BYRON 2009-0029, Change to Operator Licensing Examination 2011 Dates

From kanterella
Jump to navigation Jump to search
Change to Operator Licensing Examination 2011 Dates
ML090710318
Person / Time
Site: Byron  Constellation icon.png
Issue date: 03/11/2009
From: Enright D
Exelon Generation Co, Exelon Nuclear
To: Mcneil D
Operations Branch III
References
1.10.0101, BYRON 2009-0029
Download: ML090710318 (1)


Text

Exelon Generation Company, LLC Byro n Stat ion 4450 North German Church Road Byron.IL 61010-9794 March 11, 2009 LTR:

BYRON 2009-0029 File:

1.10.0101 www.exeloncorp.com Exel Nuclear Mr. Dell McNeil Operations Branch - Region III U.S. Nuclear Regulatory Commission 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket nos. STN 50-454 and STN 50-455

Subject:

Mr. McNeil:

Change to Byron Station Operator Licensing Examination 2011 Dates In conversation with Mr. Gregg Smith, Senior Operations Training Instructor at Byron Station, a request has been made to reschedule the current 2011 Byron Station Initial Operator License Examination dates.

Per response to RIS 2008-16 NRC Form 536 submitted in Exelon Generation Company letter RS-08-092 dated July 22, 2008, the current dates were provided. Proposed revised dates are shown below.

Current Date Weeks of Sept. 12 and 19, 2011 (12 candidates)

Proposed Date Weeks of Sept. 26 and Oct. 3, 2011 (12 candidates)

Please confirm these revisions by contacting Mr. Gregg Smith at 815-406-2386.

Sincerely, D~.~

Daniel J. Enrightd Site Vice President Byron Station DJElGSffH/cy ecc:

Director - Licensing and Regulatory Affairs Manager, Licensing - Braidwood, Byron and LaSalle County Stations E. Bogue, Byron Training Director S. Fruin, Byron Shift Operations Superintendent G. Smith, Byron Sr. Operations Training Instructor T. Hulbert, Byron Reg. Assurance