|
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000320/20240032024-11-21021 November 2024 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2024003 IR 05000320/20240012024-08-28028 August 2024 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report Nos. 05000320/2024001 and 05000320/2024002 IR 07200077/20240012024-06-18018 June 2024 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report No. 07200077/2024001 IR 05000320/20230042024-02-0707 February 2024 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2023004 IR 05000289/20230062024-01-29029 January 2024 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report No. 05000289/2023006 IR 05000320/20230032023-11-28028 November 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2, NRC Inspection Report No. 05000320/2023003 IR 05000320/20230022023-08-17017 August 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2023002 IR 05000289/20230052023-08-14014 August 2023 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report 05000289/2023005 IR 05000320/20230012023-04-12012 April 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report No. 05000320/2023001 IR 05000320/20220042023-02-16016 February 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report Nos. 05000320/2022004 and 05000320/2022401 IR 05000289/20220022023-02-13013 February 2023 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 – NRC Inspection Report Nos. 05000289/2022002 and 005000289/2022402 IR 05000289/20220012022-08-26026 August 2022 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report Nos. 05000289/2022001 and 07200077/2022001 ML22228A0142022-08-17017 August 2022 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report IR 05000289/20224012022-04-12012 April 2022 NRC Security Decommissioning Inspection Report No. 05000289/2022401 IR 05000289/20210022022-01-31031 January 2022 NRC Inspection Report 05000289/2021002 and 07200077/2021001 IR 05000320/20210042022-01-27027 January 2022 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2021004 IR 05000289/20210012021-06-28028 June 2021 NRC Inspection Report No. 05000289/2021001, Exelon Generation Co., LLC, Three Mile Island Nuclear Station, Unit 1 IR 05000289/20214012021-06-28028 June 2021 Security Decommissioning Inspection Report 05000289/2021401 IR 05000320/20210032021-06-22022 June 2021 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2021003 IR 05000289/20200052021-02-0101 February 2021 NRC Inspection Report No. 05000289/2020005, Exelon Generation Co., LLC, Three Mile Island Nuclear Station Unit 1 IR 05000320/20200022020-10-19019 October 2020 Gpu Nuclear, Inc., Three Mile Island Nuclear Station, Unit 2, NRC Inspection Report 05000320/2020002 IR 05000289/20204012020-09-0101 September 2020 Unit 1 - Security Baseline Inspection Report 05000289/2020401 IR 05000289/20200032020-07-20020 July 2020 NRC Inspection Report No. 05000289/2020003, Exelon Generation Co., LLC, Three Mile Island Nuclear Station, Unit 1 IR 05000289/20200012020-04-30030 April 2020 NRC Inspection Report 05000289/2020001 IR 05000289/20190102020-02-0404 February 2020 NRC Inspection Report No. 05000289/2019010, Exelon Generation Co., LLC, Three Mile Island Unit 1, Middletown, PA IR 05000289/20190032019-11-0606 November 2019 Integrated Inspection Report 05000289/2019003 IR 05000289/20190052019-08-28028 August 2019 Updated Inspection Plan Inspection Report 05000289/2019005 IR 05000289/20193012019-08-15015 August 2019 Initial Operator Licensing Examination Report 05000289/2019301 IR 05000289/20190022019-08-0909 August 2019 Integrated Inspection Report 05000289/2019002 IR 05000320/20190012019-06-10010 June 2019 Gpu Nuclear, Inc., Three Mile Island Station, Unit 2 - NRC Inspection Report 05000320/2019001 IR 05000289/20195012019-06-0303 June 2019 Emergency Preparedness Biennial Exercise Inspection Report 05000289/2019501 IR 05000289/20194102019-03-18018 March 2019 Baseline Security Inspection Report 05000289/2019410 IR 05000289/20180062019-03-0404 March 2019 Annual Assessment Letter for Three Mile Island Station, Unit 1 (Report 05000289/2018006) IR 05000289/20180042019-01-31031 January 2019 Integrated Inspection Report 5000289/2018004 IR 05000289/20182012018-12-13013 December 2018 NRC Inspection Report 05000289/2018201 IR 05000289/20180032018-11-0808 November 2018 Integrated Inspection Report 5000289/2018003 IR 05000289/20184102018-09-18018 September 2018 Baseline Security Inspection Report 05000289/2018410 (Letter Only) IR 05000289/20180052018-08-28028 August 2018 Updated Inspection Plan Inspection Report 05000289/2018005 IR 05000289/20180022018-08-0202 August 2018 Integrated Inspection Report 5000289/2018002 IR 05000320/20180112018-05-23023 May 2018 NRC Inspection Report 05000320/2018011 IR 05000289/20180012018-05-0202 May 2018 Integrated Inspection Report 5000289/2018001 and Exercise of Enforcement Discretion IR 05000289/20180102018-05-0202 May 2018 Design Bases Assurance Inspection (Teams) Report 05000289/2018010 IR 05000289/20170062018-02-28028 February 2018 Annual Assessment Letter for Three Mile Island Station-Unit 1 (Reports 05000289-2017006 and 05000289-2017402 and 05000289-2017501) IR 05000289/20170042018-01-25025 January 2018 Integrated Inspection Report 05000289-2017004 IR 05000289/20174052017-11-29029 November 2017 Problem Identification and Resolution Cyber Security Inspection Report 05000289/2017405 (Cover Letter) IR 05000289/20170032017-10-25025 October 2017 Integrated Inspection Report 5000289/2017003 IR 05000289/20174032017-09-25025 September 2017 Baseline Security Inspection Report 05000289/2017403 (Cover Letter) IR 05000289/20170052017-08-28028 August 2017 Updated Inspection Plan for Three Mile Island Station, Unit 1, with Report 22 (Report 05000289/2017005) IR 05000289/20170102017-08-25025 August 2017 Susquehanna Steam Electric Station, Units 1 and 2 - Problem Identification and Resolution Cyber Security Inspection Report 05000387/2017405 and 05000388/2017405 (Cover Letter) IR 05000289/20173012017-08-23023 August 2017 Initial Operator Licensing Examination Report 05000289/2017301 2024-08-28
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000289/19990071999-09-27027 September 1999 Insp Rept 50-289/99-07 on 990718-0828.No Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support IR 05000289/19990041999-08-19019 August 1999 Insp Rept 50-289/99-04 on 990606-0717.Noncited Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000289/19990051999-07-0909 July 1999 Insp Rept 50-289/99-05 on 990510-28.No Violations Noted. Major Areas Inspected:Effectiveness of Engineering Functions in Providing for Safe Operation of Plant IR 05000289/19990061999-07-0808 July 1999 Insp Rept 50-289/99-06 on 990608-11.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Plan IR 05000289/19990031999-06-29029 June 1999 Insp Rept 50-289/99-03 on 990425-0605.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000289/19990021999-05-14014 May 1999 Insp Rept 50-289/99-02 on 990314-0424.Two Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Aspects of Licensee Operations,Maint,Engineering & Plant Support.Security Program Met Safeguards Requirements IR 05000289/19990011999-04-16016 April 1999 Insp Rept 50-289/99-01 on 990131-0313.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000289/19980081999-01-12012 January 1999 Insp Rept 50-289/98-08 on 981101-1226.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000289/19980071998-12-0303 December 1998 Insp Rept 50-289/98-07 on 980920-1031.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support,Including Results of Insps by Regional Inspector Re Emergency Preparedness & Radiological Controls IR 05000289/19980061998-10-15015 October 1998 Insp Rept 50-289/98-06 on 980810-27.Violations Noted.Major Areas Inspected:Engineering Activities Associated with Findings from NRC Architect Engineering Team Insp Completed in Jan 1997 & Documented in NRC Insp Rept 50-289/96-201 IR 05000289/19980051998-10-0202 October 1998 Insp Rept 50-289/98-05 on 980726-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Security Facilities & Equipment Were Well Maintain, Reliable & Met Licensee Commitments & NRC Requirements IR 05000289/19980031998-09-0404 September 1998 Insp Rept 50-289/98-03 on 980524-0725.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000289/19980021998-06-22022 June 1998 Insp Rept 50-289/98-02 on 980322-0523.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000289/19980011998-04-0909 April 1998 Insp Rept 50-289/98-01 on 980125-0321.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000289/19970091997-12-0202 December 1997 Insp Rept 50-289/97-09 on 970907-1101.Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support Over 8 Wk Period IR 05000289/19970081997-10-0909 October 1997 Insp Rept 50-289/97-08 on 970728-0906.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support & Results of Announced Insp in Area of Emergency Preparedness IR 05000289/19970061997-08-19019 August 1997 Insp Repts 50-289/97-06 & 50-320/97-02 on 970616-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000289/19970071997-07-23023 July 1997 Insp Rept 50-289/97-07 on 970428-0502 & 0512-16.Violations Noted.Major Areas Inspected:Engineering IR 05000289/19970051997-07-11011 July 1997 Insp Rept 50-289/97-05 on 970428-0615.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000289/19970041997-06-27027 June 1997 Insp Rept 50-289/97-04 on 970512-15.Violations Noted. Major Areas Inspected:Insp Evaluated Licensee Performance During Remedial EP Exercise IR 05000289/19970031997-05-29029 May 1997 Insp Rept 50-289/97-03 on 970303-0427.Apparent Violations Being Considered for Escalated Enforcement Action IAW NUREG-1600.Major Areas Inspected:Plant Operations,Maint, Engineering & Plant Support IR 05000289/19970021997-04-24024 April 1997 Insp Rept 50-289/97-02 on 970305-07.No Violations Noted. Major Areas Inspected:Insp Evaluated Licensee Emergency Response Capabilities Demonstrated During Biennial Full Participation EP Exercise ML20137W9391997-04-15015 April 1997 Insp Rept 50-289/96-201 on 961202-20 & 970106-10.No Violations Noted.Major Areas Inspected:Conduct of Engineering,Insp Scope & Methodology,Makeup & Purification Sys,Decay Heat Removal Sys & Control of Calculations ML20140B7051997-03-21021 March 1997 Insp Repts 50-289/97-01 & 50-320/97-01 on 970106-970302. Violations Noted.Major Areas Inspected:Plant Operations, Maintenance,Engineering & Plant Support IR 05000289/19960091997-01-22022 January 1997 Insp Rept 50-289/96-09 on 961119-970105.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000289/19960071996-11-18018 November 1996 Insp Rept 50-289/96-07 on 960929-1118.Violations Noted. Major Areas Inspected:Conduct of Operations, Quality Assurance in Operations & Conduct of Maint ML20135B0901996-11-14014 November 1996 Insp Rept 50-289/96-06 on 960804-0928.Violations Noted.Major Areas Inspected:Plant Operations,Engineering,Maint & Plant Support IR 05000289/19960081996-11-0707 November 1996 Insp Rept 50-289/96-08 on 960603-07 & 0926-27.No Violations Noted.Major Areas Inspected:Maintenance ML20129B3761996-09-13013 September 1996 Insp Rept 50-289/96-05 on 960617-0803.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000320/20040281995-06-0505 June 1995 Insp Repts 50-335/95-05 & 50-389/95-05 on 950320-0428. Violations Noted.Major Areas Inspected:Engineering & Technical Support & Follow Up on Previous Insp Findings IR 05000289/19930251994-01-0404 January 1994 Insp Rept 50-289/93-25 on 931026-1206.No Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Engineering,Radiological Controls,& Security Activities in Relation to Plant Safety IR 05000320/19930071993-12-23023 December 1993 Insp Rept 50-320/93-07 on 931101-1217.No Violations Noted. Major Areas Inspected:Licensee Completion of Pdms Requirements & Commitments for TMI-2 IR 05000289/19930221993-11-0909 November 1993 Insp Rept 50-289/93-22 on 930910-1025.Violation Noted But Not Cited.Major Areas Inspected:Plant Operations,Maint, Engineering,Radiological Controls & Security Activities as Related to Plant Safety IR 05000289/19930231993-11-0808 November 1993 Insp Rept 50-289/93-23 on 931004-08.Violations Noted.Major Areas Inspected:Radiological Controls During Planned Shutdown of Plant Operations for Refueling & Maint IR 05000289/19930211993-11-0808 November 1993 Insp Rept 50-289/93-21 on 931018-21.No Violations Noted. Major Areas Inspected:Mgt Support & Security Program Plans, Protected Areas Physical Barriers,Detection & Assessment Aids & Protected & Vital Area Access Control of Personnel IR 05000286/19930161993-10-19019 October 1993 Insp Rept 50-286/93-16 on 930802-06 & 0920-24.No Violations Noted.Major Areas Inspected:Isi Program,Procedures,Scope of ISI Work for Outage,Current Insp Plan & Testing Procedures IR 05000289/19930191993-09-24024 September 1993 Insp Repts 50-289/93-19 on 930801-0909.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support Activities Re Plant Safety ML20057A3861993-09-0303 September 1993 Enforcement Conference Rept 50-289/93-08 on 930824 to Discuss Delay in Callout of Emergency Response Organization During Vehicle Intrusion on 930207 IR 05000289/19930151993-08-27027 August 1993 Insp Rept 50-289/93-15 on 930727-30.No Violations or Deviations Noted.Major Areas Inspected:Review of Licensees C/As of Three Previously Identified Edsfi & follow-up of Unresolved Item Which Resulted in non-cited Violation IR 05000289/19930171993-08-17017 August 1993 Insp Rept 50-289/93-17 on 930802-06.No Violations Noted. Major Areas Inspected:Radiological & Nonradiological Chemistry Programs ML20056F4291993-08-11011 August 1993 Safety Insp Rept 50-289/93-14 on 930622-0731.Violations Noted.Major Areas Inspected:Plant Operations,Maint, Engineering,Radiological Control & Security as Related to Plant Safety ML20056D9101993-08-0505 August 1993 Insp Rept 50-289/93-08 on 930607-11.Violations Noted.Major Areas Inspected:Changes to EP & Implementing Procedures, Emergency Facilities,Equipment,Instrumentation & Supplies, Organization & Mgt Control & Training Effectiveness ML20045G4861993-07-0202 July 1993 Insp Rept 50-289/93-12 on 930517-21.No Violations Noted. Major Areas Inspected:Response to 930207 Forced Intrusion Into Protected Area of TMI-1,contingency Drills,Safety/ Safeguards Interface & Land Vehicle Bomb Procedure IR 05000289/19930131993-06-30030 June 1993 Insp Repts 50-289/93-13 & 50-320/93-06 on 930511-0621.Formal Root Cause Analysis Being Performed.Major Areas Inspected: Plant Operations,Maint,Radiological Controls,Security & Engineering & Technical Support Activities IR 05000289/19930101993-06-21021 June 1993 Insp Rept 50-289/93-10 on 930518-20.No Violations Noted. Major Areas inspected:annual,full-participation Exercise IR 05000289/19930111993-05-21021 May 1993 Insp Repts 50-289/93-11 & 50-320/93-05 on 930328-0510. Violation Noted.Major Areas Inspected:Plant Operations, Maint,Radiological Controls,Security & Engineering & Technical Support Activities Re Plant Safety IR 05000289/19930071993-04-15015 April 1993 Insp Rept 50-289/93-07 on 930222-26.No Violations Noted. Major Areas Inspected:Licensee Corrective Actions on Previously Identified Edsfi Findings IR 05000289/19930091993-04-14014 April 1993 Insp Repts 50-289/93-09 & 50-320/93-03 on 930223-0327. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Radiological Controls,Surveillance,Security, Engineering & Technical Support Activities Re Plant Safety IR 05000289/19930061993-04-12012 April 1993 Insp Rept 50-289/93-06 on 930208-0319.No Violations Noted. Major Areas Inspected:Design Mod in Process & Completed, Corporate & Site Activities in Support of TMI-1 & Overall Communications Between Corporate & Site Engineering ML20035F0281993-04-0808 April 1993 Insp Rept 50-320/93-04 on Stated Date.Violations Noted.Major Areas Inspected:Radwaste Shipment 1999-09-27
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000320/20240032024-11-21021 November 2024 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2024003 IR 05000320/20240012024-08-28028 August 2024 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report Nos. 05000320/2024001 and 05000320/2024002 IR 07200077/20240012024-06-18018 June 2024 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report No. 07200077/2024001 IR 05000320/20230042024-02-0707 February 2024 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2023004 IR 05000289/20230062024-01-29029 January 2024 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report No. 05000289/2023006 IR 05000320/20230032023-11-28028 November 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2, NRC Inspection Report No. 05000320/2023003 IR 05000320/20230022023-08-17017 August 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2023002 IR 05000289/20230052023-08-14014 August 2023 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report 05000289/2023005 IR 05000320/20230012023-04-12012 April 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report No. 05000320/2023001 IR 05000320/20220042023-02-16016 February 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report Nos. 05000320/2022004 and 05000320/2022401 IR 05000289/20220022023-02-13013 February 2023 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 – NRC Inspection Report Nos. 05000289/2022002 and 005000289/2022402 IR 05000289/20220012022-08-26026 August 2022 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report Nos. 05000289/2022001 and 07200077/2022001 ML22228A0142022-08-17017 August 2022 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report IR 05000289/20224012022-04-12012 April 2022 NRC Security Decommissioning Inspection Report No. 05000289/2022401 IR 05000289/20210022022-01-31031 January 2022 NRC Inspection Report 05000289/2021002 and 07200077/2021001 IR 05000320/20210042022-01-27027 January 2022 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2021004 IR 05000289/20210012021-06-28028 June 2021 NRC Inspection Report No. 05000289/2021001, Exelon Generation Co., LLC, Three Mile Island Nuclear Station, Unit 1 IR 05000289/20214012021-06-28028 June 2021 Security Decommissioning Inspection Report 05000289/2021401 IR 05000320/20210032021-06-22022 June 2021 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2021003 IR 05000289/20200052021-02-0101 February 2021 NRC Inspection Report No. 05000289/2020005, Exelon Generation Co., LLC, Three Mile Island Nuclear Station Unit 1 IR 05000320/20200022020-10-19019 October 2020 Gpu Nuclear, Inc., Three Mile Island Nuclear Station, Unit 2, NRC Inspection Report 05000320/2020002 IR 05000289/20204012020-09-0101 September 2020 Unit 1 - Security Baseline Inspection Report 05000289/2020401 IR 05000289/20200032020-07-20020 July 2020 NRC Inspection Report No. 05000289/2020003, Exelon Generation Co., LLC, Three Mile Island Nuclear Station, Unit 1 IR 05000289/20200012020-04-30030 April 2020 NRC Inspection Report 05000289/2020001 IR 05000289/20190102020-02-0404 February 2020 NRC Inspection Report No. 05000289/2019010, Exelon Generation Co., LLC, Three Mile Island Unit 1, Middletown, PA IR 05000289/20190032019-11-0606 November 2019 Integrated Inspection Report 05000289/2019003 IR 05000289/20190052019-08-28028 August 2019 Updated Inspection Plan Inspection Report 05000289/2019005 IR 05000289/20193012019-08-15015 August 2019 Initial Operator Licensing Examination Report 05000289/2019301 IR 05000289/20190022019-08-0909 August 2019 Integrated Inspection Report 05000289/2019002 IR 05000320/20190012019-06-10010 June 2019 Gpu Nuclear, Inc., Three Mile Island Station, Unit 2 - NRC Inspection Report 05000320/2019001 IR 05000289/20195012019-06-0303 June 2019 Emergency Preparedness Biennial Exercise Inspection Report 05000289/2019501 IR 05000289/20194102019-03-18018 March 2019 Baseline Security Inspection Report 05000289/2019410 IR 05000289/20180062019-03-0404 March 2019 Annual Assessment Letter for Three Mile Island Station, Unit 1 (Report 05000289/2018006) IR 05000289/20180042019-01-31031 January 2019 Integrated Inspection Report 5000289/2018004 IR 05000289/20182012018-12-13013 December 2018 NRC Inspection Report 05000289/2018201 IR 05000289/20180032018-11-0808 November 2018 Integrated Inspection Report 5000289/2018003 IR 05000289/20184102018-09-18018 September 2018 Baseline Security Inspection Report 05000289/2018410 (Letter Only) IR 05000289/20180052018-08-28028 August 2018 Updated Inspection Plan Inspection Report 05000289/2018005 IR 05000289/20180022018-08-0202 August 2018 Integrated Inspection Report 5000289/2018002 IR 05000320/20180112018-05-23023 May 2018 NRC Inspection Report 05000320/2018011 IR 05000289/20180012018-05-0202 May 2018 Integrated Inspection Report 5000289/2018001 and Exercise of Enforcement Discretion IR 05000289/20180102018-05-0202 May 2018 Design Bases Assurance Inspection (Teams) Report 05000289/2018010 IR 05000289/20170062018-02-28028 February 2018 Annual Assessment Letter for Three Mile Island Station-Unit 1 (Reports 05000289-2017006 and 05000289-2017402 and 05000289-2017501) IR 05000289/20170042018-01-25025 January 2018 Integrated Inspection Report 05000289-2017004 IR 05000289/20174052017-11-29029 November 2017 Problem Identification and Resolution Cyber Security Inspection Report 05000289/2017405 (Cover Letter) IR 05000289/20170032017-10-25025 October 2017 Integrated Inspection Report 5000289/2017003 IR 05000289/20174032017-09-25025 September 2017 Baseline Security Inspection Report 05000289/2017403 (Cover Letter) IR 05000289/20170052017-08-28028 August 2017 Updated Inspection Plan for Three Mile Island Station, Unit 1, with Report 22 (Report 05000289/2017005) IR 05000289/20170102017-08-25025 August 2017 Susquehanna Steam Electric Station, Units 1 and 2 - Problem Identification and Resolution Cyber Security Inspection Report 05000387/2017405 and 05000388/2017405 (Cover Letter) IR 05000289/20173012017-08-23023 August 2017 Initial Operator Licensing Examination Report 05000289/2017301 2024-08-28
[Table view] Category:UTILITY
MONTHYEARIR 05000289/19900801990-10-0303 October 1990 Safety Insp Rept 50-289/90-80 on 900911-13.Exercise Weaknesses Noted.Major Areas Inspected:Licensee Annual & partial-participation,emergency Preparedness Exercise Conducted on 900911-13 IR 05000289/19900161990-08-23023 August 1990 Insp Repts 50-289/90-16 & 50-320/90-07 on 900806-10.No Violations Noted.Major Areas Inspected:Radiological Controls Program,Including Corrective Actions Re NRC Followup Items, Organization & Staffing & Applied Health Physics IR 05000289/19900101990-06-22022 June 1990 Insp Rept 50-289/90-10 on 900507-11.Violation Noted.Major Areas Inspected:Licensee Implementation of Reg Guide 1.97, Rev 3 Re post-accident Monitoring Instrumentation IR 05000289/19900081990-06-15015 June 1990 Safety Insp Rept 50-289/90-08 on 900404-0515.No Violations Noted.Major Areas Inspected:Power Operations,Including Plant Operations,Maint/Surveillance,Radiological Practices, Security Measures & Engineering Support Activities IR 05000320/19900031990-06-14014 June 1990 Insp Rept 50-320/90-03 on 900303-0515.Licensee Identified Violation Noted.Major Areas Inspected:Decontamination & Defueling Activities,Review of Safe Fuel Mass Limit Analysis & Procedures Rept & LER 90-01 IR 05000289/19900111990-06-0101 June 1990 Insp Rept 50-289/90-11 on 900503-15.No Violations Noted. Major Areas Inspected:Design,Design Changes & Mods, Installation & Testing of Mods,Onsite & Corporate Engineering Interface & Staffing & Mgt Support IR 05000320/19900041990-05-16016 May 1990 Insp Rept 50-320/90-04 on 900319-23.No Violations,Deviations or Unresolved Items Identified.Major Areas Inspected:Changes to Emergency Plan & Implementing Procedures,Emergency Preparednesss Program & Emergency Response Facilities IR 05000289/19900071990-05-15015 May 1990 Safety Insp Rept 50-289/90-07 on 900319-23.No Violations, Deviations or Unresolved Items Noted.Major Areas Inspected: Licensee Emergency Preparedness Program,Including Emergency Response Facilities,Equipment & Supplies IR 05000289/19900091990-05-0808 May 1990 Partially Withheld Insp Rept 50-289/90-09 on 900404-06 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected: Unresolved Items Noted in Insp Rept 50-289/89-13 Re Testing & Maint of motor-operated Valves & Concerns Re Fuel Oil IR 05000289/19900061990-05-0303 May 1990 Safety Insp Rept 50-289/90-06 on 900227-0403.No Violations Noted.Major Areas Inspected:Power Operations Including,Plant Operations,Responses to Event,Maint/Surveillance Activities, Radiological Practices & Security Measures ML20034A2891990-04-10010 April 1990 Maint Team Insp Rept 50-289/89-82 on 891204-15 & 900122-25. Violations Noted.Major Areas Inspected:Maint Program & Implementation IR 05000289/19900041990-04-0606 April 1990 Insp Rept 50-289/90-04 on 900124-0226.No Violations Noted. Major Areas Inspected:Plant Operations,Refueling Activities & Maint/Surveillance Activities Related to Plant Safety IR 05000289/19900011990-03-0707 March 1990 Insp Rept 50-289/90-01 on 900108-26.No Violations Noted. Major Areas Inspected:Engineering Support Provided by Offsite Technical Functions Dept to Site Activities & Inservice Insp Activities.One Unresolved Item Identified IR 05000289/19900051990-03-0101 March 1990 Insp Repts 50-289/90-05 & 50-320/90-02 on 900122-26.No Violations Noted.Major Areas Inspected:Fire Protection/ Prevention Program Including,Program Administration & Organization & Administrative Control of Combustibles IR 05000289/19890261990-02-27027 February 1990 Insp Rept 50-289/89-26 on 891219-900123.Violations Noted. Major Areas Inspected:Power Operation,Reduced Power Operation,Plant Shutdown/Cooldown Activities & Maint/ Surveillance Activities Re Plant Safety IR 05000289/19900031990-01-24024 January 1990 Insp Rept 50-289/90-03 on 900116-19.No Violations Noted. Major Areas Inspected:Radiological Controls Program, Including Refueling Outage Work & Status of Previously Identified Items IR 05000289/19890251990-01-18018 January 1990 Insp Rept 50-289/89-25 on 891109-1218.No Violations or Unresolved Items Identified.Major Areas Inspected:Plant Operations,Maint/Surveillance & Engineering/Technical Support Activities Re Plant Safety IR 05000289/19890241989-12-29029 December 1989 Insp Rept 50-289/89-24 on 891005-1107.Violation Noted Re Engineered Safeguards Actuation During Surveillance Testing. Major Areas Inspected:Plant Operations & Maint/Surveillance Activities & Emergency Diesel Generator Cooling Fan Failure IR 05000320/19890131989-12-29029 December 1989 Insp Rept 50-320/89-13 on 891130 & 1215.Violation Noted. Major Areas Inspected:Circumstances Connected W/Unplanned Exposure of Radiological Controls Technician Associated W/ Removal of Fuel Lines from Reactor Vessel IR 05000320/19890081989-11-29029 November 1989 Insp Rept 50-320/89-08 on 890818-1020.Personnel Hazard Events Noted.Major Areas Inspected:Decontamination & Defueling Activities,Including Proper Implementation of Radiological Controls & Housekeeping Measures IR 05000289/19890811989-11-21021 November 1989 Insp Rept 50-289/89-81 on 891016-18.No Violations Noted. Major Areas inspected:full-participation Emergency Exercise on 891016-18 IR 05000289/19890181989-10-31031 October 1989 Safety Insp Rept 50-289/89-18 on 890826-1004.No Unresolved Items Noted.Major Areas Inspected:Power Operations Activities & Plant Activities Re Safety,Including Integrated Control Sys Transient & ESF Walkdown of Bldg Spray Sys IR 05000320/19890091989-10-26026 October 1989 Reactive Insp Rept 50-320/89-09 on 890928 & 1012-13. Apparent Violations Noted:Exposure of Two Workers in Excess of 10CFR20.101 Limits & Failure to Make 24 H Notification in Accordance W/Requirements of 10CFR20.403(b) ML19325D5751989-10-10010 October 1989 Insp Rept 50-289/89-21 on 890926-29.No Violations or Deviations Noted.Major Areas Inspected:Radiological Environ Monitoring Programs,Including Mgt Controls,Audits,Qa & Implementation of Listed Programs IR 05000289/19890141989-10-0606 October 1989 Insp Rept 50-289/89-14 on 890715-0825.No Violations Noted. Major Areas Inspected:Plant Operations & Maint/Surveillance in Area of Safety,Including Spent Fuel Ultrasonic Exam & Licensee Action on Previous Insp Findings IR 05000320/19890051989-09-0707 September 1989 Insp Rept 50-320/89-05 on 890603-0818.Major Areas Inspected: Defueling & Decontamination Activities,Including Proper Implementation of Radiological Controls,Housekeeping Measures & Actions on Previous Insp Findings IR 05000289/19890151989-09-0505 September 1989 Insp Repts 50-289/89-15 & 50-320/89-06 on 890724-28.No Violations Noted.Major Areas Inspected:Organization, Staffing & Hot Particle Control Program at Unit 2 Reactor & Events Connected W/Suspected Intake of Radioactive Matl IR 05000289/19890161989-08-30030 August 1989 Insp Rept 50-289/89-16 & 50-320/89-07 on 890814-18.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste Sys,Transportation & Liquid & Gaseous Effluents Programs Including Mgt Controls,Audits & QA IR 05000289/19890131989-08-22022 August 1989 Insp Rept 50-289/89-13 on 890626-0707.No Violations Noted. Major Areas Inspected:Corrective Actions Resulting from IE Bulletin 85-003 Addressing Improper Limit Switch & Torque Switch Settings in motor-operated Valves IR 05000289/19890121989-08-16016 August 1989 Insp Rept 50-289/89-12 on 890610-0714.No Violations Noted. Major Areas Inspected:Power Operations Activities,Plant Operations & Maint/Surveillance,Control Rod Drive Indication Problem & Diesel Generator Fuel Oil QA Program IR 05000289/19890081989-07-12012 July 1989 Insp Rept 50-289/89-08 on 890401-0508.No Violations Noted. Major Areas Inspected:Plant Operations,Equipment Operability,Emergency Power Sys Operability & Licensee Action on Previous Insp Findings IR 05000289/19890801989-07-0707 July 1989 Insp Rept 50-289/89-80 on 890306-17.No Violations or Deviations Noted.Major Areas Inspected:Review of Adequacy of Emergency Operating Procedures IR 05000289/19890111989-06-28028 June 1989 Insp Rept 50-289/89-11 on 890510-0609.Two non-cited Violations Identified.Major Areas Inspected:Plant Operations,Equipment Operability (Maint & Surveillance) & Licensee Action on Previous Insp Findings IR 05000320/19890041989-06-20020 June 1989 Insp Rept 50-320/89-04 on 890422-0602.Major Areas Inspected: Defueling & Decontamination Activities,Including Proper Implementation of Radiological Controls,Housekeeping Measures & Actions on Previous Insp Findings IR 05000289/19890101989-06-0707 June 1989 Insp Rept 50-289/89-10 on 890508-12.No Violations Noted. Major Areas Inspected:Licensee Evaluation & Resolution of EQ Issues IR 05000320/19850101989-06-0505 June 1989 Errata to Insp Rept 50-320/85-10.Inspector Followup Item 50-320/84-24-01 Should Be 50-320/84-24-03 IR 05000289/19870111989-05-25025 May 1989 Errata to Insp Rept 50-289/87-11,correcting Unresolved Item Number on Page 18 ML20247K0221989-05-15015 May 1989 Mgt Meeting Rept 50-289/89-09 on 890428.Major Area Discussed:Nrc Nonradiological Chemistry Program for Clarification on NRC Acceptance Criteria & Statistical Method Used to Evaluate Program & NRC Training Program IR 05000320/19890031989-05-0909 May 1989 Insp Rept 50-320/89-03 on 890305-0421.No Violations Noted. Major Areas Inspected:Routine Safety Insp of Defueling & Decontamination Activities,Including Proper Implementation of Radiological Controls & Housekeeping Measures IR 05000289/19890041989-05-0808 May 1989 Insp Rept 50-289/89-04 on 890226-0331.No Violations Noted. Major Areas Inspected:Plant Operations Activities,Equipment Operability & Licensee Action on Previous Insp Findings IR 05000289/19890061989-04-27027 April 1989 Insp Rept 50-289/89-06 on 890403-07.No Violations Noted. Major Areas Inspected:Implementation of Radiation Protection Program IR 05000320/19890021989-04-26026 April 1989 Insp Rept 50-320/89-02 on 890129-0306.No Violations Noted. Major Areas Inspected:Defueling & Decontamination Activities,Including Proper Implementation of Radiological Controls & Housekeeping Measures IR 05000289/19890071989-04-24024 April 1989 Insp Rept 50-289/89-07 on 890404-06.No Violations Noted. Major Areas Inspected:Licensee Corrective Actions for Previously Identified Environ Qualification Issues IR 05000289/19890011989-03-27027 March 1989 Insp Rept 50-289/89-01 on 890115-0225 & 27.No Violations Noted.Major Areas Inspected:Areas of Plant Operations, Equipment Operability (Maint & Surveillance) & Licensee Action on Previous Insp Findings ML20236B9891989-03-10010 March 1989 Insp Repts 50-289/89-02 & 50-320/89-01 on 890123-26.No Violations Noted.Major Areas Inspected:Licensee Emergency Preparedness Program IR 05000289/19890091989-02-28028 February 1989 Insp Rept 50-289/89-09 on 890213-16.Potential Violation Noted.Major Areas Inspected:Diesel Generator Air Sys Failures IR 05000289/19880291989-02-27027 February 1989 Safety Insp Rept 50-289/88-29 on 881203-890114 & 18.No Violations Noted.Major Areas Inspected:Plant Operations, Equipment Operability (Maint & Surveillance) & Engineering & Technical Support IR 05000289/19890051989-02-21021 February 1989 Insp Rept 50-289/89-05 on 890214-15.No Violations Noted. Major Areas Inspected:Performance of Visual Fire Damper Surveillance Test,Surveillance Test Records,Security Records of Personnel Access & Witnessing of Surveillance Test IR 05000320/19880201989-02-15015 February 1989 Insp Rept 50-320/88-20 on 881218-890131.No Major Problems Noted.Major Areas Inspected:Defueling & Decontamination Activities,Including Proper Implementation of Radiological Controls & Housekeeping Measures IR 05000289/19880271988-11-28028 November 1988 Insp Rept 50-289/88-27 on 881115-17.No Violations or Deviations Noted.Major Areas Inspected:Licensee Partial Participation Annual Emergency Preparedness Exercise Conducted 881116 1990-08-23
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000289/19990071999-09-27027 September 1999 Insp Rept 50-289/99-07 on 990718-0828.No Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support IR 05000289/19990041999-08-19019 August 1999 Insp Rept 50-289/99-04 on 990606-0717.Noncited Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000289/19990051999-07-0909 July 1999 Insp Rept 50-289/99-05 on 990510-28.No Violations Noted. Major Areas Inspected:Effectiveness of Engineering Functions in Providing for Safe Operation of Plant IR 05000289/19990061999-07-0808 July 1999 Insp Rept 50-289/99-06 on 990608-11.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Plan IR 05000289/19990031999-06-29029 June 1999 Insp Rept 50-289/99-03 on 990425-0605.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000289/19990021999-05-14014 May 1999 Insp Rept 50-289/99-02 on 990314-0424.Two Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Aspects of Licensee Operations,Maint,Engineering & Plant Support.Security Program Met Safeguards Requirements IR 05000289/19990011999-04-16016 April 1999 Insp Rept 50-289/99-01 on 990131-0313.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000289/19980081999-01-12012 January 1999 Insp Rept 50-289/98-08 on 981101-1226.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000289/19980071998-12-0303 December 1998 Insp Rept 50-289/98-07 on 980920-1031.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support,Including Results of Insps by Regional Inspector Re Emergency Preparedness & Radiological Controls ML20154L9821998-10-15015 October 1998 Notice of Violation from Insp on 980810-27.Violation Noted: in Oct 1997,change to Facility as Described in Section 6.1, Eccs,Of TMI-1 Ufsar,Involving Unreviewed Safety Question,Was Made Without Prior Commission Approval IR 05000289/19980061998-10-15015 October 1998 Insp Rept 50-289/98-06 on 980810-27.Violations Noted.Major Areas Inspected:Engineering Activities Associated with Findings from NRC Architect Engineering Team Insp Completed in Jan 1997 & Documented in NRC Insp Rept 50-289/96-201 IR 05000289/19980051998-10-0202 October 1998 Insp Rept 50-289/98-05 on 980726-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Security Facilities & Equipment Were Well Maintain, Reliable & Met Licensee Commitments & NRC Requirements ML20153E9471998-09-24024 September 1998 Exam Rept 50-289/98-301 Conducted on 980824-27.Exam Results: Four SRO Applicants Passed All Portions of Initial License Exam IR 05000289/19980031998-09-0404 September 1998 Insp Rept 50-289/98-03 on 980524-0725.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000289/19980021998-06-22022 June 1998 Insp Rept 50-289/98-02 on 980322-0523.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000289/19980011998-04-0909 April 1998 Insp Rept 50-289/98-01 on 980125-0321.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20203L7821998-02-26026 February 1998 Notice of Violation from Insp on 971102-980124.Violation Noted:Licensee Not Review & Approve Substantive Change to Existing Inservice Test Surveillance Procedure. Page 25 of Incoming Submittal Not Included IR 05000289/19980991998-02-26026 February 1998 SALP Rept 50-289/98-99 for Period 960805-980124 ML20199H6141998-01-27027 January 1998 Notice of Violation from Insp on 970907-1101.Violation Noted:Pressurizer Power Operated Relief Valve Was Returned to Svc Without Performing an IST to Verify Proper Valve Operation After Valve Replaced IR 05000289/19970091997-12-0202 December 1997 Insp Rept 50-289/97-09 on 970907-1101.Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support Over 8 Wk Period PNO-I-97-068, on 971103,unplanned Shutdown Greater than 72 H Occurred.Oil Leaks Detected & Repaired.Third RCP Inspected & Engineers Found Low Seal Flow at Second Stage Pump Seal. Resident Inspectors Following Onsite Activities1997-11-0505 November 1997 PNO-I-97-068:on 971103,unplanned Shutdown Greater than 72 H Occurred.Oil Leaks Detected & Repaired.Third RCP Inspected & Engineers Found Low Seal Flow at Second Stage Pump Seal. Resident Inspectors Following Onsite Activities IR 05000289/19970081997-10-0909 October 1997 Insp Rept 50-289/97-08 on 970728-0906.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support & Results of Announced Insp in Area of Emergency Preparedness ML20217H3281997-10-0808 October 1997 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $210,000.Violation Noted:On 940601,design Bases Were Not Correctly Translated Into Operating Procedures Re Switchover of Dhrs Pumps from Bwst to Reactor Building Sump ML20198R2831997-10-0303 October 1997 EN-97-096:on 971008,notice of Proposed Imposition of Civil Penalty in Amount of $210,000 Issued to Licensee.Action Based on Violations Involving Design Engineering,Equipment Classification & Corrective Actions ML20210R9641997-08-19019 August 1997 Notice of Violation from Insp on 970616-0727.Violation Noted:Licensee Failed to Implement EP Implementing Procedure EPIP-TMI-.03,Exhibit 1, Emergency Notifications & Call Outs IR 05000289/19970061997-08-19019 August 1997 Insp Repts 50-289/97-06 & 50-320/97-02 on 970616-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000289/19970071997-07-23023 July 1997 Insp Rept 50-289/97-07 on 970428-0502 & 0512-16.Violations Noted.Major Areas Inspected:Engineering ML20149K0081997-07-23023 July 1997 Notice of Violation from Insp on 970428-0502 & 0512-16. Violations Noted:On 970430,LER 97-03,did Not Contain Clear, Specific,Narrative Description of What Occurred IR 05000289/19970051997-07-11011 July 1997 Insp Rept 50-289/97-05 on 970428-0615.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000289/19970041997-06-27027 June 1997 Insp Rept 50-289/97-04 on 970512-15.Violations Noted. Major Areas Inspected:Insp Evaluated Licensee Performance During Remedial EP Exercise IR 05000289/19970031997-05-29029 May 1997 Insp Rept 50-289/97-03 on 970303-0427.Apparent Violations Being Considered for Escalated Enforcement Action IAW NUREG-1600.Major Areas Inspected:Plant Operations,Maint, Engineering & Plant Support IR 05000289/19970021997-04-24024 April 1997 Insp Rept 50-289/97-02 on 970305-07.No Violations Noted. Major Areas Inspected:Insp Evaluated Licensee Emergency Response Capabilities Demonstrated During Biennial Full Participation EP Exercise ML20137W9391997-04-15015 April 1997 Insp Rept 50-289/96-201 on 961202-20 & 970106-10.No Violations Noted.Major Areas Inspected:Conduct of Engineering,Insp Scope & Methodology,Makeup & Purification Sys,Decay Heat Removal Sys & Control of Calculations PNO-I-97-018, on 970328,protest Related to TMI-2 Accident Occurred.Protesters Walked in Circle,Outside of Util Property,Blocking Plant Entrance Lane.Plant Notified NRC Headquarter to Inform of Event1997-03-28028 March 1997 PNO-I-97-018:on 970328,protest Related to TMI-2 Accident Occurred.Protesters Walked in Circle,Outside of Util Property,Blocking Plant Entrance Lane.Plant Notified NRC Headquarter to Inform of Event ML20140B7051997-03-21021 March 1997 Insp Repts 50-289/97-01 & 50-320/97-01 on 970106-970302. Violations Noted.Major Areas Inspected:Plant Operations, Maintenance,Engineering & Plant Support IR 05000289/19960091997-01-22022 January 1997 Insp Rept 50-289/96-09 on 961119-970105.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20135F1641996-12-0606 December 1996 Notice of Violation from Insp on 960929-1118.Violation Noted:Scaffold tied-off & Supported by Safety Related Pipe Support for Nuclear River Water Sys W/O Prior Engineering Evaluation & Approval IR 05000289/19960071996-11-18018 November 1996 Insp Rept 50-289/96-07 on 960929-1118.Violations Noted. Major Areas Inspected:Conduct of Operations, Quality Assurance in Operations & Conduct of Maint ML20135B0851996-11-14014 November 1996 Notice of Violation from Insp on 960804-0928.Violation Noted:Improper Control of Posted High Radiation Area Entrance ML20135B0901996-11-14014 November 1996 Insp Rept 50-289/96-06 on 960804-0928.Violations Noted.Major Areas Inspected:Plant Operations,Engineering,Maint & Plant Support IR 05000289/19960081996-11-0707 November 1996 Insp Rept 50-289/96-08 on 960603-07 & 0926-27.No Violations Noted.Major Areas Inspected:Maintenance ML20129B3761996-09-13013 September 1996 Insp Rept 50-289/96-05 on 960617-0803.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20129B3601996-09-13013 September 1996 Notice of Violation from Insp on 960617-0803.Violation Noted:Inspectors Could Not Confirm Valve Factor Inputs to Calculations Which Establish Design Basis Functionality of Motor Operated Valves in Safety Re Applications IR 05000320/20040281995-06-0505 June 1995 Insp Repts 50-335/95-05 & 50-389/95-05 on 950320-0428. Violations Noted.Major Areas Inspected:Engineering & Technical Support & Follow Up on Previous Insp Findings IR 05000289/19930251994-01-0404 January 1994 Insp Rept 50-289/93-25 on 931026-1206.No Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Engineering,Radiological Controls,& Security Activities in Relation to Plant Safety IR 05000320/19930071993-12-23023 December 1993 Insp Rept 50-320/93-07 on 931101-1217.No Violations Noted. Major Areas Inspected:Licensee Completion of Pdms Requirements & Commitments for TMI-2 ML20058A4891993-11-12012 November 1993 Notice of Violation from Insp on 931004-08.Violation Noted: Several Examples of High Radiation Areas Where Licensee Did Not Barricade or Properly Control Access to Prevent Inadvertent Entry IR 05000289/19930221993-11-0909 November 1993 Insp Rept 50-289/93-22 on 930910-1025.Violation Noted But Not Cited.Major Areas Inspected:Plant Operations,Maint, Engineering,Radiological Controls & Security Activities as Related to Plant Safety IR 05000289/19930211993-11-0808 November 1993 Insp Rept 50-289/93-21 on 931018-21.No Violations Noted. Major Areas Inspected:Mgt Support & Security Program Plans, Protected Areas Physical Barriers,Detection & Assessment Aids & Protected & Vital Area Access Control of Personnel IR 05000289/19930231993-11-0808 November 1993 Insp Rept 50-289/93-23 on 931004-08.Violations Noted.Major Areas Inspected:Radiological Controls During Planned Shutdown of Plant Operations for Refueling & Maint 1999-09-27
[Table view] |
Text
.
-
-
!
.
.
.
.
'O U.S. NUCLEAR REGULATORY COMMISSION
,
OFFICE OF INSPECTION AND ENFORCEMENT Region I j
Report No.
50-320/81-07 i
Docket No.
50-320 i
License No. DPR-73 Priority Category C
---
l Licensee:
Metropolitan Edison Comoany j
100 Interpace Parkway Parsippany, New Jersey 07054 j
r Facility Name: Three Mile Island Nuclear Station, Unit 2
.
Inspection at: Middletown, Pennsylvania Inspection conducted: March 31 - April 3,1981 j
Inspectors: ' 9 /. W Y te Y d,u it M /fP /
w.c. aanaer, neactor inspector v date signed
IL,%
f - 2'j - !/
A. n.x _._ar n!
,
a, nescwr inspecwr date signed l
.
-
l
!
date signed
.
Cf.
)/. c{, Awd Ul'rl', j
~
_
-
!
Approved by:
,
E.E.Tr/p#p, Section Chief Materials
- * *'9"'
& Processes Section, EIB, DETI
,
!
Inspection Summary:
Inspection on March 31 - Aoril 3,1931 (Insoection Recort No. 50-320/81-07)
!
Areas Insoectea: Routine unannounced inspection by two region based inspectors of construction., civil, structural supports, fabrication of piping system, welding and NDE activities related to tM Submerged Demineralyzer system.
The inspection
'
involved fifty-two. (52) insoector-hours on site by two region based inspectors.
Resultsi No items of nonccmpliance were identified..
l t
i i
I
,
i I
Region I Form 12 i
(Rev. April 77)
8106 180 O
.
,
,
,., _. _ _.,
.. _..
_
_
_
.,, _ _ _ _ _ _ _ _,
-...
_
.
.
.
'
.,
-
.
,
OETAILS
-
1.
Persons Contacted
Metropolitan Edison Company / General Public Utilities Service i
J. Becker - N.D.E./ Piping, Lead Supervisor
"
R. Corbit - Lead Welding Inspector M. Herlihy - Startup and Test Manager N. Hollenbush - Modification Turnover System Coordinator
!
- L. King - G.P.U. Operations i
E. Mummert - Supervisor-Coordinator Unit 2 Standards
!
- J. Wright - Quality Control Manager J. Tietjen - Modification Construction Supervisor i
- L. J. Lehman, Licensing Engineer l
- +J. C. Devine, Manager Recovery Engineering
'
- T. R. Osterhaudt, Nuclear Recovery Engineer
- +G. R. Skillman, Recovery Project Engineer
>
.L. Lohnes, QA Engineer N. Hollerbush, QA Engineer i
'
+G. Hovey
+R.
Neuman Catalytic Comoany R. E. Lewis, Construction Superintendent
- Denotes those at Exit Meeting with W. F. Sanders, April 2,1981
- Denotes those at Exit Meeting with A. A. Varela, April 3, 1981
+0enotes Conferees with Telecon 4/10/81 t
2.
General
i r
This inspection was made to inspect the work ac,1vities in progress, completed
!
work, fabrication and testing status on the Submerged Demineralizer System
}
(-SDS) and review the records of the completed work for compliance with
!
the licensee commitments or regulatory requirements. The requirements are
!
defined in the Technical Evaluation Report (TER) dated April 10, 1980, ANSI
!
Code for Pressure Piping B31.1, Regulatory Guide 1.143, and GPU procedure 3803-Rev.2 relative to the welding and inspection of the piping system.
!
i This inspection is a follow-up to an inspection in July 23-25, 1980 and i
was related to the verification of the following items:
i
i
-
Control, verification and issuing of welding material.
l
-
t I
l i
f
'
!
.
t
--
-
-
-
,-..n.
--
.,
..,e-ye,+,,,
- - -- - -,
w
.,
~
.
.
<
.
-
.
t Review of the contractor welding procedures.
{
-
~
'
Review of the qualification records cf the weld procedures.
-
i Review of the welder qualification records
-
- -
Review of selected drawings
Rcview of selected audit reports of vender activities
-
,
Observation of welding in progress on the filter manifold.
I
-
Two walk through inspections of the work in progress.
.
-
i 3.
Work Observations
'
These observations were made to inspect the completed parts of the piping system in the areas of (1) trial fit of the remete reach rods for the
'
underwater connecting and disconrecting of the flow piping to the filter oed tanks; (2) Although tb4 majority of the main fluid containing piping was either shielded with lead jackets or inaccessible, a visual inspection was made of the welds in the instrument and air system for conditions that would enc oach on the minimum wall thickness such as undergrind of the weld fusion lines-Particular note was taken of the welds with respect to surface condition and the mergjng of the weld to the base material. This inspection included observations of the lead shielding attachments to the RCS Manifold, High Radiation Filter Manifold, and three Glove Box Control
'
Consoles. No items of noncompliance were identified.
Personnel Qualifications The requirement and commitment for the Non-Destructive Examination (NDE) of the piping welds was extracted from the ANSI Power Piping Code B31.1 and i
the more definitivo licensee procedure GPU 3803 Rev. 2 which defines a visual examination to be performed after completion of the pipe welds. This is the extent of the NDE examination. The records documenting the quali-i fications of the two inspectors who performed the visu ' inspections on the l
welds were examined to the requirements of ANSI 45.2.6 with the following
!
'
attributes noted:
Eye examination for visual acuity within the year i
Insoector a
-
i i
Visual training school 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />.
-
Experience, 5 years of nuclear inspection l
-
-
i TMI training on material non-conformance program
!
-
Procedure 15-03
,
,
e w
a
-
-n--
--v-p.
c--
e e
4 - r yo-
-.
,,
-.
m 4m y
-*p.
g.
,-,
m4. -.
- __
e
-
-
.
Eye examination for visual acuity within the year Inspector b
-
QA training, 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />
-
'
Visual training school 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />
-
Experience, 7 years NDE, 5 years nuclear
-
,
No items of noncompliance w>re identified.
,
5.
Record Review An inspection was made of two randomly selected record packages which were considered complete, reviewed by quality control and turned over to the i
startup and test group. The records in these packages are listed and l
described below:
Record packaoe ' identified as " Installation of Chem-Nuclear demineralizer a.
in the B' spent fuel storage pool, subsystem WG-25, inspection boundary
,
ECM 700 Rev.0. Filter Manifold."
b.
Turnover agreement. This record tabulates itemr which have nct been completed and will require further rework or cisposition. The list is compiled after a walk-down inspection by quality control of a specific
section of the system and all items.of this nature are listed for subsequent actions or resolutions.
The turnover agreement if acceptable, is assigned to the startup and test g? cup who accepts the responsibility for completion prior to startup of the system.
c.
Weld material records which list the weld electrodes withdrawn by each of the welders from the controlled storage and issue station.
d.
Weld data documentation which lists the welder identity, filler metal used, and signature documentation of the visual inspection of the weld after completion. Thirty-two welds were reviewed.
e.
Records for the installation of the Chem-Nuclear Demineralizer in "B" spent fuel storige pool for reactor building clean-up ECM 719 Rev. 1 and CNTM-018, installation of feed pump and associating piping, including:
Turnover agreement for the quality control final acceptance of the
-
inspection walkdown similar to Sb.
Review of weld records described in 5d fcr 34 welds.
-
No items of noncompliance were identified.
.
'
.
.
.
.
'
6.
Requirements for Construction / Inspection and Verification
'The inspection affort included review of the following:
Bechtel's technical specification number P-321A, Installation, Inspection I
-
and Documentation of Rigid Pipe Supports, Hangers and Restraints for j
the.SDS Piping.
GPU quality assurance procedure number TMI-10-MO-002, QA Modifications
-
/ Operations Section - Inspection Program GPU quality assurance procedure number TMI-15-03, Important to Safety
-
Material - Nanconformance Report Drawings by Chem-Nuclear Systems on the following: Monitor Tanks, Ion I
-
Exchange and Final Filter, Off Gas Separator, Prefilter/ Agitator, Radiation Monitors for Ion Exchange Filters, Fuel Pool Floor Equipment i
'
Bases and Installations, and Ton Exchange Support Rack Piping.
Other drawings were reviewed in conjunction with above to evaluate
-
,
design criteria, material, fabrication and Civil / Structural requirements
,
for conformance to codes and standards. These were observed clearly identified and cross referenced:
ANSI B31.1-77 Pcwer Piping Code AISC - 7th Edition Steel Constructior. Manual MSS-SP-89-78 Manufacturers' Standards for Hangers and f
Supports - Fabrication and Installation Practice.
,
No items of noncompliance were identified.
7.
Observation and Record Review of SDS Feed and Monitor Tank System I
Civil / Structural Succorts The inspector performed a walkdown inspection of the fut:1 handling building i
in comp ny with contractor personnel to observe and discuss completed
!
structural supports for the SOS Feed and Monitor Tank System. Ha observed
!
the overall appearance to conform to standards of good practice and he i
randomly selected specific units for further detailed review of documentation
!
prescribed by technical specification P-321A. Subsequently the inspector
!
!
- was informed by GPU QC that their inspection and audit of c.antractor
.
documentation had not been completed due to need of clarification mouested bw
!
~
EPU of Bechtel on the Safety -ge etassification of ECM 714 on the Installation
'
'
of SDS Feea and Monitor Tank System. NRC review of ECM 714 documentation received from contractor and approved by GPU will be made in a subsequent inspection.
,
,
?
-,-
._
-
-
-
.
-
.
-
. -
!
'
'
.
i No items of noncompliance were identified.
!
8.
Inspector Evaluation of Civil / Structural Aspects of the SOS j
The inspector observed in his review of the civil / structural aspects of the SDS that the regulatory positions of Regulatory Guide 1.143-78 appeared
'
full filled. This guide identifies:
t Foundations and adjacent walls of structures that house the radwaste
-
system should be designed to seismic loads for the buildings.
Equipment and components used to collect, process or store solid or j
-
liquid radwastes need not be designed to seismic criteria required for
'
the butiding housing the radwaste system.
,
No items of noncompliance were identified.
?
9.
Unresolved Items - Licensee Commits to Recort on Engineering
Rationale and Justification for SOS Non-Seismic Design-l Whereas the SOS is required to conform to Power Piping Code ANSI B31.1-77, the inspector was informed by the licensee that code section 101.5.3 on
!
!
!
earthc;uake design was interpreted as not applicable. The inspector therefore
.
requested justification for this deviation from the committed code.
l
'
Licensee presented a draft report of his justification for the deviation at
<
!
the exit interview April 3, 1981. This report will be revised to address items discussed at the exit. meeting.
I r
Subsequent to the exit interview, in telephonic discussions with licensee, j
i they connitted to include in the final _ engineer _ina.recort, noted above, the
matter of excess loading or. the SDS fuel pool tank "A."
This tank, a part of the seismically designed original Unit 2 fuel pool, contains four upright j
15,000 gallon steel tanks filled during the special process control (SPC),
emergency recovery following the accident.
Radiation shielding covers of
-
massive steel beams-and concrete slabs have additionally subjected the fuel
pool structure to excess loading. This appears to be a hazard that could l
Jeopardize the structural integrity of the fuel pool during a seismic j
event. The licensee has comrr.itted to an evaluation analysis and justification
that leakage resulting from seismic rupture of the overloaded fuel pool
'
tank "A" will be contained and will not endanger the health and safety of the public.
The final engineering report will be reviewed in a subsequent inspection.
Pending his review, the NRC inspector had no further questions, This is
!
unresolved iten number 81-07-01.
-
.
-
-
.
.
-- -
.
. - -
- -
-
.-
,.9.
-
.
,
,
10. Unresolved Items
,
.
Unresolved items are matters about which more information is required in order to ascertain whether they are acceptable items, items of non-compliance, or deviations. One unresolved item disclosed during this inspection is discussed in paragraph 9.
11. Exit Interview At the conclusion of the inspections on April 2-3, separate meetings were
'
held at the site with representatives of the licensee. Attendees at this meeting included personnel whose names are indicated in paragraph 1.
The inspector summarized the results of the inspection as des:ribed in
!
this report.
!
!
r
.
i
.
l I
f i
!
!
!
i i
i
!
>
!
f
!
.
-
-.
,
,
,,, - -