Exeton Generation Company, LLC www.exeloncorp.com Nuclear Byron Station 4450 North German Church Road Byron, IL61010-9794 April 15, 2002 LTR: BYRON 2002-0035 File: 2.07.0300 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Byron Station, Unit 1 and Unit 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455

Subject:

Annual Environmental Operating Report Byron Station is submitting the Annual Environmental Operating Report as required by Facility Operating License No. NPF-37, Appendix B, "Environmental Protection Plan (Non-Radiological),"

Section 5.4, "Plant Reporting Requirements." This report addresses the period from January 1, 2001, to December 31, 2001. The objectives of the Environmental Protection Plan as stated in Appendix B, Section 1.0, "Objectives of the Environmental Protection Plan," have been met during this period.

There were no non-compliances to the Environmental Protection Plan; therefore, no corrective actions were required by Appendix B, Subsection 5.4.1(1). There were no changes in the station design or operation, or tests and experiments which involved a potentially significant, unreviewed environmental question as defined in Subsection 3.1, "Plant Design and Operation." There were no non-routine reports submitted per Subsection 5.4.2. Byron Station received no noise complaints during 2001. The aerial photographic monitoring program, described in Subsection 4.2.1, "Aerial Remote Sensing," was completed in 1993. The confirmatory sound survey requirements, described in subsection 4.2.2, "Confirmatory Sound Level Survey," were completed in 1988.

April 15, 2002 U.S. Nuclear Regulatory Commission Page 2 If there are any questions regarding this report, please contact William Grundmann, Regulatory Assurance Manager, at (815) 406-2800.

Respectfully, Rtiia rd~ri ore Site Vice President Byron Nuclear Generating Station RPL/WG/dpk cc: Regional Administrator- NRC Region III NRC Senior Resident Inspector - Byron Station NRC Project Manager- NRR - Byron Station Office of Nuclear Facility Safety - Illinois Department of Nuclear Safety