07/01/2008 Summary of Telephone Conference with Firstenergy Concerning Requests for Additional Information Pertaining to the Beaver Valley, Units 1 & 2 License Renewal Application
ML082120586
Person / Time
Site: Beaver Valley
Issue date: 08/07/2008
From: Howard K L
NRC/NRR/ADRO/DLR
To:
Howard K, NRR/DLR/RPB2, 415-2989
References
TAC MD6593, TAC MD6594
Download: ML082120586 (6)


Text

August 7, 2008 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Beaver Valley Power Station, Units 1 and 2

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON JULY 1, 2008, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE BEAVER VALLEY POWER STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company held a telephone conference call on July 1, 2008, to discuss and clarify the staff's requests for additional information (RAIs) concerning the Beaver Valley Power Station, Units 1 and 2, license renewal application. The telephone conference call was useful in clarifying the intent of the staff's RAIs.

Enclosure 1 provides a listing of the participants and Enclosure 2 contains a listing of the RAIs discussed with the applicant, including a brief description on the status of the items.

The applicant had an opportunity to comment on this summary.

\RA\ Kent L. Howard, Sr., Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412

Enclosures:

As stated cc w/encls: See next page

ML082120586 OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR NAME IKing KHoward RFranovich DATE 8/1/08 8/4/08 8/7/08 TELEPHONE CONFERENCE CALL BEAVER VALLEY POWER STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS JULY 1, 2008 PARTICIPANTS AFFILIATIONSKent Howard U.S. Nuclear Re gulator y Commission (NRC)Geor ge Wilson NRCKenn Miller NRC Clifford I. Custer FirstEner gy Nuclear O peratin g Com p an y John Thomas FENOCSteve Dort FENOC

ENCLOSURE 1 REQUESTS FOR ADDITIONAL INFORMATION BEAVER VALLEY POWER STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION JULY 1, 2008

The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company held a telephone conference call on July 1, 2008, to discuss and clarify the following requests for additional information (RAIs) concerning the Beaver Valley Power Station (Beaver Valley), Units 1 and 2, license renewal application (LRA).

RAI 2.5-1 Clarify the description of the electrical scoping boundary in the Beaver Valley license renewal application, Section 2.5 to include the first breaker as described in ISG 2008-01.

Discussion The applicant indicated that the question is clear.

The discussion centered on scoping in Section 2.5 with respect to the station blackout scoping boundary. Specifically, the scope of license renewal shall include the switchyard breakers on the switchyard end of the two GDC 17 required circuits between the switchyard and the plant Class 1E busses. Figures 2.5-1 and 2.5-2 of the Beaver Valley LRA include the switchyard breaker, but the LRA text excludes them from boundary scope. This issue is specifically addressed in proposed License Renewal Interim Staff Guidance, LR-ISG-2008-01. The applicant indicated that this was an omission and the breakers are in scope and the text will be corrected.

ENCLOSURE 2

Memo to FirstEnergy Nuclear Operating Company from K. Howard, dated August, 7, 2008 DISTRIBUTION

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON JULY 1, 2008, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE BEAVER VALLEY POWER STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION HARD COPY: DLR RF E-MAIL: PUBLIC RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDciCvib RidsNrrDciCpnb RidsNrrDraAfpb RidsNrrDeEmcb RidsNrrDeEeeb RidsNrrDssSbwb RidsNrrDssSbpb RidsNrrDssScvb RidsOgcMailCenter ------------- KHoward ESayoc NMorgan MModes, RI PCataldo, RI DWerkheiser, RI

Beaver Valley Power Station, Units 1 and 2 cc: Joseph J. Hagan President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-19 76 South Main Street Akron, OH 44308 James H. Lash Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308

Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Paul A. Harden Vice President, Nuclear Support FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308

David W. Jenkins, Attorney FirstEnergy Corporation Mail Stop A-GO-15 76 South Main Street Akron, OH 44308

Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308 Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308 Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-A P.O. Box 4, Route 168 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission

475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 298 Shippingport, PA 15077 Cliff Custer FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077 Steve Dort FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077

Mike Banko FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077