Similar Documents at Hatch |
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARHL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5493, Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant HL-5475, Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5447, Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5416, Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5393, Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5364, Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 2 HL-5332, Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant1997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant HL-5314, Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant1997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant HL-5296, Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 21996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5283, Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 21996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 2 HL-5265, Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5249, Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 21996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 2 HL-5237, Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20116J3821996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5202, Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20112J0661996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Ehnp ML20116J3971996-05-31031 May 1996 Revised MOR for May 1996 for Ei Hatch Nuclear Plant Unit 1 ML20112J0691996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant ML20116J3901996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant Unit 1 ML20111B0061996-04-30030 April 1996 Monthly Operating Repts for April 1996 for Ei Hatch Nuclear Plant HL-5144, Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant1996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant ML20111B0131996-03-31031 March 1996 Revised Pages E2-4 for March 1996 for Ei Hatch Nuclear Plant Unit 2 ML20101B1911996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5111, Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant1996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant ML20101B2001996-01-31031 January 1996 Revised Page E1-2 for Monthly Operating Rept for Jan 1996 for Ei Hatch Unit 1 HL-5098, Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant HL-5085, Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant1995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217D3061999-10-13013 October 1999 SER Accepting Licensee Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation HL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A6641999-09-13013 September 1999 Safety Evaluation Authorizing Relief Request RR-V-16 for Third 10 Yr Interval Inservice Testing Program HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With ML20210J9631999-08-0202 August 1999 SER Finding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20210J9271999-08-0202 August 1999 SER Finds That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant,Susceptible to Pressure Locking or Thermal Binding HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207E7631999-06-0303 June 1999 Safety Evaluation Concluding That Licensee Proposed Alternative to Use Code Case N-509 Contained in RR-4 Provides Acceptable Level of Quality & Safety.Considers Rev 2 to RR-4 & RR-6 Acceptable HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with ML20206G1691999-05-0404 May 1999 SER Approving Requirements of Istb 4.6.2(b) Pursuant to 10CFR50.55a(a)(3)(ii) HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207M1891999-03-11011 March 1999 SER Accepting Relief Request for Authorization of Alternative Reactor Pressure Vessel Exam for Circumferential Weld HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20206P6981999-01-0707 January 1999 Ehnp Intake Structure Licensing Rept HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20196J4931998-12-0707 December 1998 Safety Evaluation Accepting Proposed Alternatives in Relief Requests RR-V-12,RR-V-15,RR-P-15,RR-V-7,RR-V-12,RR-V-14 & RR-V-15 HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With ML20155B6121998-10-28028 October 1998 Safety Evaluation of TR SNCH-9501, BWR Steady State & Transient Analysis Methods Benchmarking Topical Rept. Rept Acceptable HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20153G2481998-09-24024 September 1998 SE Concluding That Licensee Implementation Program to Resolve USI A-46 at Plant Adequately Addressed Purpose of 10CFR50.54(f) Request ML20239A2531998-09-0303 September 1998 SER Accepting Licensee Request for Relief Numbers RR-17 & RR-18 for Edwin I Hatch Nuclear Plant,Units 1 & 2.Technical Ltr Rept on Third 10-year Interval ISI Request for Reliefs for Plant,Units 1 & 2 Encl HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20238F7131998-08-31031 August 1998 9,change 2 to QAP 1.0, Organization HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5657, Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures1998-07-30030 July 1998 Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures ML20236W3441998-07-30030 July 1998 Safety Evaluation Accepting Relief Requests for Second 10-yr ISI for Plant,Units 1 & 2 ML20236V5191998-07-28028 July 1998 Safety Evaluation Accepting Proposed License Amend Power Uprate Review ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20236L1821998-07-0707 July 1998 Safety Evaluation Accepting 980428 Proposed Alternative to ASME Boiler & Pressure Vessel Code,Section Xi,Repair & Replacement Requirements Under 10CFR50.55a(a)(3) HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20248B8651998-05-15015 May 1998 Quadrennial Simulator Certification Rept HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20216B2711998-02-28028 February 1998 Extended Power Uprate Safety Analysis Rept for Ei Hatch Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20199B0561997-12-31031 December 1997 Rev 0 GE-NE-B13-01869-122, Jet Pump Riser Weld Flaw Evaluation Handbook for Hatch Unit 1 HL-5581, Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 21997-12-31031 December 1997 Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20212A1981997-10-16016 October 1997 Safety Evaluation Denying Licensee Request for Relief from Implementation of 10CFR50.55a Requirements Re Use of 1992 Edition of ASME Code Section XI for ISI of Containments ML20211M6491997-10-0808 October 1997 Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted ML20211H5311997-10-0101 October 1997 Rev 2 to Unit 1,Cycle 17 Colr ML20211H5251997-10-0101 October 1997 Rev 3 to Unit 1,Cycle 17 Colr 1999-09-30
[Table view] |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
c.cg,a n>w cavany
. 40 own,ess cmer ho ur
. f W O't.t e 635 495
. .brmmy.am Aiatema 3401 te mon e,e. M b77 TF79
- . uom. . ;,. Georgia Power v4 e neuem _. eu w Hat;n h ap
- 1 HL-1766 000116 August 12, 1991 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50 321, 50-366 OPERATING LICENSES DPR-57, NPF-5 MONTHLY OPERATING REPORTS Gentlemen:
Enclosed are the July 1991 Monthly Operating Ror "ts for Edwin 1.
Hatch Nuclear Plant - Unit 1 Docket No. 50-321, t.d Unit 2, Docket No. 50-366. These reports are submitted in accordance with the requirements of Technical Specifications Section 6.9.1.10.
Sincerely,
'O -
. T. Beckham, Jr.
SP.P/sp
Enclosures:
- 1. Monthly Operating Report for Plant Hatch - Unit 1
- 2. Monthly Operating Report for Plant Hatch - Unit 2 c: (See next page.)
i i
9108150267 910731 nY e
PDR ADOCK 05000321 / I R FDR I
, I
GeolgillPOWer U.S. Nuclear Regulatory Commission August 12, 1991 Page Two c: Scorcia Power _ Company Mr. II. L. Sumner, General Manager Nuclear Plant Mr. J. D. Iloidt, Manager Engineering and Licensing - Ilatch NORMS LkS,._Huclear Re.gulatory Commission._Mashinoton. D.C.
Mr. K. Jabbour Licensing Project Manager - itatch U.S. Hurliar Regulatory Commission. Reaion 1.1 Mr. S. D. Ebneter, Regional Administrator Mr. L. D. Wert, Senior Resident inspector - Ilatch A
ill-1766 000116-l 7CMJ7 7%
ENCLOSURE 1 l i
PLANT HATCH UNIT 1 NRC DOCKET 50-321 MONTHLY OPERATING REPORT July 1991 TABLE OF CONTENTS P_iLqa Narrative Report El-1 Operating Data Report El-2 Average Daily Power Level El-3 Unit Shutdowns and Power Reductions El-4 l-l HL-1766.
000116
. . - - . . - ~
PLANT E. I. HATCH - UNIT ONE DOCKET NO.: 50-321 DATE: AUGUST 5 NARRATIVE REPORT COMPLETED BY: k.1991 M. BEARD TELEPHONE: (912) 367-7781 x2878 JULY 1 0000 Shift continued to maintain rated thermal power.
JULY 12 2200 Shift began reducing load to approximately 690 GMWe to perform Turbine Control Valve and Turbine Bypass Valve Testing.
JULY 13 0050 Shift began returning the unit to rated thermal power.
JULY 13 0120 The unit attained rated thermal power.
JULY 31 2400 Shift continued to maintain rated thermal power.
i El-1 l
4 OPERATING DATA REPORT DOCKET NO.: 50-321 DATE: AUGUST 5 COMPLETED BY: k.1991 M. BEARD
~
OPERATING STATUS
- 1. UNIT NAME: E. 1. HATCH - UNIT ONE
- 2. REPORT PERIOD: JULY 1991 PWt : 2436
- 3. LICENSED
- 4. NAMEPLATE THERMAL RATING (GROSS POWER (MWe : 850 l
- 5. DESIGN ELECTRICAL RATING N T MWe : 776.3 !
- 6. MAXIMUM DEPENDABLE CAPACI Y GROS MWe): 774
- 7. MAXIHUM DEPENDABLE CAPACITY NET MWe 741
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS):
(ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: NO CHANCi.S
- 9. POWER LEVEL TO WHICH RESTRICTED, if ANY (NET MWe): NO RESVRICTIONS
- 10. REASONS FOR RESTRICTION, IF ANY: N/A THIS HONTH YEAR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD: 744,0 5087 136582
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL: /44.0 4808.3 100355.8
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 14. HOURS GENERATOR ON LINE: 744.0 4755.2 95815.3
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 1810128 11384534 212297982
- 16. GROSS THERMAL ENERGY GENERATED
- 17. GROSS ELECTRICAL ENERGY GENERATED (MW 568050 (MWHt)He): 1613780 68383640
- 18. NEI ELECTRICAL ENERGY GENERATED (HWHe): 542856 3453039 65033207
- 19. UNIT SERVICE FACTOR: 100.0% 93.5% 70.2%
- 20. UNIT AVAILABILITY FACTOR: 100.0% 93.5% 70.2%
- 21. UNIT CAPACITY FACTOR USING MDC NET : 98.5% 91.6% 63.5%
- 22. UNIT CAPACITY FACTOR USING DER NET : 94.0% 87.4% 61.0%
- 23. UNIT FORCED OUTAGE RA E: 0.0% 6.5% 13.1%
- 24. SHUTDOWNS SCHEDULED Refuelin Outage: OVER THE Tentativel NEXT 6 MONTHS (d for Schedule SeatemberTYPE, 18, 1951; .'< Oays):DATE, AND DU
- 25. IF SHUTDOWN A END OF REPORT PERIO ESTIMATED DATE OF STARTUP: N/A 26.UNITSINTESTSTATUS(PRIOR 10COMMERCIALOPERATION):
. N/A L
El-2
PLANT E. I. HATCH - UNIT ONE DOCKET NO.: 50-321 DATE: AUGUST 5 AVERAGE DAILY POWER LEVEL COMPLETED BY: k.1991 M. BEARD TELEPHONE: (912) 367-7781 x2878 DAY Net MWe 1 .............. 729 2 .............. 729 3 .............. 727 4 .............. 728 5 .............. 721 6 .............. 731 7 .............. 727 8 .............. 734 i l
9 .............. 730 10 .............. 730 11 .............. 730 12 .............. 722 i 13 .............. 725 14 .............. 729 15 .............. 731 16 .............. 732 1 17 .............. 732 18 .............. 731 19 .............. 730-20 .............. 730 21 .............. 731 22 .............. 731 23 .............. 727 24 .............. 729 25 .............. 732 26 .............. 730 27 .............. 731-28 .............. 728 29 .............. 729 30 .............. 730 31 .............. 733 El-3
, 1 i
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-321 i DATE: AUGUST 5 -
UNIT NAME: E..l. HATCH - UNIT ONE COMPLETED BY: k.1991 M. BEARD ,
TELEPHONE: (912) 367-7781 x2878 REPORT MONTH: JULY 1991 ,
'R H S E E Y T A T LICENSEE SC :
Y S H EVENT T0 COMPONENT CAUSE & CORRECTIVE P DURATION 0 0 REPORT ED CODE ACTION TO NO. DATE E (HOURS) N D NUMBER HE (SUBCODE) PREVENT RECURRENCE No significant power reductions occurred this-month.
- TYPE:' REASON:- METHOD: EVENTS REPORTED INVOLVE A GREATER THAN 20% -
F-FORCED 1-MANUAL- REDUCTION IN AVERAGE
- S-SCHEDULED A-EQUIPMENTFAILURE(EXPLAIN)2-MANUALSCRAM B-MAINTENANCE OR TEST DAILY POWER-LEVEL FOR C-REFUELING 3-AUTOMATIC SCRAM THE PRECEDING 24 HOURS..
D-REGULATORY RESTRICTION. 4-CONTINVATIONS E-0PERATOR TRAINING & LICENSE 5-LOAD REDUCTION'
-F-ADMINISTRATIVE 9-0THER (EXPLAIN)
G-0PERATIONAL ERROR (EXPLAIN)
-H-0THER (EXPLAIN)
El-4 l
., W_ m._,w - , . . _ _ - , - . . , . us.- r
~
ENCLOSURE 2 PLANT HATCH UNIT 2 NRC DOCKET 50-366 MONTHLY OPERATING REPORT daly_1191 TABLE OF CONTENTS EA92 Narrative Report E2-1 Operating Data Report E2-2 Average Daily Power level E2-3 Unit Shutdowns and Power Reductions E2-4 HL-1766 000116
s ,
PLANT E. 1. HATCH - UNIT TWO DOCKET NO: 50-366 DATE: AUGUST 5 NARRATIVE REPORT COMPLETED BY: k.1991 M. BEARD TELEPHONE: (912) 367-7781 x2878 JULY l 0000 Shift continued to maintain rated thermal power.
JULY '/ 1622 Shift began reducing 1. -d to maintain an appropriate amount of vacuum in the Main Cr kss r when air in-leakage levels began ee to a hole in the Discharge Bellows increasingRaactorisignifict of the "B *
,atv ump Turbine. Load was reduced to approxinutoiy 450 GMWe, and the hole in the Discharge Bellows was repaired.
JULY 9 1210 Shift began returning the unit to rated thermal power.
JULY 9 1550 The unit attained rated tiiermal power.
JULY 13 2305 Shift began reducing load to approximately 690 GMWe to Turbine Control Valve and Turbine Bypass Valve Testing perform JULY 14 0205 Shift began returning the unit to rated thermal power.
JULY 14 03:5 The unit attained rated thermal power.
JULY 31 2400 Shift continued to maintain rated thermal power.
3 E2-1
OPERATING DATA REPORT DOCKET NO: 50-366 DATE: AUGUST 5 COMPLETED BY: k.1991 M. BEARD
~
OPERATING STATUS:
- 1. UNIT NAME: E. I. HATCH - UNIT TWO
- 2. REPORTING PERIOD: JULY 1991 i
- 3. LICENSED THERMAL POWER (MWt : 2436
- 4. NAMEPLATE RATING (GROSS MWe : 850 i
- 5. DESIGN ELECTRICAL RATING N T MWe : 784
- 6. MAXIMUM DEPENDABLE CAPACI Y GROS MWe): 794
- 7. MAXIMUM DEPENDABLE CAPACITY NET MWe 761
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS):
(ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: NO CHANGES
- 9. NWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS ;
l 10. REASONS FOR RESTRICTION, IF ANY: N/A 1
l THIS MONTH YEAR-TO-DATE CUMULATIVE 1
- 11. HOURS IN REPORTING PERIOD: 744.0 5087 104208
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL: 744.0 3105.8 77188.5 l l
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0 !
- 14. HOURS GENERATOR ON LINE: 744.0 2984.6 74146.6 l 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0 l l
- 1766784 6950438 163244031 l-
- 16. GROSS THERMAL ENERGY GENERATED
- 17. GROSS ELECTRICAL ENERGY GENERATED (MW 570430 (MWHt)He):
2256060 53535680 i
- 18. NET ELECTRICAL ENERGY GENERATED (MWHe): 545543 2140991 50965106 l
- 19. UNIT SERVICE FACTOR: 100.0% 58.7% 71.2%
l 20. UNIT AVAILABILITY FACTOR: 100.0% 58.7% 71.2% 1
! 21. UNIT CAPACITY FACTOR USING MDC NET : 96.4% 55 3% 64.0%
- 22. UNIT CAPACITY FACTOR USING DER NET : 93.5% 53,7% 62.4%
- 23. UNIT FORCED OUTAGE RA E: 0.0% 9.4% 7.7%
l <
24.SHUTDOWNSSCHEDULEDOVERTHENEXTSIXMONTHS(TYPE
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIhATED DAT OF [DATE,ANDDURATIONOFEACH):
STARTUP: N/A N/A I
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): N/A l
l l
i I 1
E2-2 l
l
PLANT E. I. HATCH - UNIT TWO DOCKET NO: 50-366 DATE: AUGUST 5 AVERAGE DAILY POWER LEVEL COMPLETED BY: k.1991 M. BEARD TELEPHONE: (912) 367-7781 x2878 DAY Net HWe 1 .............. 756 2 .............. 756 3 .............. 752 4 .............. 753 5 .............. 755 6 .............. 756 7 .............. 659 8 .............. 421 9 .............. 559 10 .............. 749 11 .............. 750 12 .............. 749 13 .............. 746 14 .............. 742 15 .......... ... 754 16 .............. 754 17 .............. 755 18 .............. 755 19 .............. 753 20 .............. 751 21 .............. 752 22 .............. 751 23 .............. 150 24 .............. 750 25 .............. 753 26 .............. 758 27 .............. 761 28 .............. 760 29 .............. 756 30 .............. 757 31 .............. 760 E2-3 1
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-366 DATE: AUGUST 5 UNIT NAME: E. I. HATCH - UNIT TWO COMPLETED BY: k.1991 M. BEARD TELEPHONE: (912) 367-7781 x2878 REPORT HONTH: JULY 1991 R H S E E Y T A T LICENSEE SC Y S H EVENT T0 COMPONENT CAUSE & CORRECTIVE P DURATION 0 0 REPORT ED CODE ACTION TO NO. DATE E (HOURS) N D NUMBER HE (SUBCODE) PREVENT RECURRENCE 91-006 910707 F 0.0 B 5 N/A HH PIPEXX A hole in the Discharge (E) Bellows of the "B" Reactor Feed Pump Turbine caused an increase in the amount of air in-leakaga into the tc.areby Main Condenser,bility affecting the a to maintain vacuum at full power.
Load was reduced, and a patch was placed over the hole in the Discharge Bellows.
I -
TVPE: REASON: METHOD: EVENTS REPORTED INVOLVE A GREATER THAN 20%
F-FORCED A-EQUIPMENT FAILURE (EXPl.AIN) 1-MANUAL REDUCTION IN AVERAGE S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL SCRAM DAILY POWER LEVEL FOR C-REFUELING 3-AU10MATIC SCR a THE PRECEDING 24 HOURS.
D-REGULATORY RESTRICTION 4-CONTINVAT10NS E-0PERATOR TRAINING & LICENSE 5-LOAD REDUCTION F-ADMINISTRATIVE 9-0THER (EXPLAIN)
G-0PERATIONAL ER90R (EXPLAIN)
H-0THER (EXPLAIN)
El-4
- __ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ - - - _ _ _ _ _ _____ _ - .