BYRON 2014-0139, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report

From kanterella
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report
ML14324A224
Person / Time
Site: Byron, Quad Cities  Constellation icon.png
Issue date: 11/20/2014
From: Kearney F
Exelon Generation Co
To:
Document Control Desk, NRC/NMSS/SFPO
References
1.10.0101, 2.12.1522.01, BYRON 2014-0139
Download: ML14324A224 (1)


Text

Byron Generating Station Exelon Generation 4450 North German Church Rd Byron. IL 61010-9794 www.exeloncorp.com November 20, 2014 10 CFR 72.44 (d)(3)

LTR: BYRON 2014-0139 File: 1.10.0101 2.12.1522.01 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-001 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455

Subject:

Byron Station Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report In accordance with 10 CFR 72.44 (d)(3) this letter provides the annual radioactive effluent release report for Byron Generating Station Independent Spent Fuel Storage Installation (ISFSI) for the period September 9, 2013 through September 9, 2014.

During this period there were no radioactive effluents released from the Byron Nuclear Station Independent Spent Fuel Storage Installation.

Should you have any questions concerning this letter, please contact Mr. Douglas Spitzer, Regulatory Assurance Manager, at (815) 406-2800.

Respectfully, r A. Kearney Site Vice President Byron Generating Station FAKILZ/sg cc: Regional Administrator NRC Region III Senior NRC Resident Inspector Byron Generating Station