MONTHYEARIR 05000289/19990071999-09-27027 September 1999 Insp Rept 50-289/99-07 on 990718-0828.No Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support IR 05000289/19990041999-08-19019 August 1999 Insp Rept 50-289/99-04 on 990606-0717.Noncited Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000289/19990051999-07-0909 July 1999 Insp Rept 50-289/99-05 on 990510-28.No Violations Noted. Major Areas Inspected:Effectiveness of Engineering Functions in Providing for Safe Operation of Plant IR 05000289/19990061999-07-0808 July 1999 Insp Rept 50-289/99-06 on 990608-11.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Plan IR 05000289/19990031999-06-29029 June 1999 Insp Rept 50-289/99-03 on 990425-0605.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000289/19990021999-05-14014 May 1999 Insp Rept 50-289/99-02 on 990314-0424.Two Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Aspects of Licensee Operations,Maint,Engineering & Plant Support.Security Program Met Safeguards Requirements IR 05000289/19990011999-04-16016 April 1999 Insp Rept 50-289/99-01 on 990131-0313.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000289/19980091999-03-0505 March 1999 Insp Rept 50-289/98-09 on 981227-990130.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000289/19980081999-01-12012 January 1999 Insp Rept 50-289/98-08 on 981101-1226.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000289/19980071998-12-0303 December 1998 Insp Rept 50-289/98-07 on 980920-1031.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support,Including Results of Insps by Regional Inspector Re Emergency Preparedness & Radiological Controls ML20154M0251998-10-15015 October 1998 Insp Rept 50-289/98-06 on 980810-27.Violations Noted.Major Areas Inspected:Engineering Activities Associated with Findings from NRC Architect Engineering Team Insp Completed in Jan 1997 & Documented in NRC Insp Rept 50-289/96-201 IR 05000289/19980051998-10-0202 October 1998 Insp Rept 50-289/98-05 on 980726-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Security Facilities & Equipment Were Well Maintain, Reliable & Met Licensee Commitments & NRC Requirements IR 05000289/19980031998-09-0404 September 1998 Insp Rept 50-289/98-03 on 980524-0725.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000289/19980021998-06-22022 June 1998 Insp Rept 50-289/98-02 on 980322-0523.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000289/19980011998-04-0909 April 1998 Insp Rept 50-289/98-01 on 980125-0321.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000289/19970101998-02-26026 February 1998 Insp Repts 50-289/97-10 & 50-320/97-03 on 971102-980124. Violations Noted.Major Areas Inspected:Maint,Engineering & Plant Support.License Operator Requalification Program, Corrective Actions Program & Security Also Inspected ML20203D7591997-12-0202 December 1997 Insp Rept 50-289/97-09 on 970907-1101.Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support Over 8 Wk Period IR 05000289/19970081997-10-0909 October 1997 Insp Rept 50-289/97-08 on 970728-0906.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support & Results of Announced Insp in Area of Emergency Preparedness ML20210R9801997-08-19019 August 1997 Insp Repts 50-289/97-06 & 50-320/97-02 on 970616-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000289/19970061997-08-19019 August 1997 Insp Repts 50-289/97-06 & 50-320/97-02 on 970616-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20149K0171997-07-23023 July 1997 Insp Rept 50-289/97-07 on 970428-0502 & 0512-16.Violations Noted.Major Areas Inspected:Engineering IR 05000289/19970051997-07-11011 July 1997 Insp Rept 50-289/97-05 on 970428-0615.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20148S2321997-06-27027 June 1997 Insp Rept 50-289/97-04 on 970512-15.Violations Noted. Major Areas Inspected:Insp Evaluated Licensee Performance During Remedial EP Exercise IR 05000289/19970031997-05-29029 May 1997 Insp Rept 50-289/97-03 on 970303-0427.Apparent Violations Being Considered for Escalated Enforcement Action IAW NUREG-1600.Major Areas Inspected:Plant Operations,Maint, Engineering & Plant Support IR 05000289/19970021997-04-24024 April 1997 Insp Rept 50-289/97-02 on 970305-07.No Violations Noted. Major Areas Inspected:Insp Evaluated Licensee Emergency Response Capabilities Demonstrated During Biennial Full Participation EP Exercise ML20137W9391997-04-15015 April 1997 Insp Rept 50-289/96-201 on 961202-20 & 970106-10.No Violations Noted.Major Areas Inspected:Conduct of Engineering,Insp Scope & Methodology,Makeup & Purification Sys,Decay Heat Removal Sys & Control of Calculations ML20140B7051997-03-21021 March 1997 Insp Repts 50-289/97-01 & 50-320/97-01 on 970106-970302. Violations Noted.Major Areas Inspected:Plant Operations, Maintenance,Engineering & Plant Support IR 05000289/19960091997-01-22022 January 1997 Insp Rept 50-289/96-09 on 961119-970105.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000289/19960071996-11-18018 November 1996 Insp Rept 50-289/96-07 on 960929-1118.Violations Noted. Major Areas Inspected:Conduct of Operations, Quality Assurance in Operations & Conduct of Maint ML20135B0901996-11-14014 November 1996 Insp Rept 50-289/96-06 on 960804-0928.Violations Noted.Major Areas Inspected:Plant Operations,Engineering,Maint & Plant Support IR 05000289/19960081996-11-0707 November 1996 Insp Rept 50-289/96-08 on 960603-07 & 0926-27.No Violations Noted.Major Areas Inspected:Maintenance ML20129B3761996-09-13013 September 1996 Insp Rept 50-289/96-05 on 960617-0803.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000289/19930251994-01-0404 January 1994 Insp Rept 50-289/93-25 on 931026-1206.No Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Engineering,Radiological Controls,& Security Activities in Relation to Plant Safety IR 05000320/19930071993-12-23023 December 1993 Insp Rept 50-320/93-07 on 931101-1217.No Violations Noted. Major Areas Inspected:Licensee Completion of Pdms Requirements & Commitments for TMI-2 IR 05000289/19930221993-11-0909 November 1993 Insp Rept 50-289/93-22 on 930910-1025.Violation Noted But Not Cited.Major Areas Inspected:Plant Operations,Maint, Engineering,Radiological Controls & Security Activities as Related to Plant Safety ML20058A4941993-11-0808 November 1993 Insp Rept 50-289/93-23 on 931004-08.Violations Noted.Major Areas Inspected:Radiological Controls During Planned Shutdown of Plant Operations for Refueling & Maint IR 05000289/19930211993-11-0808 November 1993 Insp Rept 50-289/93-21 on 931018-21.No Violations Noted. Major Areas Inspected:Mgt Support & Security Program Plans, Protected Areas Physical Barriers,Detection & Assessment Aids & Protected & Vital Area Access Control of Personnel IR 05000286/19930161993-10-19019 October 1993 Insp Rept 50-286/93-16 on 930802-06 & 0920-24.No Violations Noted.Major Areas Inspected:Isi Program,Procedures,Scope of ISI Work for Outage,Current Insp Plan & Testing Procedures IR 05000289/19930191993-09-24024 September 1993 Insp Repts 50-289/93-19 on 930801-0909.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support Activities Re Plant Safety ML20057A3861993-09-0303 September 1993 Enforcement Conference Rept 50-289/93-08 on 930824 to Discuss Delay in Callout of Emergency Response Organization During Vehicle Intrusion on 930207 IR 05000289/19930151993-08-27027 August 1993 Insp Rept 50-289/93-15 on 930727-30.No Violations or Deviations Noted.Major Areas Inspected:Review of Licensees C/As of Three Previously Identified Edsfi & follow-up of Unresolved Item Which Resulted in non-cited Violation ML20056F4291993-08-11011 August 1993 Safety Insp Rept 50-289/93-14 on 930622-0731.Violations Noted.Major Areas Inspected:Plant Operations,Maint, Engineering,Radiological Control & Security as Related to Plant Safety ML20056D9101993-08-0505 August 1993 Insp Rept 50-289/93-08 on 930607-11.Violations Noted.Major Areas Inspected:Changes to EP & Implementing Procedures, Emergency Facilities,Equipment,Instrumentation & Supplies, Organization & Mgt Control & Training Effectiveness IR 05000289/19930041993-02-0404 February 1993 Physical Security Insp Rept 50-289/93-04 on 930125-28.No Violations Noted.Major Areas Inspected:Mgt Support & Security Program Plans,Emergency Power Supply,Maint & Security Training IR 05000289/19920221993-02-0202 February 1993 Insp Repts 50-289/92-22 & 50-320/92-16 on 921208-930118.No Violations Noted.Major Areas Inspected:Plant Operations, Maint,Radiological Controls,Security & Engineering & Technical Support Activities Re Plant Safety IR 05000320/19930021993-01-29029 January 1993 Insp Rept 50-320/93-02 on 921221.Violation Noted.Major Areas Inspected:Util Was Originator of Radwaste Shipment Which Was Inspected by State of Wa at Us Ecology Waste Disposal Site Near Richland,Wa IR 05000289/19930011993-01-29029 January 1993 Insp Rept 50-289/93-01 on 930111-15.No Violations Noted. Major Areas Inspected:Fire Protection Program Including Implementation of Administrative Controls,Fire Surveillance Program,Fire Audits & Fire Training Programs IR 05000289/19920211993-01-12012 January 1993 Insp Repts 50-289/92-21 & 50-320/92-15 on 921207-11. Violation Noted.Major Area Inspected:Postings & Other Controls Observed During Facility Tours,Reactor Building Entry During Power Operation & Organization & Staffing IR 05000289/19920201992-12-23023 December 1992 Insp Repts 50-289/92-20 & 50-320/92-14 on 921027-1207. Violations Noted.Major Areas Inspected:Power Operations & Cleanup Activities,Plant Operations,Maint,Radiological Controls,Security & Engineering IR 05000289/19920191992-11-25025 November 1992 Insp Repts 50-289/92-19 & 50-320/92-13 on 921102-06.No Safety Concerns or Violations Noted.Major Areas Inspected: Unit 1 Radioactive Liquid & Gaseous Effluent Control Programs,Projected Dose Calculations & Mgt Controls 1999-09-27
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000289/19990071999-09-27027 September 1999 Insp Rept 50-289/99-07 on 990718-0828.No Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support IR 05000289/19990041999-08-19019 August 1999 Insp Rept 50-289/99-04 on 990606-0717.Noncited Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000289/19990051999-07-0909 July 1999 Insp Rept 50-289/99-05 on 990510-28.No Violations Noted. Major Areas Inspected:Effectiveness of Engineering Functions in Providing for Safe Operation of Plant IR 05000289/19990061999-07-0808 July 1999 Insp Rept 50-289/99-06 on 990608-11.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Plan IR 05000289/19990031999-06-29029 June 1999 Insp Rept 50-289/99-03 on 990425-0605.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000289/19990021999-05-14014 May 1999 Insp Rept 50-289/99-02 on 990314-0424.Two Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Aspects of Licensee Operations,Maint,Engineering & Plant Support.Security Program Met Safeguards Requirements IR 05000289/19990011999-04-16016 April 1999 Insp Rept 50-289/99-01 on 990131-0313.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000289/19980091999-03-0505 March 1999 Insp Rept 50-289/98-09 on 981227-990130.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000289/19980081999-01-12012 January 1999 Insp Rept 50-289/98-08 on 981101-1226.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000289/19980071998-12-0303 December 1998 Insp Rept 50-289/98-07 on 980920-1031.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support,Including Results of Insps by Regional Inspector Re Emergency Preparedness & Radiological Controls ML20154M0251998-10-15015 October 1998 Insp Rept 50-289/98-06 on 980810-27.Violations Noted.Major Areas Inspected:Engineering Activities Associated with Findings from NRC Architect Engineering Team Insp Completed in Jan 1997 & Documented in NRC Insp Rept 50-289/96-201 IR 05000289/19980051998-10-0202 October 1998 Insp Rept 50-289/98-05 on 980726-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Security Facilities & Equipment Were Well Maintain, Reliable & Met Licensee Commitments & NRC Requirements IR 05000289/19980031998-09-0404 September 1998 Insp Rept 50-289/98-03 on 980524-0725.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000289/19980021998-06-22022 June 1998 Insp Rept 50-289/98-02 on 980322-0523.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000289/19980011998-04-0909 April 1998 Insp Rept 50-289/98-01 on 980125-0321.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000289/19970101998-02-26026 February 1998 Insp Repts 50-289/97-10 & 50-320/97-03 on 971102-980124. Violations Noted.Major Areas Inspected:Maint,Engineering & Plant Support.License Operator Requalification Program, Corrective Actions Program & Security Also Inspected ML20203D7591997-12-0202 December 1997 Insp Rept 50-289/97-09 on 970907-1101.Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support Over 8 Wk Period IR 05000289/19970081997-10-0909 October 1997 Insp Rept 50-289/97-08 on 970728-0906.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support & Results of Announced Insp in Area of Emergency Preparedness ML20210R9801997-08-19019 August 1997 Insp Repts 50-289/97-06 & 50-320/97-02 on 970616-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000289/19970061997-08-19019 August 1997 Insp Repts 50-289/97-06 & 50-320/97-02 on 970616-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20149K0171997-07-23023 July 1997 Insp Rept 50-289/97-07 on 970428-0502 & 0512-16.Violations Noted.Major Areas Inspected:Engineering IR 05000289/19970051997-07-11011 July 1997 Insp Rept 50-289/97-05 on 970428-0615.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20148S2321997-06-27027 June 1997 Insp Rept 50-289/97-04 on 970512-15.Violations Noted. Major Areas Inspected:Insp Evaluated Licensee Performance During Remedial EP Exercise IR 05000289/19970031997-05-29029 May 1997 Insp Rept 50-289/97-03 on 970303-0427.Apparent Violations Being Considered for Escalated Enforcement Action IAW NUREG-1600.Major Areas Inspected:Plant Operations,Maint, Engineering & Plant Support IR 05000289/19970021997-04-24024 April 1997 Insp Rept 50-289/97-02 on 970305-07.No Violations Noted. Major Areas Inspected:Insp Evaluated Licensee Emergency Response Capabilities Demonstrated During Biennial Full Participation EP Exercise ML20137W9391997-04-15015 April 1997 Insp Rept 50-289/96-201 on 961202-20 & 970106-10.No Violations Noted.Major Areas Inspected:Conduct of Engineering,Insp Scope & Methodology,Makeup & Purification Sys,Decay Heat Removal Sys & Control of Calculations ML20140B7051997-03-21021 March 1997 Insp Repts 50-289/97-01 & 50-320/97-01 on 970106-970302. Violations Noted.Major Areas Inspected:Plant Operations, Maintenance,Engineering & Plant Support IR 05000289/19960091997-01-22022 January 1997 Insp Rept 50-289/96-09 on 961119-970105.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000289/19960071996-11-18018 November 1996 Insp Rept 50-289/96-07 on 960929-1118.Violations Noted. Major Areas Inspected:Conduct of Operations, Quality Assurance in Operations & Conduct of Maint ML20135B0901996-11-14014 November 1996 Insp Rept 50-289/96-06 on 960804-0928.Violations Noted.Major Areas Inspected:Plant Operations,Engineering,Maint & Plant Support IR 05000289/19960081996-11-0707 November 1996 Insp Rept 50-289/96-08 on 960603-07 & 0926-27.No Violations Noted.Major Areas Inspected:Maintenance ML20129B3761996-09-13013 September 1996 Insp Rept 50-289/96-05 on 960617-0803.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000289/19930251994-01-0404 January 1994 Insp Rept 50-289/93-25 on 931026-1206.No Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Engineering,Radiological Controls,& Security Activities in Relation to Plant Safety IR 05000320/19930071993-12-23023 December 1993 Insp Rept 50-320/93-07 on 931101-1217.No Violations Noted. Major Areas Inspected:Licensee Completion of Pdms Requirements & Commitments for TMI-2 IR 05000289/19930221993-11-0909 November 1993 Insp Rept 50-289/93-22 on 930910-1025.Violation Noted But Not Cited.Major Areas Inspected:Plant Operations,Maint, Engineering,Radiological Controls & Security Activities as Related to Plant Safety ML20058A4941993-11-0808 November 1993 Insp Rept 50-289/93-23 on 931004-08.Violations Noted.Major Areas Inspected:Radiological Controls During Planned Shutdown of Plant Operations for Refueling & Maint IR 05000289/19930211993-11-0808 November 1993 Insp Rept 50-289/93-21 on 931018-21.No Violations Noted. Major Areas Inspected:Mgt Support & Security Program Plans, Protected Areas Physical Barriers,Detection & Assessment Aids & Protected & Vital Area Access Control of Personnel IR 05000286/19930161993-10-19019 October 1993 Insp Rept 50-286/93-16 on 930802-06 & 0920-24.No Violations Noted.Major Areas Inspected:Isi Program,Procedures,Scope of ISI Work for Outage,Current Insp Plan & Testing Procedures IR 05000289/19930191993-09-24024 September 1993 Insp Repts 50-289/93-19 on 930801-0909.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support Activities Re Plant Safety ML20057A3861993-09-0303 September 1993 Enforcement Conference Rept 50-289/93-08 on 930824 to Discuss Delay in Callout of Emergency Response Organization During Vehicle Intrusion on 930207 IR 05000289/19930151993-08-27027 August 1993 Insp Rept 50-289/93-15 on 930727-30.No Violations or Deviations Noted.Major Areas Inspected:Review of Licensees C/As of Three Previously Identified Edsfi & follow-up of Unresolved Item Which Resulted in non-cited Violation ML20056F4291993-08-11011 August 1993 Safety Insp Rept 50-289/93-14 on 930622-0731.Violations Noted.Major Areas Inspected:Plant Operations,Maint, Engineering,Radiological Control & Security as Related to Plant Safety ML20056D9101993-08-0505 August 1993 Insp Rept 50-289/93-08 on 930607-11.Violations Noted.Major Areas Inspected:Changes to EP & Implementing Procedures, Emergency Facilities,Equipment,Instrumentation & Supplies, Organization & Mgt Control & Training Effectiveness IR 05000289/19930041993-02-0404 February 1993 Physical Security Insp Rept 50-289/93-04 on 930125-28.No Violations Noted.Major Areas Inspected:Mgt Support & Security Program Plans,Emergency Power Supply,Maint & Security Training IR 05000289/19920221993-02-0202 February 1993 Insp Repts 50-289/92-22 & 50-320/92-16 on 921208-930118.No Violations Noted.Major Areas Inspected:Plant Operations, Maint,Radiological Controls,Security & Engineering & Technical Support Activities Re Plant Safety IR 05000320/19930021993-01-29029 January 1993 Insp Rept 50-320/93-02 on 921221.Violation Noted.Major Areas Inspected:Util Was Originator of Radwaste Shipment Which Was Inspected by State of Wa at Us Ecology Waste Disposal Site Near Richland,Wa IR 05000289/19930011993-01-29029 January 1993 Insp Rept 50-289/93-01 on 930111-15.No Violations Noted. Major Areas Inspected:Fire Protection Program Including Implementation of Administrative Controls,Fire Surveillance Program,Fire Audits & Fire Training Programs IR 05000289/19920211993-01-12012 January 1993 Insp Repts 50-289/92-21 & 50-320/92-15 on 921207-11. Violation Noted.Major Area Inspected:Postings & Other Controls Observed During Facility Tours,Reactor Building Entry During Power Operation & Organization & Staffing IR 05000289/19920201992-12-23023 December 1992 Insp Repts 50-289/92-20 & 50-320/92-14 on 921027-1207. Violations Noted.Major Areas Inspected:Power Operations & Cleanup Activities,Plant Operations,Maint,Radiological Controls,Security & Engineering IR 05000289/19920191992-11-25025 November 1992 Insp Repts 50-289/92-19 & 50-320/92-13 on 921102-06.No Safety Concerns or Violations Noted.Major Areas Inspected: Unit 1 Radioactive Liquid & Gaseous Effluent Control Programs,Projected Dose Calculations & Mgt Controls 1999-09-27
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000289/19990071999-09-27027 September 1999 Insp Rept 50-289/99-07 on 990718-0828.No Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support IR 05000289/19990041999-08-19019 August 1999 Insp Rept 50-289/99-04 on 990606-0717.Noncited Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000289/19990051999-07-0909 July 1999 Insp Rept 50-289/99-05 on 990510-28.No Violations Noted. Major Areas Inspected:Effectiveness of Engineering Functions in Providing for Safe Operation of Plant IR 05000289/19990061999-07-0808 July 1999 Insp Rept 50-289/99-06 on 990608-11.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Plan IR 05000289/19990031999-06-29029 June 1999 Insp Rept 50-289/99-03 on 990425-0605.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000289/19990021999-05-14014 May 1999 Insp Rept 50-289/99-02 on 990314-0424.Two Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Aspects of Licensee Operations,Maint,Engineering & Plant Support.Security Program Met Safeguards Requirements IR 05000289/19990011999-04-16016 April 1999 Insp Rept 50-289/99-01 on 990131-0313.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000289/19980091999-03-0505 March 1999 Insp Rept 50-289/98-09 on 981227-990130.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000289/19980081999-01-12012 January 1999 Insp Rept 50-289/98-08 on 981101-1226.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000289/19980071998-12-0303 December 1998 Insp Rept 50-289/98-07 on 980920-1031.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support,Including Results of Insps by Regional Inspector Re Emergency Preparedness & Radiological Controls ML20154L9821998-10-15015 October 1998 Notice of Violation from Insp on 980810-27.Violation Noted: in Oct 1997,change to Facility as Described in Section 6.1, Eccs,Of TMI-1 Ufsar,Involving Unreviewed Safety Question,Was Made Without Prior Commission Approval ML20154M0251998-10-15015 October 1998 Insp Rept 50-289/98-06 on 980810-27.Violations Noted.Major Areas Inspected:Engineering Activities Associated with Findings from NRC Architect Engineering Team Insp Completed in Jan 1997 & Documented in NRC Insp Rept 50-289/96-201 IR 05000289/19980051998-10-0202 October 1998 Insp Rept 50-289/98-05 on 980726-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Security Facilities & Equipment Were Well Maintain, Reliable & Met Licensee Commitments & NRC Requirements ML20153E9471998-09-24024 September 1998 Exam Rept 50-289/98-301 Conducted on 980824-27.Exam Results: Four SRO Applicants Passed All Portions of Initial License Exam IR 05000289/19980031998-09-0404 September 1998 Insp Rept 50-289/98-03 on 980524-0725.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000289/19980021998-06-22022 June 1998 Insp Rept 50-289/98-02 on 980322-0523.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000289/19980011998-04-0909 April 1998 Insp Rept 50-289/98-01 on 980125-0321.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20203L7821998-02-26026 February 1998 Notice of Violation from Insp on 971102-980124.Violation Noted:Licensee Not Review & Approve Substantive Change to Existing Inservice Test Surveillance Procedure. Page 25 of Incoming Submittal Not Included ML20197A8771998-02-26026 February 1998 SALP Rept 50-289/98-99 for Period 960805-980124 IR 05000289/19970101998-02-26026 February 1998 Insp Repts 50-289/97-10 & 50-320/97-03 on 971102-980124. Violations Noted.Major Areas Inspected:Maint,Engineering & Plant Support.License Operator Requalification Program, Corrective Actions Program & Security Also Inspected ML20199H6141998-01-27027 January 1998 Notice of Violation from Insp on 970907-1101.Violation Noted:Pressurizer Power Operated Relief Valve Was Returned to Svc Without Performing an IST to Verify Proper Valve Operation After Valve Replaced ML20203D7591997-12-0202 December 1997 Insp Rept 50-289/97-09 on 970907-1101.Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support Over 8 Wk Period PNO-I-97-068, on 971103,unplanned Shutdown Greater than 72 H Occurred.Oil Leaks Detected & Repaired.Third RCP Inspected & Engineers Found Low Seal Flow at Second Stage Pump Seal. Resident Inspectors Following Onsite Activities1997-11-0505 November 1997 PNO-I-97-068:on 971103,unplanned Shutdown Greater than 72 H Occurred.Oil Leaks Detected & Repaired.Third RCP Inspected & Engineers Found Low Seal Flow at Second Stage Pump Seal. Resident Inspectors Following Onsite Activities IR 05000289/19970081997-10-0909 October 1997 Insp Rept 50-289/97-08 on 970728-0906.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support & Results of Announced Insp in Area of Emergency Preparedness ML20217H3281997-10-0808 October 1997 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $210,000.Violation Noted:On 940601,design Bases Were Not Correctly Translated Into Operating Procedures Re Switchover of Dhrs Pumps from Bwst to Reactor Building Sump ML20198R2831997-10-0303 October 1997 EN-97-096:on 971008,notice of Proposed Imposition of Civil Penalty in Amount of $210,000 Issued to Licensee.Action Based on Violations Involving Design Engineering,Equipment Classification & Corrective Actions ML20210R9641997-08-19019 August 1997 Notice of Violation from Insp on 970616-0727.Violation Noted:Licensee Failed to Implement EP Implementing Procedure EPIP-TMI-.03,Exhibit 1, Emergency Notifications & Call Outs IR 05000289/19970061997-08-19019 August 1997 Insp Repts 50-289/97-06 & 50-320/97-02 on 970616-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210R9801997-08-19019 August 1997 Insp Repts 50-289/97-06 & 50-320/97-02 on 970616-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20149K0171997-07-23023 July 1997 Insp Rept 50-289/97-07 on 970428-0502 & 0512-16.Violations Noted.Major Areas Inspected:Engineering ML20149K0081997-07-23023 July 1997 Notice of Violation from Insp on 970428-0502 & 0512-16. Violations Noted:On 970430,LER 97-03,did Not Contain Clear, Specific,Narrative Description of What Occurred IR 05000289/19970051997-07-11011 July 1997 Insp Rept 50-289/97-05 on 970428-0615.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20148S2321997-06-27027 June 1997 Insp Rept 50-289/97-04 on 970512-15.Violations Noted. Major Areas Inspected:Insp Evaluated Licensee Performance During Remedial EP Exercise IR 05000289/19970031997-05-29029 May 1997 Insp Rept 50-289/97-03 on 970303-0427.Apparent Violations Being Considered for Escalated Enforcement Action IAW NUREG-1600.Major Areas Inspected:Plant Operations,Maint, Engineering & Plant Support IR 05000289/19970021997-04-24024 April 1997 Insp Rept 50-289/97-02 on 970305-07.No Violations Noted. Major Areas Inspected:Insp Evaluated Licensee Emergency Response Capabilities Demonstrated During Biennial Full Participation EP Exercise ML20137W9391997-04-15015 April 1997 Insp Rept 50-289/96-201 on 961202-20 & 970106-10.No Violations Noted.Major Areas Inspected:Conduct of Engineering,Insp Scope & Methodology,Makeup & Purification Sys,Decay Heat Removal Sys & Control of Calculations PNO-I-97-018, on 970328,protest Related to TMI-2 Accident Occurred.Protesters Walked in Circle,Outside of Util Property,Blocking Plant Entrance Lane.Plant Notified NRC Headquarter to Inform of Event1997-03-28028 March 1997 PNO-I-97-018:on 970328,protest Related to TMI-2 Accident Occurred.Protesters Walked in Circle,Outside of Util Property,Blocking Plant Entrance Lane.Plant Notified NRC Headquarter to Inform of Event ML20140B7051997-03-21021 March 1997 Insp Repts 50-289/97-01 & 50-320/97-01 on 970106-970302. Violations Noted.Major Areas Inspected:Plant Operations, Maintenance,Engineering & Plant Support IR 05000289/19960091997-01-22022 January 1997 Insp Rept 50-289/96-09 on 961119-970105.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20135F1641996-12-0606 December 1996 Notice of Violation from Insp on 960929-1118.Violation Noted:Scaffold tied-off & Supported by Safety Related Pipe Support for Nuclear River Water Sys W/O Prior Engineering Evaluation & Approval IR 05000289/19960071996-11-18018 November 1996 Insp Rept 50-289/96-07 on 960929-1118.Violations Noted. Major Areas Inspected:Conduct of Operations, Quality Assurance in Operations & Conduct of Maint ML20135B0901996-11-14014 November 1996 Insp Rept 50-289/96-06 on 960804-0928.Violations Noted.Major Areas Inspected:Plant Operations,Engineering,Maint & Plant Support ML20135B0851996-11-14014 November 1996 Notice of Violation from Insp on 960804-0928.Violation Noted:Improper Control of Posted High Radiation Area Entrance IR 05000289/19960081996-11-0707 November 1996 Insp Rept 50-289/96-08 on 960603-07 & 0926-27.No Violations Noted.Major Areas Inspected:Maintenance ML20129B3761996-09-13013 September 1996 Insp Rept 50-289/96-05 on 960617-0803.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20129B3601996-09-13013 September 1996 Notice of Violation from Insp on 960617-0803.Violation Noted:Inspectors Could Not Confirm Valve Factor Inputs to Calculations Which Establish Design Basis Functionality of Motor Operated Valves in Safety Re Applications IR 05000289/19930251994-01-0404 January 1994 Insp Rept 50-289/93-25 on 931026-1206.No Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Engineering,Radiological Controls,& Security Activities in Relation to Plant Safety IR 05000320/19930071993-12-23023 December 1993 Insp Rept 50-320/93-07 on 931101-1217.No Violations Noted. Major Areas Inspected:Licensee Completion of Pdms Requirements & Commitments for TMI-2 ML20058A4891993-11-12012 November 1993 Notice of Violation from Insp on 931004-08.Violation Noted: Several Examples of High Radiation Areas Where Licensee Did Not Barricade or Properly Control Access to Prevent Inadvertent Entry IR 05000289/19930221993-11-0909 November 1993 Insp Rept 50-289/93-22 on 930910-1025.Violation Noted But Not Cited.Major Areas Inspected:Plant Operations,Maint, Engineering,Radiological Controls & Security Activities as Related to Plant Safety 1999-09-27
[Table view] |
Text
. - . .. -
,
'
.
,
-
>
'
!;
.
>
U.S. NUCLEAR REGULATORY COMMISSION . l REGIONI t
!
REPORT N /93-15-l DOCKET N ,
!
l t I
'
LICENSE N DPR-50 t
.
LICENSEE: GPU Nuclear Corporation j
!
-
t l FACILITY NAME: Three Mile Island Nuclear Station, Unit 1 !
l !
I INSPECTION DATES: July 27-30,1993 i
i
!
INSPECTOR:
~Y W l
,, b(Ind %
%ne M. Qy, Reactor Engineer Dste -
Electrical Section, EB, DRS -
l APPROVED BY: A Y 7['13 )
illiam H. Ruland, Ghief /Date i Electrical Section, EB, DRS - j I
-
l
,
l l-l
,
4 l
!
9309100251 930827 .> -
PDR G
ADOCK'05000289 3 q PDR i i
- , -- ~
, ,.. - , , , . .
.
!
!
.
2 ;
t l Area Insoected: This was an announced mspection to review the licensee's corrective actions of three previously identified electrical distribution safety functional inspection (EDSFI)
findings; the process for addressing Information Notices and Generic Letters related t<> i
electrical issues; and follow-up of unresolved item 89-24-03 which resulted in a non-cited '
violation related to the cleaning and inspection of emergency diesel generator fan drive gear box component Resuks: No violations or deviations were identified. Of the three open unresolved items reviewed in Unit 1, one unresolved item was closed. These items are discussed in Section ,
,
! !
,
i 1 ,
.
~
l l
l
)
.
,
l
.
_ _ - _ _ _ _ _ _ _ __
-
I 3 l
!
DETAILS l l
l PURPOSE i
The purpose of this inspection was to review and verify the licensee's corrective actions for previously identified NRC findings including Electrical Distribution System Functional Inspection (EDSFI) open items and the licensee's process for addressing Generic letters and Information Notice .0 FOLLOWUP OF PREVIOUS IDENTIFIED FINDINGS (Open) Unresolved Item (50-289/90-81-02) for the 120 Vac voltage drop i calculation l i
i This item pertains to the verification and acceptability of voltage levels at end device l terminals supplied from 120 Vac vital distribution panels. The Electrical Distribution Safety l Functional Inspection (EDSFI) team requested documentation that described indisidual loads ,
I on vital bus circuits to determine inverter loading and actual voltage drops. With respect to the voltage drop, the licensee had performed calculations to confirm that the voltage at the end devices would not fall below the minimum required voltage. However, the criteria and assumptions used by the licensee for the verification were not clear. The licensee expressed ;
confidence that the design limits were not exceeded based on past experience, but agreed to I address the team's concerns and perform the necessary analysi In response to the team's concerns, the licensee calculated the voltage drops for the incoming l and outgoing circuits for each of the four vital power ac distribution panels. Based on these '
i calculations, the voltage levels at the end devices including the inverters were evaluated to verify that the available voltage was greater than the minimum voltage needed for operatio i Calculations C1101-735-5350-005 and -006 contained the voltage drop calculations and l
'
evaluations for vital ac panels VBC and VBD. Calculations C1101-735-5350-003 and -004 contained the voltage drop calculations and evaluations for vital ac panels VBA and VB The inspector reviewed all four voltage drop studies. Calculations for ac panels VBC and l
i VBD were approved, however, the calculations for panels VBA and VBB had not been ,
'
approved based on recommendations presented within the calculations to improve voltages for certain components. Assumptions made within all four calculations were determined to be appropriate and conservative. A base voltage for inverter output of 115.64 V and voltage drop considerations for feeder and branch circuits were used to determine the voltage at the end device terminals. Based on this review, the calculations for vital ac panels VBC and VBD demonstrated that the available voltages at the end devices were greater than the l l minimum pick-up voltages needed for operation. These calculations verified that the end l
device voltages would not fall below the minimum required voltage of 102.00 :
l l
.
Calculations C1101-735-5350-003 and -004 were reviewed and determined to have used the same assumptions as calculations C1104-735-5350-005 and -006. However, these two calculations for distribution panels VBA and VBB presented recommendations for replacing certain cables. The recommendations were to replace some of the existing cables with larger cables to reduce the voltage drop across them and improve end device terminal voltage. The licensee stated that they are considering these recommendations but intend an performing current / voltage measurements to verify the necessity of the recommendation The inspector concluded that the voltage drop calculations were adequate and assumptions used were clearly presented. This item remains open pending NRC review of the licensee's actions to improve the available voltage for the circuits identified in calculations C1101-735-5350-003 and -004 and verification that minimum voltage available at the devices is greater than the minimum voltage required. (Unresolved Item 50-289/90-81-02) (Open) Unresolved Item 50-289/90-81-03 regarding the ac system fault analysis The EDSFI team's review of the adequacy of the interrupting capability of the Class IE distribution system equipment identified discrepancies between the short circuit study and actual plant equipment settings. Calculation G/C2734, Revision 0, " Electrical System Studies, Short Circuit and Coordination Review, Technical Report" assumed the auxiliary transformers' tap position to be the central one (0%) instead of the actual setting of -2.5%
and assumed a lower maximum grid voltage than the voltage actually observed. The team noted that only a narrow margin existed between available short circuit current and the interrupting capability of the 4.16 kV breakers. Based on these differences involving the tap settings and grid voltage, the team stated that this margin would be further reduced. The !
team further explained that, in consideration of the fact that only minimum margin had been calculated to exist, the impact of this difference could not be ignored without adequate justification. The licensee concurred that the study needed to be upgraded to take into
!
account the different tap settings and agreed that the revised calculation would also address maximum grid voltag In response to this item, the licensee initiated Licensing Action Item (LAI) 91-9060 to perform a short circuit study with proper considerations for auxiliary transformer impedances based on actual tap settings of-2.5% and a maximum grid voltage of 242 kV. During this l inspection, the licensee provided a Memorandum, dated July 20,1993, stipulating the i planned scope and basis assumptions to be used in the revised calculation. The scope of the l study included several DAPPER program models previously described in calculation G/C 2734 and verification of valid loads used in the DAPPER models using licensee technical data report no. 836, revision 5, for determining fault contributions and multiplier The licensee committed to completing this study by October 31,1993, in Letter no. C31I-91-2003 dated January 15, 1991. This item remains open pending completion of the study and review by the NRC. (Unresolved Item 50-289/90-81-03)
,
l !
'
i l
- ,
.
I
,
l
'
(Closed) Unresolved Item No. 50-289/90-81-06 for the makeup pump motor l i performance verification i j
The EDSFI team's comparison of makeup pump motor nameplate information with data used to perform load calculations revealed that the maximum horsepower (Hp) required for the pumps during LOCA conditions exceeded the nameplate rating of the motors. In response to the team's question regarding the capability of the motors to provide the required Hp, the l licensee presented a letter from the manufacturer, Westinghouse, dated February 27,198 '
This letter stated that based on calculations performed, the motors were capable of providing the required 837 Hp for 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> with a temperature rise ofless than 80 degrees However, the licensee could not provide any analysis from the manufacturer to support the letter's statement that the motor's design temperature limits would not be exceeded under accident condition ;
l During a follow-up inspection as documented in inspection report 93-07, the licensee
!
presented an analysis performed by Westinghouse in support of the motor's capability. The l
inspectors found that the motor temperature did not agree with the actual nameplate data drawing. In addition, motor frame type, reavited motor operation duration, and shop order numbers did not agree between the makeup pump motor nameplate information and analysis presented. At the conclusion of this inspection, the licensee had no additional clarification ,
On May 24,1993, in letter C311-93-2083, the licensee provided clarifying inn.rmation to support the acceptability of the Westinghouse analysis discussed above. The inspector reviewed each variation between the nameplate data and input data used as the basis for the
analysis. Based on review of these clarifications, the inspector concluded that the Westinghouse calculation was adequate to support the analysis for operation of the makeup i pump motors at 837 Hp. The inspector noted that this analysis had recently been updated to ,
reflect an updated required Hp of 750, thereby providing additional margin for motor !
'
operation. This loading of the makeup pump and other ECCS pumps was presented in calculation C1101-212-5300-043, Revision 0. Based on this review of adequate supporting ,
documentation, this item is closed. (50-289/90-81-06)
,
t Implementation of Information Notices and Generic Letters i
The inspector performed a review of the licensee's process for addressing Information Notices and Generic Letters related to electrical issues. The review was made to assess licensee review of information for applicability to Three Mile Island and consideration of actions, as appropriate, to avoid similar problems presented in NRC generic communication i Licensee procedure 1000-ADM-1216.03, Revision 3, " Regulatory Correspondence Control" r was reviewed. This procedure sets forth requirements for the management of regulatory i
correspondence and the assignment of tasks associated with that correspondence. Based on the review of this procedure, the inspector determined that good controls had been .
'
established for the tracking ofitems/ issues and individual responsibilities related to the
r i
t
_. __ _ __ _
,
-
i l
6 .
l process were clearly defined. The dispositioning of a selected sample of Information Notices issued within the last 30 months, as listed below, were reviewed for licensee applicability i and consideration of necessary action IN 93-26: Molded Case Circuit Breaker Failures To Close ;
IN 92-77: Applications of Electropneumatic Relays l IN 92-01: Cable Damage Caused by Inadequate Controls IN 90-18 Crosby Safety Relief Valves on EDG Air Tanks IN 91-62 Hydraulic Lockup Causing EDG Damage IN 91-34 EDG Potential Problems IN 91-29: Deficiencies Identified During EDSFIs (also Supplement 1)
!
The inspector concluded the licensee adequately addressed the regulatory informatioa for the sample reviewed and had established good controls for managing the information provide .5 Follow-up of Unresolved Item 89-24-03 regarding EDG Cooling Fan Failure On November 14,1989, as documented in inspection report 89-24, the licensee declared the
"A" emergency diesel generator (EDG) inoperable due to sludge build-up in the right angle j
-
gear drive oil sump. This sludge clogged the oil pump suction piping, strainer, and check valve resulting in loss of pump prime and a right angle gear drive upper bearing failur Following identification of the sludge build-up, the licensee observed this condition existed on the "B" EDG also which could have rendered both diesels inoperable. The root cause of l this sludge build-up was a combination of overheating of the lubricating oil and inadequate procedures for the inspection and maintenance of the EDG lubrication syste i Inspection report 91-05 presented the licensee's corrective actions including several maintenance procedure enhancements and a modification to decrease the thermostat setting and immersion heater size to reduce the likelihood of overheating the gear drive oil in the future. That follow-up inspection of the EDG failure classified this issue as a non-cited violation as reviewed against enforcement criteria presented in Part 2, Appendix C of 10 ,
CF l This inspection verified the procedure improvements to prevent the sludge problem from ;
reoccurring. Surveillance procedure 1301-8.2, Revision 56, " Diesel Generator Annual l Inspection" was reviewed to verify: oil sump immersion heater de-energization prior to draining oil; flushing of the fan drive gear box; cleaning and inspection of the lubricating oil j pump suction strainer; inspection of the oil pump suction valve; and disassembly of the fan drive gear box to inspect all component i Based on review of the change modification request to change to immersion heaters, reduce the thermostat settings, and verification of the maintenance procedure enhancements, the inspector concluded the licensee's corrective actions were adequately implemente l
!
i
.
,
.
.
- UNRESOLVED ITEMS
!
Unresolved items are matters about which additional information is necessary to determine whether they are acceptable, a deviation, or a violation. Several unresolved items are discussed in detail under Section , EXIT MEETING The inspector met with the licensee's personnel denoted in Attachment 1 of this report at the conclusion of the inspection period on July 30,1993. At that time, the scope of the inspection and inspection results were summarized. The licensee acknowledged the inspection findings as detailed in this report and had no additional comments regarding the inspection result i
!
.
!
l l
s
!
_-__ -__ -
.
.
~
ATTACHMENT 1 PERSONS CONTACTED GPU Nuclear Corporation
- W. Heysek, Licensing Engineer V. Orlandi, Lead I&C Engineer
"H. Robinson, Manger, Electric Power
- E. Showalter, Lead Electrical Engineer 1 J. Valent, Plant Engineer :