Forwards LER 97-034-00 IAW 10CFR50.73(a)(2)(i)(B) Due to Failure to Perform Snubber Functional Test as Required by TS
ML20198M770
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/15/1998
From: Ewing E
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20198M775 List:
References
W3F1-98-0001, W3F1-98-1, NUDOCS 9801200117
Download: ML20198M770 (1)


LER-2097-034, Forwards LER 97-034-00 IAW 10CFR50.73(a)(2)(i)(B) Due to Failure to Perform Snubber Functional Test as Required by TS
Event date:
Report date:
3822097034R00 - NRC Website

text

. _ - _ - - - - _ _ - _ - _ _ _ - _ _ _ _ - _

l Me gy pef ations, Inc.

y

  • Kmona. LA 70066 Te! 504 739 6242 C. Ewing,111 ggy. ,~

W3F1-98-0001 A4.05 PR January 15,1998 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Reporting of Licensee Event Report Gentlemen:

Attached is Licensee Event Report (LER) 97-034-00 for Waterford Steam Electric Station Unit 3. Tnis LER is submitted in awardance with 10CFR 50.73(a)(2)(i)(B) due to the failure to perform a snubber functional test as required by Technical Specifications.

Very truly yours,

{

X~

{ J E.C. Ewing Director, Nuclear Safety & Regulatory Affairs ECE/DMUlssf '

Attachment ',Qd_

cc: E.W. Merschoff (NRC Region IV), C.P. Patel (NRC-NRR),

A.L. Garibaldi, J.T. Wheelock - INPO Records Center, J. Smith, N.S. Reynolds, NRC Resident inspectors Office, Administrator - LRPD 9001200137 900115 PDR ADOCK 0500o382 , , ,