L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations

From kanterella
Jump to navigation Jump to search
– Preparation and Scheduling of Operator Licensing Examinations
ML24191A440
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 07/09/2024
From: Dornseif S
Northern States Power Company, Minnesota, Xcel Energy
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
RIS 2024-01, L-MT-24-022
Download: ML24191A440 (1)


Text

2807 West County Road 75 fl Xcel Energy Monticello, MN 55362

July 9, 2024 L-MT 022 RIS 2024-01

ATTN: Document C ontrol D esk U.S. Nuclear Re gulatory Co mmission Washington, D C 2 0555- 0001

Monticello Nuclear G enerating Plant Docket N o. 50- 263 Renewed F acility O perating License No. D PR-22

NRC Regulatory Issue Summary 202 4 Preparation and Scheduling of Operator Licensing Examinations

As requested by Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations, dated March 5, 2024, Northern States Power Company, a Minnesota Corporation (NSPM), doing business as Xcel Energy, hereby submits the operator licensing examination data for calendar years 2025 through 2028, for the Monticello Nuclear Generating Plant (MNGP). Enclosed is the corresponding NRC Form 536, which provides the estimated number of applicants to be tested and proposed primary and alternate dates for the examinations.

Summary of Commitments

This letter makes no new commitments and no revisions to existing commitments.

Sean P. Dornseif Regulatory Affairs Manager, Monticello Nuclear Generating Plant Northern States Power Company - Minnesota

Enclosure (1)

cc: Administrator, Region III, USNRC Region III, ATTN: Operations Branch, USNRC Project Manager, Monticello, USNRC Resident Inspector, Monticello, USNRC ENCLOSURE 1

Operator Licensing Examination Data For the Monticello Nuclear Generating Plant (MNGP)

NRC Form 536 NRC FORM 536 APPROVED BY OMB: NO. 3150-0131EXPIRES: 01/31/2027 (01-16-2024)U. S. NUCLEAR REGULATORY COMMISSION..;J>A AEau Estimated burden per response to comply with this voluntary information collection request: 45 minutes.

~" <,.>. This information collection is used to plan budgets and resources for operator examinations. Send

< 0 OPERATOR LICENSING comments regarding burden estimate to the FOIA, Library, and Information Collections Branch (T-6

  • A10M), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by email to

. ~

l-~? ~ ~ EXAMINATION DATA Infocollects.Resource@nrc.gov, and the OMB reviewer at: OMB Office of Information and Regulatory

~,s,-? ~o~ Affairs, (3150-0131), Attn: Desk Officer for the Nuclear Regulatory Commission, 725 17th Street NW,

....... Washington, DC 20503; email: oira_submission@omb.eop.gov. The NRC may not conduct or

sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currently valid OMB control number.

FACILITY NRC REGION

Monticello Nuclear Generating Plant III

I I A. PROPOSED EXAMINATION PREPARATION SCHEDULE

PROPOSED NUMBER CY 2526CY CY 2728CY

ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 EXAMINATIONS

ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS

B. INITIAL OPERATOR LICENSE EXAMINATIONS

PROPOSED NUMBERCY 2526CY CY 2728CY

NUMBER OF REACTOR 8 8 OPERATORS

NUMBER OF SENIOR REACTOR 9 6 OPERATORS - INSTANT

NUMBER OF SENIOR REACTOR 1 2 OPERATORS - UPGRADE

NUMBER OF SENIOR REACTOR 0 0 OPERATORS - LIMITED

PROPOSED DATES

PRIMARY DATE 9/21/2026 09/18/2028

ALTERNATE DATE 10/19/2026 10/02/2028

NRC FORM 536 (01-16-2024)