IE Insp Repts 50-335/82-13 & 50-389/82-15 on 820412-16.No Noncompliance Noted.Major Areas Inspected:Followup on Previous Insp Findings,Witnessing Preoperational Testing & Unit 2 Tour
ML20053B156
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 04/29/1982
From: Fiedler R, Jape F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20053B151 List:
References
50-335-82-13, 50-389-82-15, NUDOCS 8205280124
Download: ML20053B156 (4)


Text

e

,

,

.

4*t, UNITED STATES

-

NUCLEAR REGULATORY COMMISSION g

a REGION 11 o

101 MARIETTA ST NYl., SUITE 3100 g%y ATLANTA, GEORGIA 30303 Report Nos. 50-335/82-13, 50-389/82-15 Licensee:

Florida Power & Light Company P. O. Box 529100 Miami, Florida 33152 Facility Name:

St. Lucie Docket Nos. 50-335, 50-389 License Nos. DPR-67, CPPR-144 Inspection at St. Lucie site near Ft. Pierce, Florida Inspector:

/w

'/~ z 9-9.L a

R. L. Fiedler Date signed Accompanying Personnel:

K. Davenport Approved by:

A F. Jape, Section Chief

[/ //

Date Signed Engineering Inspection Bratich Division of Engineering and Technical Programs SUMMARY Inspection on April 12-16, 1982 Areas Inspected This routine, unannounced inspection involved 64 inspector-hours on site in the areas of followup on previous inspection findings, witnessing preoperational testing and a tour of Unit 2.

Results Of the three areas inspected, 'o violations or deviations were identified.

82052,80 l M

.

.

REPORT DETAILS 1.

Persons Contacted Licensee Employees

  • C. M. Wethy, Plant Manager
  • B. J. Escue, Site Manager
  • G. J. Boissy, Startup Superintendent
  • K. N. Flanagan, Assistant Site Manager J. H. Barrow, Operations Superintendent
  • N. G. Roos, QC Supervisor
  • R. E. Dawson, Startup Lead Mechanical Engir.eer
  • G. E. Regal, Startup Lead Electrical Engineer
  • J. E. Garner, Startup Lead I&C Engineer
  • W. S. Windecker, Planning and Scheduling Supervisor R. J. Frechette, Chemistry Supervisor Other licensee employees contacted included construction craftsmen, technicians and operators.

Other Organizations i

  • R. A. Garramore, Senior Resident Engineer, Ebasco
  • Attended exit interview 2.

Exit Interview The inspection scope and findings were summarized on April 16, 1982, with those persons indicated in paragraph 1 above. The licensee acknowledged the findings and made no comment.

3.

Licensee Action on Previous Inspection Findings Not inspected.

Unresolved Items Unresolved items were not identified during this inspection.

  • 5.

Witnessing Preoperational Testing Portions of the following preoperational tests were observed:

a.

2-0620080, " Circulating Water System Preoperational Test" b.

2-2200083, "2B Diesel Generator and Auxiliary System Preoperational Test" i

,

__

. _ _ _

,

'

.

,

The completed procedure 2-0410084 "High Pressure Safety Injector System -

Initial Pump Run" was reviewed.

The inspector attended a regularly scheduled startup meeting.

The above areas were inspected to verify the following:

a.

That current approved test procedures were being used by test

personnel.

b.

That the conduct of testing was being coordinated.

i l

c.

That methods are available to document significant event, unusual conditions, or interruptions to testing.

!

d.

That identified deficiencies are being documented and that their

!

resolution and retesting are being documented.

e.

That procedures for making changes to test procedures are being followed.

There were no violations or deviations identified in this area.

.

6.

Followup on Previous Inspection Findings i

a.

(Closed)

IFI 389/81-17-03 Potential Problem in Verifying That Discrepancies Identi fied During the Startup Testing Program are l

Reviewed for 10 CFR 50.55(e)

Reportability.

Revision

to

QI-15-RP/PSL-2 revised step 5.1.3 to require that a Discrepant Field Coordination Report (DFCR) be subic'tted, if in the startup engineers judgement, the item should be reviewed for reportability. This item is closed.

I i

b.

(Closed) IFI 389/81-17-06 No Provisions for Issuing A Single Copy of

Each Test Procedure Designated as the Official Copy.

The startup superintendent issued a letter instructing the startup department to

!

designate a single copy of the preoperational test procedure as the official test copy, to be used by the startup engineers.

The

'

inspectors verified that preoperational test procedures being used by

l startup were designated as the official test copy.

This item is closed, i

c.

(Closed) IFl 389/81-23-01 Administrative controls for maintaining water

chemistry requirements for fluid systems undergoing preoperational and functional testing have been established by Letter of Instructions

,

l-LOI-CC-01 through LOI-CC-08. This item is closed.

!

i i

i

.,, _ _ _, _ - _ _ -. _ _

_ _, _... _.. _..

.

-

-...-

'-

.

.

.

.

7.

Tour of the Unit 2 Control Room, Auxiliary Building and Reactor Building A tour of the accessible area was conducted to determine by observation that plant conditions and activities were in accordance with applicable requirements.

Within the areas inspected, there were no violations er deviations identified.