MONTHYEARBYRON 2024-0046, Cycle 27 Core Operating Limits Report2024-09-19019 September 2024 Cycle 27 Core Operating Limits Report BYRON 2024-0031, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-05-16016 May 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation BYRON 2024-0028, Annual Radiological Environmental Operating Report (AREOR)2024-05-0909 May 2024 Annual Radiological Environmental Operating Report (AREOR) BYRON 2024-0022, 2023 Regulatory Commitment Change Summary Report2024-05-0202 May 2024 2023 Regulatory Commitment Change Summary Report BYRON 2024-0020, Annual Dose Report for 20232024-04-18018 April 2024 Annual Dose Report for 2023 BYRON 2024-0021, Registration of Use of Cask to Store Spent Fuel2024-04-11011 April 2024 Registration of Use of Cask to Store Spent Fuel BYRON 2024-0019, Registration of Use of Cask to Store Spent Fuel2024-03-28028 March 2024 Registration of Use of Cask to Store Spent Fuel BYRON 2023-0065, Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline2023-11-17017 November 2023 Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline BYRON 2023-0063, Day Inservice Inspection Report for Interval 4, Period 3, (B2R24)2023-11-16016 November 2023 Day Inservice Inspection Report for Interval 4, Period 3, (B2R24) BYRON 2023-0029, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements2023-06-0101 June 2023 Response to Request for Additional Information Regarding Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements BYRON 2023-0022, 2022 Annual Radiological Environmental Operating Report (AREOR)2023-05-0404 May 2023 2022 Annual Radiological Environmental Operating Report (AREOR) BYRON 2023-0002, Unit 2, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2023-04-0606 April 2023 Unit 2, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements BYRON 2023-0012, Cycle 26 Core Operating Limits Report2023-03-16016 March 2023 Cycle 26 Core Operating Limits Report BYRON 2022-0081, CFR72.48 Evaluation Summary Report2022-12-0909 December 2022 CFR72.48 Evaluation Summary Report BYRON 2022-0072, Steam Generator Tube Inspection Report for Refueling Outage 232022-10-27027 October 2022 Steam Generator Tube Inspection Report for Refueling Outage 23 BYRON 2022-0069, 2021 Regulatory Commitment Change Summary Report2022-10-13013 October 2022 2021 Regulatory Commitment Change Summary Report BYRON 2022-0071, Materials Reliability Program: Topical Report for Primary Water Stress Corrosion Cracking Mitigation by Surface Stress Improvement (MRP-335, Revision 3-A) Final Causal Report and Description of Corrective Action Assignment2022-10-13013 October 2022 Materials Reliability Program: Topical Report for Primary Water Stress Corrosion Cracking Mitigation by Surface Stress Improvement (MRP-335, Revision 3-A) Final Causal Report and Description of Corrective Action Assignment BYRON 2022-0065, Registration of Use of Cask to Store Spent Fuel2022-10-13013 October 2022 Registration of Use of Cask to Store Spent Fuel BYRON 2022-0063, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report for September 9, 2021 to September 8, 20222022-09-29029 September 2022 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report for September 9, 2021 to September 8, 2022 BYRON 2022-0064, Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed)2022-09-28028 September 2022 Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed) BYRON 2022-0059, Registration of Use of Cask to Store Spent Fuel2022-09-15015 September 2022 Registration of Use of Cask to Store Spent Fuel BYRON 2022-0045, Day Inservice Inspection Report for Interval 4, Period 2, (B2R23)2022-07-15015 July 2022 Day Inservice Inspection Report for Interval 4, Period 2, (B2R23) BYRON 2022-0026, Annual Radiological Environmental Operating Report2022-05-0505 May 2022 Annual Radiological Environmental Operating Report BYRON 2022-0030, Materials Reliability Program: Topical Report for Primary Water Stress Corrosion Cracking Mitigation by Surface Stress Improvement (MRP-335, Revision 3-A) Report2022-05-0303 May 2022 Materials Reliability Program: Topical Report for Primary Water Stress Corrosion Cracking Mitigation by Surface Stress Improvement (MRP-335, Revision 3-A) Report BYRON 2022-0028, Cycle 24 Core Operating Limits Report2022-04-28028 April 2022 Cycle 24 Core Operating Limits Report BYRON 2022-0016, Annual Dose Report for 20212022-04-0707 April 2022 Annual Dose Report for 2021 BYRON 2021-0033, Submittal on Initial Operator Licensing Examination Outline2021-10-28028 October 2021 Submittal on Initial Operator Licensing Examination Outline BYRON 2021-0072, Post Exam Submittal Letter2021-10-28028 October 2021 Post Exam Submittal Letter BYRON 2021-0063, Reactor Coolant System Pressure and Temperature Limits Report2021-09-28028 September 2021 Reactor Coolant System Pressure and Temperature Limits Report BYRON 2021-0064, Cycle 25 Core Operating Limits Report2021-09-28028 September 2021 Cycle 25 Core Operating Limits Report BYRON 2021-0032, 2020 Annual Radiological Environmental Operating Report (AREOR)2021-05-0606 May 2021 2020 Annual Radiological Environmental Operating Report (AREOR) BYRON 2021-0031, 2020 Annual Radioactive Effluent Release Report2021-04-21021 April 2021 2020 Annual Radioactive Effluent Release Report BYRON 2021-0027, Annual Dose Report for 20202021-03-30030 March 2021 Annual Dose Report for 2020 BYRON 2021-0023, Registration of Use of Cask to Store Spent Fuel2021-03-25025 March 2021 Registration of Use of Cask to Store Spent Fuel BYRON 2021-0024, 2020 Regulatory Commitment Change Summary Report2021-03-19019 March 2021 2020 Regulatory Commitment Change Summary Report BYRON 2021-0001, Day Inservice Inspection Report for Interval 4, Period 2, (B2R22)2021-01-13013 January 2021 Day Inservice Inspection Report for Interval 4, Period 2, (B2R22) BYRON 2020-0087, National Pollutant Discharge Elimination System (NPDES) Permit No. IL00483132020-12-16016 December 2020 National Pollutant Discharge Elimination System (NPDES) Permit No. IL0048313 BYRON 2020-0084, 10 CFR 72.48 Evaluation Summary Report2020-12-10010 December 2020 10 CFR 72.48 Evaluation Summary Report BYRON 2020-0085, 10 CFR 50.59 Summary Report2020-12-10010 December 2020 10 CFR 50.59 Summary Report BYRON 2020-0067, Cycle 22 Core Operating Limits Report2020-10-20020 October 2020 Cycle 22 Core Operating Limits Report BYRON 2020-0063, Independent Spent Fuel Storage Installation - Transmittal of Annual Radioactive Effluent Release Repo2020-10-0101 October 2020 Independent Spent Fuel Storage Installation - Transmittal of Annual Radioactive Effluent Release Repo BYRON 2020-0053, Steam Generator Tube Inspection Report for Refueling Outage 232020-09-10010 September 2020 Steam Generator Tube Inspection Report for Refueling Outage 23 BYRON 2020-0025, Annual Dose Report 20192020-03-24024 March 2020 Annual Dose Report 2019 BYRON 2020-0015, Cycle 24 Core Operating Limits Report2020-03-17017 March 2020 Cycle 24 Core Operating Limits Report BYRON 2020-0010, Revision to Byron Station Site Security Plan, Safeguards Contingency Plan, Training and Qualification Plan, and Independent Spent Fuel Storage Installation Plan, Revision 172020-02-13013 February 2020 Revision to Byron Station Site Security Plan, Safeguards Contingency Plan, Training and Qualification Plan, and Independent Spent Fuel Storage Installation Plan, Revision 17 BYRON 2020-0008, 2019 Regulatory Commitment Change Summary Report2020-02-0707 February 2020 2019 Regulatory Commitment Change Summary Report BYRON 2019-0105, Post Examination Submittal Letter2019-11-26026 November 2019 Post Examination Submittal Letter BYRON 2019-0095, Registration of Use of Cask to Store Spent Fuel2019-10-10010 October 2019 Registration of Use of Cask to Store Spent Fuel BYRON 2019-0090, Registration of Use of Cask to Store Spent Fuel2019-09-18018 September 2019 Registration of Use of Cask to Store Spent Fuel BYRON 2019-0078, Registration of Use of Cask to Store Spent Fuel2019-08-22022 August 2019 Registration of Use of Cask to Store Spent Fuel 2024-09-19
[Table view] |
Text
February 7, 2013 LTR: BYRON 2013-0012 File: 1.10.0101 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455
Subject:
2012 Regulatory Commitment Change Summary Report Enclosed please find the "Regulatory Commitment Change Summary Report" for Byron Station.
This report contains summary information from January 1 through December 31, 2012.
Revisions to docketed regulatory commitments were processed using the current revision of Nuclear Energy Institutes' document NEI 99-04 "Guidelines for Managing Nuclear Regulatory Commission (NRC) Commitment Changes."
If you have any questions concerning this report, please contact D. Gudger, Regulatory Assurance Manager at (815) 406-2800.
Respectfully, Ti thy J. Tulon S e Vice President Byron Station TJT /TLH/ cy Enclosure
ATTACHMENT BYRON STATION REGULATORY COMMITMENT CHANGE
SUMMARY
REPORT FOR 2012 Original Document and Commitment:
NRC Generic Letter 98-089 Periodic Justification of Design Basis Capability of Safety Related Motor Operated Valve and ComEd letter August 24, 1998 from R. M. Krich to NRC (AR1336558)
In response to NRC Generic Letter 96-05, Byron Nuclear Generating Station committed to implement the Joint Owners Group (JOG) Program for Motor Operated Valve (MOV)Periodic Verification in accordance with MPR-1 807 (interim) and MPR-2524-A Rev 1 (Final). Note: Not all GL 96-05 MOV Program Valves are within the scope of the final JOG program. This was not known when the original commitment was made.
Subject of Change:
At Byron, a small number of GL 96-05 MOV Program Valves are not included in the Final JOG Program Report (MPR-2524-A) such that JOG MOV PV evaluations for service related degradation effects are not applicable. GL 96-05 MOVs not within the scope of the JOG MOV PV final Report are referred to as JOG Class D MOVs. Therefore, Byron must apply alternative methods to address service related degradation that were not included in the NRC approved JOG MOV PV Program. This review concerns a change in the reporting requirements for the Class D valves.
Applicable to: Essential Service WaterOSX162A,B,C,D Low risk butterfly valves and 0SX163A,B,C,D,E,F,G,H Low risk butterfly valves These 12 MOVs are classified as JOG Class D due to having 300SS low friction surface treated bearings. These valves are classified as Class D due to the Microseal / Melanite treated 315 SS bearings.
Engineering assessment concluded that the configuration and application of these valves and the conservatisms used in assessing their valve factor capability preclude susceptibility to further performance degradation. Therefore, these valves can continue to be tested in accordance with the requirements of Class "B" valves under the updated JOG Requirements "Generic Methodology for JOG MOV Periodic Verification (PV) Program-Category D MOV Evaluations", Section 8.1.3 Margin Threshold Method - Quarter-Turn Valves with low friction surface treated metallic bearings (LFSTMB)
Justification for Change:
The JOG Class D MOVs have been installed at Byron since original construction and tested in accordance with the requirements of GL 89 and 96 -05. Byron is following the JOG program requirements to develop and justify an alternative method to address service related degradation. This commitment change is in accordance with the guidance provided in NRC Regulatory Issue Summary 2011-13, Following Up To Generic Letter 96-05 for Evaluation of Class D Valves under Joint Owners Group Motor Operated Valve Periodic Verification Program.
Status:
The commitment was changed under Commitment Change Number 2012-12.