June 3, 2019
SUBJECT:
THREE MILE ISLAND UNIT 1 - EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000289/2019501
Dear Mr. Hanson:
On May 10, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Three Mile Island Unit 1 and discussed the results of this inspection with Mr. Ed Callan and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Fred L. Bower, III, Chief Plant Support Branch Division of Reactor Safety
Docket No.: 05000289 License No.: DPR-50
Enclosure:
Inspection Report 05000289/2019501
Inspection Report
Docket Number:
05000289
License Number:
Report Number:
Enterprise Identifier: I-2019-501-0021
Licensee:
Exelon Generation Co., LLC
Facility:
Three Mile Island, Unit 1
Location:
Middletown, PA
Inspection Dates:
May 06, 2019 to May 10, 2019
Inspectors:
J. Ambrosini, Sr. Emergency Preparedness Inspector
J. DeBoer, Senior Project Engineer
P. Ott, Operations Engineer
D. Silk, Senior Operations Engineer
Approved By:
Fred L. Bower, III, Branch Chief
Plant Support Branch
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an Emergency Preparedness Biennial Exercise Inspection at Three Mile Island Unit 1 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
Findings and violations being considered in the NRCs assessment are summarized in the table below.
List of Findings and Violations
No findings were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71114.01 - Exercise Evaluation
Inspection Review (IP Section 02.01-02.11) (1 Sample)
The inspectors evaluated the biennial emergency plan exercise. The exercise scenario simulated a train derailment, a reactor coolant system leak near the 'A' reactor coolant pump, and a leak into the auxiliary building from the letdown line on May 7.
71114.04 - Emergency Action Level and Emergency Plan Changes
Inspection Review (IP Section 02.01-02.03) (1 Sample)
The inspectors verified that there were no changes made to the emergency plan, Emergency Action Levels, or lower-tier implementing procedures for the time period reviewed, October 2018 through May 2019.
71114.08 - Exercise Evaluation Scenario Review
Inspection Review (IP Section 02.01 - 02.04) (1 Sample)
The inspectors reviewed and evaluated the proposed scenario for biennial emergency plan exercise on April
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
EP01: Drill/Exercise Performance (IP Section 02.12)===
January 1, 2018, through March 31, 2019
EP02: ERO Drill Participation (IP Section 02.13) (1 Sample)
January 1, 2018, through March 31, 2019
EP03: Alert & Notification System Reliability (IP Section 02.14) (1 Sample)
January 1, 2018, through March 31,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On May 10, 2019, the inspector presented the Emergency Preparedness Biennial Exercise Inspection results to Mr. Ed Callan and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
232791
232824
247356
247359
247361
247363
247367
247390
247413
247436
247449
Miscellaneous
Three Mile Island Nuclear Station 2019 Emergency
Preparedness Biennial Exercise Scenario Package
May 7, 2019
Procedures
Three Mile lsland Generating Station Emergency Plan Annex
Revision 29
71151
Corrective Action
Documents
4094525
22808
22924
4133152
4190582
200965