MONTHYEARL-15-150, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 8052015-05-27027 May 2015 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Project stage: Response to RAI ML15280A0742015-10-0909 October 2015 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Project stage: RAI L-15-325, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 8052015-11-0606 November 2015 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Project stage: Response to RAI ML15320A4132015-11-24024 November 2015 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Project stage: RAI L-15-371, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 8052015-12-21021 December 2015 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Project stage: Response to RAI L-16-058, Supplemental Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 8052016-02-24024 February 2016 Supplemental Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Project stage: Supplement ML16099A0112016-03-0303 March 2016 NRR E-mail Capture - Draft 3rd Round PRA RAIs - Beaver Valley Units 1 & 2 - NFPA-805 LAR (CAC Nos. MF3301 & MF3302) Project stage: Draft RAI ML16084A8442016-03-30030 March 2016 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Project stage: RAI ML16089A0622016-03-30030 March 2016 Meeting to Discuss BVPS Draft PRA RAI - Slides Project stage: Request ML16071A1222016-04-0707 April 2016 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Project stage: RAI ML16105A0082016-04-25025 April 2016 March 30, 2016, Summary of Meeting with Firstenergy Nuclear Operating Company on Its Draft Probabilistic Risk Assessment RAI Related to Its License Amendment Request to Adopt NFPA Standard 805 Project stage: Draft RAI L-16-162, Response to Requests for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, and Request to Change Implementation Schedule2016-05-12012 May 2016 Response to Requests for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, and Request to Change Implementation Schedule Project stage: Response to RAI ML16158A0022016-06-0101 June 2016 NRR E-mail Capture - Beaver Valley, Units 1 & 2 - Update on NFPA 805 (CAC Nos. MF3301 & MF3302) Project stage: Other ML16333A0162016-12-0202 December 2016 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Project stage: RAI L-17-024, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 8052017-01-30030 January 2017 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Project stage: Response to RAI L-17-197, Response to Request for Additional Information and Supplemental Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 8052017-06-23023 June 2017 Response to Request for Additional Information and Supplemental Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Project stage: Supplement ML17220A2342017-08-0808 August 2017 E-mail Regarding Request for Additional Information for NFPA 805 License Amendment Request Project stage: RAI ML17313A6422017-11-0909 November 2017 Transmittal of Draft Safety Evaluation for Proposed Amendments Transition to NFPA 805 (CAC Nos. MF3301 and MF3302; EPID L-2013-LLF-0001) Project stage: Draft Approval ML17335A0962017-11-27027 November 2017 NRR E-mail Capture - Beaver Valley: NFPA 805 LAR: License Condition: Fire Protection Program Changes That Have More than Minimal Risk Impact (CAC Nos. MF3301 and MF3302; EPID L-2013-LLF-0001) Project stage: Other ML18058A9422017-12-11011 December 2017 NFPA 805 Amendment Application Transition License Condition Project stage: Other ML17291A0812018-01-22022 January 2018 Issuance of Amendments Transition to NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (CAC Nos. MF3301 and MF3302; EPID L-2013-LLF-0001) Project stage: Approval ML18058B0722018-02-23023 February 2018 BVPS NFPA 805 License Amendment Change Requested, and Other SE Comments Project stage: Other ML18059A7982018-02-26026 February 2018 BVPS NFPA 805 License Amendment Change Requested, and Other SE Comments Project stage: Other ML18058A9852018-02-27027 February 2018 BVPS-1 License Condition Page Project stage: Other ML18058A9532018-02-27027 February 2018 Comments on BVPS SE Project stage: Other ML18065A4032018-04-0505 April 2018 Correction of Errors in Safety Evaluation Associated with License Amendment Nos. 301 and 190 Project stage: Approval ML18099A2322018-04-18018 April 2018 Correction of an Error in the Renewed Facility Operating License No. DPR-66 Associated with License Amendment No. 301 CAC No. MF3301; EPID L-2013-LLF-0001) Project stage: Other 2016-06-01
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML23179A0012023-06-28028 June 2023 6/7/2023 - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - Meeting Summary ML23135A7872023-05-19019 May 2023 Summary of Conference Calls Regarding the Spring 2023 Steam Generator Tube Inspections ML23026A3552023-01-31031 January 2023 Summary of Public Meeting with Energy Harbor Nuclear Corp. Regarding Beaver Valley Power Station License Amendment Request to Consolidate Fuel Decay Time TS Into New Limiting Condition for Operation ML22187A1462022-07-0606 July 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Meeting Summary ML22105A3932022-04-20020 April 2022 Summ. of March 17, 2022, Public Meeting with Ehnc Regarding Planned License Amendment Request to Consolidate Fuel Decay Time Requirements in a New Limiting Condition for Operation for Beaver Valley Power Station, Units 1 and 2 ML22053A2982022-02-25025 February 2022 Summary of the February 15, 2022, Meeting with Energy Harbor Nuclear Corp. Regarding the License Amendment Request Related to Revising TS 5.6.3 Core Operating Limits Report (COLR) ML21308A0712021-11-0909 November 2021 Summary of Teleconference with Energy Harbor Nuclear Corp. Regarding Fall 2021 Steam Generator Inspections at Beaver Valley Power Station, Unit 2 ML20197A2722020-07-15015 July 2020 2020 Beaver Valley, Calvert Cliffs, Limerick Peach Bottom, Susquehanna Annual Assessment Webinar Summary ML20148M3852020-06-0101 June 2020 Summary of May 26, 2020, Public Meeting with Energy Harbor Nuclear Corp. Potential License Amendment Request Related to Steam Generator Tube Sleeve Inspections and Maintenance ML20122A0032020-05-19019 May 2020 Summary of April 22, 2020, Teleconference with Energy Harbor Nuclear Corp. Regarding Spring 2020 Steam Generator Inspections at Beaver Valley Power Station, Unit 2 ML20111A0142020-04-27027 April 2020 Summary of March 31, 2020, Public Meeting with Energy Harbor Nuclear Corp. to Discuss COVID-19 Potential Submittals of Regulatory Actions ML19280A0382019-10-22022 October 2019 Ti 2515-191 Summary of Findings ML16125A5072019-10-22022 October 2019 Ti 191 Issue Matrix ML19191A1882019-07-0909 July 2019 Joint Annual Assessment Meeting (Webinar) for Pennsylvania Power Plants - Meeting Summary ML18325A0232018-11-28028 November 2018 Summary of Teleconference with Firstenergy Nuclear Operating Company Regarding Fall 2018 Steam Generator Inspections at Beaver Valley Power Station, Unit 2 ML18099A0812018-04-0606 April 2018 Bv Annual Assessment Meeting Summary and Attendance List 2018 ML17347A8082017-12-20020 December 2017 December 5, 2017, Summary of Public Meeting with Firstenergy Nuclear Operating Company to Discuss a Proposed License Amendment Request Extending Sleeve Life on the Steam Generator at Beaver Valley Power Station, Unit 2 ML17158B1662017-06-0909 June 2017 Summary of Meeting with Firstenergy Nuclear Operating Company Regarding the Spring 2017 Steam Generator Inspections at Beaver Valley Power Station, Unit 2 ML17082A1842017-03-28028 March 2017 March 20, 2017, Summary of Annual Assessment Meeting with Beaver Valley, Units 1 and 2 ML16250A5012016-10-0303 October 2016 Summary of August 30, 2016, Meeting with Firstenergy Nuclear Operating Company Regarding Planned Submittal of Emergency Action Level Scheme Change ML16105A0082016-04-25025 April 2016 March 30, 2016, Summary of Meeting with Firstenergy Nuclear Operating Company on Its Draft Probabilistic Risk Assessment RAI Related to Its License Amendment Request to Adopt NFPA Standard 805 ML16091A0702016-03-31031 March 2016 2016 Beaver Valley Annual Assessment Meeting Summary 2016 ML15320A3912015-11-24024 November 2015 Summary of Conference Call Regarding the Fall 2015 Steam Generator Inspections ML15225A4812015-08-14014 August 2015 July 23, 2015, Summary of Meeting with Representatives of the U.S. Army Corps, U.S. Nuclear Regulatory Commission and First Energy Nuclear Operating Co. to Discuss Flooding Analysis Associated with Beaver Valley Power Station ML15135A2982015-05-21021 May 2015 Summary of April 28, 2015, Meeting Between Representatives of the U.S. Army Corps of Engineers, Nuclear Regulatory Commission, and First Energy Nuclear Operating Co. to Discuss Flooding Analysis Associated with Beaver Valley Power Station, ML15104A6652015-04-14014 April 2015 April 9, 2015 Summary of Annual Assessment Meeting with Beaver Valley Power Station, Units 1 and 2 ML14325A7782014-12-16016 December 2014 October 6, 2014, Summary of Pre-Application Meeting with Firstenergy Nuclear Operating Company to Discuss Proposed Combination of Site Emergency Plans ML14184B1962014-08-14014 August 2014 Summary of June 18, 2014, Closed Meeting Between Representatives of the U.S. Army Corps of Engineers, Nuclear Regulatory Commission, and Firstenergy Nuclear Operating Co. to Discuss Flooding Analysis Associated with Beaver Valley Power Stat ML14160B1032014-07-10010 July 2014 June 6, 2014 Summary of Meeting with FENOC Flooding Hazard Reevaluation Extension Request for Beaver Valley Power Station, Units 1 and 2 and Flooding Hazard Reevaluation Report for Davis-Besse Nuclear Power Station, Unit 1 ML14142A0872014-06-0909 June 2014 Summary of Conference Call Regarding the Spring 2014 Steam Generator Inspections ML14099A1732014-04-0909 April 2014 Annual Assessment Meeting Summary, ROP14 ML13295A2182013-10-22022 October 2013 Summary of Public Meeting with Beaver Valley, ML13114A2072013-04-22022 April 2013 Summary of Annual Assessment Meeting at Beaver Valley ML13057A6782013-03-11011 March 2013 2/20/2013 - Summary of Meeting with Firstenergy Nuclear Operating Company to Discuss Proposed Request for Additional Information Response Regarding Beaver Valley Power Station End-of-Life Moderator Temperature Coefficient Testing ML12321A3012012-11-29029 November 2012 Summary of November 15, 2012, Meeting with Firstenergy Nuclear Operating Company to Discuss Upcoming License Amendment Request Relating to the Implementation of the Alternate Pressurized Thermal Shock Rule ML12310A0662012-11-13013 November 2012 Summary of Conference Call with Firstenergy Nuclear Operating Company to Discuss 2012 Steam Generator Tube Inspections ML12293A0402012-11-0101 November 2012 October 18, 2012 - Summary of Meeting with Firstenergy Nuclear Operating Company to Discuss Request for Additional Information Regarding Fenoc'S Extension Request for Upcoming Beaver Valley Power Station National Fire Protection Association ML12277A4082012-10-0303 October 2012 September 26, 2012, Summary of Public Meeting to Discuss FENOC Fleet Performance ML12223A4672012-08-22022 August 2012 August 1, 2012 - Summary of Meeting with FENOC to Discuss Upcoming National Fire Protection Association Standard 805 License Amendment Request Status ML12195A1132012-07-16016 July 2012 Summary of Public Meeting with FENOC Regarding Licensing Practices and Processes ML12104A1052012-04-13013 April 2012 Meeting Summary of Annual Assessment Meeting on March 22, 2012 ML1115805152011-06-15015 June 2011 (BVPS-2) - Summary of Conference Call Regarding the Spring 2011 Steam Generator Tube Inspection Results ML1112504622011-05-0505 May 2011 Summary of Annual Assessment Open House Public Meeting, Beaver Valley ML1035606612010-12-29029 December 2010 Summary of Beaver Valley Power Station, Unit 2 Public Conference Call Regarding Spent Fuel Pool Rerack LAR Draft RAI Responses Discussion ML1027903512010-10-18018 October 2010 Summary of Meeting with Firstenergy Nuclear Operating Company, on the Request for Additional Resposnses Regarding the Spent Fuel Rerack for Beaver Valley Power Station, Unit No. 2 ML1014105172010-05-21021 May 2010 Summary of the May 2010 Annual Assessment Open-House Public Meeting ML1013206652010-05-18018 May 2010 Summary of Category 1 Teleconference with Firstenergy Nuclear Operating Company to Discuss NRC Request for Additional Information Regarding Generic Letter 2004-02 ML1009502432010-04-0505 April 2010 Meeting Summary of 3-31-10 Public Meeting with FENOC ML0931407282009-11-18018 November 2009 Steam Generator Tube Inspections ML0909203872009-04-0202 April 2009 Summary of Annual Assessment Open-House Meeting Regarding the Safety Performance of the Beaver Valley Units 1 and 2 2023-06-28
[Table view] |
Text
LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Beaver Valley Power Station, Units 1 and 2
SUBJECT:
SUMMARY
OF MARCH 30, 2016, MEETING WITH FIRSTENERGY NUCLEAR OPERATING COMPANY REGARDING DRAFT PROBABILISTIC RISK ASSESSMENT REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE LICENSE AMENDMENT REQUEST TO ADOPT NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 (CAC NOS. MF3301 AND MF3302)
On March 30, 2016, the U.S. Nuclear Regulatory Commission (NRC or the Commission) staff conducted a Category 1 public meeting with FirstEnergy Nuclear Operating Company (the licensee) at NRC Headquarters, 11555 Rockville Pike, One White Flint North, Rockville, Maryland. The purpose of the meeting was to discuss the NRC staff's draft probabilistic risk assessment request for additional information (RAI) related to the licensee's license amendment request (LAR) to change the Beaver Valley Power Station (BVPS), Units 1 and 2, fire protection program to one based on the National Fire Protection Association Standard 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants," 2001 Edition, as incorporated into Title 10 of the Code of Federal Regulations Section 50.48(c). The LAR was submitted by letter dated December 23, 2013 (Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML14002A086), as supplemented by letters dated February 14, 2014; April 27, 2015; May 27, 2015; June 26, 2015; November 6, 2015; December 21, 2015; February 24, 2016; March 30, 2016; and April 7, 2016 (ADAMS Accession Nos. ML14051A499, ML15118A484, ML15147A372, ML15177A110, ML15313A306, ML15356A136, ML16055A160, ML16084A844, and ML16071A122, respectively). The meeting notice and agenda, dated March 7, 2016, are available in ADAMS at Accession No. ML16089A069. The talking points and presentation from the meeting can be found at ADAMS Package Accession No. ML16098A166.
In advance of the meeting, the NRC staff provided the licensee a set of questions (ADAMS Accession No. ML16099A011) in an RAI, which was the focus of the discussion. The purpose of the questions was to seek additional information regarding joint human error probabilities (HEPs). Specifically, the NRC staff sought information to conclude that the quantitative fire risk estimates exclude the impact of unrealistically low joint HEPs. The licensee requested technical clarification on the RAI, which resulted in the public meeting.
The licensee discussed the details of its probabilistic risk assessment (PRA) model and modelling approach. The licensee further clarified previous responses (ADAMS Accession No. ML16089A062) to NRC staff RAls. The licensee stated an evaluation was performed consistent with NRC guidance, but only a small portion of the evaluation was described in the previous RAI response. During the meeting, the licensee described how its modelling approach evaluated and incorporated joint HEPs into the PRA model. The licensee explained that only one other NFPA 805 applicant used its modelling approach and, therefore, it could not respond
to the RAI as most other applicants had. After some discussion, the licensee indicated it could use its approach to support an RAI response similar to the response provided by the other applicant that uses its modelling approach. The NRC staff agreed to shorten and simplify the RAI but retain the original question. The RAI was edited and subsequently issued on April 7, 2016 (ADAMS Accession No. ML16071A122).
Members of the public were in attendance, but no comments were received at the end of the meeting. Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-7128 orTaylor.Lamb@nrc.gov.
Taylor A. Lamb, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412
Enclosure:
List of Attendees cc w/enclosure: Distribution via Listserv
LIST OF ATTENDEES MARCH 30, 2016, MEETING WITH FIRSTENERGY NUCLEAR OPERATING COMPANY (FENOC)
BEAVER VALLEY POWER STATION'S DRAFT PROBABILISTIC RISK ASSESSMENT REQUEST FOR ADDITIONAL INFORMATION Name Affiliation Taylor Lamb NRC JS Hyslop NRC Stephen Dinsmore NRC Jay Robinson NRC Charles Moulton NRC Anoela Wu NRC Todd Hilsmeier NRC Mehdi Reisifard NRC Mihaela Biro NRC Garrill Coles Pacific Northwest National Laboratory Mark Manoleras FE NOC Carmen Mancuso FE NOC Colin Keller FE NOC Mike Testa FE NOC Ray Fine FE NOC Rick Stremple FE NOC Bill Etzel FE NOC Doug Rapp FE NOC Tom Lentz FE NOC Phil Lashley FE NOC Dave McCreary FE NOC Chris Lord FE NOC Tom Collopy FE NOC Sum Leung FE NOC Dan Weller FE NOC Jim Belfiore FE NOC Paul Boulden Appendix R Solutions, Inc.
Mike Roder Appendix R Solutions, Inc.
Mike Smith Appendix R Solutions, Inc.
Kelly Taylor Appendix R Solutions, Inc.
Paul Bemis Pacific Gas & Electric Company Enclosure
ML16071A122).
Members of the public were in attendance, but no comments were received at the end of the meeting. Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-7128 or Taylor.Lamb@nrc.gov.
IRA/
Taylor A. Lamb, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412
Enclosure:
List of Attendees cc w/enclosure: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrDraApla Resource LPL 1-2 R/F CMoulton, NRR RidsACRS_MailCTR Resource AWu, NRR RidsNrrDorlLpl 1-2 Resource JHyslop, NRR RidsNrrPMBeaverValley Resource SDinsmore, NRR RidsNrrLALRonewicz Resource RidsNrrDraApla Resource RidsRgn1 MailCenter Resource JRobinson, NRR TWertz, NRR JBowen, OEDO THilsmeier, NRR MReisifard, NRR MBiro, NRR ADAMS Accession Nos.: ML16105A008 Notice: ML16089A069 Handouts: ML16098A166 OFFICE DORL/LPL 1-2/PM DORL/LPL 1-2/LA DORL/LPL 1-2/BC DORL/LPL 1-2/PM NAME TLamb LRonewicz ( TWengert for) TLamb DBroaddus DATE 4/14/2016 4/14/2016 4/22/2016 4/25/2016