Forwards Revised Emergency Response Procedures for Limerick Generating Station Units 1 & 2 & Peach Bottom Atomic Station Units 2 & 3
ML20137U021
Person / Time
Site: Peach Bottom, Limerick  Constellation icon.png
Issue date: 04/03/1997
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20137U025 List:
References
NUDOCS 9704160246
Download: ML20137U021 (3)


Text

e

.. . .M

_ A--

. 2FRAhbsY"'

v PECO NUCLEAR ecco see,2, cemnem, 965 Chesterbrook Boulevard A Unit of PECO Energy Wayne, PA 19087-5691 April 3,1997 Docket Nos. 50-352 50-353 50-277 50-278 License Nos. NPF-39 NPF-85 DPR-44 DPR-56 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

Limerick Generating Station, Units 1 and 2 Peach Bottom Atomic Power Station, Units 2 and 3 Emergency Response Procedure Revisions Gentlemen:

Enclosed are the following common Emergency Response Procedures (ERP-Cs) for Limerick Generating Station (LGS), Units 1 and 2, and Peach Bottom Atomic Power Station, Units 2 and 3, which have been recently revised or cancelled. These procedures are required to be submitted within 30 days of their revision or cancellation, in accordance with the requirements of 10CFR50, Appendix E.

o ERP-C-1000, Rev. 3 " Emergency Operations Facility (EOF)

Activation / Deviation."

o ERP-C-1200, Rev. 6 " Emergency Response Manager."

o Exhibit ERP-C-1300, Rev. 6 " Emergency Operations Facility (EOF)

Dose Assessment Team Leader."

o Exhibit ERP-C-1300-1, Rev.1 " Dose Assessment Team Leader initial Actions."

o Exhibit ERP-C-1300-6, Rev. 0 " Dose Assessment Group Initial Actions."

o Exhibit ERP-C-1300-7, Rev. 0 " Obtaining EPDS Met / Rad Data."

o Exhibit ERP-C-1300-8, Rev. 0 "Use of Mode A/ Mode B of CDM."

o Exhibit ERP-C-1300-9, Rev. 0 " Obtaining Met Data From National Weather Service."

o ERP-C-1320, Rev. 4 ' Emergency Operations Facility (EOF)

Fletd Survey Group Leader."

o Exhibit ERP-C-13201, Rev.1 " Field Survey Group Leader initial Actions." I Exhibit ERP-C-1320-2, Rev.1 " Field Survey Group Leader Turnover Sheet."

o o ERP-C-1400, Rev. 3 " Engineering Support Team." f4g/g 7 A

o ERP-C-1500, Rev. 4 " Logistics Support Team."

o ERP-C-1900, Rev. 2 Recovery Phase implementation."

~ o Exhibit ERP-C-1900-2, Rev.1 PBAPS Recovery Acceptance Checklist."

]0019g , exnibii ERP.C.1900 3, Rey.1. LGS Recovery Acceptance Checklist."

o Exhibit ERP-C-1900-4, Rev.1 " Recovery Plan Outline."

^

9704160246 970403 PDR ADOCK 05000277 lllll%I0lIllllllllN F , ,

PDR m

i April 3,1997 s - - (O Page 2.

The following ERP-C procedure and associated exhibits have been cancelled.

o ERP-C-1310 Rev. 3 " Emergency Operations Facility (EOF) Dose l Assessment Group."

o Exhibit ERP-C-1310, Rev. 0 " Dose Assessment Group Leader initial Actions." l o Exhibit ERP-C-1310-2, Rev. 0 " Obtaining Met Data From National l Weather Service." j o Exhibit ERP-C-1310-3, Rev. 0 " Obtaining EPDS Met / Rad Data."

o Exhibit ERP-C-1310-4, Rev. 0 "Use Of Mode A/ Mode B Of CDM."

In addition, the following PBAPS, Unit 2 and 3, station specific Emergency Response Procedures (ERPs) are enclosed. These procedures are also required to be submitted within 30 days of their revision in accordance with the requirements of 10CFR50, Appendix E.

o ERP-340, Rev. 6. "Fleid Survey Group."

o ERP-340, Appendix 1, Rev. 3, Fleid Survey Data Sheet." j Also enclosed are copies of computer generated report indexes for the LGS and PBAPS )

ERP-Cs and the PBAPS ERPs. These indexes identify the latest revisions of the procedures.

If you have any questions or require additional information, please do not hesitate to contact us.

Very truly yours, George A. Hunger, Jr.

Director - Ucensing Enclosures cc: H. J. Miller, Administrator, Region I, USNRC (2 copies of ennlosures)

N. S. Perry, USNRC Senior Resident inspector, LGS (w/ enclosures)

W. L Schmidt, USNRC Senior Resident inspector, PBAPS (w/ enclosures) 1

. . . _ - . _ . . . . . _ . , .-. .m,. _ .. ... .

W J

~i CURD L DOC PROC REV EFFECTIVE RESP SYSTEM FAC TYPE TVPE PROCEDURE NUVBER NBR TITLE DATE GROUP NBR '

F~ PB PROC ERP ERP-C-1000 0003 EMERGENCV OPERATIONS FACILITV (EOF) ACTIVATION /DECACTIVATION 03/26/97 DwE PB PROC ERP ERP-C-1000-1 0001 EOF ACTIVATION CHECKLIST ~ 09/19/94 PwE PB PROC ERP ERP-C-1000-2 0001 EOF DEACTIVATION CHECKLIST 08/13/94 PwE  :

f PS PROC ERP ERP-C-1100 0003 EOF'5TAFF AUGMENTATION- CANCELLED - REPLACED BY ERP-C-1250 09/14/94 PwE PB PROC ERP ERP-C-1200 0006 EMERGENCV REP 50NSE MANAGER 03/26/97 PwE PB PROC ERP ERP-C-1200-1 0000 EMERGENCV RESPONSE MANAGER TURNOVER / BRIEFING FORM 09/14/94 PwE +

PB PROC ERP ERP-C-1200-2 EXH 0000 PROTECTIVE ACTION RECOMMENDATION WDRMSHEET CANCELLED REPLACED BV 10/24/95- PwE i ERP-C-1200 DB PROC EcP ERP-C-12tC 0002 A55!STAN~ EVERGENCV PESPONSE UANAGCR (AEPV) CANCELLED - REPLACED 10124/95 PwF i sv EPo u C- t 2r }

PE PROC ER: EPP-C-1250 000? EMERGENC' PREPAREDN'S5 COODDINA'OR/ Err 09/14/94 PwE  !

PB PDOC ERP EEP-C 1250-i 0000 EMERGENCY POWER INSTPUCTION5 09/14/94 PwE  !

PB PROC ERP EPP-C-1250-2 0000 EMERGENCv PREPAREDNESS C00RDINATOL INSTDuCTIONS FOR ASPEN 09/14/94 DwE BACKUP NOTIFICATION SYSTEM l PB PROC ERP ERP-C-1250-3 0000 EMERGENCv PREPAREDNESS COORDINATOR IN5 RUCTIONS TO STOP 09/14/94 Pwr t STAFFING ,

PB PROC ERP ERP-C-1250-4 0000 EMERGENCV PREPAREDNESS COORDINATOR INSTUCTIONS FOR SYSTEM RESET 09/14/94 PwE j
DB. PROC ERP ERP-C-1300 0006 EMERGENCv OPERATIONS FACILITv (EO*) DOSE ASSESSMENT TEAM LEADER 03/26/97 PwE l PB PROC ERP ERP-C-1300-1 0001 DOSE ASSESSMENT TEAM LEADER INITIAL ACTIONS 03/26/97 PwE i PB PROC ERP ERP-C-1300-2 0000 DOSE ASSE55 VENT TURNOVER LIST 09/23/94 DwE PB PROC ERP ERP-C-1300-3 0001 DOSE ASSES 5 MENT PROTECTIVE ACTION WORKESHEET 10/24/95 PwE PB PROC ERP ERP-C-1300-4 0000 0FFSITE SAMPLE ANALYSIS REQUESTS 09/23/94 PwE PB PROC ERP ERP-C-1300-5 0000 DETERMINATION OF PROTECTIVE ACTION RECOMMENDATIONS (PAR $} 09/23/94 DwE PB PROC ERP ERP-C-1300-6 0000 DOSE ASSESSMENT GROUP INITIAL ACTIONS 03/26/97 PwE )

PB PROC ERP ERP-C-1300-7 0000 OBTAINING EPDS MET / RAD DATA 03/26/97 PwE

! PB PROC ERP ERP-C-1300-B 0000 U5E OF MODE A/ MODE B 0F CDM 03/26/97 PwE PB PROC ERP ERP-C-1300-9 0000 GBTAINING MET DATA FROM NATIONAL WEATHER SERVICE 03/27/97 PwE PB PROC ERP ERP-C-1310 0003 EVERGENCY OPERATIONS FACILITY (EOF) DOSE ASSESSMENT GROUP - 03/26/97 PwE CANCELLED - REPLACED BY ERP-C-1300 .

PB PROC ERP ERP-C-1310-1 0000 DOSE ASSESSMENT GROUP LEADER INITIAL ACTIONS CANCELLED - 03/26/97 PwE REPLACED BV ERP-C-1300 PB PROC ERP ERP-C-1310-2 0000 OBTAINING MET DATA FROM NATIONAL WEATHER SERVICE CANCELLED - 03/24/97 PwE REPLACE 0 BV ERP-C-1300 PB PROC ERP ERP-C-1310-3 0000 OBTAINING EPDS MET / RAD DATA - CANCELLED - NO REPLACED BV 03/26/97 PwE  ;

ERP-C-1300 DB PDOC ERP ERP-C-1310-4 0000 USE Oc MODE A/ MODE B 0F CDM CANCELLED - REPLACED BY ERP-C-1300 03/26/97 DwE '

i PB PROC ERP ERP-C-1320 0004 EMERGENCV OPERATIONS FACILITY (EOF) FIELD SURVEV GROUP LEADER 03/26/97 Pwh  ;

l PB PROC ERP ERP-C-1320-1 0001 FIELD SURVEV GROUP LEADER INITIAL ACTIONS 03/26/97 PwE  !

PB PROC ERP ERP-C-1320-2 0001 FIELD SURVEV GROUP LEADER TURNOVER SHEET 03/26/97 PwE

  • PB PROC ERP ERP-C-1320-3 0000 FIELD SURVEV GROUP LEADER DATA SHEET 09/23/94 PwE 6 PB PROC ERP ERP-C-1400 0003 ENGINEERING SUPPORT TEAM PwE i PB PROC ERP ERP-C-1400-1 0001 ENGINEERING SUPPORT TEAM CHECKLIST 03/26/97 PWE i PB PROC ERP ERP-C-1410 0001 CORE DAMAGE ASSESSMENT 09/14/94 PwE '

PB PROC ERP EPP-C-1410-1 0000 RADIOLOGICAL DATA 09/14/94 PWE PB PROC ERP ERP-C-1410-2 0000 HVDROGEN CONCENTRATION DATA 09/14/94 PwE PB PROC ERP ERP-C-1410-3 0000 CONTAINMENT RADIATION MONITOR DATA 09/14/94 PwE PB PROC ERP ERP-C-1410-4 0000 KETAL WATER REACTION 09/14/94 PwE ,

PB PROC ERP ERP-C-1410-5 0000 PERCENT OF FUEL INVENTORY AIRBCRNE IN THE CONTAINMENT 09/14/94 PwE I VS. APPROKIMATE SOURCE AND DAMAGE ESTIMATE .

PB PROC ERP ERP-C-1410-6 0000 PROCEDURES FOR ESTIMATING FUEL DAMAGE BASED ON MEASURED I-131 09/14/94 DME I