Category:Letter type:L
MONTHYEARL-MT-24-038, Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI2024-10-15015 October 2024 Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI L-MT-24-025, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2024-09-26026 September 2024 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements L-MT-24-029, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI2024-09-13013 September 2024 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI L-MT-24-028, Response to RCI for RR-017 ISI Impracticality2024-08-28028 August 2024 Response to RCI for RR-017 ISI Impracticality L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations L-MT-24-019, Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii)2024-06-10010 June 2024 Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii) L-MT-24-017, Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-01602024-06-0404 June 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-0160 L-MT-24-015, Response to Request for Additional Information - Alternative Request VR-09 for OMN-172024-05-16016 May 2024 Response to Request for Additional Information - Alternative Request VR-09 for OMN-17 L-MT-24-013, 2023 Annual Radiological Environmental Operating Report2024-05-14014 May 2024 2023 Annual Radiological Environmental Operating Report L-MT-24-016, 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP)2024-05-0808 May 2024 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) L-MT-24-002, Submittal of Revision 41 to the Updated Safety Analysis Report2024-04-17017 April 2024 Submittal of Revision 41 to the Updated Safety Analysis Report L-MT-24-004, Submittal of 10 CFR 72.48 Report for Monticello Nuclear Generating Plant (MNGP)2024-04-17017 April 2024 Submittal of 10 CFR 72.48 Report for Monticello Nuclear Generating Plant (MNGP) L-MT-24-006, Subsequent License Renewal Application Annual Update 1 and Supplement 92024-02-29029 February 2024 Subsequent License Renewal Application Annual Update 1 and Supplement 9 L-MT-24-007, Response to NRC Request for Additional Information on Proposed Inservice Inspection Alternative RR-002 for the Sixth Ten-Year ISI Interval2024-02-15015 February 2024 Response to NRC Request for Additional Information on Proposed Inservice Inspection Alternative RR-002 for the Sixth Ten-Year ISI Interval L-MT-24-001, 10 CFR 50.55a Request RR-017 - Inservice Inspection (ISI) Impracticality in Accordance with 10 CFR 50.55a(g)(5)(iii) During the Fifth Ten-Year Interval2024-01-30030 January 2024 10 CFR 50.55a Request RR-017 - Inservice Inspection (ISI) Impracticality in Accordance with 10 CFR 50.55a(g)(5)(iii) During the Fifth Ten-Year Interval L-MT-23-054, Subsequent License Renewal Application Supplement 82024-01-11011 January 2024 Subsequent License Renewal Application Supplement 8 L-MT-23-047, License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data2023-12-29029 December 2023 License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data L-MT-23-056, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 22023-12-18018 December 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 2 L-MT-23-042, 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462023-12-11011 December 2023 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-23-052, Subsequent License Renewal Application Supplement 72023-11-30030 November 2023 Subsequent License Renewal Application Supplement 7 L-MT-23-051, Update to the Technical Specification Bases2023-11-28028 November 2023 Update to the Technical Specification Bases L-MT-23-049, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 12023-11-21021 November 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 L-MT-23-043, 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-092023-11-13013 November 2023 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-09 L-MT-23-038, License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.62023-11-10010 November 2023 License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 L-MT-23-046, Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 12023-11-0909 November 2023 Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 1 L-MT-23-041, Subsequent License Renewal Application Response to Request for Confirmation of Information Set 22023-10-0303 October 2023 Subsequent License Renewal Application Response to Request for Confirmation of Information Set 2 L-MT-23-037, Subsequent License Renewal Application Response to Request for Additional Information Set 32023-09-22022 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 3 L-MT-23-036, Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 62023-09-0505 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 6 L-MT-23-035, Subsequent License Renewal Application Supplement 52023-08-28028 August 2023 Subsequent License Renewal Application Supplement 5 L-MT-23-034, Subsequent License Renewal Application Response to Request for Additional Information Set 12023-08-15015 August 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 1 L-MT-23-032, 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-112023-07-31031 July 2023 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-11 L-MT-23-028, 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report2023-07-31031 July 2023 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report L-MT-23-031, Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 12023-07-18018 July 2023 Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 1 L-MT-23-030, Subsequent License Renewal Application Supplement 32023-07-0404 July 2023 Subsequent License Renewal Application Supplement 3 L-MT-23-025, Subsequent License Renewal Application Supplement 22023-06-26026 June 2023 Subsequent License Renewal Application Supplement 2 L-MT-23-020, Submittal of 2022 Annual Radioactive Effluent Release Report2023-05-10010 May 2023 Submittal of 2022 Annual Radioactive Effluent Release Report L-MT-23-019, Submittal of 2022 Annual Radiological Environmental Operating Report2023-05-10010 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report L-MT-23-021, Core Operating Limits Report (COLR) for the Monticello Nuclear Generating Plant for Cycle 322023-05-0202 May 2023 Core Operating Limits Report (COLR) for the Monticello Nuclear Generating Plant for Cycle 32 L-MT-23-017, 2022 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP)2023-04-18018 April 2023 2022 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) L-MT-23-010, Subsequent License Renewal Application Supplement 12023-04-0303 April 2023 Subsequent License Renewal Application Supplement 1 L-MT-23-013, Core Operating Limits Report (COLR) for Cycle 31, Revision 32023-03-28028 March 2023 Core Operating Limits Report (COLR) for Cycle 31, Revision 3 L-MT-23-012, Core Operating Limits Report (COLR) for Monticello Nuclear Generating Plant Cycle 31, Revision 22023-03-17017 March 2023 Core Operating Limits Report (COLR) for Monticello Nuclear Generating Plant Cycle 31, Revision 2 L-MT-23-008, 10CFR50.55a Request to Use Later Edition of ASME Section XI for ISI Code of Record (RR-003)2023-02-0707 February 2023 10CFR50.55a Request to Use Later Edition of ASME Section XI for ISI Code of Record (RR-003) L-MT-23-004, CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program2023-01-23023 January 2023 CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program L-MT-23-005, Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088)2023-01-0606 January 2023 Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088) L-MT-22-049, Industry Groundwater Protection Initiative Special Report2022-12-15015 December 2022 Industry Groundwater Protection Initiative Special Report L-MT-22-052, L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative2022-12-15015 December 2022 L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative L-MT-22-046, 2022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462022-12-13013 December 2022 2022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-22-048, Update to the Monticello Technical Specification Bases2022-11-28028 November 2022 Update to the Monticello Technical Specification Bases L-MT-22-047, Withdrawal of Request for Relief from ASME OM Code for the Sixth Inservice Testing Interval2022-11-10010 November 2022 Withdrawal of Request for Relief from ASME OM Code for the Sixth Inservice Testing Interval 2024-09-26
[Table view] Category:License-Operator
MONTHYEARML24277A0202024-10-0303 October 2024 Operator Licensing Examination Approval Monticello Nuclear Generating Plant, October 2024 L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24082A2452024-03-22022 March 2024 Confirmation of Initial License Examination IR 05000263/20223012022-11-21021 November 2022 NRC Initial License Examination Report 05000263/2022301 ML23011A2512022-11-10010 November 2022 Form 1.3-1 ML23011A3362022-11-10010 November 2022 Form 2.1-1 ML23012A1032022-11-10010 November 2022 Form 2.3-5 ML23012A0982022-11-10010 November 2022 Form 2.3-3 L-MT-22-045, Letter Submitting Post-Exam Package2022-11-0404 November 2022 Letter Submitting Post-Exam Package ML23012A1652022-10-25025 October 2022 As-Administered Operating Test JPMs ML23012A1682022-10-25025 October 2022 As-Administered Written Examination and Answer Key ML23012A1692022-10-25025 October 2022 As-Administered Written Exam Reference Handouts ML23012A1662022-10-25025 October 2022 As-Administered Operating Test Scenarios ML23011A3392022-10-21021 October 2022 Form 5.1-1 ML22271A9162022-10-0303 October 2022 Operator Licensing Examination Approval ML23012A1392022-09-28028 September 2022 Proposed Written Examination ML23012A0122022-09-28028 September 2022 Form 2.3-4 ML23012A1432022-09-28028 September 2022 Form 3.3-1 Proposed Scenario Outlines ML23012A1372022-09-28028 September 2022 Form 3.3-2 Proposed Operating Test Simulator Scenario Guides ML23012A1342022-09-28028 September 2022 Proposed Admin Topics JPMs ML23012A0092022-09-28028 September 2022 Form 2.3-2 ML23012A1362022-09-28028 September 2022 Proposed Sim and Inplant System JPMs ML23012A1922022-08-28028 August 2022 Form 2.3-1 ML23012A2152022-08-28028 August 2022 Form 3.2-1 ML23012A2062022-08-28028 August 2022 Form 3.4-1 ML23012A2162022-08-28028 August 2022 Form 3.2-2 ML23012A2222022-08-28028 August 2022 Form 4.1-1, Record of Rejected Knowledge and Abilities ML23018A1882022-08-28028 August 2022 OP Test Outline Issue Identified ML23012A2182022-08-28028 August 2022 Form 3.3-1 ML23012A2192022-08-28028 August 2022 Form 4.1-BWR and Common ML23012A2102022-07-26026 July 2022 Letter Submitting Monticello Outline Package L-MT-22-023, 75-Day Exam Package2022-07-26026 July 2022 75-Day Exam Package ML21342A3762021-12-13013 December 2021 Confirmation of Initial License Examination ML21215A2172021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-MT-21-031, Preparation and Scheduling of Operator Licensing Examinations2021-04-20020 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21110A5762021-04-19019 April 2021 GFE Results, March 2021 ML21020A1002020-11-0303 November 2020 Initial License Exam Form ES-201-1 ML21013A5122020-11-0303 November 2020 Initial License Exam Outline Submittal Letter ML21020A1232020-11-0303 November 2020 Initial License Exam Outline Review Comments ML21019A5732020-11-0303 November 2020 Initial License Exam Administered Scenarios ML21020A1062020-11-0303 November 2020 Initial License Exam Form ES-403-1 ML21013A5422020-11-0303 November 2020 Initial License Exam Forms ES-301-2 ML21019A2202020-11-0303 November 2020 Initial License Exam Proposed Written Exam Key ML21020A1132020-11-0303 November 2020 Initial License Exam Form ES-401-4 ML21020A1202020-11-0303 November 2020 Initial License Exam Forms ES-401-9 ML21013A5412020-11-0303 November 2020 Initial License Exam Forms ES-301-1 ML21013A5432020-11-0303 November 2020 Initial License Exam Forms ES-401-1 and 401-3 ML21020A1172020-11-0303 November 2020 Initial License Exam Forms ES-301-7 ML21013A5072020-11-0303 November 2020 Initial License Exam Forms ES-301-5 ML21019A1752020-11-0303 November 2020 Initial License Exam Form ES-401-6 2024-07-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24277A0202024-10-0303 October 2024 Operator Licensing Examination Approval Monticello Nuclear Generating Plant, October 2024 L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24082A2452024-03-22022 March 2024 Confirmation of Initial License Examination IR 05000263/20223012022-11-21021 November 2022 NRC Initial License Examination Report 05000263/2022301 ML23011A2512022-11-10010 November 2022 Form 1.3-1 ML23011A3362022-11-10010 November 2022 Form 2.1-1 ML23012A1032022-11-10010 November 2022 Form 2.3-5 ML23012A0982022-11-10010 November 2022 Form 2.3-3 L-MT-22-045, Letter Submitting Post-Exam Package2022-11-0404 November 2022 Letter Submitting Post-Exam Package ML23012A1692022-10-25025 October 2022 As-Administered Written Exam Reference Handouts ML23012A1662022-10-25025 October 2022 As-Administered Operating Test Scenarios ML23012A1652022-10-25025 October 2022 As-Administered Operating Test JPMs ML23012A1682022-10-25025 October 2022 As-Administered Written Examination and Answer Key ML23011A3392022-10-21021 October 2022 Form 5.1-1 ML22271A9162022-10-0303 October 2022 Operator Licensing Examination Approval ML23012A0092022-09-28028 September 2022 Form 2.3-2 ML23012A1372022-09-28028 September 2022 Form 3.3-2 Proposed Operating Test Simulator Scenario Guides ML23012A1362022-09-28028 September 2022 Proposed Sim and Inplant System JPMs ML23012A1342022-09-28028 September 2022 Proposed Admin Topics JPMs ML23012A1392022-09-28028 September 2022 Proposed Written Examination ML23012A1432022-09-28028 September 2022 Form 3.3-1 Proposed Scenario Outlines ML23012A0122022-09-28028 September 2022 Form 2.3-4 ML23012A2182022-08-28028 August 2022 Form 3.3-1 ML23012A2222022-08-28028 August 2022 Form 4.1-1, Record of Rejected Knowledge and Abilities ML23018A1882022-08-28028 August 2022 OP Test Outline Issue Identified ML23012A2062022-08-28028 August 2022 Form 3.4-1 ML23012A2192022-08-28028 August 2022 Form 4.1-BWR and Common ML23012A2162022-08-28028 August 2022 Form 3.2-2 ML23012A2152022-08-28028 August 2022 Form 3.2-1 ML23012A1922022-08-28028 August 2022 Form 2.3-1 ML23012A2102022-07-26026 July 2022 Letter Submitting Monticello Outline Package L-MT-22-023, 75-Day Exam Package2022-07-26026 July 2022 75-Day Exam Package ML21342A3762021-12-13013 December 2021 Confirmation of Initial License Examination ML21215A2172021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-MT-21-031, Preparation and Scheduling of Operator Licensing Examinations2021-04-20020 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21019A5722020-11-0303 November 2020 Initial License Exam Administered JPMs ML21020A1202020-11-0303 November 2020 Initial License Exam Forms ES-401-9 ML21019A5742020-11-0303 November 2020 Initial License Exam Administered Written Exam Key ML21019A1752020-11-0303 November 2020 Initial License Exam Form ES-401-6 ML21013A5412020-11-0303 November 2020 Initial License Exam Forms ES-301-1 ML21020A1232020-11-0303 November 2020 Initial License Exam Outline Review Comments ML21020A1172020-11-0303 November 2020 Initial License Exam Forms ES-301-7 ML21013A5452020-11-0303 November 2020 Initial License Exam Forms ES-D1 ML21019A5732020-11-0303 November 2020 Initial License Exam Administered Scenarios ML21019A2092020-11-0303 November 2020 Initial License Exam Proposed JPMs ML21020A1132020-11-0303 November 2020 Initial License Exam Form ES-401-4 ML21019A2202020-11-0303 November 2020 Initial License Exam Proposed Written Exam Key ML21013A5422020-11-0303 November 2020 Initial License Exam Forms ES-301-2 ML21013A5122020-11-0303 November 2020 Initial License Exam Outline Submittal Letter ML21020A1022020-11-0303 November 2020 Initial License Exam Security Agreement Forms 2024-07-09
[Table view] Category:Schedule and Calendars
[Table view] |
Text
2807 West County Road 75 fl Xcel Energy Monticello, MN 55362
July 9, 2024 L-MT 022 RIS 2024-01
ATTN: Document C ontrol D esk U.S. Nuclear Re gulatory Co mmission Washington, D C 2 0555- 0001
Monticello Nuclear G enerating Plant Docket N o. 50- 263 Renewed F acility O perating License No. D PR-22
NRC Regulatory Issue Summary 202 4 Preparation and Scheduling of Operator Licensing Examinations
As requested by Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations, dated March 5, 2024, Northern States Power Company, a Minnesota Corporation (NSPM), doing business as Xcel Energy, hereby submits the operator licensing examination data for calendar years 2025 through 2028, for the Monticello Nuclear Generating Plant (MNGP). Enclosed is the corresponding NRC Form 536, which provides the estimated number of applicants to be tested and proposed primary and alternate dates for the examinations.
Summary of Commitments
This letter makes no new commitments and no revisions to existing commitments.
Sean P. Dornseif Regulatory Affairs Manager, Monticello Nuclear Generating Plant Northern States Power Company - Minnesota
Enclosure (1)
cc: Administrator, Region III, USNRC Region III, ATTN: Operations Branch, USNRC Project Manager, Monticello, USNRC Resident Inspector, Monticello, USNRC ENCLOSURE 1
Operator Licensing Examination Data For the Monticello Nuclear Generating Plant (MNGP)
NRC Form 536 NRC FORM 536 APPROVED BY OMB: NO. 3150-0131EXPIRES: 01/31/2027 (01-16-2024)U. S. NUCLEAR REGULATORY COMMISSION..;J>A AEau Estimated burden per response to comply with this voluntary information collection request: 45 minutes.
~" <,.>. This information collection is used to plan budgets and resources for operator examinations. Send
< 0 OPERATOR LICENSING comments regarding burden estimate to the FOIA, Library, and Information Collections Branch (T-6
- A10M), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by email to
. ~
l-~? ~ ~ EXAMINATION DATA Infocollects.Resource@nrc.gov, and the OMB reviewer at: OMB Office of Information and Regulatory
~,s,-? ~o~ Affairs, (3150-0131), Attn: Desk Officer for the Nuclear Regulatory Commission, 725 17th Street NW,
....... Washington, DC 20503; email: oira_submission@omb.eop.gov. The NRC may not conduct or
sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currently valid OMB control number.
FACILITY NRC REGION
Monticello Nuclear Generating Plant III
I I A. PROPOSED EXAMINATION PREPARATION SCHEDULE
PROPOSED NUMBER CY 2526CY CY 2728CY
ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 EXAMINATIONS
ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS
B. INITIAL OPERATOR LICENSE EXAMINATIONS
PROPOSED NUMBERCY 2526CY CY 2728CY
NUMBER OF REACTOR 8 8 OPERATORS
NUMBER OF SENIOR REACTOR 9 6 OPERATORS - INSTANT
NUMBER OF SENIOR REACTOR 1 2 OPERATORS - UPGRADE
NUMBER OF SENIOR REACTOR 0 0 OPERATORS - LIMITED
PROPOSED DATES
PRIMARY DATE 9/21/2026 09/18/2028
ALTERNATE DATE 10/19/2026 10/02/2028
NRC FORM 536 (01-16-2024)