MONTHYEARHL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5493, Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant HL-5475, Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5447, Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5416, Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5393, Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5364, Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 2 HL-5332, Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant1997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant HL-5314, Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant1997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant HL-5296, Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 21996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5283, Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 21996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 2 HL-5265, Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5249, Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 21996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 2 HL-5237, Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20116J3821996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5202, Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20112J0661996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Ehnp ML20116J3971996-05-31031 May 1996 Revised MOR for May 1996 for Ei Hatch Nuclear Plant Unit 1 ML20112J0691996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant ML20116J3901996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant Unit 1 ML20111B0061996-04-30030 April 1996 Monthly Operating Repts for April 1996 for Ei Hatch Nuclear Plant HL-5144, Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant1996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant ML20111B0131996-03-31031 March 1996 Revised Pages E2-4 for March 1996 for Ei Hatch Nuclear Plant Unit 2 ML20101B1911996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5111, Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant1996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant ML20101B2001996-01-31031 January 1996 Revised Page E1-2 for Monthly Operating Rept for Jan 1996 for Ei Hatch Unit 1 HL-5098, Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant HL-5085, Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant1995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217D3061999-10-13013 October 1999 SER Accepting Licensee Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation HL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A6641999-09-13013 September 1999 Safety Evaluation Authorizing Relief Request RR-V-16 for Third 10 Yr Interval Inservice Testing Program HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With ML20210J9631999-08-0202 August 1999 SER Finding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20210J9271999-08-0202 August 1999 SER Finds That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant,Susceptible to Pressure Locking or Thermal Binding HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207E7631999-06-0303 June 1999 Safety Evaluation Concluding That Licensee Proposed Alternative to Use Code Case N-509 Contained in RR-4 Provides Acceptable Level of Quality & Safety.Considers Rev 2 to RR-4 & RR-6 Acceptable HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with ML20206G1691999-05-0404 May 1999 SER Approving Requirements of Istb 4.6.2(b) Pursuant to 10CFR50.55a(a)(3)(ii) HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207M1891999-03-11011 March 1999 SER Accepting Relief Request for Authorization of Alternative Reactor Pressure Vessel Exam for Circumferential Weld HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20206P6981999-01-0707 January 1999 Ehnp Intake Structure Licensing Rept HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20196J4931998-12-0707 December 1998 Safety Evaluation Accepting Proposed Alternatives in Relief Requests RR-V-12,RR-V-15,RR-P-15,RR-V-7,RR-V-12,RR-V-14 & RR-V-15 HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With ML20155B6121998-10-28028 October 1998 Safety Evaluation of TR SNCH-9501, BWR Steady State & Transient Analysis Methods Benchmarking Topical Rept. Rept Acceptable HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20153G2481998-09-24024 September 1998 SE Concluding That Licensee Implementation Program to Resolve USI A-46 at Plant Adequately Addressed Purpose of 10CFR50.54(f) Request ML20239A2531998-09-0303 September 1998 SER Accepting Licensee Request for Relief Numbers RR-17 & RR-18 for Edwin I Hatch Nuclear Plant,Units 1 & 2.Technical Ltr Rept on Third 10-year Interval ISI Request for Reliefs for Plant,Units 1 & 2 Encl HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20238F7131998-08-31031 August 1998 9,change 2 to QAP 1.0, Organization HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5657, Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures1998-07-30030 July 1998 Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures ML20236W3441998-07-30030 July 1998 Safety Evaluation Accepting Relief Requests for Second 10-yr ISI for Plant,Units 1 & 2 ML20236V5191998-07-28028 July 1998 Safety Evaluation Accepting Proposed License Amend Power Uprate Review ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20236L1821998-07-0707 July 1998 Safety Evaluation Accepting 980428 Proposed Alternative to ASME Boiler & Pressure Vessel Code,Section Xi,Repair & Replacement Requirements Under 10CFR50.55a(a)(3) HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20248B8651998-05-15015 May 1998 Quadrennial Simulator Certification Rept HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20216B2711998-02-28028 February 1998 Extended Power Uprate Safety Analysis Rept for Ei Hatch Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20199B0561997-12-31031 December 1997 Rev 0 GE-NE-B13-01869-122, Jet Pump Riser Weld Flaw Evaluation Handbook for Hatch Unit 1 HL-5581, Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 21997-12-31031 December 1997 Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20212A1981997-10-16016 October 1997 Safety Evaluation Denying Licensee Request for Relief from Implementation of 10CFR50.55a Requirements Re Use of 1992 Edition of ASME Code Section XI for ISI of Containments ML20211M6491997-10-0808 October 1997 Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted ML20211H5311997-10-0101 October 1997 Rev 2 to Unit 1,Cycle 17 Colr ML20211H5251997-10-0101 October 1997 Rev 3 to Unit 1,Cycle 17 Colr 1999-09-30
[Table view] |
Text
. . _ _ _ _ . _ _ _.
Georp a Ftwer Company
- 40 tevemess Center Parkway g
. ,f ,ibst Bnmmg%mOft:ceAlabarria Box 1295 Telephone 205 877 7279 35201
( ,
m J. T. Bec k ham, Jr. L COlgill POWCf Vice Pret. dent-Nuclear ' #
hd*Ch bf 0;t)Cl HL-1730 000116 July ll, 1991 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 MONTHLY OPERATING REPORTS Gentlemen:
Enclosed are the June 1991 Monthly Operating Reports for Edwin 1.
Hatch Nuclear Plant - Unit 1, Docket No. 50-321, and Unit 2, Docket No. 50-366. These reports are submitted in accordance with the requirements of Technical Specifications Section 6.9.1.10.
Sincerely, hl J.T.Beckham,Jr.!
SRP/sp
Enclosures:
- 1. Monthly Operating neport for Plant Hatch - Unit 1
- 2. Monthly Operating Report for Plant Hatch - Unit 2 c: (See next page.)
9107150389 910630 POR f4 DOCK 05000321
... L R PDR
l' Gtoigia Power d.
U.S. Nuclear Regulatory Commission July 11, 1991 Page Two c: Georoia Power Company Mr. H. L. Sumner, General Manager - Nuclear Plant Mr. J. D. Heidt, Manager Engineering and Licensing - Hatch NORMS U.S. Nuclear Reaulatory Commission. Washing 1sn. D.C.
Mr. K Jabbour, Licensing Project Manager - Hatch U.S. Nuclear Reaulatory Commission. Reaion 11 Mr. S. D. Ebneter, Regional Administrator Mr. L. D. Wert, Senior Resident inspector - Hatch HL-1730 000116 7'JJ77$
ENCLOSURE 1 PLANT HATCH UNIT 1 NRC DOCKET 50-321 MONTHLY OPERATING REPORT June 1991 TABLE OF CONTENTS PARC Narrative Report El-1 Operating Data Report El-2 6 -
Average Daily Power Level El-3 o Unit Shutdowns and Power Reductions El-4 4
HL-1730 000116
PLANT E. I. HATCH - UNIT ONE DOCKET NO.: 50-321 DATE: -July 3, 1991 NARRATIVE EEPORT COMPLETED BY: R. 71. BEARD TELEPHONE: (912)367-7781x287(
JUNE l' 0000 Shif t continued to maintain-rated thermal power.
JUNE-14. 2155 Shift began to reduce load to approximately 420 PM c to perform a Control Rod Sequence Exchange and maintenance on the "A" Reactor feed Pump Turbine Oil System, and to tepair steam leaks in the Condenser Bay.
-JUNE 16 2345- -The unie attained rated thermal power.
JUNE 21 2015 Shift reduced load to approximately 695 GMWe for Turbine Control !
Valve and Turbine Bypass Valve Testing. '
JUNE 21 2233 Shift began ascension to rated thermal power. -
JUNE 21 2254 The unit attained rated thermal power. I JUNE 30 2400 Shift continued to maintain rated thermal power.
l l
El-1
OPERATING DATA REPORT DOCKET NO.: 50-321 DATE: 1991 COMPLETED JulyBY:
3, R. M. BEARD OPERATING STATUS
- 1. UNIT NAME: E. 1. HATCH - UNIT ONE
- 2. REPOR1 PERIOD: JUNE 1991
- 3. LICENSED THERMAL POWER (MWt : 2436
- 4. NAMEPLATE RATING (GROSS MWe : 850
- 5. DESIGN ELECTRICAL RATING LN 1 MWe : 776.3 MWe : 774
- 6. MAXIMUM DEPENDABLE CAPAC11Y (GROSSINCENO LAST CHANGES REPORT,)GIVE REASONS:
- 7. TEMS 3 THROUGH 7) CAPACITY XIMUM DEPENDABLE 741
- 8. If CHANGES OCCUR IN CAPACITY (NET MWe):
RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPOR'(, GIVE REASONS: NO CHANGES
- 9. POWER LEVEL 10 WHICH RESTRICTED, If ANY (Nll MWe): NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION, if ANY: N/A THIS MONTH YEAR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD: 720.0 4343 135838
- 12. NUMBER Of HOURS REACTOR WAS CRITICAL: 720.0 4064.3 99611.8
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0 h 14. HOURS GENERATOR ON LINE: 720.0 4011.2 95071.3
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWHt): 1704534 9574406 210487854
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWHe): 537220 3045730 67815590
- 18. NET ELECTRICAL ENERGY GENERATED (MWHe): 513399 2910183 64490351
- 19. UNIT SERVICE FACTOR: 100.0% 92.4% 70.0%
- 20. UNIT AVAILABILITY FACTOR: 100.0% 92.4% 70.0%
- 21. UNIT CAPACITY FACTOR USING MDC NET : 96.2% 90.4% 63.3%
- 22. UNIT CAPACITY FACTOR USING DER NET : 91.9% 86.3% 60.9%
- 23. UNIT FORCED OUTAGE RA'E: 0.0% 7.6% 13.2%
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE DATE AND DURATION Of EACH Refuelin Outage: Tentative 1 Scheduled for Seitember 18, 1991; 68 day):. s
- 25. If SHUTDOWN A END Of REPORT PER10 ESTIMATED DATE F STARTUP: N/A 26.UNITSINTESTSTATUS(PRIORTOCOMM[RCIALOPERATION): N/A El-2
PLANT E. 1. HATCH - UNIT ONE DOCKET NO.: 50-321 DATE: 1991 AVERAGE DAILY POWER LEVEL COMPLETED JulyBY: 3, R. M. BEARD TELEPHONE: (912) 367-7/81 x2878 DAY Net MWe 1 .............. 736 2 .............. 736 3 .............. 734 4 ....... ...... 732 5 .............. 737 6 .............. 744 7 .............. 743 8 .............. 744 9 .............. 743 10 .............. 740 11 .............. 738 12 .............. 736 13 .............. 737 14 .............. 717 15 .............. 396 16 .............. 431 17 .............. 732 18 .............. 732 19 .............. 734 20 .............. 734 21 .............. 724 22 .............. 732 23 .............. 731 24 .............. 734 25 .............. 733 26 .............. 735 27 .............. 733 28 .............. 732 29 .............. 731 30 .............. 730 El-3
- UNIT SHUTDOWNS AND PGk'EP REDUCTIONS DOCKET NO.- 50-321 DATE: 1991 UNIT NAME: E. I. HATCH - UNIT ONE COMPLETED JulyBY:
3, R. M. BEARD TELEPHONE: (912) 367-7781 x2878 REPORT MONTH: JUNE 1991 R M S E E Y P DURATION 0 0 REPORT ED CODE ACTION TO N0. DATE E (HOURS) N D NUMBER HE (SUBCODE) PREVENT RECURRENCE 91-005 910614 5 0.0 B 5 h/A CH PUMPXX Load was reduced to perform (B) a Control Rod Sequence Exchange-and maintenance on the "A" Reactor Feed Pump .
and to Turbine repair steam 011 System,in leaks the i Condenser Bay.
I j
TYPE: REASON: METHOD:
F-FORCED 1-MANUAL EVENTS REPORTED INVOLVE S-SCHEDULED A-EQUIPMENTFAILURE(EXPLAIN)2-MANUALSCRAM
.B-MAINTENANCE OR TEST A GREATER THAN 20%
C-REFUELING 3-AUTOMATIC SCRAM REDUCTION IN AVERAGE D-REGULATORY RESTRICTION' 4-CONTINUATIONS' DAILY POWER LEVEL FOR L E-OPERATOR TRAINING & LICENSE 5-LOAD REDUCTION. THE PRECEDING 24 HOURS.
F-ADMINISTRATIVE 9-0THER (EXPLAIN)
G-OPERATIONAL ERROR (EXPLAIN)
H-0THER (EXPLAIN)
El-4
ENCLOSURE 2 PLANT HATCH UNIT 2 NRC DOCKET 50 366 MONTHLY OPERATING REPORT June 1991 TABLE OF CONTENTS P_iLqc Narrative Report E2-1 Cperating Data Report E2-2 Average Daily Power Level E2-3 Unit Shutdowns and Power Reductions E2-4 l
l-l HL-1730 000116 i
- - - - - , ,, ,..,,,? , , , - . , . . . - _ . . . _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ - - _ _ _ _ _ _ _ _ _ _ . _
- t PLANT E. 1. HATCH - UNIT TWO DOCKET NO: 50-366 DATE: July 3, 1991 NARRATIVE REPORT COMPLETED BY: R. M. BEARD TELEPHONE: (912) 367-7781 x2878 JUNE 1 0000 Shift continued with activities for reactor startup and placing the unit on-line.
JUNE 2 1635 Shift tied the generator to the grid.
JUNE 2 2218 Shift removel the generator from the grid for Turbine Overspeed Trip Testing.
JUNE 3 0002 Shift tied the generator to the grid and began ascension to rated thermal power.
JUNE 9 0230 The unit attnined rated thermal power.
JUNE 15 2105 Shift reduced load to approximately 710 GMWe to Control Valve and Turbine Bypass Valve Testing. perform Turbine JUNE 15 2345 Shift began ascension to rated thermal power.
JUNE 16 0010 The unit attained rated thermal power.
JUNE 24 0817 Shift began to reduce load to ap)roximately 450 GMWe to repair a steam leak in the vent line of tie "A" Reactor Feed Pump Turbine.
JUNE 25 0340 Shift began ascension to rated thermal power.
JUNE 25 0638 The unit attained rated thermal power.
JUNE 30 2400 Shift continued to maintain rated thermal power.
E2-1
l *
\ .
t OPERATING DATA REPORT DOCKET NO: 50-366 DATE: July 3 1991 COMPLETED BY:, R. M. BEARD
~
OPERATING STATUS:
- 3. UNIT NAME: E. 1. HATCH - UNIT TWO
- 2. REFORTING PERIOD: JUNE 1991 MWt : 2436
- 3. LICENSED
- 4. NAMEPLATE THERHAL RATING (GROSS POWER (MWe : 850
- 5. DESIGN ELECTRICAL RATING N T MWe : 784
- 6. MAXIMUM DEPENDABLE CAPACI Y GROS MWe): 794
- 7. HAXIMUM OEPENDABLE CAPACITY NET MWe 761
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS):
(ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: NO CHANGES
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION, IF ANY: N/A THIS HONTH YEAR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD: 720.0 4343 103464
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL: 720.0 2361.8 76444.5
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 14. HOURS GENERATOR ON LINE: 677.7 2240.6 73402.6
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 1475200 5183654 161477247
- 16. GROSS THERMAL ENERGY GENERATED (MWHt)He):
- 17. GROSS ELECTRICAL ENERGY GENERATED (MW 471410 1685630 52965250
- 18. NET ELECTRICAL ENEUCY GENERATED (MWHe): 449404 1595448 50419563
- 19. UNIT SERVICE FACT 0F: 94.1% 51.6% 70.9%
- 20. UNIT AVAILABILITY FACTOR: 94.1% 51.6% 70.9%
- 21. UNIT CAPACITY FACTCR USING MDC NET : 82.0% 48.3% 63.7%
- 22. UNIT CAPACITY FACT 01 USING DER NET : 79.6% 46.9% 62.2%
- 23. UNIT FORCED OUTAGE FA E: 0.0% 12.2% 7.8%
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE DA1E AND DURATION OF EACH): NA
- 25. IF SHUTDOWN AT END Of REPORT PERIOD ESTIMATEDDATEOFSIARTUP: NA
- 26. UNITS IN TEST STATUS (PRIOR TO COMM$RCIAL OPERATION): N/A E2-2 l
t Pl. ANT E. I. HATCH - UNIT TWO DOCKET NO: 50-366 I DATE: July 3, 1991 AVERAGE DAILY POWER LEVEL COMPLETED BY: R. M. BEARD TELEPHONE: (912) 367-7781 x2878 DAY Net PWe 1 .............. 0 2 .............. 4 3 .............. 160 4 .............. 263 5 .............. 390 6 .............. 414 7 .............. 496 8 .............. 596 9 .............. 760 10 .............. 769 11 .............. 766 12 .............. 766 13 .............. 762 14 .............. 761 15 .............. 749 16 .............. 758 17 .............. 759 18 .............. 758 19 .............. 760 20 .............. 759 21 .............. 758 22 .............. 757 23 .............. 758 24 .............. 543 25 .............. 690 26 .............. 758 27 .............. 760 28 .............. 756 29 .............. 757 30 .............. 757 E2-3
9
.' UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-366 DATE: 1991 UNIT NAME: E. I. HATCH - UNIT TWO COMPLETED JulyBY:
3, R. M. BEARD TELEPHONE: (912) 367-7781 x2878 1 REPORT MONTH: JUNE 1991 R M S E E Y T A T LICENSEE SC l
-Y S H EVENT T0 COMPONENT CAUSE & CORRECTIVE l P DURATION 0 0 REPORT ED CODE ACTION TO NO. DATE E (HOURS) N D NUMBER HE (SUBCODE) PREVENT RECURRENCE 91-003 910320 S 40.58 C 4 N/A RC FUELXX The unit was shot down for the 9th Refueling Outage.
l 91-004 910602 S 1.73 B 5 N/A HA TURBlN The generator was removed L from the grid for Turbine l Overspeed Trip Testing.
S1-005 910624 S 0.0 B 5 N/A CH PUMPXX Load was reduced to repair a (B) leak in a 1-in. vent line ,
on the discharge side of the i "A"-Reactor feed Pump Turbine.
TYPE: REASON: METHOD:
F-FORCED 1-MANUAL EVENTS REPORTED INVOLVE
'S-SCHEDULED A-EQUIPHENTFAILURE[
B-MAINTENANCE OR TES1 EXPLAIN)2-MANUALSCRAM A GREATER THAN 20%
C-REFUELING 3-AUTOMATIC SCRAM REDUCTION IN AVERAGE D-REGULATORY RESTRICTION 4-CONTINUATIONS- DAILY POWER LEVEL-FOR E-0PERATOR TRAINING & LICENSE 5-LOAD REDUCTION THE PRECEDING 24 HOURS i F-ADMINISTRATIVE 9-0THER (EXPLAIN)
L G-OPERATIONALERROR(EXPLAIN)
! H-0THER (EXPLAIN)
L E2-4 l
l L
i,--,,,.,_,,-- --
. _- .. - - - - - . . . - . _ - _ _ . - . _ _ - - - - - - - - - - - - -