IR 05000289/1981031

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Rept 50-289/81-31 on 811116-20.No Noncompliance Noted.Major Areas Inspected:Review of Security Plan & Implementing Procedures.Details Withheld (Ref 10CFR73.21)
ML20049H669
Person / Time
Site: Crane Constellation icon.png
Issue date: 02/02/1982
From: Bailey R, Devlin J, Mckeown L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20049H666 List:
References
50-289-81-31, NUDOCS 8203030426
Download: ML20049H669 (1)


Text

,

..

.

.

.

U.S. NUCLEAR REGULATORY COMMISSION 0FFICE OF INSPECTION AND ENFORCEMENT Region I Report No.

50-289/81-31 Docket No.

50-289 License No.

DPR-50 Safeguards Group 4 Licensee:

Metropolitan Edison Company EEF1N B 3fs

.

100 Interpace Parkway tNAaEE

'f (SIGN 4TtRE)/

7M)

/

-2 HS7W Parsippany, New Jersey 07054 g gg)

y,

,

Facility Name:

Three Mile Island Nuclear Station, Unit 1 Inspection At:

Middletown, Pennsylvania Inspection Conducted:

November 16-?0, 1981 Date of Last Physical Protection Inspection:

May 11-15, 21-22, 1931 Type of Inspectiony'

outinec0ganrfd7;ncedPhysicalProtection

/ '28'[.b Inspectors:

/

R. J4 ailey Phf alp [tectionInspector date signed B

.

.)

[&

L. McKeown, py' Jcal Pr;6tection Inspector date signed Approved By O f m v b

. 'W. Devlin, Acting Chief, Safeguards date signed e

Section, Technical Inspection Branch Inspection Sunnary:

Inspection on November 16-20, 1981 (Re3 ort No. 50-289/81-31)

Areas Inspected:

Included review of t1e Physical Security Plan and Implementing Procedures; Site Orientation; Security Organization - (Management), (Personnel),

and (Response); Security Program Audit; Records and Reports; Testing and Maintenance; Locks, Keys and Combinations; Physical Barriers - (Protected Areas); Physical Barriers - (Vital Areas); Security System Pcwer Supply; Lighting; Assessment Aids; Access Control - (Personnel), (Packages), and (Vehicles); Detection Aids -

(Protected Area); Detection Aids - (Vital Areas); Alarm Stations; Communications; Followup on items of noncompliance. The inspection involved 66 inspector-hours by two regional based NRC inspectors.

The inspection began during regular hours; 2 inspector hours were accomplished during off shift periods.

Results: The licensae was found to be in compliance with NRC requirements within the 22 functional areas examined during the inspection.

THE INFORMATION ON THIS PAGE IS DEEMED TO BE S-F1 -83-13 APPROPRIATE FOR PUBLIC DISCLOSURE PURSUANT TO Copya of TCopies 10 CFR 73.21 j_Pages PARNING: SANJARDS INFORMATION THE REPORT DETAILS CONTAIN (Safeguards Information)

SECTION 147 ATOMIC E:CEGY AcI 1954.

VIOLATIONS OF TE FKoIECTICN 8203030426 820216

, REQUIREvr;IS oF lo cra 73.21 PDR ADOCK 05000289 O

PDR enm