IR 05000289/1981031
| ML20049H669 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 02/02/1982 |
| From: | Bailey R, Devlin J, Mckeown L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20049H666 | List: |
| References | |
| 50-289-81-31, NUDOCS 8203030426 | |
| Download: ML20049H669 (1) | |
Text
,
..
.
.
.
U.S. NUCLEAR REGULATORY COMMISSION 0FFICE OF INSPECTION AND ENFORCEMENT Region I Report No.
50-289/81-31 Docket No.
50-289 License No.
DPR-50 Safeguards Group 4 Licensee:
Metropolitan Edison Company EEF1N B 3fs
.
100 Interpace Parkway tNAaEE
'f (SIGN 4TtRE)/
7M)
/
-2 HS7W Parsippany, New Jersey 07054 g gg)
y,
,
Facility Name:
Three Mile Island Nuclear Station, Unit 1 Inspection At:
Middletown, Pennsylvania Inspection Conducted:
November 16-?0, 1981 Date of Last Physical Protection Inspection:
May 11-15, 21-22, 1931 Type of Inspectiony'
outinec0ganrfd7;ncedPhysicalProtection
/ '28'[.b Inspectors:
/
R. J4 ailey Phf alp [tectionInspector date signed B
.
.)
[&
L. McKeown, py' Jcal Pr;6tection Inspector date signed Approved By O f m v b
. 'W. Devlin, Acting Chief, Safeguards date signed e
Section, Technical Inspection Branch Inspection Sunnary:
Inspection on November 16-20, 1981 (Re3 ort No. 50-289/81-31)
Areas Inspected:
Included review of t1e Physical Security Plan and Implementing Procedures; Site Orientation; Security Organization - (Management), (Personnel),
and (Response); Security Program Audit; Records and Reports; Testing and Maintenance; Locks, Keys and Combinations; Physical Barriers - (Protected Areas); Physical Barriers - (Vital Areas); Security System Pcwer Supply; Lighting; Assessment Aids; Access Control - (Personnel), (Packages), and (Vehicles); Detection Aids -
(Protected Area); Detection Aids - (Vital Areas); Alarm Stations; Communications; Followup on items of noncompliance. The inspection involved 66 inspector-hours by two regional based NRC inspectors.
The inspection began during regular hours; 2 inspector hours were accomplished during off shift periods.
Results: The licensae was found to be in compliance with NRC requirements within the 22 functional areas examined during the inspection.
THE INFORMATION ON THIS PAGE IS DEEMED TO BE S-F1 -83-13 APPROPRIATE FOR PUBLIC DISCLOSURE PURSUANT TO Copya of TCopies 10 CFR 73.21 j_Pages PARNING: SANJARDS INFORMATION THE REPORT DETAILS CONTAIN (Safeguards Information)
SECTION 147 ATOMIC E:CEGY AcI 1954.
VIOLATIONS OF TE FKoIECTICN 8203030426 820216
, REQUIREvr;IS oF lo cra 73.21 PDR ADOCK 05000289 O
PDR enm