Forwards LER 91-003-02.Containment Atmosphere Monitoring Piping & Mark I Support Installation Work Will Be Completed Prior to Startup from Current Forced Outage Q2F41
ML20112E248
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 05/29/1996
From: Pearce L
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20112E251 List:
References
LWP-96-041, LWP-96-41, NUDOCS 9606050199
Download: ML20112E248 (2)


LER-2091-003, Forwards LER 91-003-02.Containment Atmosphere Monitoring Piping & Mark I Support Installation Work Will Be Completed Prior to Startup from Current Forced Outage Q2F41
Event date:
Report date:
2542091003R00 - NRC Website

text

_ _ _ _ _ _ _ _-_-_

( . erliittos)u r.slth l div tri I e Filip.llin 4,1 Latl 4 6 tit = ( .t tit r.lbr1.',1 %t.ihi tti

. . n in .. o, u t iim s,nii i ortlos. 11(*l),29',0 nl um s n,\

LWP-96-041 Date: May 29, 1996 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Reference:

Quad Cities Nuclear Station Docket Number 50-265, DPR-30, Unit Two

Subject:

Licensee Event Report (LER) 254/91-003 Supplemental Information.

' As stated in LER 254/91-003 Supplement 1, supplemental information is being provided. This information constitutes revision 02 to the original LER documentation.

Attachment 1 is a reproduction of the supplement I text of LER 254/91-003.

This report is submitted in accordance with the requirements of the Code of. Federal Regulations, Title 10, Part 50.73(a)(2)(ii)(8), "Any event or condition that resulted in the condition of the nuclear power plant, including its principal safety barriers, being seriously degraded or that resulted in the nuclear plant being in a condition that was outside the design basis of the plant."

Containment Atmosphere Monitoring piping and Mark I support installation work will be completed prior to startup from the current Unit 2 forced outage Q2F41.

Work required to resolve the Atmosphere Containment Atmosphere Dilution piping support issues will be completed prior to startup from the current Refuel Outage QlR14 (for Unit 1) and prior to startup from forced outage Q2F41 (for Unit 2).

050027 96060S0199 960529 4 1/

f h i PDR ADOCK 05000254 l l S PDR

(

SulGRi96041.LWP

\ 1 im ..m i omnim

a If there are any questions.or comments concerning this. letter, please refer them to Nick Chrissotimoc, Regulatory Assurance Administrator at 309-654-2241, ext. 3100.

Respectfully, COMMONWEALTH EDIS0N COMPANY QU(DCTIESNUCLEARSTATION

/J. .

L.W. Pearce M /

Station Manager Attachment 1- LER 254/91-003 Supplement 1 (Copy) cc: P. Piet C. Miller INP0 Records Center NRC Region 111 l

l l

STMGR\96041.LWP