| | | Reporting criterion |
|---|
| 05000382/LER-1998-001, Forwards LER 98-001-00,providing Details of TS 3.0.3 Condition Experienced During Plant Malfunction When LCO Section 3.1.2.4 Was Not Met | Forwards LER 98-001-00,providing Details of TS 3.0.3 Condition Experienced During Plant Malfunction When LCO Section 3.1.2.4 Was Not Met | 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications |
| 05000382/LER-1998-001-01, :on 980214,TSs 3.0.3 Condition Occurred Due to Inoperable Charging Pumps.Replaced Failed SX-1 Relay |
- on 980214,TSs 3.0.3 Condition Occurred Due to Inoperable Charging Pumps.Replaced Failed SX-1 Relay
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2) |
| 05000382/LER-1998-002, :on 980215,brief Loss of Command Function in CR Occurred.Caused by Inappropriate Action (Human Error) on Part of Shift Superintendent.Ss Was Counseled IAW Corporate Discipline Policy |
- on 980215,brief Loss of Command Function in CR Occurred.Caused by Inappropriate Action (Human Error) on Part of Shift Superintendent.Ss Was Counseled IAW Corporate Discipline Policy
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(x) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2) |
| 05000382/LER-1998-003, :on 980302,inoperable Hydrogen Analyzers Were Noted Due to Undersized Thermal Overloads.Engineering Personnel Conducted all-hands Meetings to Discuss Management Expectations for Verifying Critical Design Inputs |
- on 980302,inoperable Hydrogen Analyzers Were Noted Due to Undersized Thermal Overloads.Engineering Personnel Conducted all-hands Meetings to Discuss Management Expectations for Verifying Critical Design Inputs
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2) |
| 05000382/LER-1998-004, :on 980304,TS 4.0.3 Condition - CPC Channel Functional Test,Was Concluded from Preliminary CEOG Rept. Caused by Human Error.Cpc Channels A,B & C Were Satisfactorily Tested |
- on 980304,TS 4.0.3 Condition - CPC Channel Functional Test,Was Concluded from Preliminary CEOG Rept. Caused by Human Error.Cpc Channels A,B & C Were Satisfactorily Tested
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications |
| 05000382/LER-1998-005, :on 980312,missed Thermal Overload TS Surveillance Were Noted.Caused by Inadequate Review of 1992 Rev to TS 3.8.4.2 IAW GL 91-08.Thermal Overloads for 8 MOVs Were Subsequently Tested & Determined to Be Operable |
- on 980312,missed Thermal Overload TS Surveillance Were Noted.Caused by Inadequate Review of 1992 Rev to TS 3.8.4.2 IAW GL 91-08.Thermal Overloads for 8 MOVs Were Subsequently Tested & Determined to Be Operable
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications |
| 05000382/LER-1998-006, :on 980306,increased Differential Pressure for Feedwater Isolation Valves Occurred.Caused by Failure to Consider All Pressure Source Affecting Mfivs.Admin Controls Have Been Enacted Requiring Entry Into TS 3.6.3 |
- on 980306,increased Differential Pressure for Feedwater Isolation Valves Occurred.Caused by Failure to Consider All Pressure Source Affecting Mfivs.Admin Controls Have Been Enacted Requiring Entry Into TS 3.6.3
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2) |
| 05000382/LER-1998-007, :on 980317,discovered That No Allowance for Instrument Loop Uncertainity Included in Surveillance for Chilled Water Outlet Temp.Caused by Failure to Consider Instrument Loop Uncertainty.Revised Task |
- on 980317,discovered That No Allowance for Instrument Loop Uncertainity Included in Surveillance for Chilled Water Outlet Temp.Caused by Failure to Consider Instrument Loop Uncertainty.Revised Task
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2) |
| 05000382/LER-1998-008-01, Forwards LER 98-008-01,updating Info Re Potential for Concurrent Reduced Cooling Capacity in Both Trains of Ecw Sys.Revs Are Annotated W/Vertical Change Bars in right-hand Margin | Forwards LER 98-008-01,updating Info Re Potential for Concurrent Reduced Cooling Capacity in Both Trains of Ecw Sys.Revs Are Annotated W/Vertical Change Bars in right-hand Margin | |
| 05000382/LER-1998-008, :on 980414,potential Concurrent Degraded Ecw Sys Trains a & B Was Noted.Cause Was Indeterminate. Affected Circuits Have Been Corrected (within Design Parameters) to Address Condition |
- on 980414,potential Concurrent Degraded Ecw Sys Trains a & B Was Noted.Cause Was Indeterminate. Affected Circuits Have Been Corrected (within Design Parameters) to Address Condition
| 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2) |
| 05000382/LER-1998-009, :on 980415,inadvertent ESF Actuation Occurred. Caused by Inadequate Configuration Control.Restored Incorrectly Lifted Lead to Terminal Point & Made Maint Personnel Aware of Drawing Discrepancy |
- on 980415,inadvertent ESF Actuation Occurred. Caused by Inadequate Configuration Control.Restored Incorrectly Lifted Lead to Terminal Point & Made Maint Personnel Aware of Drawing Discrepancy
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2) |
| 05000382/LER-1998-010, :on 980514,potential Overpressurization of N Sys Was Noted.Caused by Inadequate Design.N Sys Lineup Changed to Allow for Addl Overpressure Protection Through Alternate Existing ASME Section Viii Relief Valve |
- on 980514,potential Overpressurization of N Sys Was Noted.Caused by Inadequate Design.N Sys Lineup Changed to Allow for Addl Overpressure Protection Through Alternate Existing ASME Section Viii Relief Valve
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function |
| 05000382/LER-1998-011, :on 980603,TS 3.0.3 Entry Was Noted.Caused by Component Cooling Water Makeup Check Valve Failing Ist. Operability of a Train of CCW Was Restored Immediately & Check Valve Internals Were Replaced |
- on 980603,TS 3.0.3 Entry Was Noted.Caused by Component Cooling Water Makeup Check Valve Failing Ist. Operability of a Train of CCW Was Restored Immediately & Check Valve Internals Were Replaced
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2) |
| 05000382/LER-1998-012, :on 980609,TS Channel Check for TS Surveillance 4.3.1.1 Was Missed.Caused by Human Error.Involved Employees Were Counseled & All Licensed Operators Were Apprised of Event |
- on 980609,TS Channel Check for TS Surveillance 4.3.1.1 Was Missed.Caused by Human Error.Involved Employees Were Counseled & All Licensed Operators Were Apprised of Event
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2) |
| 05000382/LER-1998-013, :on 980701,IST Valve Surveillances Were Missed. Caused by Inadequate Processing of Info Transferred Between Operations Procedure Group & Programs Engineering.Procedure Revised |
- on 980701,IST Valve Surveillances Were Missed. Caused by Inadequate Processing of Info Transferred Between Operations Procedure Group & Programs Engineering.Procedure Revised
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2) |
| 05000382/LER-1998-014, :on 980716,manual Reactor Trip W/Subsequent EFAS Actuation Occurred.Caused by Short Circuit in FW Pump Turbine a Speed Control Relay.Plant Mgt Established Significant Event Response Team |
- on 980716,manual Reactor Trip W/Subsequent EFAS Actuation Occurred.Caused by Short Circuit in FW Pump Turbine a Speed Control Relay.Plant Mgt Established Significant Event Response Team
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2) |
| 05000382/LER-1998-015, :on 980724,discovered That T-ring Rubber Seat on CR Normal Outside Air Intake Downstream Isolation Valve Was Incorrectly Installed.Caused by Inadequate Info in Vendor Manual.Reworked Valves to Correct Configuration |
- on 980724,discovered That T-ring Rubber Seat on CR Normal Outside Air Intake Downstream Isolation Valve Was Incorrectly Installed.Caused by Inadequate Info in Vendor Manual.Reworked Valves to Correct Configuration
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2) |
| 05000382/LER-1998-016, :on 980730,failed to Meet TS Requirements for for RT Bypasses.Cause Not Determined Because of Age of condition.1E-4% Bistables for All for Channels of Excore Log Power Channels Were Declared Inoperable 980730 |
- on 980730,failed to Meet TS Requirements for for RT Bypasses.Cause Not Determined Because of Age of condition.1E-4% Bistables for All for Channels of Excore Log Power Channels Were Declared Inoperable 980730
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2) |
| 05000382/LER-1998-017, :on 980803,calculated Peak Clad Temp Exceeded 10CFR50.46 Criteria.Caused by Energy Redistributed Factor Error.Incorporated 0.2kw/ft Penalty for Plhgr Into Colss,Per Wa 01162252 |
- on 980803,calculated Peak Clad Temp Exceeded 10CFR50.46 Criteria.Caused by Energy Redistributed Factor Error.Incorporated 0.2kw/ft Penalty for Plhgr Into Colss,Per Wa 01162252
| 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2) |
| 05000382/LER-1998-018, :on 980901,TS 3.0.3 Was Entered,As Bldg Ventilation Valve Train a & B Inoperable Simultaneously. Caused by Electricians Performing Maint on Wrong Component. Panel Debriefing Held with Involved Personnel |
- on 980901,TS 3.0.3 Was Entered,As Bldg Ventilation Valve Train a & B Inoperable Simultaneously. Caused by Electricians Performing Maint on Wrong Component. Panel Debriefing Held with Involved Personnel
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2) |
| 05000382/LER-1998-019-01, Forwards LER 98-019-01,IAW 10CFR50.73(a)(2)(ii). LER 98-019-00,discussed.Refs to Feedwater Valves Have Been Deleted in Revised LER | Forwards LER 98-019-01,IAW 10CFR50.73(a)(2)(ii). LER 98-019-00,discussed.Refs to Feedwater Valves Have Been Deleted in Revised LER | 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition |
| 05000382/LER-1998-019, :on 980920,failure of Containment Isolation Valves to Close During Testing Was Noted.Caused by Solenoid Failures.Solenoids Were Replaced & Valves Were Retested Successfully |
- on 980920,failure of Containment Isolation Valves to Close During Testing Was Noted.Caused by Solenoid Failures.Solenoids Were Replaced & Valves Were Retested Successfully
| 10 CFR 50.73(a)(2)(x) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2) |
| 05000382/LER-1998-020, :on 981204,determined That Certain Core Power Distribution SRs Had Been Incorrectly Scheduled.Caused by TS Change Implementation Error.Will Perform Final Review of TS SRs with 4.0.4 Exemption.With |
- on 981204,determined That Certain Core Power Distribution SRs Had Been Incorrectly Scheduled.Caused by TS Change Implementation Error.Will Perform Final Review of TS SRs with 4.0.4 Exemption.With
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(i) |
| 05000382/LER-1998-021, :on 981210,boron Concentration Below TS Limit in SIT 2B,occurred.Caused by Lack of Complete Understanding of Cumulative Effects of Sys Design.B Concentration in SIT 2B Was Returned to within TS Required Concentrations |
- on 981210,boron Concentration Below TS Limit in SIT 2B,occurred.Caused by Lack of Complete Understanding of Cumulative Effects of Sys Design.B Concentration in SIT 2B Was Returned to within TS Required Concentrations
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2) |