IR 05000263/2023004 | 31 January 2024 | Integrated Inspection Report 05000263/2023004 | |
IR 05000263/2024401 | 22 January 2024 | Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000263/2024401 | |
IR 05000263/2023402 | 13 December 2023 | Security Baseline Inspection Report 05000263/2023402 | Fitness for Duty Safeguards Contingency Plan |
IR 05000263/2023003 | 13 November 2023 | Integrated Inspection Report 05000263/2023003 and 07200058/2023001 | Unanalyzed Condition Packing leak Commercial Grade Dedication Enforcement Discretion Functionality Assessment Significance Determination Process Annual Radiological Environmental Operating Report Operability Determination Fire Protection Program Scaffolding Power Uprate |
IR 05000263/2023010 | 7 September 2023 | Commercial Grade Dedication Inspection Report 05000263/2023010 | Half scram Commercial Grade Dedication Condition Adverse to Quality Significance Determination Process |
IR 05000263/2023005 | 30 August 2023 | Updated Inspection Plan for Monticello Nuclear Generating Plant (Report 05000263/2023005) | |
IR 05000263/2023002 | 7 August 2023 | Plantintegrated Inspection Report 05000263/2023002 | High Radiation Area Offsite Dose Calculation Manual Enforcement Discretion Met Tower Nondestructive Examination Functionality Assessment FLEX Aging Management Operability Determination Pressure Boundary Leakage Fire Protection Program Coast down |
IR 05000263/2023501 | 13 July 2023 | Emergency Preparedness Inspection Report 05000263/2023501 | |
IR 05000263/2023001 | 4 May 2023 | Integrated Inspection Report 05000263/2023001 | High winds Offsite Dose Calculation Manual Fire Barrier Stroke time Enforcement Discretion Temporary Modification Functionality Assessment FLEX Operability Determination Fire Protection Program Fire Watch Power change Coast down |
IR 05000263/2023401 | 4 May 2023 | Security Baseline Inspection Report 05000263/2023401 | Affidavit |
IR 05000263/2022006 | 1 March 2023 | Annual Assessment Letter for Monticello Nuclear Generating Plant, Unit 1 (Report 05000263/2022006) | Commercial Grade Dedication Exemption Request COVID-19 |
IR 05000263/2022004 | 17 January 2023 | Integrated Inspection Report 05000263/2022004 | Temporary Modification Functionality Assessment Operability Determination Fire Protection Program |
IR 05000263/2022012 | 15 December 2022 | Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000263/2022012 | Scaffolding Weak link |
IR 05000263/2022013 | 21 November 2022 | Biennial Problem Identification and Resolution Inspection Report 05000263/2022013 | Packing leak Cyber Security Condition Adverse to Quality FLEX Scaffolding Inattentive Siren |
IR 05000263/2022301 | 21 November 2022 | NRC Initial License Examination Report 05000263/2022301 | Job Performance Measure |
IR 05000263/2022003 | 17 November 2022 | Reissue - Monticello Nuclear Generating Plant - Integrated Inspection Report 05000263/2022003 | Ultimate heat sink Internal Flooding Temporary Modification Zebra Mussel Functionality Assessment FLEX Aging Management Significance Determination Process Operability Determination License Renewal Fire Protection Program |
ML22307A182 | 14 November 2022 | Integrated Inspection Report 05000263/2022003 | Ultimate heat sink Internal Flooding Temporary Modification Zebra Mussel Functionality Assessment FLEX Aging Management Fire Protection Program |
IR 05000263/2022403 | 19 October 2022 | Security Baseline Inspection Report 05000263/2022403 (Public) | Affidavit |
IR 05000263/2022005 | 29 August 2022 | Updated Inspection Plan for Monticello Nuclear Generating Plant (Report 05000263/2022005) | Commercial Grade Dedication Operator Manual Action Open Phase Condition Exemption Request Coronavirus |
IR 05000263/2022002 | 28 July 2022 | Integrated Inspection Report 05000263/2022002 | Functionality Assessment Operability Determination Minimum staff Fire Protection Program Siren |
IR 05000263/2022001 | 10 May 2022 | Generation Plant - Integrated Inspection Report 05000263/2022001 | Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment Operability Determination Severe Accident Management Guideline Fire Protection Program Scaffolding Power change Unidentified leakage |
IR 05000263/2022402 | 5 May 2022 | Security Baseline Inspection Report 05000263/2022402; Independent Spent Fuel Storage Installation Security Inspection Report 07200058/2022401 | Affidavit |
IR 05000263/2022401 | 28 March 2022 | Generation Plant - Cyber Security Inspection Report 05000263/2022401 | Cyber Security |
IR 05000263/2021006 | 2 March 2022 | Annual Assessment Letter for Monticello Nuclear Generating Plant, Unit 1 (Report 05000263/2021006) | Commercial Grade Dedication Exemption Request Coronavirus |
IR 05000263/2021004 | 28 January 2022 | Integrated Inspection Report 05000263/2021004 and 07200058/2021001 | Internal Flooding Nondestructive Examination Temporary Modification Functionality Assessment FLEX Job Performance Measure Operability Determination Fire Protection Program |
IR 05000263/2021402 | 16 December 2021 | Triennial Material Control and Accounting Report 05000263/2021402 | Affidavit |
IR 05000263/2021420 | 15 November 2021 | Security Baseline Inspection Report Cover Letter 05000263 2021420 | Affidavit |
IR 05000263/2021003 | 27 October 2021 | Plan, Integrated Inspection Report 05000263/2021003 | Internal Flooding Cyber Security Functionality Assessment Locked High Radiation Area FLEX Aging Management Operability Determination Coronavirus COVID-19 Fire Protection Program |
IR 05000263/2021010 | 8 October 2021 | Design Basis Assurance Inspection (Teams) Inspection Report 05000263/2021010 | Internal Flooding Probabilistic Risk Assessment Significance Determination Process Large early release frequency Time Critical Operator Action Earthquake Coronavirus COVID-19 |
IR 05000263/2021011 | 29 September 2021 | Plan - Temporary Instruction 2515/194 Inspection; Ibspection Report 05000263/2021011 | Probabilistic Risk Assessment Operator Manual Action Open Phase Condition Large early release frequency Coronavirus COVID-19 |
IR 05000263/2021501 | 1 September 2021 | Emergency Preparedness Biennial Exercise Inspection Report 05000263/2021501 | Coronavirus COVID-19 |
IR 05000263/2021005 | 1 September 2021 | Updated Inspection Plan for Monticello Nuclear Generating Plant 2 (Report 05000263/2021005) | Cyber Security Open Phase Condition Exemption Request Coronavirus |
IR 05000263/2021002 | 3 August 2021 | Integrated Inspection Report 05000263/2021002 | High Radiation Area Nondestructive Examination Temporary Modification VT-2 Functionality Assessment Locked High Radiation Area FLEX Aging Management Scram Discharge Volume Operability Determination Coronavirus COVID-19 Pressure Boundary Leakage Fire Protection Program Coast down |
IR 05000263/2021001 | 30 April 2021 | Integrated Inspection Report 05000263/2021001 | Packing leak Enforcement Discretion Functionality Assessment Operability Determination Coronavirus COVID-19 Offsite Circuit Fire Protection Program Power change Coast down Weak link |
IR 05000263/2020006 | 4 March 2021 | Annual Assessment Letter for the Monticello Nuclear Generating Plant (Report 05000263/2020006) | Open Phase Condition Exemption Request Coronavirus |
IR 05000263/2020010 | 2 March 2021 | Reissue - Monticello Nuclear Generating Plant - Biennial Problem Identification and Resolution Inspection Report 05000263/2020010 | Stroke time Internal Flooding Past operability Condition Adverse to Quality Foreign Material Exclusion Scram Discharge Volume Pandemic Coronavirus COVID-19 Flow Induced Vibration Operability Assessment Power Uprate |
IR 05000263/2020004 | 20 January 2021 | Integrated Inspection Report 05000263/2020004 | High winds Internal Flooding Enforcement Discretion Functionality Assessment Foreign Material Exclusion Operability Determination Time Critical Operator Action Coronavirus COVID-19 Fire Protection Program Coast down |
ML21013A422 | 13 January 2021 | Biennial Problem Identification and Resolution Inspection Report 05000263/2020010 | Stroke time Internal Flooding Past operability Condition Adverse to Quality Foreign Material Exclusion Scram Discharge Volume Pandemic Coronavirus COVID-19 Flow Induced Vibration |
IR 05000263/2020301 | 9 December 2020 | NRC Initial License Examination Report 05000263/2020301 | Job Performance Measure |
IR 05000263/2020402 | 3 December 2020 | Security Baseline Inspection Report 05000263/2020402 (Cover Letter Only) | Affidavit |
IR 05000263/2020015 | 9 November 2020 | NRC Inspection Report 05000263/2020015 | Safe Shutdown Past operability Probabilistic Risk Assessment Significance Determination Process Large early release frequency Fire Protection Program |
IR 05000263/2020003 | 9 November 2020 | Integrated Inspection Report 05000263/2020003 | Packing leak Internal Flooding Temporary Modification Functionality Assessment Scram Discharge Volume Operability Determination Coronavirus COVID-19 Fire Protection Program |
IR 05000263/2020013 | 13 October 2020 | Design Basis Assurance Inspection (Programs) Inspection Report 05000263/2020013 | Stroke time Anchor Darling Squib Operability Determination Power-Operated Valves Coronavirus COVID-19 Weak link |
IR 05000263/2020401 | 22 September 2020 | Security Baseline Inspection Report 05000263/2020401 (Cover Letter Only) | Affidavit |
IR 05000263/2020005 | 1 September 2020 | Updated Inspection Plan for Monticello Nuclear Generating Plant (Report 05000263/2020005) | Fitness for Duty Operator Manual Action Cyber Security Open Phase Condition Exemption Request Power-Operated Valves COVID-19 |
IR 05000263/2020002 | 3 August 2020 | Integrated Inspection Report 05000263/2020002 | Packing leak Past operability Anchor Darling Temporary Modification Functionality Assessment Scram Discharge Volume Operability Determination Coronavirus COVID-19 Fire Protection Program Downpower Weak link Unidentified leakage Siren Exclusive Use |
IR 05000263/2020014 | 30 June 2020 | License Renewal Phase IV Report 05000263/2020014 | Coatings Aging Management License Renewal Subsequent License Renewal Coronavirus COVID-19 |
IR 05000263/2020012 | 26 May 2020 | Inspection of the Implementation of EA-13-09: Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Report 05000263/2020012 | FLEX B.5.b Coronavirus COVID-19 |
IR 05000263/2020001 | 4 May 2020 | Integrated Inspection Report 05000263/2020001 | Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment Operability Determination Coronavirus COVID-19 Fire Protection Program Power change |
IR 05000263/2020011 | 31 March 2020 | Triennial Fire Protection Inspection Report 05000263/2020011 | Hot Short Safe Shutdown Time Critical Operator Action Fire Protection Program |