March 3, 2010
SUBJECT:
ANNUAL ASSESSMENT LETTER - MONTICELLO NUCLEAR GENERATING PLANT (05000263/2010001)
Dear Mr. OConnor:
On February 11, 2010, the NRC staff completed its performance review of Monticello Nuclear Generating Plant. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information.
A separate letter designated and marked as "Official Use Only -- Security Information" will include the Security Cornerstone review and resultant inspection plan.
Overall, Monticello Nuclear Generating Plant operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
In the Annual Assessment Letter dated March 4, 2009, the NRC opened a substantive cross-cutting issue (SCCI) in the area of Human Performance with themes in the aspects of oversight of work controls (H.4(c)) and correct and adequate procedures (H.2(c)). In the Mid-Cycle Assessment Letter dated September 1, 2009, the NRC closed the cross-cutting issue associated with the theme of correct and adequate procedures (H.2(c)) based on a reduction of human performance issues in this area. The SCCI in the area of Human Performance remained open due to continued issues associated with the oversight of work activities theme. In that letter, we stated that in order to clear this theme, an assessment on whether corrective actions have resulted in a positive sustainable improvement in this area and a decrease in the number of findings associated with this cross-cutting aspect should be evident.
T. O'Connor
- 2 -
During the last two quarters of the assessment cycle, the NRC has seen a decrease in the number of findings associated with the cross-cutting aspect of oversight of work activities (H.4(c)). You have also implemented actions to improve performance in this area. Based on an assessment of these actions, the NRC has gained confidence in your ability to identify and correct issues associated with the oversight of work activities. As a result, the cross-cutting aspect theme of H.4(c) will be cleared. Also, based on your sustained progress and a decrease in the number of issues in the area of Human Performance, the substantive cross-cutting issue is closed. Although we are closing the substantive cross-cutting issue in the area of Human Performance and have recently seen some positive changes in the behaviors that contributed to the SCCI, we will continue to monitor your actions to sustain performance improvements in this area and the associated themes as part of the baseline inspection program.
The enclosed inspection plan details the inspections, including baseline and other infrequently conducted inspections, less those related to security, scheduled through June 30, 2011. We also plan on conducting several special and infrequently performed inspection procedures which include: Inspection Procedure (IP) 71003, "Post-Approval Site Inspection For License Renewal"; "IP 71004, "Power Uprate"; and IP 92709, "Licensee Strike Contingency Plans."
The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle review.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Kenneth Riemer at 630-829-9628 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Steven West, Director Division of Reactor Projects
Docket No. 50-263 License No. DPR-22
Enclosure: Monticello Inspection/Activity Plan
cc w/encl: Distribution via ListServ
T. O'Connor
- 2 -
During the last two quarters of the assessment cycle, the NRC has seen a decrease in the number of findings associated with the cross-cutting aspect of oversight of work activities (H.4(c)). You have also implemented actions to improve performance in this area. Based on an assessment of these actions, the NRC has gained confidence in your ability to identify and correct issues associated with the oversight of work activities. As a result, the cross-cutting aspect theme of H.4(c) will be cleared. Also, based on your sustained progress and a decrease in the number of issues in the area of Human Performance, the substantive cross-cutting issue is closed. Although we are closing the substantive cross-cutting issue in the area of Human Performance and have recently seen some positive changes in the behaviors that contributed to the SCCI, we will continue to monitor your actions to sustain performance improvements in this area and the associated themes as part of the baseline inspection program.
The enclosed inspection plan details the inspections, including baseline and other infrequently conducted inspections, less those related to security, scheduled through June 30, 2011. We also plan on conducting several special and infrequently performed inspection procedures which include: Inspection Procedure (IP) 71003, "Post-Approval Site Inspection For License Renewal"; "IP 71004, "Power Uprate"; and IP 92709, "Licensee Strike Contingency Plans."
The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle review.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Kenneth Riemer at 630-829-9628 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Steven West, Director Division of Reactor Projects Docket No. 50-263 License No. DPR-22 Enclosure: Monticello Inspection/Activity Plan cc w/encl: Distribution via ListServ DOCUMENT NAME: G:\\1-SECY\\1-WORK IN PROGRESS\\2009 EOC LETTERS\\MONTICELLO EOC LETTER.DOC G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl
"E" = Copy with attach/encl "N" = No copy
OFFICE
RIII
N
RIII
N
RIII
RIII
NAME
AScarbeary:cms
KRiemer
SWest
DATE
02/27/10
02/27/10
03/03/10
OFFICIAL RECORD COPY
Letter to T. O'Connor from S. West dated March 3, 2010
SUBJECT:
ANNUAL ASSESSMENT LETTER - MONTICELLO NUCLEAR GENERATING PLANT (05000263/2010001)
DISTRIBUTION:
Susan Bagley RidsNrrDorlLpl3-1 Resource RidsNrrPMMonticello RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource
Inspection / Activity Plan 03/01/2010 - 06/30/2011 Planned Dates Start End Inspection Activity Title No. of Staff on Site Monticello BI&UPRAT
- ENG MODS/50.59 & EXTENDED POWER UPRATE
IP Power Uprate 71004 03/08/2010 03/26/2010 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 03/08/2010 03/26/2010 IP Component Design Bases Inspection 7111121 03/08/2010 03/26/2010 BI ENG
- TRIENNIAL HEAT SINK INSPECTION
IP Heat Sink Performance 7111107T 04/26/2010 04/30/2010 BI RP
- RADIATION PROTECTION BASELINE INSPECTION
IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/24/2010 05/28/2010 BI RP
- RADIATION PROTECTION BASELINE INSPECTION
IP Occupational ALARA Planning and Controls 71124.02 06/14/2010 06/18/2010 IP Reactor Coolant System Activity 71151-BI01 06/14/2010 06/18/2010 IP Occupational Exposure Control Effectiveness 71151-OR01 06/14/2010 06/18/2010 IP RETS/ODCM Radiological Effluent 71151-PR01 06/14/2010 06/18/2010 RENEWAL
- LICENSE RENEWAL 71003 - PHASE 2
IP Post-Approval Site Inspection for License Renewal 71003 06/28/2010 07/16/2010 BI EP
- EP ROUTINE INSPECTION / PI VERIFICATION
IP Radiological Environmental Monitoring Program 7111402 06/28/2010 07/02/2010 IP Emergency Response Organization Augmentation Testing 7111403 06/28/2010 07/02/2010 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 06/28/2010 07/02/2010 IP Drill/Exercise Performance 71151-EP01 06/28/2010 07/02/2010 IP ERO Drill Participation 71151-EP02 06/28/2010 07/02/2010 IP Alert & Notification System 71151-EP03 06/28/2010 07/02/2010 STRIKE
- STRIKE CONTINGENCY-OPS/MAINT/RP/PLN/ETC
IP Licensee Strike Contingency Plans 92709 09/01/2010 12/31/2010 BI PI&R
- BIENNIAL PI&R INSPECTION
IP Identification and Resolution of Problems 71152B 09/13/2010 10/01/2010 OL PREP
- MONTICELLO INIT PREP - NOV. 2010
OL - INITIAL EXAM - DEC 2010 - MONT W90221 11/15/2010 11/19/2010 BI RP
- RADIATION PROTECTION BASELINE INSPECTION
IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 11/29/2010 12/03/2010 OL EXAM
- MONTICELLO INIT EXAM - DEC. 2010
OL - INITIAL EXAM - DEC 2010 - MONT W90221 12/06/2010 12/17/2010 UPRATE
- POWER UPRATE - FAC/EC NON-OUTAGE PORTION
IP Power Uprate 71004 02/07/2011 02/11/2011
Inspection / Activity Plan 03/01/2010 - 06/30/2011 Planned Dates Start End Inspection Activity Title No. of Staff on Site Monticello BI RP
- RADIATION PROTECTION BASELINE INSPECTION
IP Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2515/179 01/31/2011 02/04/2011 IP Radiological Hazard Assessment and Exposure Controls 71124.01 01/31/2011 02/04/2011 BI ENG
- ENGINEERING INSERVICE INSPECTION
IP Inservice Inspection Activities - BWR 7111108G 03/05/2011 05/09/2011 UPRATE
- POWER UPRATE FAC/EC OUTAGE PORTION
IP Power Uprate 71004 03/05/2011 05/09/2011 BI RP
- RADIATION PROTECTION BASELINE INSPECTION
IP Radiation Monitoring Instrumentation 71124.05 03/14/2011 03/18/2011 BI ENG
- TRIENNIAL FIRE PROTECTION INSPECTION
IP Fire Protection [Triennial]