification of Weld Metal Records -
paragraph 1 ,
. .
3. Licensee Action on Previous Inspection Findings (0 pen) Unresolved Item 389/81-07-08, Welder Not Qualified to WPS Specified on Weld Traveler. This item pertained to an incident where a welder was qualified to WPS 006, withdrew welding material to WPS 006 and welded a l weld requiring the use of WPS 050. Although the records did not indicate the welder to be qualified to WPS 50, in actuality, he was qualified for the portion of the weld he welded. WPS 050 and WPS 006 are identical except for the root. The welder in question did not weld the root. How-ever, review of this item revealed that control procedures do not clearly define responsibilities for verification of welder qualificatio The licensee agreed to investigate this problem and make any necessary proce-dure change (Closed) Violation 389/82-07-02, Failure to Follow NDE Procedures. Florida Power and Light Company's (FP&L) letter of response dated April 20, 1982, has been reviewed and determined to be acceptable by Region II. Based on examination of corrective actions as stated in the letter of response, the inspectors concluded that FP&L had determined the full extent of the subject violation, performed the necessary survey and followup actions to correct the present conditions and developed the necessary corrective actions to preclude recurrence of similar circumstance The corrective actions identified in the letter of response have been implemente . Unresolved Items Unresolved items are matters about which more information is required to determine whether they are acceptable or may involve violations or devia-tions. New unresolved items identified during this inspection are discussed in paragraph 1 . Inspector Followup Items (Closed) Inspector Followup Item 389/82-07-01, Clarification of Quali-fication Requirements for PSI Site Supervisor. FP&L position descrip-tion for " Nuclear Energy Plant Coordinator PSI Site Supervisor (Coor-dinator)" has been issued and was reviewed by the inspectors. There are no further questions on this matte (Closed) Inspector Followup Item 389/82-13-04, Revision of MT Procedure to Identify Yoke Calibration Requirements. FCN 00071 to procedure NDE 2.1 has been issued to specify yoke calibration requirement There are no further questions on this matte (Closed) Inspector Followup Item 389-82-13-06, Revision of Procedure NDE 5.2 to Clarify Tranducer Size. FCN 00070 to procedure NDE 5.2 has been issued to clarify tranducer size requirements for 20" diameter pipe. There are no further questions on this matter, (Closed) Inspector Followep Item 389/81-10-01, Repair of RT Indication in loop Weld 115-0 The inspectors reviewed weld repair records consisting of the following:
-- ..
.
Weld Repair Report (WRR) 4329
" Radiographic Test and Inspection Report" dated 6/27/81, view 20-30 -
" Visual-Liquid Penetrant-Magnetic Particle Inspection Report" dated 6/26/81 for VT and MT
" Visual-Liquid Penetrant-Magnetic Particle Inspection Report" dated 6/26/81 tor MT of cavity i
Weld Repair RT Film l
l PSI UT report af ter repai There are no further questions on this matte . Licensee Identified Items (LII)
Prior to this inspection, the licensee identified the following items under 10 CFR 50.55(e):
_ (0 pen) Item 389/81-10-02, CDR 81-001, Linear Indication in RC Pump Shell. On June 10, 1981, Florida Power and Ligh+. Company notified RII of a potential 50.55(e) item concerning linear indications in the 2A1 RC pump shell area next to weld RC-112-004. Interim reports were issued on 7/14/81, 8/28/81, and 10/27/81. A final construction defi-ciency report was issued on January 12, 1982. Review of the report revealed that the possibility of similar defects in the other pumps had not been adressed in the report. The licensee agreed to supplement the report by May 21, 1982 to address the other pumps. This item remains open pending receipt and review of the supplemental informatio (Closed) Item 389/81-25-09, CDR81-003, Linear Indication in Reactor Coolant Pip On June 25, 1981, Florida Power and Light Company notified RII of a potential 50.55(e) item concerning linear indica-tions observed in a reactor coolant system piping weld. An interim report was issued on July 24, 198 On September 25, 1981, the licensee submitted a final report which stated that the condition had been evaluated and determined not reportabl The justification <
for considering the item nonreportable was based on the fact that it was discovered during a planned PSI, was repaired using standard site procedures, and did not require any extensive evaluation, extensive repair, or extensive redesig The inspectors have no further questions on this ite (Closed) Item 389/81-25-10, CDR81-004, Linear Indications In Reactor Coolant Instrument Line. On September 9,1981, Florida Power and Light Company notified RII of a potential 50.55(e) item concerning a linear indication in a reactor coolant 3/4 in.ch 304 SS pipe. On October 8, 1981, the licensee submitted a final report which stated that the
.
- - . - - - - - - -
_ . . . . . . . _
.
condition had been evaluated and determined nonreportable. The justi-fication for considering the item nonreportable was that the indication was determined to be a seam with maximum depth of .020" which met ASME requirements. The inspectors have no further questions on this ite (Closed) Item 389/81-25-08, CRDM Motor Housing ND On November 24, 1980, Florida Power and Light Company notified RII of a potential 50.55(e) item concerning a missed ASME Section III final NDE step in the manufacture of the CROM housings. On December 23, 1980, the licensee submitted a final report which stated that the condition had been evaluated and determined nonreportabl The justification for considering the item nonreportable was that the omission of the NDE could not reasonably be expected to create a substantial safety hazar This wcs based on the NDE performed, analysis of the possibility of defects and their consequences if not detected, and previous inspection histor The missed NDE was performed with no defects. There are no further questions on this ite . Preservice Inspection-Review of Progran The inspectors reviewed the licensee's preservice inspection (PSI) program as described below to determine whether regulatory requirements were being me The PSI is being performed in accordance with the ASME Boiler and Pressure Vessel Code, Section XI, 1977 edition with addenda through S78 as modified by 10 CFR 50.55a.(g). The inspection is being performed using FP&L program and procedures with Nuclear Energy Services (NES) furnishing the examination personnel . The inspectors reviewed the following documents:
(1) " Florida Power and Light Company St. Lucie Unit #2 Preservice Inspection Program Description", PNS-CIG-002-4 (Draft)
(2) Program Plan Description, PNS-CIG-002-3 (Draft)
(3) Inspection Plan, PNS-CIG-002-1 (Draf t)
(4) " Control of Special Processes-Nondestructive Examination (NDE)"
PRN-QI 9.2, revi sion 0 (5) "Preservice Inspection (PSI)" QI 10 PR/PSL-2, revision 1 (6) FP&L PSI Implementing Instructions -
- 1 " Preparation and Approval of PSI Implementing Instructions",
revision 0
- 2 " Control and Distribution of PSI Procedures, Instructions, Plans and Drawings", revision 1
- 3 " Approval and Revision of PSI Inspection Plan", revision 1
_ _ _ . .
. .
-
.,. .e- - - --
. . li -
T
- 4 " Receipt Inspection and Control of Nonconforming Materials During PSI
- 5 " Field Changes to NDE Procedures", revision 0
- 6 " Corrective Action", revision 1 (7) " Qualification of QA Audit, QC Inspection, and Construction Test Personnel", QP 2.9, revision 4 (8) " Conduct of Quality Assurance Department Quality. Audits", QP 18.1, revision 5 (9) " Quality Assurance Records", QI 17-PR/PSL-1, revision 4 (10) " Scheduling of Quality Assurance Department Audit Activities", QI 18 QAD 3, revision 0 (11) Audit check list No. QAO-PSL-82-04-242 "dnit #2 PSI Program" B
(12) " Nondestructive Examination Personnel yualification and Certifi-cation", PRN-QI 9.3, revision 0 These documents were. reviewed to assure that procedures and plans had been established (written, reviewed, approved and issued) to control and accomplish the following activities:
-
Audits including procedures, frequency, and qualification of personnel
-
Control of processes including suitably controlled work conditions, special methods, and use of qualified personnel
>
-
Corrective action
-
Document control
-
Control of examination equipment
,
-
Quality records including documentation of indications and NDE
- findings, review of documentation, provisions to assure legibility and
- retrievability, and corrective action
!
-
Scope of the inspection including description of areas to be examined, i examination category, method of inspection, extent of examination and
justification for any exception
! -
Qualification of NDE personnel
! -
Controls for generation, approval, custody,. storage and maintenance o NDE records i
!
... - - . - _ _ - - ._ - - - . - .- --- . .. ._
. .
~4
<L As noted in RII report 50-389/82-07, after the PSI started, FP&L decided to terminate their contract with Combustion Engineering (CE)
and perform the PSI themselves under their own program and procedure ;The program description, inspection plan description and the inspection clan were in the process of being changed from CE documents to FP&L g.'
' documents at the time of the 50-389/82-07 inspection. During the current inspection, the inspector noted that the program description and plan description were still in draft form. Although the CE program and plan descriptions are technically acceptable, the licensee agreed that the FP&L documents should be issued. The, licensee stated that the FP&L' documents will be issued by May 19, 1982. This matter is iden-tified as Inspector Followup . Item 389/82-19-01, Issue of FP&L PSI k Program and Plan Description ,
i Within the areas inspected, no violations or deviations were identifie . Preservice Inspection - Review of Procedures The inspectors reviewed the PSI procedures as described below to determine whether the procedures were consistent with regulatory requirement See paragraph 7 above for the applicable Cod Liquid Penetrant (PT) inspection procedu N N'DE 3.1,4 revision 1, FCN 00005,
" Liquid Penetrant Examination Visible Dye Technique" was reviewed for
-
technical content relative to: Method consistent with ASME code Specification of brand names of penetrant materials Specification of limits for sulfur and total halogens for materials Pre-examination surface preparation Minimum drying time following surface cleaning f Penetrant application and penetration time Temperature requirements Solvent removal Method of surface drying Type of developer and method of application Examination technique Technique for evaluation Acceptance standards
. .
7 Requalification requirements Within the areas inspected, no violations or deviations were identifie . Inservice Inspection - Observation of Work and Work Activities The inspectors observed the ISI activities described below to determine whether these activities were being performed in accordance with regulatory requirements and licensee procedures. See paragraph 7 above for the applic-able cod In process ultrasonic (UT) inspection, including " Cal-out", for the 0 inspection of weld 210-111-6-SW-1, Zone 44 was observed and compared with applicable procedures in the following areas:
(1) Availability of and compliance with approved NDE procedures (2) Use of knowledgeable NDE personnel (3) Use of NDE personnel qualified to the proper level (4) Recording of inspection results (5) Type of apparatus used (6) Extent of coverage of weldment (7) Calibration requirements (8) Search units (9) Beam angles (10) DAC curves (11) Reference level for monitoring discontinuities (12) Method for demonstrating penetration (13) Limits for evaluating and recording indications (14) Recording significant indications (15) Acceptance limits
. In process liquid penetrant (PT) inspection was observed for welds 113-2A-SW-1 and 113-2A-SW-3 in Zone 43 and compared with applicable procedures in the areas of:
(1) Availability of and compliance with approved NDE Procedures (2) Use of knowledgeable NDE personnel (3) Use of NDE personnel qualified to the proper level (4) Recording of inspection results (5) Method consistent with procedure (6) Penetrant materials identified and consistent with ASME Code (7) Certification of sulfur and halogen content for penetrant materials (8) Surface preparation (9) Drying time following surface temperature (10) Penetrant application and penetration time (11) Examination surface temperature (12) Penetrant removal (13) Drying of surface prior to developing (14) Developer type, application and time interval after penetration removal
.
(15) Time interval between developer application and evaluation (16) Evaluation technique (17) Reporting examination results The inspectors reviewed the repair records described below relative to repairs made as a result of PSI inspectio WELD RECORDS REVIEWED RC-ll2-001 WRR 4339 RT report dtd. 6/24/81 VT report dtd. 6/23/81 MT report dtd. 6/23/81
'.
PSI UT report dtd. 12/15/81 and 12/19/81 RC-112-004 NCR 2033 Weld Traveler 83749 VT report dtd. 8/17/81 RT report dtd. 8/19/81 PT report dtd. 8/17/81 RC-124-003 WRR 4470 VT report dtd. 7/21/81 MT report dtd. 7/21/81 RT report dtd. 7/23/82 PSI UT report dtd.1/15/82 and 12/11/82 RC-121-003 WRR 4350 VT report dtd. 7/11/81 l MT report dtd. 7/11/81 RT report dtd. 7/13/81 PSI UT report dtd. 12/22/81 RC-124-002 WRR 4093 VT report dtd. 6/20/81 MT report dtd. 6/20/81 RT report dtd. 6/23/81 PSI UT report dtd. 12/17/81 The records were reviewed in the areas of:
(1) Completed weld meeting visual examination acceptance standards (2) Examination of completed weld by qualified personnel using approved procedures (3) Performance of PSI af ter repair , O 9 During a previous inspection (see report 50-389/82-13) RII inspectors, using RII equipment, identified two UT indications in reactor coolant (RC) loop weld RC-112-1. Based on calculations made on site at the time the indications were found, the indications were thought to be acceptabl Further evaluation by FP&L af ter conclusion of the inspection, using standard ASME Section XI sizing and calculation techniques, showed the indications to be rejectable. In addition, at about the same time, FP&L identified a totai of 8 (3-weld RC-121-6, 3-weld RC-112-6, and 2-weld RC-123-1) other indications rejectable using standard ASME Section XI sizing and calculation technique FP&L excavated all but 2 (one in weld RC-123-1 and one in weld RC-121-6) of the eight indications identified by FP& These six indications were near the 0.D. surface and were removed without vio-lating minimum wall thickness. In order to better define the location and size of the indications, prior to excavation, four of the indica-tions were located and sized using a 70*, 5.0 MHz tranduce In addition, for all six of the indications, FP&L made a beam spread correction to the original 45 /60 results using the beam spread plots developed in accordance with ASME Section V, Article 4. The beam spread corrected 45*/60 results and the 70 results indicated that the indications were located deeper from the 0. D. surface and had less thru-wall thickness than indicated with the uncorrected 45 /60 inspections. The six indications were excavated by closely monitoring the grinding and carefully measuring the actual depth and thru-wall thickness of the defect FP&L noted good correlation between the actual defect dimensions (depth and thru-wall) and the dimensions predicted with the 70 inspection and the beam spread corrected 45*/60 inspection Based on the above results, FP&L applied beam spread correction data to the results for the two indications identified by NRC in weld RC-112-1 and the indications not excavated in welds RC-123-1 and RC-121- In addition, the indications in welds RC-123-1 and RC-121-6 were evaluated using the 70 method. Using these methods of evaluation, FP&L con-siders all four indications to be acceptable. However, since the beam spread correction method of sizing indications is not covered in the ASME Code, disposition of indications using this method will require further NRC evaluatio This matter is identified as inspector ,
followup item 389/82-19-02, Disposition of UT Indications in Welds RC-112-1, RC-123-1, and RC-121- Within the areas inspected, no violations or deviations were identifie . Safety-Related Structures (Unit 2)
The inspectors reviewed the quality records for both welding and non-welding activities for safety-related structures outside containment. The records for the structural support for Pump 2B in the Low Pressure Safety Injection System and the Refueling Water Storage Tank were reviewed to determine whether applicable code and procedure requirements were being met. The l
- - - . .. _ _ - - _ - . . - _ - _ - - - . . . - _ - _ - - -.
___ _ ._.
- .
applicable code for the installation of the pump support is the American i
Welding Society, Structural Welding Code, D1.1-74, and for the fabrication I of the Refueling Water Storage Tank is the ASME Boiler and Pressure Vessel Code, Section III, Subsection NC, 1974 Edition with addenda through summer 197 Review of Non-Welding Quality Records The quality records for pump 28 support and the storage tank were reviewed for the following:
(1) Material (a) Material test reports / certification records (b) Vendor manufacturing and inspection records / certifications (c) Receiving inspection reports (d) Nonconformance reports (e) Tests on structural steel (2) Installation / Erection (a) Construction / erection specifications adhered to (b) Components installed and located as required (c) Testing requirements met (3) Inspection (QC)_ Records (a) Records of inspection activities were complete, legible and readily retrievable (b) Qualification records of inspection personnel were current and reflect adequate qualifications for activities performe Wi t t. i n these areas, the following quality records provided by the
'1censee and subcontractor (Precision Metals) were reviewed:
(1) Pump _2B Support (a) Material Test Reports for ASTM A-36, Heat Nos. J53633 and H46358
_ _ _ _ _ _ _ _ .___
. s
11 (b) Material Test Reports for ASTM A-490 Bolting, Heat No P0879 and 578C7079 (2) Storage Tank
.
(a) Material ' Test Reports for ASME SA 240-75A, Heat No F80225 and F 80223 b. Review of Welding Quality Records The welding quality records for both the pump support and the storage tank were reviewed for the following:
(1) Inspection records covering visual and dimensional inspection (2) Weld history records ,
(3) Heat treatment records covering preheat and interpass temperature, post weld control, stress relief and total time at temperature, as applicable (4) NDE records covering evaluation of quality of welds (by RT, MT, etc.), incl ~uding correlation of records to specific weld (5) Weld repair records covering defect removal technique used, defect removal verification, nondestructive examinations, heat treatment, and final acceptance of repairs, as appropriate (6) Welding material control records (welding rod, flux, electrode an gas)
(7) Welder qualification records (8) Inspector qualification records relative to welding activities
- pump 2B support was partially fabricated by Precision Metals and completed by the licensee. Quality records from both sources were reviewe The following listing is a sample of the records reviewed for clarity, completeness and accuracy
- (1) Inspection Report Nos. C79-3244, C79-3383 and C79-2276
!
j (2) Nonconformance Report No. 756C i
(3) Field Change Request Nos. 2-1071 and 2-1152 (4) Welder Qualification Records for four welders (5) Weld Metal Certifications for E70S-6 l
l
,
t
o
,
The weld metal certifications for the E705-6 weld wire listed seven (7)
I serial numbers and gave typical (not specific) chemistry and mechanical properties. The inspector was unable to determine which heat or serial number of wire was used for fabrication of the pump support welds and the specific chemistry and mechanical properties of that wire. This will be Unresolved Item No. 389/82-19-03, Clarification of Weld Metal Record The Refueling Water Storage Tank was fabricated and erected at St. Lucie Unit 2 by the Pittsburg-Des Moines Steel Company. Quality records for the following tive welds were reviewed:
(1) Vertical Weld Seam No. IV1 (2) Vertical Weld Seam No. 2V2 (3) Horizontal Weld Seam No.1H1 (4) Vertical Weld Seam No. 4V5 (5) Horizontal Weld Seam No. 4HS In addition, quality records were reviewed for ten (10) weld repairs performed on the storage tan .
Within the areas inspected, no violations or deviations were identifie . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _